Time and Work
Type I
Exp 1 Rizwan can do a piece of work in 6 days and Payam can do the same work in 8 days,working together ,in
how many days they will complete the same work:
Solution:
Step I Take the L.C.M(6,8) of number of days taken by R and P alone to complete the work
Imagine there are 24 bricks(Total work) in total ,R can transfer all bricks in 6 days from one place to
other, So he will have to pick 4 bricks a day and P will have to pick 3 bricks a day.
R -6 4(24/6)
L.C.M(6,8)=24
P-8 3(24/8)
Step II if P and R work together they will pick 7 bricks/day.
Step III They can pick all 24 bricks in
=
24
7
days =
𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠
𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
Type II
Exp 2 Gulfshan and Maryam working together can do a piece of work in 8 days. If Gulfshan alone can do it in
24 days, in How many days Maryam alone can complete the same work?
Solution:
G+M-8 3(24/8)
L.C.M (8, 24) =24
G-24 1(24/24)
M alone can pick =2(3-1) bricks/day.
So Maryam alone can do the same work in
= 12 =
24
2
days =
𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠
𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Type III
Exp 3 If Afshan and Sahir can do a work in 18 days and 24 days respectively. They worked together
for 8 days and then Afshan left. The remaining work was finished by Sahir in How many days?
Solution:
A-18 4(72/18)
L.C.M (18, 24)=72
S-24 3(72/24)
Step I A+S can pick 7(4+3) bricks/day.
Step II They worked for 8 days so, they will pick 56(8*7(4+3)) bricks in 8 days.
Step III Left over bricks 16(72-56)
Step IV B will pick remaining 16 bricks in 16/3 days.
Type IV
Exp 4:Sajid can do a piece of work in 18 days and Haider in 12 days. They began the work together, But Haider
left the work 3 days before its completion. In How many days in all was the work completed?
Solution:
S-18 2(36/18)
L.C.M (18, 12)=36
H-12 3(36/12)
Let say work was finished in N days ,So S worked for N days and H worked for X-3 days ,together they have to
pick 36 bricks.
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Total Bricks=no of days S worked×S can pick bricks/day+no of days H worked×H can pick bricks/day
36=N×2+ (N-3)×3
N= 9days
Shortcut:
H didn’t work for 3 days, so those extra bricks 9(3×3) will be added to total bricks
So your answer will be
36+9/5(3+2)
9 days
Type V
Exp 5:Shabnam and Ayesha together can complete a work in 15 days. Shabnam is 50 % more efficient worker
than Ayesha. How long Shabnam will take to complete the work alone?
Solution:
If S is 50% more efficient worker, She will Pick 150 Bricks and A will pick 100 Bricks in a day.
S=150 bricks
A=100 bricks
S+A=250 bricks
If they can finish the work in 15 days and can pick 250 bricks in a day, there would have been 250×15 bricks in
total. Which can be picked by S in
=
𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠
𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
=
250×15
150
= 25 𝑑𝑎𝑦𝑠
Type VI
Exp6:Ashba does 4/5 of a piece of work in 20 days, She then calls in Asra and they finish the remaining work in
3 days. How long Asra alone will take to do the whole work?
Solution:
Ah =
4
5
work 20 days
Full work (1) 20×
5
4
=25 days
Ah+Ar1= 1-
4
5
=
1
5
3 days
Full work (1) 3×
5
1
=15 days
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Ah+Ar -15 5(75/15)
L.C.M (15, 25)=75
Ah-25 3(75/25)
M alone can pick =2(5-3) bricks/day.
So Maryam alone can do the same work in
=
75
2
days =
𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠
𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
VII
Exp7:If Manal can do a piece of work in 12 days and Najam can do it in 15 days. How many days it will take to
complete the same work, If they work alternatively starting from Manal:
Solution: 5(60/12)
M 12 60(L.C.M (12, 15))
N 14 4(60/15)
Since they are working on alternate days, so they will pick 9(5+4) bricks in 2 days.
Days bricks
2 9
Now we will multiply bricks with a NUMBER which will make bricks near to total bricks (60), but not greater
than 60, and we will multiply days with the same number.
Days bricks
2 ×6 9×6(54)
Now we are left with 6 bricks, since M has started work, now again its M’s turn after 12 days work.
Days bricks
12 54
+1 +5
13 59
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Now its N’s turn and we are left with 1 brick, which can be picked by N in ¼ days.
=
𝑛𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑛𝑒𝑒𝑑 𝑡𝑜 𝑏𝑒 𝑝𝑖𝑐𝑘𝑒𝑑
𝑛𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑐𝑎𝑛 𝑏𝑒 𝑝𝑖𝑐𝑘𝑒𝑑 𝑖𝑛 𝑎 𝑑𝑎𝑦
13+1/4 59+1=60 bricks
So work will be complete in 13
1
4
days.
TypeVIII
Exp 8: Manal and Najam can do a piece of work in 12 days, Najam and Ayesha can do it in 15 days, Manal and
Ayesha can do it in 20 days. how long it will take to complete the work, If they work together and alone?
Solution:
M+N 12 5(60/12)
N+A 15 60 [L.C.M (12, 15, 20)] 4(60/15)
M+A 20 3(60/20)
Since there is double counting of every one so we will multiply total bricks by 2.
M+N+A=
2×60
5+4+3
=10days
If we want to calculate it for M alone, we need to add bricks of those equations where M is present and
subtracted those where M is absent
2 × 60
5 − 4 + 3
= 30 𝑑𝑎𝑦𝑠
Same for N and A
N alone
2 × 60
5 + 4 − 3
= 20𝑑𝑎𝑦𝑠
A alone
2 × 60
4 + 3 − 5
= 60𝑑𝑎𝑦𝑠
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Type IX
A=X+t1
B=X+t2
A+B=X=√𝑡1 × 𝑡2
Exp9: If Manal takes 16 hrs more to complete the work than Manal and Asra take together to do the same work
and Asra takes 9 hrs more to do the same work than they together take. How many days it will take to finish the
work if they work together?
Solution:
According to formula
X=√𝑡1 × 𝑡2
X=√16 × 9
=12 days
Type X
Exp 10:If A Men or B women or C children can do a piece of work in N days, How Many days it will take to
complete the same work by D men and E women and F children:
1
𝐴𝑛𝑠
=
1
𝑁
× (
𝐷
𝐴
+
𝐸
𝐵
+
𝐹
𝐶
)
3M or 4 W can do a piece of work in 43 days then 7 M and 5 W will do it in how many days?
Solution:
1
𝐴𝑛𝑠
=
1
𝑁
× (
𝐷
𝐴
+
𝐸
𝐵
+
𝐹
𝐶
)
1
𝐴𝑛𝑠
=
1
43
×
7
3
+
5
4
=
1
12
=12 days
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Type XI
𝑀×𝐷×𝐻
𝑊
=
𝑀1×𝐷1×𝐻1
𝑊1
+
𝑀2×𝐷2×𝐻2
𝑊2
+
𝑀3×𝐷3×𝐻3
𝑊3
+……
Exp 11:If 40 men can finish a work in 60 days working 6 hrs a day, how long it will take to finish the double
work by 60 men working 8 hrs a day?
Solution:
𝑀 × 𝐷 × 𝐻
𝑊
=
𝑀1 × 𝐷1 × 𝐻1
𝑊1
40 × 60 × 6
1
=
60 × 𝐷1 × 8
2
=60 days
Exp12:A certain number of person can complete a piece of work in 55 days. If there were 6 person more, the
work could have been finished in 11 days less. How many person were originally there?
𝑀 × 𝐷 × 𝐻
𝑊
=
𝑀1 × 𝐷1 × 𝐻1
𝑊1
𝑀 × 55
1
=
(𝑀 + 6) × 44(55 − 11)
1
M=24 days
Type XII
Exp13:4 men and 6 women can complete the work in 8 days, While 3 men and 7 women can complete the work
in 10 days, In how many days will 10 women and 5 men will complete the same work?
[4M+6W=
1
8
]×8……………………………………(i)
[3M+7W=
1
10
]×10………………………………..(ii)
(i)=(ii)
32 M+48 W=30M+70W
1M=11W=M/W=11/1
Take M=1,W=1
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
We know that
𝑀 × 𝐷 × 𝐻
𝑊
=
𝑀1 × 𝐷1 × 𝐻1
𝑊1
(4M+6W) ×8=(10W+5M)×D
(4×11+6×1) ×8=(10×1+5×11) ×D
D=80/13 days

Weitere ähnliche Inhalte

Ähnlich wie Time and work

UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.pptDeependra46
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_priya mega
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptxgoud10
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxMRUNALSHETHIYA1
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdLearningHomeBD.com
 
Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfRishabRoy10
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...SOURAV DAS
 
Banks and SSC Time and Work
Banks and SSC Time and WorkBanks and SSC Time and Work
Banks and SSC Time and WorkGeorge Prep
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdfalphared4
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
 

Ähnlich wie Time and work (20)

3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.ppt
 
Numerical reasoning II
Numerical reasoning IINumerical reasoning II
Numerical reasoning II
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
C11
C11C11
C11
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptx
 
Doc
DocDoc
Doc
 
Time and work
Time and workTime and work
Time and work
 
Time and work rbi
Time and work rbiTime and work rbi
Time and work rbi
 
TRW
TRWTRW
TRW
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
 
TIME & WORK.pptx
TIME & WORK.pptxTIME & WORK.pptx
TIME & WORK.pptx
 
Time and work ea #2
Time and work  ea #2Time and work  ea #2
Time and work ea #2
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
 
Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdf
 
Time and work standard level
Time and work standard levelTime and work standard level
Time and work standard level
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
 
Banks and SSC Time and Work
Banks and SSC Time and WorkBanks and SSC Time and Work
Banks and SSC Time and Work
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdf
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 

Mehr von Mayank Gupt

Mehr von Mayank Gupt (13)

Vedic part 1
Vedic part 1Vedic part 1
Vedic part 1
 
Workshop topics
Workshop topicsWorkshop topics
Workshop topics
 
Mayank gupt cv
Mayank gupt cvMayank gupt cv
Mayank gupt cv
 
Ppt
PptPpt
Ppt
 
Motivational
MotivationalMotivational
Motivational
 
Indian polity
Indian polityIndian polity
Indian polity
 
Compound interest
Compound interestCompound interest
Compound interest
 
Profit and Loss
Profit and LossProfit and Loss
Profit and Loss
 
Faculty
FacultyFaculty
Faculty
 
Orientation presentation
Orientation presentationOrientation presentation
Orientation presentation
 
jamia cms intro
jamia cms introjamia cms intro
jamia cms intro
 
Job satisfaction just temporary
Job satisfaction just temporaryJob satisfaction just temporary
Job satisfaction just temporary
 
Summer training
Summer trainingSummer training
Summer training
 

Kürzlich hochgeladen

NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 

Kürzlich hochgeladen (20)

NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 

Time and work

  • 1. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Time and Work Type I Exp 1 Rizwan can do a piece of work in 6 days and Payam can do the same work in 8 days,working together ,in how many days they will complete the same work: Solution: Step I Take the L.C.M(6,8) of number of days taken by R and P alone to complete the work Imagine there are 24 bricks(Total work) in total ,R can transfer all bricks in 6 days from one place to other, So he will have to pick 4 bricks a day and P will have to pick 3 bricks a day. R -6 4(24/6) L.C.M(6,8)=24 P-8 3(24/8) Step II if P and R work together they will pick 7 bricks/day. Step III They can pick all 24 bricks in = 24 7 days = 𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠 𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦 Type II Exp 2 Gulfshan and Maryam working together can do a piece of work in 8 days. If Gulfshan alone can do it in 24 days, in How many days Maryam alone can complete the same work? Solution: G+M-8 3(24/8) L.C.M (8, 24) =24 G-24 1(24/24) M alone can pick =2(3-1) bricks/day. So Maryam alone can do the same work in = 12 = 24 2 days = 𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠 𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
  • 2. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Type III Exp 3 If Afshan and Sahir can do a work in 18 days and 24 days respectively. They worked together for 8 days and then Afshan left. The remaining work was finished by Sahir in How many days? Solution: A-18 4(72/18) L.C.M (18, 24)=72 S-24 3(72/24) Step I A+S can pick 7(4+3) bricks/day. Step II They worked for 8 days so, they will pick 56(8*7(4+3)) bricks in 8 days. Step III Left over bricks 16(72-56) Step IV B will pick remaining 16 bricks in 16/3 days. Type IV Exp 4:Sajid can do a piece of work in 18 days and Haider in 12 days. They began the work together, But Haider left the work 3 days before its completion. In How many days in all was the work completed? Solution: S-18 2(36/18) L.C.M (18, 12)=36 H-12 3(36/12) Let say work was finished in N days ,So S worked for N days and H worked for X-3 days ,together they have to pick 36 bricks.
  • 3. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Total Bricks=no of days S worked×S can pick bricks/day+no of days H worked×H can pick bricks/day 36=N×2+ (N-3)×3 N= 9days Shortcut: H didn’t work for 3 days, so those extra bricks 9(3×3) will be added to total bricks So your answer will be 36+9/5(3+2) 9 days Type V Exp 5:Shabnam and Ayesha together can complete a work in 15 days. Shabnam is 50 % more efficient worker than Ayesha. How long Shabnam will take to complete the work alone? Solution: If S is 50% more efficient worker, She will Pick 150 Bricks and A will pick 100 Bricks in a day. S=150 bricks A=100 bricks S+A=250 bricks If they can finish the work in 15 days and can pick 250 bricks in a day, there would have been 250×15 bricks in total. Which can be picked by S in = 𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠 𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦 = 250×15 150 = 25 𝑑𝑎𝑦𝑠 Type VI Exp6:Ashba does 4/5 of a piece of work in 20 days, She then calls in Asra and they finish the remaining work in 3 days. How long Asra alone will take to do the whole work? Solution: Ah = 4 5 work 20 days Full work (1) 20× 5 4 =25 days Ah+Ar1= 1- 4 5 = 1 5 3 days Full work (1) 3× 5 1 =15 days
  • 4. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Ah+Ar -15 5(75/15) L.C.M (15, 25)=75 Ah-25 3(75/25) M alone can pick =2(5-3) bricks/day. So Maryam alone can do the same work in = 75 2 days = 𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠 𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦 VII Exp7:If Manal can do a piece of work in 12 days and Najam can do it in 15 days. How many days it will take to complete the same work, If they work alternatively starting from Manal: Solution: 5(60/12) M 12 60(L.C.M (12, 15)) N 14 4(60/15) Since they are working on alternate days, so they will pick 9(5+4) bricks in 2 days. Days bricks 2 9 Now we will multiply bricks with a NUMBER which will make bricks near to total bricks (60), but not greater than 60, and we will multiply days with the same number. Days bricks 2 ×6 9×6(54) Now we are left with 6 bricks, since M has started work, now again its M’s turn after 12 days work. Days bricks 12 54 +1 +5 13 59
  • 5. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Now its N’s turn and we are left with 1 brick, which can be picked by N in ¼ days. = 𝑛𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑛𝑒𝑒𝑑 𝑡𝑜 𝑏𝑒 𝑝𝑖𝑐𝑘𝑒𝑑 𝑛𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑐𝑎𝑛 𝑏𝑒 𝑝𝑖𝑐𝑘𝑒𝑑 𝑖𝑛 𝑎 𝑑𝑎𝑦 13+1/4 59+1=60 bricks So work will be complete in 13 1 4 days. TypeVIII Exp 8: Manal and Najam can do a piece of work in 12 days, Najam and Ayesha can do it in 15 days, Manal and Ayesha can do it in 20 days. how long it will take to complete the work, If they work together and alone? Solution: M+N 12 5(60/12) N+A 15 60 [L.C.M (12, 15, 20)] 4(60/15) M+A 20 3(60/20) Since there is double counting of every one so we will multiply total bricks by 2. M+N+A= 2×60 5+4+3 =10days If we want to calculate it for M alone, we need to add bricks of those equations where M is present and subtracted those where M is absent 2 × 60 5 − 4 + 3 = 30 𝑑𝑎𝑦𝑠 Same for N and A N alone 2 × 60 5 + 4 − 3 = 20𝑑𝑎𝑦𝑠 A alone 2 × 60 4 + 3 − 5 = 60𝑑𝑎𝑦𝑠
  • 6. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Type IX A=X+t1 B=X+t2 A+B=X=√𝑡1 × 𝑡2 Exp9: If Manal takes 16 hrs more to complete the work than Manal and Asra take together to do the same work and Asra takes 9 hrs more to do the same work than they together take. How many days it will take to finish the work if they work together? Solution: According to formula X=√𝑡1 × 𝑡2 X=√16 × 9 =12 days Type X Exp 10:If A Men or B women or C children can do a piece of work in N days, How Many days it will take to complete the same work by D men and E women and F children: 1 𝐴𝑛𝑠 = 1 𝑁 × ( 𝐷 𝐴 + 𝐸 𝐵 + 𝐹 𝐶 ) 3M or 4 W can do a piece of work in 43 days then 7 M and 5 W will do it in how many days? Solution: 1 𝐴𝑛𝑠 = 1 𝑁 × ( 𝐷 𝐴 + 𝐸 𝐵 + 𝐹 𝐶 ) 1 𝐴𝑛𝑠 = 1 43 × 7 3 + 5 4 = 1 12 =12 days
  • 7. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Type XI 𝑀×𝐷×𝐻 𝑊 = 𝑀1×𝐷1×𝐻1 𝑊1 + 𝑀2×𝐷2×𝐻2 𝑊2 + 𝑀3×𝐷3×𝐻3 𝑊3 +…… Exp 11:If 40 men can finish a work in 60 days working 6 hrs a day, how long it will take to finish the double work by 60 men working 8 hrs a day? Solution: 𝑀 × 𝐷 × 𝐻 𝑊 = 𝑀1 × 𝐷1 × 𝐻1 𝑊1 40 × 60 × 6 1 = 60 × 𝐷1 × 8 2 =60 days Exp12:A certain number of person can complete a piece of work in 55 days. If there were 6 person more, the work could have been finished in 11 days less. How many person were originally there? 𝑀 × 𝐷 × 𝐻 𝑊 = 𝑀1 × 𝐷1 × 𝐻1 𝑊1 𝑀 × 55 1 = (𝑀 + 6) × 44(55 − 11) 1 M=24 days Type XII Exp13:4 men and 6 women can complete the work in 8 days, While 3 men and 7 women can complete the work in 10 days, In how many days will 10 women and 5 men will complete the same work? [4M+6W= 1 8 ]×8……………………………………(i) [3M+7W= 1 10 ]×10………………………………..(ii) (i)=(ii) 32 M+48 W=30M+70W 1M=11W=M/W=11/1 Take M=1,W=1
  • 8. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com We know that 𝑀 × 𝐷 × 𝐻 𝑊 = 𝑀1 × 𝐷1 × 𝐻1 𝑊1 (4M+6W) ×8=(10W+5M)×D (4×11+6×1) ×8=(10×1+5×11) ×D D=80/13 days