As the name suggest two words : Construction Planning & Construction 
Management ,which are co-related with each other. In common it meant that we 
have to execute the plan of construction by means of various management 
techniques. Our presentation is based upon the importance of modern 
technology in Construction Management, Construction Planning, 
Construction Equipment, Construction Contract, Safety Management, 
Earthquake management and also Universal Management with the 
fabricated system of Building Construction in Indian context which can be 
considered as important for the survival in the present scenario of civilization. 
As we know that with the tremendous development taking place in this 
modern period of Science and Technology, Management are of vital importance. 
Without Planning and Management we can’t complete the work of construction 
within our time and cost. So to move rapidly the work of development of World 
or particularly the developing nations like India, we have to participate in the 
modern work of construction with the foot step of planning and management by 
the help of modern technology.
 Completing the work within specified time and 
budget 
 Evolving a reputation for high quality workmanship 
 Providing safe working conditions for staff and 
workers 
 Taking sound decisions at lowest practical 
management level through delegation of authority 
 Motivating people to give their best 
 Creating an organization that works as a team
Deciding in advance what is to be done, how and in what 
order it is to be done. It involves : 
 Crystallizing objectives 
 Collecting and synthesizing information 
 Developing alternatives within specified constraints 
 Comparing alternatives in terms of objective feasibility and 
consequences 
 Selecting optimum course of action 
 Establishing policies, methods, systems, standards and 
budgets for objectives
 Dividing the work into component activities 
 Designing job structures 
 Defining targets and responsibilities 
 Allocating resources 
 Delegating specific tasks to individuals 
 Establishing organizational chart for better 
coordination
 Bringing together and coordinating the work of 
various departments 
 Arranging regular meeting of departments
 Providing right quality resources at right time 
 Preparing resource procurement schedules 
 Developing specifications for required resources 
 Deciding appropriate source of procurement 
 Budgeting resources and arranging approvals and 
purchases 
 Preventing wastage at site
 Providing effective leadership 
 Motivating participants behavior 
 Communicating instructions and orders 
 Providing suitable climate for subordinate’s 
development
 Specifying the factors to be controlled 
 Monitoring the performance in terms of progress, 
quality and cost 
 Comparing actual and planned performance 
 Analysis of shortfalls and implementation of suitable 
remedial measures 
 Quick and accurate flow of information
Men Material Machinery Money 
Power Water Space 
Communication 
means
 Work force – man power 
 Technical and managerial personnel ( organization)
 Work force is Skilled and unskilled labor. 
 Timely employment of just required numbers of 
workmen of right trade and skill. 
 Over-manning and under-manning both are bad. 
 Sudden fluctuations in labor strength should be 
avoided. 
 Describe work elements.
 Assess no. of workdays to be put every week/month. 
 Draw a chart of manpower needed using CPM 
network. 
 Adjust schedule and requirement avoiding sudden 
fluctuations. 
 Ascertain availability of right trade and skill for 
recruitment. 
 Maintain a reasonable ratio between supervisor and 
workmen.
A social arrangement which pursues collective goals, 
which controls its own performance.
 Give responsibilities to the group of employee. 
 Provides adequate communication. 
 Demarcates authority, responsibilities, and duties of 
each group and employee. 
 Coordinates and controls activities of group and 
individual to achieve common objective.
 Brick, stone, timber, cement, water, aggregate, paint, 
electrical fittings, lime, sand etc. 
 Material schedule showing quantity, quality and time 
of delivery should be prepared with reference to work 
schedule 
 Plan the adequate supply of material.
 Requirements depends on type of project. 
 Batching plant, mixer, trucks, vibrator, tractors, 
excavators and cranes etc. 
 Equipment schedule or calendar should be prepared. 
 Equipments can be transferred from one site to another 
or can be purchased new depending on economic 
analysis. 
 Non-availability of right equipment or tool may lead to 
financial loss or can hold up the work.
 Most important resource 
 All other resources depends on availability of funds. 
 So financial resources should be planned very carefully.
CONSTRUCTIONS 
PARTICIPANTS
There are five main agencies actively associated with 
the execution of major works. These are:- 
Business 
promoter/Client 
Construction 
management 
consultants 
Architect- 
Engineering 
Associates 
Contractors 
Input suppliers
Also called the client, he is the potential owner of the 
construction facility. It is he who sponsors the work, 
finances their construction and utilizes the facility 
constructed. Client may be a govt. body, a public or 
private enterprises. Construction work can be executed 
through clients own organization or through 
contractors
The emerging trend these days is to hire these 
consultants for rendering certain services on contract 
basis. Generally task assigned includes – 
(a) Project feasibility study, including cost estimates. 
(b) Site survey and soil investigation.
(c) Estimating, initial planning and budgeting 
(d) Scrutiny and coordination of design and 
drawing work . 
(e) Processing prequalification of construction 
agencies, tendering and awarding contracts 
to the successful bidder. 
(f)Designing project organization for executing works and 
developing standard operating procedures and systems. 
(g)Developing detailed construction plans, project schedules 
and performance measuring standards. 
(h)Supervising works, including administration of contract 
and controlling of project time, cost and quality objectives.
 An architect is an individual who designs the buildings, 
landscapes and other artistic features. The engineers 
associated with architects develop structural, electrical, 
mechanical and other specialist systems and designs. 
Architect-engineering associates are the firm involving 
both architects as well as engineers to provide complete 
design services under one roof.
 Construction process needs resources input. 
Construction inputs exists in the form of men, 
materials, machinery and money.
Construction contractors form the backbone of the 
construction business as they execute most of the 
construction work. In the competitive construction 
business, the contractor generally tends to specialize 
in particular area of construction.
 General contractors 
 Building contractors 
 Specialist contractors for various types of heavy 
infrastructure construction work like highways, bridges, 
dams etc. 
 Specialist contractors for various categories of industrial 
works like power plants, process industries, etc. 
 Specialist utility services contractors. These include 
electrical contractors, water supply and sewage disposal 
contractors, HVAC( heating, ventilation and air-conditioning) 
contractors.
Finally after discussing the various aspects of 
“The importance of Construction Planning & 
Management ”, we conclude that these are the 
very essential functions and part of any 
constructional project to get finished within 
time with estimated cost .So we should save 
our input and money with the proper 
planning and smart management skills.
Vishal Kumar 
Manit Agarwal 
Sandeep Kumar 
Brajesh Kumar 
Shashi Shekhar 
Dep Prakash Kumar 
Md. Razwanul Haque 
Wasim Akram 
16301310012 
16301310018 
16301310033 
16301310011 
16301310023 
16301310001 
16301310017 
16301310019 
Name of Participants 
Univ. Roll no.

Weitere ähnliche Inhalte

Was ist angesagt?

Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projectsakashpadole
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methodsgayu pandian
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineeringKailash Chander
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Construction management
Construction managementConstruction management
Construction managementUsama Khalid
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and ArbitrationJIT KUMAR GUPTA
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction pptgyan singh
 

Was ist angesagt? (20)

Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Contracts
ContractsContracts
Contracts
 
Construction management
Construction managementConstruction management
Construction management
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction ppt
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 

Andere mochten auch

3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementAditi Shah
 
Unit 101, ppt 2, Principles of building, construction, information and commu...
Unit 101, ppt 2,  Principles of building, construction, information and commu...Unit 101, ppt 2,  Principles of building, construction, information and commu...
Unit 101, ppt 2, Principles of building, construction, information and commu...kevin porter
 
Project management book for mba
Project management book for mbaProject management book for mba
Project management book for mbaBikramjit Singh
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 

Andere mochten auch (6)

3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Unit 101, ppt 2, Principles of building, construction, information and commu...
Unit 101, ppt 2,  Principles of building, construction, information and commu...Unit 101, ppt 2,  Principles of building, construction, information and commu...
Unit 101, ppt 2, Principles of building, construction, information and commu...
 
6 2
6 26 2
6 2
 
Project management book for mba
Project management book for mbaProject management book for mba
Project management book for mba
 
Construction process
Construction processConstruction process
Construction process
 

Ähnlich wie Construction planning & management

Construction project management
Construction project managementConstruction project management
Construction project managementsaif hasan
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.sanjeeev bahadur, m.tech,mba
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptpisal3
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.pptDejeneTsegaye6
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016L Douglas Sargent Jr
 
Role of PMC in Construction of Collector Well Project, a Case Study
Role of PMC in Construction of Collector Well Project, a Case StudyRole of PMC in Construction of Collector Well Project, a Case Study
Role of PMC in Construction of Collector Well Project, a Case StudyIJERA Editor
 
1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.pptravi590686
 
GRE PM - proposal for MDDA
GRE PM - proposal for MDDAGRE PM - proposal for MDDA
GRE PM - proposal for MDDATarit Mohan
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 
Efficient Task Management and Scheduling: The Key to Successful Construction ...
Efficient Task Management and Scheduling: The Key to Successful Construction ...Efficient Task Management and Scheduling: The Key to Successful Construction ...
Efficient Task Management and Scheduling: The Key to Successful Construction ...iFieldsmart Technologies
 
1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdfAikaterineSmith
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in constructionSaravana murthy
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Schedulingijtsrd
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 

Ähnlich wie Construction planning & management (20)

Construction project management
Construction project managementConstruction project management
Construction project management
 
Innovative project management practices for large power sector projects.
Innovative project management  practices for large power sector projects.Innovative project management  practices for large power sector projects.
Innovative project management practices for large power sector projects.
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.ppt
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
Role of PMC in Construction of Collector Well Project, a Case Study
Role of PMC in Construction of Collector Well Project, a Case StudyRole of PMC in Construction of Collector Well Project, a Case Study
Role of PMC in Construction of Collector Well Project, a Case Study
 
1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt
 
GRE PM - proposal for MDDA
GRE PM - proposal for MDDAGRE PM - proposal for MDDA
GRE PM - proposal for MDDA
 
H1303055462
H1303055462H1303055462
H1303055462
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
H1303024956
H1303024956H1303024956
H1303024956
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Efficient Task Management and Scheduling: The Key to Successful Construction ...
Efficient Task Management and Scheduling: The Key to Successful Construction ...Efficient Task Management and Scheduling: The Key to Successful Construction ...
Efficient Task Management and Scheduling: The Key to Successful Construction ...
 
1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf1. Construction Methods and Project Management Introduction.pdf
1. Construction Methods and Project Management Introduction.pdf
 
Reduction of cost in construction
Reduction of cost in constructionReduction of cost in construction
Reduction of cost in construction
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Project Planning and Scheduling
Project Planning and SchedulingProject Planning and Scheduling
Project Planning and Scheduling
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 

Kürzlich hochgeladen

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Kürzlich hochgeladen (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Construction planning & management

  • 1.
  • 2. As the name suggest two words : Construction Planning & Construction Management ,which are co-related with each other. In common it meant that we have to execute the plan of construction by means of various management techniques. Our presentation is based upon the importance of modern technology in Construction Management, Construction Planning, Construction Equipment, Construction Contract, Safety Management, Earthquake management and also Universal Management with the fabricated system of Building Construction in Indian context which can be considered as important for the survival in the present scenario of civilization. As we know that with the tremendous development taking place in this modern period of Science and Technology, Management are of vital importance. Without Planning and Management we can’t complete the work of construction within our time and cost. So to move rapidly the work of development of World or particularly the developing nations like India, we have to participate in the modern work of construction with the foot step of planning and management by the help of modern technology.
  • 3.  Completing the work within specified time and budget  Evolving a reputation for high quality workmanship  Providing safe working conditions for staff and workers  Taking sound decisions at lowest practical management level through delegation of authority  Motivating people to give their best  Creating an organization that works as a team
  • 4. Deciding in advance what is to be done, how and in what order it is to be done. It involves :  Crystallizing objectives  Collecting and synthesizing information  Developing alternatives within specified constraints  Comparing alternatives in terms of objective feasibility and consequences  Selecting optimum course of action  Establishing policies, methods, systems, standards and budgets for objectives
  • 5.  Dividing the work into component activities  Designing job structures  Defining targets and responsibilities  Allocating resources  Delegating specific tasks to individuals  Establishing organizational chart for better coordination
  • 6.  Bringing together and coordinating the work of various departments  Arranging regular meeting of departments
  • 7.  Providing right quality resources at right time  Preparing resource procurement schedules  Developing specifications for required resources  Deciding appropriate source of procurement  Budgeting resources and arranging approvals and purchases  Preventing wastage at site
  • 8.  Providing effective leadership  Motivating participants behavior  Communicating instructions and orders  Providing suitable climate for subordinate’s development
  • 9.  Specifying the factors to be controlled  Monitoring the performance in terms of progress, quality and cost  Comparing actual and planned performance  Analysis of shortfalls and implementation of suitable remedial measures  Quick and accurate flow of information
  • 10. Men Material Machinery Money Power Water Space Communication means
  • 11.  Work force – man power  Technical and managerial personnel ( organization)
  • 12.  Work force is Skilled and unskilled labor.  Timely employment of just required numbers of workmen of right trade and skill.  Over-manning and under-manning both are bad.  Sudden fluctuations in labor strength should be avoided.  Describe work elements.
  • 13.  Assess no. of workdays to be put every week/month.  Draw a chart of manpower needed using CPM network.  Adjust schedule and requirement avoiding sudden fluctuations.  Ascertain availability of right trade and skill for recruitment.  Maintain a reasonable ratio between supervisor and workmen.
  • 14. A social arrangement which pursues collective goals, which controls its own performance.
  • 15.  Give responsibilities to the group of employee.  Provides adequate communication.  Demarcates authority, responsibilities, and duties of each group and employee.  Coordinates and controls activities of group and individual to achieve common objective.
  • 16.  Brick, stone, timber, cement, water, aggregate, paint, electrical fittings, lime, sand etc.  Material schedule showing quantity, quality and time of delivery should be prepared with reference to work schedule  Plan the adequate supply of material.
  • 17.  Requirements depends on type of project.  Batching plant, mixer, trucks, vibrator, tractors, excavators and cranes etc.  Equipment schedule or calendar should be prepared.  Equipments can be transferred from one site to another or can be purchased new depending on economic analysis.  Non-availability of right equipment or tool may lead to financial loss or can hold up the work.
  • 18.  Most important resource  All other resources depends on availability of funds.  So financial resources should be planned very carefully.
  • 20. There are five main agencies actively associated with the execution of major works. These are:- Business promoter/Client Construction management consultants Architect- Engineering Associates Contractors Input suppliers
  • 21. Also called the client, he is the potential owner of the construction facility. It is he who sponsors the work, finances their construction and utilizes the facility constructed. Client may be a govt. body, a public or private enterprises. Construction work can be executed through clients own organization or through contractors
  • 22. The emerging trend these days is to hire these consultants for rendering certain services on contract basis. Generally task assigned includes – (a) Project feasibility study, including cost estimates. (b) Site survey and soil investigation.
  • 23. (c) Estimating, initial planning and budgeting (d) Scrutiny and coordination of design and drawing work . (e) Processing prequalification of construction agencies, tendering and awarding contracts to the successful bidder. (f)Designing project organization for executing works and developing standard operating procedures and systems. (g)Developing detailed construction plans, project schedules and performance measuring standards. (h)Supervising works, including administration of contract and controlling of project time, cost and quality objectives.
  • 24.  An architect is an individual who designs the buildings, landscapes and other artistic features. The engineers associated with architects develop structural, electrical, mechanical and other specialist systems and designs. Architect-engineering associates are the firm involving both architects as well as engineers to provide complete design services under one roof.
  • 25.  Construction process needs resources input. Construction inputs exists in the form of men, materials, machinery and money.
  • 26. Construction contractors form the backbone of the construction business as they execute most of the construction work. In the competitive construction business, the contractor generally tends to specialize in particular area of construction.
  • 27.  General contractors  Building contractors  Specialist contractors for various types of heavy infrastructure construction work like highways, bridges, dams etc.  Specialist contractors for various categories of industrial works like power plants, process industries, etc.  Specialist utility services contractors. These include electrical contractors, water supply and sewage disposal contractors, HVAC( heating, ventilation and air-conditioning) contractors.
  • 28. Finally after discussing the various aspects of “The importance of Construction Planning & Management ”, we conclude that these are the very essential functions and part of any constructional project to get finished within time with estimated cost .So we should save our input and money with the proper planning and smart management skills.
  • 29.
  • 30. Vishal Kumar Manit Agarwal Sandeep Kumar Brajesh Kumar Shashi Shekhar Dep Prakash Kumar Md. Razwanul Haque Wasim Akram 16301310012 16301310018 16301310033 16301310011 16301310023 16301310001 16301310017 16301310019 Name of Participants Univ. Roll no.