SlideShare ist ein Scribd-Unternehmen logo
1 von 33
MUDA            MURA            MURI




                   ABS


MANIKANDAN.C   CINISH P ABRAHAM   VIPUL KOTADIA
LEAN MANAGEMENT


 Lean Management or quot;Leanquot; is the optimal way of managing through the
  removal of waste and implementing flow.

 It is renowned for its focus on reduction of the original process wastes in
  order to improve overall customer value.

 In simple term, more value with less work.

 Lean manufacturing is derived mostly from the Toyota Production System
  (TPS) Identified as quot;Leanquot; only after 1990s.

 Goal is to eliminate the waste from the process.
WHAT IS LEAN?
TOYOTA PRODUCTION SYSTEM

   Make what the customer needs, when it is needed, in the right
    amount.

   Minimize inventories

   Separate machine work from human work and fully utilize both

   Build quality into the process and prevent errors from happening

   Reduce lead-times to allow for rapid, flexible scheduling

   Produce a high mix of low volume products efficiently
LEAN PRODUCTION - TPS

Main goals of Toyota Production System (TPS) are to eliminate:

   Overburden or stress in the system (muri)

   Inconsistency (mura)

   Waste (muda)

    Goal is to design a process that runs smoothly, can flex without stress, and
    eliminates waste.

    Using TPS, Toyota was able to reduce lead-time and cost, while improving
    quality.
Eliminating 3 M




          MUDA (Waste)


          MURI
           (Strain / Over burden)

          MURA (Unevenness)
MUDA
MUDA is the Waste, work that does not add any value to the product




        Process-1   V Process-2   V Process-3   V Process-4 V
Input                                                           Product




                W             W             W             W



 V: Value added product/services
 W: Wasteful product / practices/services that does not add value
Economic Value of Waste

          Every business activity absorbs
           resources and every resource has
           a cost

          Every waste has a cost, and that
           is direct loss to the company.

          Economic value of waste in a
           process industry are in the range
           of 10 -35% of annual turnover
7 Seven MUDA [Wastes]

    Unnecessary Motions

    Waiting for work and materials

    Transportations

    Overproduction

    Processing

    Inventories / Unnecessary WIP

    Corrective operation
MUDA of Motion
MUDA of Motion
Movement that does not add value

 Searching for files
 Extra clicks or key strokes
 Clearing away files on the desk
 Gathering information
 Looking through manuals and catalogs
 Handling paperwork
MUDA of Waiting
MUDA of
Waiting
MUDA of Waiting



Idle time created when material, information, people or
equipment is not ready.

Waiting for:
   Faxes
   The system to come back
   Copier machine
   Customer response
   A handed off file to come back
MUDA of Transport
     I am more expensive
     since raw material is
       coming from a far
           off place.
MUDA of Transport

Movement of information that does not add
value:

 Carrying documents to and fro from shared
  equipment
 Taking files to another person
 Going to get signatures
“the more, the
    merrier
MUDA of Over
                     production
Generating more information than the customer needs
right now:




 More information than the customer needs
 Creating reports no one reads
 Making extra copies
 More information than the next process needs
MUDA of Process
1. Using more expensive
   equipment or tools where
   simpler ones would suffice.

2. Having meetings that are not
   needed.

3. Having people at meetings
   that are not required.

4. Agenda points, not to be
   included;
MUDA of
                    Process
    Efforts that create no value from the customer
    viewpoint:
     Creating reports
     Repeated manual entry of data
     Excessive paperwork
     Duplicity of work
     Use of outdated standard forms
     Use of inappropriate software
More information, project, material on hand than
the customer needs right now:
 Files waiting to be worked on
 Open projects
 Office supplies
 E-mails waiting to be read
 Unused records in the database
MUDA of Correction
Work that contains errors, rework, mistakes or
lacks something necessary:
 Data entry error
 Pricing error
 Missing information
 Missed specifications
 Lost records
 Rework
 Rescheduling meetings
How to eliminate?



   Find the Root Cause

 - Asking ‘WHY’ for 5 times

          - 5W 1H
5 W 1 H of MUDA
                              T h e Fiv e W s an d T h e O n e H

W ho                                W hat                                W here
1. W ho   do es it?                 1. W hat to do ?                     1. W here    to do it?
2. W ho   is do ing it ?            2. W hat is be ing do ne ?           2. W here    is it do ne?
3. W ho   sho u ld be do ing it ?   3. W hat sho u ld be do ne ?         3. W here    sho u ld it be do ne ?
4. W ho   e lse ca n do it?         4. W hat e lse ca n be do ne ?       4. W here    e lse ca n it be do ne ?
5. W ho   e lse sho u ld do it?     5. W hat e lse sho u ld be do ne ?   5. W here     e lse sho u ld it be
6. W ho   is do ing 3-M us?         6. W hat 3-M U s are be ing             do ne ?
                                       do ne?                            6. W here    are 3- M U s be ing
                                                                            do ne?
MURI
Muri is the overburden on equipment, facilities & people caused        by
mura and muda.

       This is in some respects on the opposite end of the spectrum of
        muda.

       Muri is pushing a machine or person beyond natural limits.

       Overburdening people results in safety and quality problems.

       Overburdening equipment causes breakdowns and defects
Identifying MURI
          MURI = Physical Strain, Overbourden
                            Bend to work?
                            Push hard?
                            Lift weight?
                            Repeat tiring action?
                            Wasteful walk?

Placing of excessive demands on
People
M/Cs, Production equipment.

  Muri is caused by the respect of unsuited standards
MURA

 Mura is the variation in the operation of a process not
  caused by the end customer.

 It is the unevenness, unbalanced work on machines.

 Mura results when employees are told to work like crazy
  early in the morning only to stand around and do nothing
  late in the day.


Result: Excess capacity allocation and increased cost.
Eliminating MURA

Happens sometimes?
Happens some places
Happens to some people
One side is ok; the other side is not ok


MURA is
Inconsistent or
Irregular or
Uneven use of person or M/c.
Quality
Doesn’t happen by
    Accident,
   It has to be
     Planned

Weitere ähnliche Inhalte

Was ist angesagt?

Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleFrank-G. Adler
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean managementPramod A
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingTimothy Wooi
 
Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)W3 Group Canada Inc.
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)Inter Alliance Werardt
 
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)Inter Alliance Werardt
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementationsudarshan jadwal
 
5S Training Presentation
5S Training Presentation5S Training Presentation
5S Training PresentationParth Devariya
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive MaintenanceRAHMAT EIE
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 

Was ist angesagt? (20)

Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
A training on 3 m’s in lean management
A training on 3 m’s in lean managementA training on 3 m’s in lean management
A training on 3 m’s in lean management
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in Manufacturing
 
Lean Manufacturing - An Overview
Lean Manufacturing - An OverviewLean Manufacturing - An Overview
Lean Manufacturing - An Overview
 
Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)Elimination of 7 types of Waste (MUDA)
Elimination of 7 types of Waste (MUDA)
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Kaizen
KaizenKaizen
Kaizen
 
Mura muri muda
Mura muri mudaMura muri muda
Mura muri muda
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
 
Muri-Mura-Muda
Muri-Mura-MudaMuri-Mura-Muda
Muri-Mura-Muda
 
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
PPT ON TOTAL PRODUCTIVE MAINTENANCE (TPM)
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
 
5S Training
5S Training5S Training
5S Training
 
Kaizen
KaizenKaizen
Kaizen
 
5S Training Presentation
5S Training Presentation5S Training Presentation
5S Training Presentation
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 

Ähnlich wie Lean Management Eliminates Waste and Variation

M U D A Ellimination
M U D A  ElliminationM U D A  Ellimination
M U D A ElliminationDMR Panda
 
An Introduction to Lean and Legal Process Improvement, University of Ottawa, ...
An Introduction to Lean and Legal Process Improvement, University of Ottawa, ...An Introduction to Lean and Legal Process Improvement, University of Ottawa, ...
An Introduction to Lean and Legal Process Improvement, University of Ottawa, ...KarenGimbal
 
Prevent and Eliminate MUDA.pdf
Prevent and Eliminate MUDA.pdfPrevent and Eliminate MUDA.pdf
Prevent and Eliminate MUDA.pdfAmanGunner
 
A STORY OF FAILURE - INSIGHTS FROM A START-UP & WHY THEY MATTER IN AN ENTERPR...
A STORY OF FAILURE - INSIGHTS FROM A START-UP & WHY THEY MATTER IN AN ENTERPR...A STORY OF FAILURE - INSIGHTS FROM A START-UP & WHY THEY MATTER IN AN ENTERPR...
A STORY OF FAILURE - INSIGHTS FROM A START-UP & WHY THEY MATTER IN AN ENTERPR...Lean Kanban Central Europe
 
How can I get rid of paper in my business processes?
How can I get rid of paper in my business processes?How can I get rid of paper in my business processes?
How can I get rid of paper in my business processes?John Mancini
 
Don't improve work, remove waste
Don't improve work, remove wasteDon't improve work, remove waste
Don't improve work, remove wastePaul Brink
 
Kaizen, A Continuous Improvements
Kaizen, A Continuous ImprovementsKaizen, A Continuous Improvements
Kaizen, A Continuous ImprovementsAshraf Hameed
 
Slashing Biomedical Budgets In 2009
Slashing Biomedical Budgets In 2009Slashing Biomedical Budgets In 2009
Slashing Biomedical Budgets In 2009Patrick Lynch
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherAlan Desrocher
 
Understanding Lean - Business Continuous Improvements
Understanding Lean - Business Continuous ImprovementsUnderstanding Lean - Business Continuous Improvements
Understanding Lean - Business Continuous ImprovementsAmin Kazemi
 

Ähnlich wie Lean Management Eliminates Waste and Variation (20)

M U D A Ellimination
M U D A  ElliminationM U D A  Ellimination
M U D A Ellimination
 
An Introduction to Lean and Legal Process Improvement, University of Ottawa, ...
An Introduction to Lean and Legal Process Improvement, University of Ottawa, ...An Introduction to Lean and Legal Process Improvement, University of Ottawa, ...
An Introduction to Lean and Legal Process Improvement, University of Ottawa, ...
 
Prevent and Eliminate MUDA.pdf
Prevent and Eliminate MUDA.pdfPrevent and Eliminate MUDA.pdf
Prevent and Eliminate MUDA.pdf
 
Manufacturing wastes
Manufacturing wastesManufacturing wastes
Manufacturing wastes
 
WASTE MINIMIZATION.pptx
WASTE MINIMIZATION.pptxWASTE MINIMIZATION.pptx
WASTE MINIMIZATION.pptx
 
A STORY OF FAILURE - INSIGHTS FROM A START-UP & WHY THEY MATTER IN AN ENTERPR...
A STORY OF FAILURE - INSIGHTS FROM A START-UP & WHY THEY MATTER IN AN ENTERPR...A STORY OF FAILURE - INSIGHTS FROM A START-UP & WHY THEY MATTER IN AN ENTERPR...
A STORY OF FAILURE - INSIGHTS FROM A START-UP & WHY THEY MATTER IN AN ENTERPR...
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 
Muda
MudaMuda
Muda
 
How can I get rid of paper in my business processes?
How can I get rid of paper in my business processes?How can I get rid of paper in my business processes?
How can I get rid of paper in my business processes?
 
Don't improve work, remove waste
Don't improve work, remove wasteDon't improve work, remove waste
Don't improve work, remove waste
 
Kaizen, A Continuous Improvements
Kaizen, A Continuous ImprovementsKaizen, A Continuous Improvements
Kaizen, A Continuous Improvements
 
Slashing Biomedical Budgets In 2009
Slashing Biomedical Budgets In 2009Slashing Biomedical Budgets In 2009
Slashing Biomedical Budgets In 2009
 
Greener It
Greener ItGreener It
Greener It
 
LEAN Practices
LEAN PracticesLEAN Practices
LEAN Practices
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 
Waste Elimination
Waste  EliminationWaste  Elimination
Waste Elimination
 
Business Process Tangles: An Introduction
Business Process Tangles: An IntroductionBusiness Process Tangles: An Introduction
Business Process Tangles: An Introduction
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Understanding Lean - Business Continuous Improvements
Understanding Lean - Business Continuous ImprovementsUnderstanding Lean - Business Continuous Improvements
Understanding Lean - Business Continuous Improvements
 

Kürzlich hochgeladen

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Kürzlich hochgeladen (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 

Lean Management Eliminates Waste and Variation

  • 1. MUDA MURA MURI ABS MANIKANDAN.C CINISH P ABRAHAM VIPUL KOTADIA
  • 2. LEAN MANAGEMENT  Lean Management or quot;Leanquot; is the optimal way of managing through the removal of waste and implementing flow.  It is renowned for its focus on reduction of the original process wastes in order to improve overall customer value.  In simple term, more value with less work.  Lean manufacturing is derived mostly from the Toyota Production System (TPS) Identified as quot;Leanquot; only after 1990s.  Goal is to eliminate the waste from the process.
  • 4. TOYOTA PRODUCTION SYSTEM  Make what the customer needs, when it is needed, in the right amount.  Minimize inventories  Separate machine work from human work and fully utilize both  Build quality into the process and prevent errors from happening  Reduce lead-times to allow for rapid, flexible scheduling  Produce a high mix of low volume products efficiently
  • 5. LEAN PRODUCTION - TPS Main goals of Toyota Production System (TPS) are to eliminate:  Overburden or stress in the system (muri)  Inconsistency (mura)  Waste (muda) Goal is to design a process that runs smoothly, can flex without stress, and eliminates waste. Using TPS, Toyota was able to reduce lead-time and cost, while improving quality.
  • 6. Eliminating 3 M  MUDA (Waste)  MURI (Strain / Over burden)  MURA (Unevenness)
  • 7. MUDA MUDA is the Waste, work that does not add any value to the product Process-1 V Process-2 V Process-3 V Process-4 V Input Product W W W W V: Value added product/services W: Wasteful product / practices/services that does not add value
  • 8. Economic Value of Waste  Every business activity absorbs resources and every resource has a cost  Every waste has a cost, and that is direct loss to the company.  Economic value of waste in a process industry are in the range of 10 -35% of annual turnover
  • 9. 7 Seven MUDA [Wastes] Unnecessary Motions Waiting for work and materials Transportations Overproduction Processing Inventories / Unnecessary WIP Corrective operation
  • 11. MUDA of Motion Movement that does not add value  Searching for files  Extra clicks or key strokes  Clearing away files on the desk  Gathering information  Looking through manuals and catalogs  Handling paperwork
  • 14. MUDA of Waiting Idle time created when material, information, people or equipment is not ready. Waiting for:  Faxes  The system to come back  Copier machine  Customer response  A handed off file to come back
  • 15. MUDA of Transport I am more expensive since raw material is coming from a far off place.
  • 16. MUDA of Transport Movement of information that does not add value:  Carrying documents to and fro from shared equipment  Taking files to another person  Going to get signatures
  • 17. “the more, the merrier
  • 18. MUDA of Over production Generating more information than the customer needs right now:  More information than the customer needs  Creating reports no one reads  Making extra copies  More information than the next process needs
  • 19. MUDA of Process 1. Using more expensive equipment or tools where simpler ones would suffice. 2. Having meetings that are not needed. 3. Having people at meetings that are not required. 4. Agenda points, not to be included;
  • 20. MUDA of Process Efforts that create no value from the customer viewpoint:  Creating reports  Repeated manual entry of data  Excessive paperwork  Duplicity of work  Use of outdated standard forms  Use of inappropriate software
  • 21.
  • 22. More information, project, material on hand than the customer needs right now:  Files waiting to be worked on  Open projects  Office supplies  E-mails waiting to be read  Unused records in the database
  • 24. Work that contains errors, rework, mistakes or lacks something necessary:  Data entry error  Pricing error  Missing information  Missed specifications  Lost records  Rework  Rescheduling meetings
  • 25. How to eliminate? Find the Root Cause - Asking ‘WHY’ for 5 times - 5W 1H
  • 26. 5 W 1 H of MUDA T h e Fiv e W s an d T h e O n e H W ho W hat W here 1. W ho do es it? 1. W hat to do ? 1. W here to do it? 2. W ho is do ing it ? 2. W hat is be ing do ne ? 2. W here is it do ne? 3. W ho sho u ld be do ing it ? 3. W hat sho u ld be do ne ? 3. W here sho u ld it be do ne ? 4. W ho e lse ca n do it? 4. W hat e lse ca n be do ne ? 4. W here e lse ca n it be do ne ? 5. W ho e lse sho u ld do it? 5. W hat e lse sho u ld be do ne ? 5. W here e lse sho u ld it be 6. W ho is do ing 3-M us? 6. W hat 3-M U s are be ing do ne ? do ne? 6. W here are 3- M U s be ing do ne?
  • 27. MURI Muri is the overburden on equipment, facilities & people caused by mura and muda.  This is in some respects on the opposite end of the spectrum of muda.  Muri is pushing a machine or person beyond natural limits.  Overburdening people results in safety and quality problems.  Overburdening equipment causes breakdowns and defects
  • 28.
  • 29.
  • 30. Identifying MURI MURI = Physical Strain, Overbourden Bend to work? Push hard? Lift weight? Repeat tiring action? Wasteful walk? Placing of excessive demands on People M/Cs, Production equipment. Muri is caused by the respect of unsuited standards
  • 31. MURA  Mura is the variation in the operation of a process not caused by the end customer.  It is the unevenness, unbalanced work on machines.  Mura results when employees are told to work like crazy early in the morning only to stand around and do nothing late in the day. Result: Excess capacity allocation and increased cost.
  • 32. Eliminating MURA Happens sometimes? Happens some places Happens to some people One side is ok; the other side is not ok MURA is Inconsistent or Irregular or Uneven use of person or M/c.
  • 33. Quality Doesn’t happen by Accident, It has to be Planned