JOHN DAY DAM By C. Manish Kumar(CE7116) K. S. AnveshRao(CE7126) D. Sandeep Reddy(CE7119)
The John Day Dam is a concrete gravity run-of-the-river dam spanning the Columbia River in the northwestern United States. [1] The dam features a navigation lock plus fish ladders on both sides. The John Day Lock has the highest lift (110 feet) of any U.S. lock. [2] The reservoir impounded by the dam is Lake Umatilla, [3] and it runs 76.4 miles (123 kilometers) up the river channel to the foot of the McNary Dam. John Day Dam is part of the Columbia River Basin system of dams INTRODUCTION
John Day Dam is located 28 miles (45 km) east of the city of The Dalles, Oregon, and just below the mouth of the John Day River. The closest town on the Washington side is Goldendale, 20 miles (32 km) north. The closest town on the Oregon side is Rufus, Oregon. Its crest elevation is approximately 570 feet (170 m) above sea level. It joins Sherman County, Oregon with Klickitat County, Washington, 216 miles (348 kilometers) upriver from the mouth of the Columbia near Astoria, Oregon. LOCATION
 Altitude: 266 feet (81 m) above sea level  Height: 183 feet (56 m)  Length: 7,365 feet (2,327 m)  Navigation lock:           o Single-lift           o 86 feet (26 m) wide           o 675 feet (206 m) long  Powerhouse           o Sixteen 135,000 kW units           o Total capacity: 2,160 MW           o Overload capacity: 2,485 MW  Spillway           o Gates: 20           o Length: 1,228 feet (374 m) SPECIFICATIONS
Construction of the dam was completed in 1968, making it the newest dam on the lower Columbia, at a total cost of US$511 million. John Day Dam was built and is operated by the U.S. Army Corps of Engineers. The dam's power generation capacity is 2,480,000 kW(overloaded capacity). HISTORY
 	A federal dam on the Columbia River, the John Day Dam produces enough electricity to power all of Seattle. The dam and lock system were completed in 1968, and soon attracted the Harvey Aluminum Corporation (now Goldendale Aluminum), which built a smelter on the Washington side of the dam. The third largest hydroelectric plant in the USA, and 25th largest in the world. It also has the deepest lock in the country, raising and lowering ships traveling on the Columbia River 113 feet.
Water stored at the upstream side of the dams falls through a giant intake draft tube to strike the turbine blades. The force of the falling water rotates the turbine. The steel shaft spins the rotor in the generator and the changing magnetic field penetrates the wire coils of the stator, producing electricity. HYDROPOWER GENERATION
1. Water enters powerhouse through intake scroll case 2. Pressure from falling water turns turbine 3. Turbine shaft turns generator’s rotor 4. Electricity generated to transmission lines 5. Water continues flow downstream through the draft tube
LOCKAGE  In the Columbia River system, the level of the water behind the dam is usually about 100 feet higher than that of the water below. The navigation lock permits vessels to pass from one level to the other. Lockage is available 24 hours a day 1. With a tow going downstream, the lower lock gates (A) are closed and the filling valve (B) is opened, allowing the lock chamber to fill. The upper lock gates (C) open and allow the tow to enter the filled chamber.
2. The filling valve and upper gates are closed. Water drains out through the drain valve (D) until it is level with water beyond the lower gates.
3. The lower gates open and the tow leaves the lock chamber and navigates downstream. This procedure is reversed if the tow is going upstream.
Navigation Lock Down Stream Lock Gate
Movement during Lockage
John day dam
John day dam

Weitere ähnliche Inhalte

Ähnlich wie John day dam

Chapter7damsandreservoirs 130630060127-phpapp01
Chapter7damsandreservoirs 130630060127-phpapp01Chapter7damsandreservoirs 130630060127-phpapp01
Chapter7damsandreservoirs 130630060127-phpapp01Burada Ganesh
 
Chapter7damsandreservoirs 130630060127-phpapp01
Chapter7damsandreservoirs 130630060127-phpapp01Chapter7damsandreservoirs 130630060127-phpapp01
Chapter7damsandreservoirs 130630060127-phpapp01Cleophas Rwemera
 
From Imperial Dam to the Salton Sea: The story of Imperial Valley's water
From Imperial Dam to the Salton Sea: The story of Imperial Valley's waterFrom Imperial Dam to the Salton Sea: The story of Imperial Valley's water
From Imperial Dam to the Salton Sea: The story of Imperial Valley's waterChris Austin
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirsMohammed Salahat
 
The Central Valley Project Slideshow: Building California
The Central Valley Project Slideshow: Building CaliforniaThe Central Valley Project Slideshow: Building California
The Central Valley Project Slideshow: Building CaliforniaChris Austin
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantSiraskarCom
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plantpranavn007
 
Three georges dam (china) real##
Three georges dam  (china) real##  Three georges dam  (china) real##
Three georges dam (china) real## Nomaan . zs
 

Ähnlich wie John day dam (20)

Dams and Reservoirs
Dams and ReservoirsDams and Reservoirs
Dams and Reservoirs
 
Chapter7damsandreservoirs 130630060127-phpapp01
Chapter7damsandreservoirs 130630060127-phpapp01Chapter7damsandreservoirs 130630060127-phpapp01
Chapter7damsandreservoirs 130630060127-phpapp01
 
Water Energy
Water EnergyWater Energy
Water Energy
 
Dam PPT
Dam PPTDam PPT
Dam PPT
 
DAMS
DAMSDAMS
DAMS
 
Chapter7damsandreservoirs 130630060127-phpapp01
Chapter7damsandreservoirs 130630060127-phpapp01Chapter7damsandreservoirs 130630060127-phpapp01
Chapter7damsandreservoirs 130630060127-phpapp01
 
Hydra powerplant
Hydra powerplantHydra powerplant
Hydra powerplant
 
From Imperial Dam to the Salton Sea: The story of Imperial Valley's water
From Imperial Dam to the Salton Sea: The story of Imperial Valley's waterFrom Imperial Dam to the Salton Sea: The story of Imperial Valley's water
From Imperial Dam to the Salton Sea: The story of Imperial Valley's water
 
Chapter 7 dams and reservoirs
Chapter 7 dams and reservoirsChapter 7 dams and reservoirs
Chapter 7 dams and reservoirs
 
Chanakya
ChanakyaChanakya
Chanakya
 
Ranjitha.S.H
Ranjitha.S.HRanjitha.S.H
Ranjitha.S.H
 
The Central Valley Project Slideshow: Building California
The Central Valley Project Slideshow: Building CaliforniaThe Central Valley Project Slideshow: Building California
The Central Valley Project Slideshow: Building California
 
Lake Caliraya in Laguna
Lake Caliraya in LagunaLake Caliraya in Laguna
Lake Caliraya in Laguna
 
Shasta dam
Shasta damShasta dam
Shasta dam
 
Biggest Projects
Biggest ProjectsBiggest Projects
Biggest Projects
 
Hoover dam
Hoover damHoover dam
Hoover dam
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
St. lawrence seaway.
St. lawrence seaway.St. lawrence seaway.
St. lawrence seaway.
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Three georges dam (china) real##
Three georges dam  (china) real##  Three georges dam  (china) real##
Three georges dam (china) real##
 

Kürzlich hochgeladen

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 

Kürzlich hochgeladen (20)

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 

John day dam

  • 1. JOHN DAY DAM By C. Manish Kumar(CE7116) K. S. AnveshRao(CE7126) D. Sandeep Reddy(CE7119)
  • 2. The John Day Dam is a concrete gravity run-of-the-river dam spanning the Columbia River in the northwestern United States. [1] The dam features a navigation lock plus fish ladders on both sides. The John Day Lock has the highest lift (110 feet) of any U.S. lock. [2] The reservoir impounded by the dam is Lake Umatilla, [3] and it runs 76.4 miles (123 kilometers) up the river channel to the foot of the McNary Dam. John Day Dam is part of the Columbia River Basin system of dams INTRODUCTION
  • 3. John Day Dam is located 28 miles (45 km) east of the city of The Dalles, Oregon, and just below the mouth of the John Day River. The closest town on the Washington side is Goldendale, 20 miles (32 km) north. The closest town on the Oregon side is Rufus, Oregon. Its crest elevation is approximately 570 feet (170 m) above sea level. It joins Sherman County, Oregon with Klickitat County, Washington, 216 miles (348 kilometers) upriver from the mouth of the Columbia near Astoria, Oregon. LOCATION
  • 4. Altitude: 266 feet (81 m) above sea level Height: 183 feet (56 m) Length: 7,365 feet (2,327 m) Navigation lock: o Single-lift o 86 feet (26 m) wide o 675 feet (206 m) long Powerhouse o Sixteen 135,000 kW units o Total capacity: 2,160 MW o Overload capacity: 2,485 MW Spillway o Gates: 20 o Length: 1,228 feet (374 m) SPECIFICATIONS
  • 5.
  • 6.
  • 7. Construction of the dam was completed in 1968, making it the newest dam on the lower Columbia, at a total cost of US$511 million. John Day Dam was built and is operated by the U.S. Army Corps of Engineers. The dam's power generation capacity is 2,480,000 kW(overloaded capacity). HISTORY
  • 8. A federal dam on the Columbia River, the John Day Dam produces enough electricity to power all of Seattle. The dam and lock system were completed in 1968, and soon attracted the Harvey Aluminum Corporation (now Goldendale Aluminum), which built a smelter on the Washington side of the dam. The third largest hydroelectric plant in the USA, and 25th largest in the world. It also has the deepest lock in the country, raising and lowering ships traveling on the Columbia River 113 feet.
  • 9. Water stored at the upstream side of the dams falls through a giant intake draft tube to strike the turbine blades. The force of the falling water rotates the turbine. The steel shaft spins the rotor in the generator and the changing magnetic field penetrates the wire coils of the stator, producing electricity. HYDROPOWER GENERATION
  • 10.
  • 11. 1. Water enters powerhouse through intake scroll case 2. Pressure from falling water turns turbine 3. Turbine shaft turns generator’s rotor 4. Electricity generated to transmission lines 5. Water continues flow downstream through the draft tube
  • 12. LOCKAGE In the Columbia River system, the level of the water behind the dam is usually about 100 feet higher than that of the water below. The navigation lock permits vessels to pass from one level to the other. Lockage is available 24 hours a day 1. With a tow going downstream, the lower lock gates (A) are closed and the filling valve (B) is opened, allowing the lock chamber to fill. The upper lock gates (C) open and allow the tow to enter the filled chamber.
  • 13. 2. The filling valve and upper gates are closed. Water drains out through the drain valve (D) until it is level with water beyond the lower gates.
  • 14. 3. The lower gates open and the tow leaves the lock chamber and navigates downstream. This procedure is reversed if the tow is going upstream.