  Menatel_Delta QS OPI
   By: Mr. Magdy Abdelsattar
    Business Unit Sr. Manager
           Delta Region
Annual Director Meeting Mar_2005
Agenda
                 2




 Problem Identification.
 Problem Analysis.
 Action Plan.
 Results.
 Process Monitoring.
Problem Identification
                           3

Months       Cairo     Alex.    Canal      Delta     MUE       SUE
January     97.10 %   95.80 %   97.90 %   94.50 %   98.20 %   98.40 %
February    97.38 %   96.96 %   98.33 %   95.19 %   98.37 %   98.41 %
March       97.51 %   98.69 %   98.20 %   95.50 %   98.40 %   98.56 %
April       97.90 %   98.70 %   98.00 %   96.20 %   98.50 %   98.70 %
May         97.80 %   98.96 %   97.81 %   96.21 %   98.46 %   98.46 %
June        98.13 %   99.02 %   98.15 %   96.66 %   98.47 %   98.97 %
July        98.32 %   98.17 %   98.16 %   96.79 %   98.31 %   98.67 %
August      98.37 %   97.82 %   98.55 %   97.26 %   98.41 %   98.86 %
September   98.59 %   98.59 %   98.69 %   97.28 %   98.21 %   98.89 %
October     98.52 %   99.04 %   98.72 %   96.65 %   98.23 %   98.98 %
November    98.49 %   98.69 %   98.73 %   97.90 %   98.20 %   98.88 %
December    95.51 %   99.43 %   98.93 %   98.73 %   98.89 %   99.33 %
Average     97.80 %   98.32 %   98.34 %   96.57 %   98.37 %   98.75 %




  The year 2003 QS table illustrate the challenge
  facing Delta team (low QS)
Problem Analysis
                          4



 We have 4 types of QS alarms represent Problem Elements.

1.   MS: this is minimum service alarm and normally is due to
     payphone faults that is technician responsibility.
2.   OOI: this is out of order incidence alarm and normally is due to
     payphone faults, that is technician responsibility also.
3.   OOS: this is out of order supervisor alarm and normally is due to
     the exchange or the PMS faults, that is S/W or system responsibility.
4.   NK: this is not connected alarm and normally is due to
     communication link between the payphone and the PMS is cut, that
     is line, cable, production, technician, Telecom Egypt network, or
     PMS responsibility.
Problem Analysis
                                5
   Using cause/effect fishbone analysis, the findings were :

         o     50 % due to PEOPLE.
         o     30 % due to PREVINTIVE MAINTINANCE.
         o     20 % due to P.M.S PERFORMANCE
                OOS (10%)                       NK (67%)

                                                                          PMS
         Exchanges
                                                                          10%
         5%                                        People
                      S/W

        PMS                                        27%
                                                                                  Preventive Maintenance
        5%                                                                        30%
         Installation
                                                                                                      QS
              Tools                                                             Skills

   People
                                                                                People

Spare
Parts
                                                            Controlling
        MS (3%)                     OOI (20%)
Problem Analysis
                                          6
By using gap analysis to see the strength of available resources to execute the an effective solution.
      Items               Menatel model       Cairo          Alex.     Canal       Delta             MUE       SUE
   Average Q.S                98 %            97.80 %       98.32 %    98.34 %    96.56 %           98.37 %   98.75 %
   Technicians                 120              47            18         15         19                10        8
    Vehicles                   60               21            10         10         8                 5         7
    Exchange                   480              93            62         63         88                54        35
    Lines IO                  30,000          12000          4739       4054       4150              2555      2150
   Supervisors                 10               4              3         2          1                 2         3
  Average calls                45               42            31         38         37                47        40
    Tech./line                 250             255.3         263.2      270.2      218.4             255.5     307.1
   Tech./exch.                  4              1.97           3.44       4.2       4.63               5.4       4.3
    Veh./tech.                  2               2.2           1.8        1.5        2.3               2         1.1
   Veh./exch.                   8               4.4           6.2        6.3        11               10.8       5
    Sup./tech.                 12              11.75           6         7.5        19                5         2.6
                                                        Tech. / Line
                                                                                            Delta
    Sup. / Tech.
                                                                                    MENATEL Model




                                                                                          Tech. / Ex.



                 Veh. / Ex.                                                      Veh. / Tech.
Conclusion
                       7

      Delta Business Unit is 1.43 % below the targeted Q.S
                   (1,000,000 LE annual loss).

 Cause :
  o   50 % due to PEOPLE.
  o  30 % due to PREVINTIVE MAINTINANCE.
  o  20 % due to P.M.S PERFORMANCE
 Effects:
  o  67 % is (NK) incidences.
  o  20 % is (OOI) incidences.
  o  10 % is (OOS) incidences.
  o  3 % is (MS) incidences.
Action Plan
                                      8
     People
     replace the current maintenance supervisor with one that is more
      skilled in terms of time management and planning.
     provide the necessary training to all the involved persons to in
      reach there skills.
   Program Name        Duration    Target Audience                    Objective                          Cost
Basic Communication                                          Understand the important of
                        2 Days        All Levels                                                   225 LE/day/person
                                                         communications in the organization.
     Teamwork                                            Getting around obstacles that prevent
                        1 Day         All Levels                                                   225 LE/day/person
                                                       team success and build an effective team.
  Problem Solving                                      Improving analysis skills for identifying
                        2 Days        All Levels        problems and recommending creative         225 LE/day/person
                                                         solutions that help the organization.
Customer Orientation    3 Days        All Levels          Understand customer satisfaction.        225 LE/day/person
  Negotiation Skills                                    Understand the important of effective
                        2 Days    Commercial persons                                               225 LE/day/person
                                                            negotiation to the organization
 Supervisory Skills                                       Understand the role of supervisor,
                        4 Days       Supervisors          understand people, how to manage         225 LE/day/person
                                                                       people.
   Service Quality                                     Understand quality and quality process;
                        2 Days       Technicians        understand the important of customer       225 LE/day/person
                                                                     satisfaction.
Action Plan
                                                  9

  Preventive Maintenance
  schedule technician’s time to cover different routes in Delta every
   48 hours, and assigned a car per governorate.
  Assign one of the technicians for workshop to be responsible for
   testing new and repaired spar parts, repairing faulty spar parts.
  Design a process for quality operation
                                                                    Civil, Booth, P
                                                                     ayphone &                 Payphone                 Cleaning &
                Line               PMS               Line                                    Maintenance &                Booth
                                                                       Cabling
                                                                      Installing              Spare Parts              Maintenance
           Request            Installing          Received



Quality Chick      Quality Chick     Quality Chick      Quality Chick          Quality Chick             Quality Chick      Quality Chick

    Test               Test                Test              Test                     Test                      Test            Test




                                             Reporting System Reporting System
                          Reporting System                                                   Reporting System
                                                       Deviation Control
                                                                                             Reporting System
Action Plan
                        10




 PMS, performance.
 The modem line should be 100 % isolated and effectively
  connected between the PMS and the modem to insure no miss
  communication.
 All the illogical faulty payphones data are to be collected and
  reported directly to HQ to be analyzed and solved if possible.
Results
                                                  11



             Continues improvements of the process
             month by month, Delta QS average 2004
             is 99.2%, above the targeted QS by 1.2%.
                                                          Delta QS
                                                   Delta QS                 Linear (Delta QS)



                                                                                                                                      99.8         99.8
                                                                                               99.5         99.6         99.6
                                                                                  99.4
                                                        99.1         99.2
                                             99
                                98.7

      98.2         98.3




jan          feb          mar          apr        may          jun          jul          aug          sep          oct          nov          dec
Process Monitoring & insuring continues
            improvements
                                   12


        Weekly KPIs reporting system,


        measures the QS related to each exchange and PMS according to alarms
            category (NK, OOI, OOS, and MS), and categorize the network to three
            categories:

       1.   More than 98 %
       2.   Less than 97 %
       3.   In between.


    Allows the branch to evaluate & measure weekly the QS operation output.
     provide a guided figure as for the next week target for improving.
    matching the branch philosophy to improve step by step,
    bushing category B to A, and C to B,
    we are on the track to maintain Branch objective.

Weitere ähnliche Inhalte

Ähnlich wie Menatel delta qs opi

Deutsche Bank Investor Tour Presentation
	 Deutsche Bank Investor Tour Presentation	 Deutsche Bank Investor Tour Presentation
Deutsche Bank Investor Tour Presentation
finance2
 
first energy MorganStanley307
first energy MorganStanley307first energy MorganStanley307
first energy MorganStanley307
finance21
 
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
ssusere3c688
 

Ähnlich wie Menatel delta qs opi (20)

Operation management business report
Operation management business reportOperation management business report
Operation management business report
 
Copy (2) of validity and reliability of mini – arabic in
Copy (2) of validity and reliability of      mini – arabic inCopy (2) of validity and reliability of      mini – arabic in
Copy (2) of validity and reliability of mini – arabic in
 
Dp and causal analysis guideline
Dp and causal analysis guidelineDp and causal analysis guideline
Dp and causal analysis guideline
 
Sratistik data latihan analisis
Sratistik data latihan analisisSratistik data latihan analisis
Sratistik data latihan analisis
 
Deutsche Bank Investor Tour Presentation
	 Deutsche Bank Investor Tour Presentation	 Deutsche Bank Investor Tour Presentation
Deutsche Bank Investor Tour Presentation
 
Dr. Jason Ross - Strategies to Improve Swine Reproduction
Dr. Jason Ross - Strategies to Improve Swine ReproductionDr. Jason Ross - Strategies to Improve Swine Reproduction
Dr. Jason Ross - Strategies to Improve Swine Reproduction
 
first energy MorganStanley307
first energy MorganStanley307first energy MorganStanley307
first energy MorganStanley307
 
Approximate dynamic programming using fluid and diffusion approximations with...
Approximate dynamic programming using fluid and diffusion approximations with...Approximate dynamic programming using fluid and diffusion approximations with...
Approximate dynamic programming using fluid and diffusion approximations with...
 
Excel/VBA model for nurse scheduling in outpatient wards
Excel/VBA model for nurse scheduling in outpatient wardsExcel/VBA model for nurse scheduling in outpatient wards
Excel/VBA model for nurse scheduling in outpatient wards
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Figure 8 Presentation
Figure 8 PresentationFigure 8 Presentation
Figure 8 Presentation
 
Parametric Risk Transfer Products - Gero Michel
Parametric Risk Transfer Products - Gero MichelParametric Risk Transfer Products - Gero Michel
Parametric Risk Transfer Products - Gero Michel
 
Caruso
CarusoCaruso
Caruso
 
Approximate Dynamic Programming using Fluid and Diffusion Approximations with...
Approximate Dynamic Programming using Fluid and Diffusion Approximations with...Approximate Dynamic Programming using Fluid and Diffusion Approximations with...
Approximate Dynamic Programming using Fluid and Diffusion Approximations with...
 
Incorporating Peripherally Inserted Central Catheters (PICC) into hospital cl...
Incorporating Peripherally Inserted Central Catheters (PICC) into hospital cl...Incorporating Peripherally Inserted Central Catheters (PICC) into hospital cl...
Incorporating Peripherally Inserted Central Catheters (PICC) into hospital cl...
 
Art c
Art cArt c
Art c
 
Art c
Art cArt c
Art c
 
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
MultivariableProcessIdentificationforMPC-TheAsymptoticMethodanditsApplication...
 
Focus Co Management 2016 Edmison
Focus Co Management 2016 Edmison   Focus Co Management 2016 Edmison
Focus Co Management 2016 Edmison
 
Amarelli 22 02 2006
Amarelli 22 02 2006Amarelli 22 02 2006
Amarelli 22 02 2006
 

Mehr von Magdy Abdelsattar Omar

Mehr von Magdy Abdelsattar Omar (20)

International Business
International BusinessInternational Business
International Business
 
Business intelligence
Business intelligence Business intelligence
Business intelligence
 
Launching new handset mobile
Launching new handset mobileLaunching new handset mobile
Launching new handset mobile
 
Reasons to leave a job
Reasons to leave a jobReasons to leave a job
Reasons to leave a job
 
How to save your job if you're about to be fired
How to save your job if you're about to be firedHow to save your job if you're about to be fired
How to save your job if you're about to be fired
 
Do not apply for this job
Do not apply for this jobDo not apply for this job
Do not apply for this job
 
Can a company cut your pay or hours
Can a company cut your pay or hoursCan a company cut your pay or hours
Can a company cut your pay or hours
 
Why you may not have gotten a raise
Why you may not have gotten a raiseWhy you may not have gotten a raise
Why you may not have gotten a raise
 
10 steps to a successful career change
10 steps to a successful career change10 steps to a successful career change
10 steps to a successful career change
 
Top 10 e commerce builders
Top 10 e commerce buildersTop 10 e commerce builders
Top 10 e commerce builders
 
Sales management
Sales managementSales management
Sales management
 
Push & pull strategy
Push & pull strategyPush & pull strategy
Push & pull strategy
 
Egyptian e commerce market to reach $2.7bn by 2020
Egyptian e commerce market to reach $2.7bn by 2020Egyptian e commerce market to reach $2.7bn by 2020
Egyptian e commerce market to reach $2.7bn by 2020
 
Economy
EconomyEconomy
Economy
 
E commerce in egypt
E commerce in egyptE commerce in egypt
E commerce in egypt
 
B plan ssm
B plan ssmB plan ssm
B plan ssm
 
Distribution strategy
Distribution strategyDistribution strategy
Distribution strategy
 
Cv vs Resume
Cv vs ResumeCv vs Resume
Cv vs Resume
 
Distribution business
Distribution businessDistribution business
Distribution business
 
Telecommunication
TelecommunicationTelecommunication
Telecommunication
 

Kürzlich hochgeladen

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Kürzlich hochgeladen (20)

Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 

Menatel delta qs opi

  • 1. 1 Menatel_Delta QS OPI By: Mr. Magdy Abdelsattar Business Unit Sr. Manager Delta Region Annual Director Meeting Mar_2005
  • 2. Agenda 2  Problem Identification.  Problem Analysis.  Action Plan.  Results.  Process Monitoring.
  • 3. Problem Identification 3 Months Cairo Alex. Canal Delta MUE SUE January 97.10 % 95.80 % 97.90 % 94.50 % 98.20 % 98.40 % February 97.38 % 96.96 % 98.33 % 95.19 % 98.37 % 98.41 % March 97.51 % 98.69 % 98.20 % 95.50 % 98.40 % 98.56 % April 97.90 % 98.70 % 98.00 % 96.20 % 98.50 % 98.70 % May 97.80 % 98.96 % 97.81 % 96.21 % 98.46 % 98.46 % June 98.13 % 99.02 % 98.15 % 96.66 % 98.47 % 98.97 % July 98.32 % 98.17 % 98.16 % 96.79 % 98.31 % 98.67 % August 98.37 % 97.82 % 98.55 % 97.26 % 98.41 % 98.86 % September 98.59 % 98.59 % 98.69 % 97.28 % 98.21 % 98.89 % October 98.52 % 99.04 % 98.72 % 96.65 % 98.23 % 98.98 % November 98.49 % 98.69 % 98.73 % 97.90 % 98.20 % 98.88 % December 95.51 % 99.43 % 98.93 % 98.73 % 98.89 % 99.33 % Average 97.80 % 98.32 % 98.34 % 96.57 % 98.37 % 98.75 % The year 2003 QS table illustrate the challenge facing Delta team (low QS)
  • 4. Problem Analysis 4  We have 4 types of QS alarms represent Problem Elements. 1. MS: this is minimum service alarm and normally is due to payphone faults that is technician responsibility. 2. OOI: this is out of order incidence alarm and normally is due to payphone faults, that is technician responsibility also. 3. OOS: this is out of order supervisor alarm and normally is due to the exchange or the PMS faults, that is S/W or system responsibility. 4. NK: this is not connected alarm and normally is due to communication link between the payphone and the PMS is cut, that is line, cable, production, technician, Telecom Egypt network, or PMS responsibility.
  • 5. Problem Analysis 5  Using cause/effect fishbone analysis, the findings were : o 50 % due to PEOPLE. o 30 % due to PREVINTIVE MAINTINANCE. o 20 % due to P.M.S PERFORMANCE OOS (10%) NK (67%) PMS Exchanges 10% 5% People S/W PMS 27% Preventive Maintenance 5% 30% Installation QS Tools Skills People People Spare Parts Controlling MS (3%) OOI (20%)
  • 6. Problem Analysis 6 By using gap analysis to see the strength of available resources to execute the an effective solution. Items Menatel model Cairo Alex. Canal Delta MUE SUE Average Q.S 98 % 97.80 % 98.32 % 98.34 % 96.56 % 98.37 % 98.75 % Technicians 120 47 18 15 19 10 8 Vehicles 60 21 10 10 8 5 7 Exchange 480 93 62 63 88 54 35 Lines IO 30,000 12000 4739 4054 4150 2555 2150 Supervisors 10 4 3 2 1 2 3 Average calls 45 42 31 38 37 47 40 Tech./line 250 255.3 263.2 270.2 218.4 255.5 307.1 Tech./exch. 4 1.97 3.44 4.2 4.63 5.4 4.3 Veh./tech. 2 2.2 1.8 1.5 2.3 2 1.1 Veh./exch. 8 4.4 6.2 6.3 11 10.8 5 Sup./tech. 12 11.75 6 7.5 19 5 2.6 Tech. / Line Delta Sup. / Tech. MENATEL Model Tech. / Ex. Veh. / Ex. Veh. / Tech.
  • 7. Conclusion 7 Delta Business Unit is 1.43 % below the targeted Q.S (1,000,000 LE annual loss).  Cause : o 50 % due to PEOPLE. o 30 % due to PREVINTIVE MAINTINANCE. o 20 % due to P.M.S PERFORMANCE  Effects: o 67 % is (NK) incidences. o 20 % is (OOI) incidences. o 10 % is (OOS) incidences. o 3 % is (MS) incidences.
  • 8. Action Plan 8  People  replace the current maintenance supervisor with one that is more skilled in terms of time management and planning.  provide the necessary training to all the involved persons to in reach there skills. Program Name Duration Target Audience Objective Cost Basic Communication Understand the important of 2 Days All Levels 225 LE/day/person communications in the organization. Teamwork Getting around obstacles that prevent 1 Day All Levels 225 LE/day/person team success and build an effective team. Problem Solving Improving analysis skills for identifying 2 Days All Levels problems and recommending creative 225 LE/day/person solutions that help the organization. Customer Orientation 3 Days All Levels Understand customer satisfaction. 225 LE/day/person Negotiation Skills Understand the important of effective 2 Days Commercial persons 225 LE/day/person negotiation to the organization Supervisory Skills Understand the role of supervisor, 4 Days Supervisors understand people, how to manage 225 LE/day/person people. Service Quality Understand quality and quality process; 2 Days Technicians understand the important of customer 225 LE/day/person satisfaction.
  • 9. Action Plan 9  Preventive Maintenance  schedule technician’s time to cover different routes in Delta every 48 hours, and assigned a car per governorate.  Assign one of the technicians for workshop to be responsible for testing new and repaired spar parts, repairing faulty spar parts.  Design a process for quality operation Civil, Booth, P ayphone & Payphone Cleaning & Line PMS Line Maintenance & Booth Cabling Installing Spare Parts Maintenance Request Installing Received Quality Chick Quality Chick Quality Chick Quality Chick Quality Chick Quality Chick Quality Chick Test Test Test Test Test Test Test Reporting System Reporting System Reporting System Reporting System Deviation Control Reporting System
  • 10. Action Plan 10  PMS, performance.  The modem line should be 100 % isolated and effectively connected between the PMS and the modem to insure no miss communication.  All the illogical faulty payphones data are to be collected and reported directly to HQ to be analyzed and solved if possible.
  • 11. Results 11 Continues improvements of the process month by month, Delta QS average 2004 is 99.2%, above the targeted QS by 1.2%. Delta QS Delta QS Linear (Delta QS) 99.8 99.8 99.5 99.6 99.6 99.4 99.1 99.2 99 98.7 98.2 98.3 jan feb mar apr may jun jul aug sep oct nov dec
  • 12. Process Monitoring & insuring continues improvements 12  Weekly KPIs reporting system,  measures the QS related to each exchange and PMS according to alarms category (NK, OOI, OOS, and MS), and categorize the network to three categories: 1. More than 98 % 2. Less than 97 % 3. In between. Allows the branch to evaluate & measure weekly the QS operation output.  provide a guided figure as for the next week target for improving. matching the branch philosophy to improve step by step, bushing category B to A, and C to B, we are on the track to maintain Branch objective.