MIGUEL SOTO, BSME, MSSE
P
PROJECT MANAGEMENT
KEYS TO SUCCESSFUL PROJECT EXECUTION
A SOTO and SOTO Production
May 2013
CHAPTER 1
Successful Project Management
Project management is an accurate procedural
knowledge
impacted by unforeseen conditions and negligencies
that must be controlled.
CHAPTER 2
Is Project Success Uncertain?
No, project success is highly predictable;
however, in project management, there is always a
question of success and failure. What is in a project
that brings thoughts of failing outcomes? Uncertainty.
The most influential element for success is Education,
(knowledge, skills, and experience).
CHAPTER 3
Project Succeeds and Fails
Why should a project face a possibility of failure?
It does not seem logical, when a project evolves in a
physical environmental field, build with finite quantity
of material, definite resources and a set time;
Yet, it fails, sometimes.
CHAPTER 4
Can Failure be avoided?
Yes, of course.
Project failures can be prevented, reduced,
or eliminated.
It is feasible to run projects
on a clean course to success more often
than on a path to failure.
Failures can be anticipated, detected
and corrected on time.
CHAPTER 5
Can Project Success be guaranteed?
It seems that no Project Manager can
guaranty the success of a project,
but a Project Manager can manage it within a
predetermined contingency range.
Success depends on managing unforeseen
Conditions, activities and events.
CHAPTER 6
Unforeseen Conditions
How can a project manager assert
project execution success when
its life evolves surrounded with
unforeseen conditions and circumstances? True, but
PMs cannot planned unforeseen conditions,
thogh these are manageable in most cases.
PMs can only add approved contingencies to
the estimated cost and time variables.
CHAPERT 7
Project Contingencies
A contingency range in project is a percentage of cost
and time added to the project as recommended by
results of a careful risk analysis.
How much contingency should be allowed?
Contingencies should be determine
by the risk analysis based on statistical data.
CHAPTER 8
What are the Elements of Success?
Reasonable initial goals and criteria
Accurate Planning of the project life
Exacting assessment of cost and time
Logical project execution approach
Sufficient experienced human resources
Adequate added contingencies
Education, knowledge, skills, and experience.
CHAPTER 9
Can PM Guaranty Success?
The Project Manager can only
Promise bringing a project in time, budget
quality, and safety
within the set of contingencies
allocated to a project.
PM cannot promise an elimination of unforeseens.
CHAPTER 10
Is there a set Procedure for success?
Experienced project managers have integrated
successful procedures to run their projects, but
procedural differences may be small from one to the
other. However, project management procedures are
as effective as the way PMs apply them.
The following suggestions could be useful if followed
closely.
CHAPTER 11
Successful Execution: Step 1
 Develop one Project Work Breakdown Structure,
 Implementation activity sequence, for both task blocks,
estimating and scheduling.
 Involve responsible field managers and foremen in the
final development of the WBS;
 CEO or OM must sign off WBS
 Prepare the schedule and cost estimating matrix using the
WBS.
CHAPTER 12
Successful Execution: Step 2
Accurately estimate activity durations in the WBS
for ground-up estimating and baseline scheduling
(preliminary and final).
Involve responsible field managers and foremen in
the estimating of activity durations;
CEO, OM, or Sr. PM must sign off WBS.
CHAPTER 13
Successful Execution: Step 3
Develop the work-schedule based on the WBS and
estimate durations; logically link activities in the way
field personnel could execute the project.
Involve responsible field managers and foremen in
developing the logic project execution sequence;
CEO, OM, or Sr. PM must sign off WBS.
Test the critical path & baseline schedule
implementation (what if scenarios).
Perform a risk analysis on the baseline schedule.
Adjust activity durations and cost (hard and soft)
according to risk analysis result.
CHAPTER 14
Successful Execution: Step 4
Create a schedule for the procurement and delivery
of parts, materials and equipment according to the
Baseline Schedule (this could be integrated into the
BL).
Identify Long Lead items in the submittal matrix and
create the procurement and delivery schedule.
Control procurement deliveries schedule according
to the weekly look ahead schedule.
CHAPTER 15
Successful Execution: Step 5
Control the project execution from Daily reports
rather than monthly schedule progress reports.
Run planned vs. actual for activities included in
the daily report.
Determine activity having delays
Calculate time and cost at end of project, report
deviations
Take actions to recover activity delays.
CHAPTER 16
Successful Execution: Step 6
 Report time and costs deviations creating delays greater than
a set unit of time (days) as determined in the risk analysis.
 Run schedule what if scenario to determine time impact (in
and out of the critical path)
 Implement a responsive activity time recovery plan as
necessary
 Adjust (crew sizing and, or vertical or horizontal work time)
for increased productivity.
CHAPTER 17
Successful Execution: Step 7
Perform status projection for the weekly look ahead
schedule calculating the situation at end of project.
Calculate and report cost and time impact weekly
(critical and non critical path activities).
Perform montly calculation of a earned value
analysis, directed to maintain zero balance.
Implement a responsive activity time recovery plan
as necessary.
CHAPTER 18
Successful Execution: Step 8
Calculate time cost and time at end of project on a
monthly basis.
Analyze and report deviations and potential impacts
as they come up
Implement recovery actions immediately, when a
situations arrive.
Close all project cost accounts, paying last invoice.
Collect all documents for project close-out.
Miguel Angel Soto
Mike@Soto-and-Soto.com
Bachelor of Science in Mechanical Engineering
Master of Science in Systems Engineering
California Licensed General Contractor
Senior Project Manager, offers over 25 years of knowledge and experience in
engineering and construction project management. Mike specializes in project management
system setup, design development and execution. His experience emphasizes hands on
planning, structuring work breakdown, project controls; cost estimating and resource-cost
loaded scheduling. He has hands-on experience in bid and award cycles, including bid's
evaluation. Mike is well experienced in tools and methods; he has developed and implemented
project manuals, procedures for construction execution monitoring and control aimed at
delivering projects within expected time and budget. Mike has deep working knowledge and
experience of cost control setup, tracking and reporting. His has worked on rail transportation,
education K12 and K14 facilities, industrial, commercial, power plant, transmission and
distribution, sea port facilities, petroleum refinery plants.
He has ample knowledge and experience of project management software, Primavera
P6, Suretrack, Contract Management (previously Expedition), including the latest MS office,
power point and SQL database. He is result and detail oriented, well organized, with proven
performance in engineering and project management life cycle. He enjoys mentoring other
project managers and assisting construction field staff.

Weitere ähnliche Inhalte

Was ist angesagt?

Project Management in 12 Slides
Project Management in 12 SlidesProject Management in 12 Slides
Project Management in 12 Slides
Pam Pauley
 
Project Management Tools
Project Management ToolsProject Management Tools
Project Management Tools
ostephens
 

Was ist angesagt? (20)

Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful Projects
 
Key Concepts for Project Mgmt
Key Concepts for Project MgmtKey Concepts for Project Mgmt
Key Concepts for Project Mgmt
 
Importance of Project Management Basics Training
Importance of Project Management Basics TrainingImportance of Project Management Basics Training
Importance of Project Management Basics Training
 
Srae2014 - Construction Projects Risks from the Perspective of Project Manage...
Srae2014 - Construction Projects Risks from the Perspective of Project Manage...Srae2014 - Construction Projects Risks from the Perspective of Project Manage...
Srae2014 - Construction Projects Risks from the Perspective of Project Manage...
 
Immutable principles of project management (utah pmi)(v1)(no exercise)
Immutable principles of project management (utah pmi)(v1)(no exercise)Immutable principles of project management (utah pmi)(v1)(no exercise)
Immutable principles of project management (utah pmi)(v1)(no exercise)
 
Pmi rmp
Pmi rmpPmi rmp
Pmi rmp
 
Applying the checklist manifesto for project management success
Applying the checklist manifesto for project management successApplying the checklist manifesto for project management success
Applying the checklist manifesto for project management success
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
5 Basic Phases of Project Management
5 Basic Phases of Project Management 5 Basic Phases of Project Management
5 Basic Phases of Project Management
 
Managing Project Risks & Issues
Managing Project Risks & Issues Managing Project Risks & Issues
Managing Project Risks & Issues
 
From WBS to Integrated Master Schedule
From WBS to Integrated Master ScheduleFrom WBS to Integrated Master Schedule
From WBS to Integrated Master Schedule
 
Project Management in 12 Slides
Project Management in 12 SlidesProject Management in 12 Slides
Project Management in 12 Slides
 
Adaptive Project Management
Adaptive Project ManagementAdaptive Project Management
Adaptive Project Management
 
Self test engine PSP-PMI-SP
Self test engine PSP-PMI-SPSelf test engine PSP-PMI-SP
Self test engine PSP-PMI-SP
 
Risk adjusted engineering management
Risk adjusted engineering managementRisk adjusted engineering management
Risk adjusted engineering management
 
Project Management Tools
Project Management ToolsProject Management Tools
Project Management Tools
 
PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360
 
Basics of project management - Week 1
Basics of project management - Week 1Basics of project management - Week 1
Basics of project management - Week 1
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Session 10 gdas pmp study group presentation
Session 10   gdas pmp study group presentationSession 10   gdas pmp study group presentation
Session 10 gdas pmp study group presentation
 

Andere mochten auch

Presentation Of Human Evolution
Presentation Of Human EvolutionPresentation Of Human Evolution
Presentation Of Human Evolution
LuciaLopez86
 
Media Proj2
Media Proj2Media Proj2
Media Proj2
vonnecyh
 
SEO Overview for Berkshire Grains
SEO Overview for Berkshire GrainsSEO Overview for Berkshire Grains
SEO Overview for Berkshire Grains
jawallace
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value Management
Glen Alleman
 

Andere mochten auch (20)

Does God Exists Web quest
Does God Exists Web questDoes God Exists Web quest
Does God Exists Web quest
 
Presentation Of Human Evolution
Presentation Of Human EvolutionPresentation Of Human Evolution
Presentation Of Human Evolution
 
Does God exists webquest
Does God exists webquestDoes God exists webquest
Does God exists webquest
 
Does God exists webquest
Does God exists webquestDoes God exists webquest
Does God exists webquest
 
Media Proj2
Media Proj2Media Proj2
Media Proj2
 
SEO Overview for Berkshire Grains
SEO Overview for Berkshire GrainsSEO Overview for Berkshire Grains
SEO Overview for Berkshire Grains
 
Media Proj2 - Kiosk Project
Media Proj2 - Kiosk ProjectMedia Proj2 - Kiosk Project
Media Proj2 - Kiosk Project
 
How to minimize project failure?
How to minimize project failure? How to minimize project failure?
How to minimize project failure?
 
Reduce the risk of project failure with ISO 21500
 Reduce the risk of project failure with ISO 21500 Reduce the risk of project failure with ISO 21500
Reduce the risk of project failure with ISO 21500
 
Project Success
Project SuccessProject Success
Project Success
 
Pp success n failure project
Pp success n failure projectPp success n failure project
Pp success n failure project
 
Improve Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon TredgoldImprove Your Business Operations and Project Success with Gordon Tredgold
Improve Your Business Operations and Project Success with Gordon Tredgold
 
Project success post_implementation & management
Project success post_implementation & managementProject success post_implementation & management
Project success post_implementation & management
 
The Formula for Hadoop Project Success
The Formula for Hadoop Project SuccessThe Formula for Hadoop Project Success
The Formula for Hadoop Project Success
 
Increasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value ManagementIncreasing the probability of project success using Earned Value Management
Increasing the probability of project success using Earned Value Management
 
Altus Alliance 2016 - Project Success Begins with Management
Altus Alliance 2016 - Project Success Begins with ManagementAltus Alliance 2016 - Project Success Begins with Management
Altus Alliance 2016 - Project Success Begins with Management
 
Training Scope Creep Linked In
Training Scope Creep Linked InTraining Scope Creep Linked In
Training Scope Creep Linked In
 
Sagrada Familia Project as a Failure
Sagrada Familia Project as a FailureSagrada Familia Project as a Failure
Sagrada Familia Project as a Failure
 
9 Reasons Why Your ERP Project Was A Complete Failure
9 Reasons Why Your ERP Project Was A Complete Failure9 Reasons Why Your ERP Project Was A Complete Failure
9 Reasons Why Your ERP Project Was A Complete Failure
 
Project Success
Project SuccessProject Success
Project Success
 

Ähnlich wie Project success 123

Presentation by beebejan valiyakath
Presentation by beebejan valiyakathPresentation by beebejan valiyakath
Presentation by beebejan valiyakath
PMI_IREP_TP
 
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docxChapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
zebadiahsummers
 
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docxChapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
bartholomeocoombs
 
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docxChapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
cravennichole326
 
Auditing projects in the early stages.pdf
Auditing projects in the early stages.pdfAuditing projects in the early stages.pdf
Auditing projects in the early stages.pdf
Addisu15
 

Ähnlich wie Project success 123 (20)

UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project Life Cycle final.pptx
Project Life Cycle final.pptxProject Life Cycle final.pptx
Project Life Cycle final.pptx
 
Engineering Project Management
Engineering Project Management Engineering Project Management
Engineering Project Management
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Project management : Pert and Cpm
Project management : Pert and CpmProject management : Pert and Cpm
Project management : Pert and Cpm
 
Role and Responsibilities of Project Manager
Role and Responsibilities of Project ManagerRole and Responsibilities of Project Manager
Role and Responsibilities of Project Manager
 
Presentation by beebejan valiyakath
Presentation by beebejan valiyakathPresentation by beebejan valiyakath
Presentation by beebejan valiyakath
 
Increasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesIncreasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and Practices
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docxChapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
 
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docxChapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
 
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docxChapter 13Project Management and SDLCPrepared by Dr. D.docx
Chapter 13Project Management and SDLCPrepared by Dr. D.docx
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
Auditing projects in the early stages.pdf
Auditing projects in the early stages.pdfAuditing projects in the early stages.pdf
Auditing projects in the early stages.pdf
 
Module 2 Project & Program Management Cycle.pptx
Module 2 Project & Program Management Cycle.pptxModule 2 Project & Program Management Cycle.pptx
Module 2 Project & Program Management Cycle.pptx
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 
Lec-01 Project Planning & Management (Th.).pdf
Lec-01 Project Planning & Management (Th.).pdfLec-01 Project Planning & Management (Th.).pdf
Lec-01 Project Planning & Management (Th.).pdf
 

Mehr von Lilly Soto Vásquez. Universidad Pontificia de Salamanca, Universidad Galileo; Universidad Rafael Landívar y Universidad de San Carlos de Guatemala , Universidad Mariano Gálvez

Mehr von Lilly Soto Vásquez. Universidad Pontificia de Salamanca, Universidad Galileo; Universidad Rafael Landívar y Universidad de San Carlos de Guatemala , Universidad Mariano Gálvez (20)

Gabo y el sandinismo 88 parrafos-3316 palabras
Gabo y el sandinismo 88 parrafos-3316 palabrasGabo y el sandinismo 88 parrafos-3316 palabras
Gabo y el sandinismo 88 parrafos-3316 palabras
 
Informe sobre valoración del proyecto un genio malagueño
Informe sobre valoración del proyecto un genio malagueñoInforme sobre valoración del proyecto un genio malagueño
Informe sobre valoración del proyecto un genio malagueño
 
Estado de la ciencia2013
Estado de la ciencia2013Estado de la ciencia2013
Estado de la ciencia2013
 
Emblema docente conectado lilly soto vásquez
Emblema docente conectado lilly soto vásquezEmblema docente conectado lilly soto vásquez
Emblema docente conectado lilly soto vásquez
 
Actividades mooc centroamerica
Actividades mooc centroamerica Actividades mooc centroamerica
Actividades mooc centroamerica
 
Emblema mooc lilly
Emblema mooc  lillyEmblema mooc  lilly
Emblema mooc lilly
 
La infografía como recurso didáctico en el proceso de enseñanza
La infografía como recurso didáctico en  el proceso de enseñanzaLa infografía como recurso didáctico en  el proceso de enseñanza
La infografía como recurso didáctico en el proceso de enseñanza
 
226159s informe unesco enseñanza -aprendizaje
226159s informe unesco enseñanza -aprendizaje226159s informe unesco enseñanza -aprendizaje
226159s informe unesco enseñanza -aprendizaje
 
La importancia de los marcadores sociales y el filtrado de curación de conten...
La importancia de los marcadores sociales y el filtrado de curación de conten...La importancia de los marcadores sociales y el filtrado de curación de conten...
La importancia de los marcadores sociales y el filtrado de curación de conten...
 
La evolución de la presencia rusa en américa latina
La evolución de la presencia rusa en américa latinaLa evolución de la presencia rusa en américa latina
La evolución de la presencia rusa en américa latina
 
Duelo doble
Duelo dobleDuelo doble
Duelo doble
 
Informe mundial de las ciencias sociales
Informe mundial de las ciencias socialesInforme mundial de las ciencias sociales
Informe mundial de las ciencias sociales
 
La voluntad popular y la espiral del silencio en la nicaragua de hoy
La voluntad popular y la espiral del silencio en la nicaragua de hoyLa voluntad popular y la espiral del silencio en la nicaragua de hoy
La voluntad popular y la espiral del silencio en la nicaragua de hoy
 
Plantilla ple lilly soto
Plantilla ple lilly sotoPlantilla ple lilly soto
Plantilla ple lilly soto
 
Presentacion satgal 1 5-13
Presentacion satgal 1 5-13Presentacion satgal 1 5-13
Presentacion satgal 1 5-13
 
La Odisea por Nicaragua: compendio histórico y Plan Humanista de Nación
La Odisea por Nicaragua: compendio histórico y Plan Humanista de Nación La Odisea por Nicaragua: compendio histórico y Plan Humanista de Nación
La Odisea por Nicaragua: compendio histórico y Plan Humanista de Nación
 
Olimpia briceño de espinoza
Olimpia briceño de espinozaOlimpia briceño de espinoza
Olimpia briceño de espinoza
 
Relaciones entre política, estrategia y poder nacional
Relaciones entre política, estrategia y poder nacionalRelaciones entre política, estrategia y poder nacional
Relaciones entre política, estrategia y poder nacional
 
Control civil de las fuerzas armadas
Control civil de las fuerzas armadasControl civil de las fuerzas armadas
Control civil de las fuerzas armadas
 
National geographic photo_winners
National geographic photo_winnersNational geographic photo_winners
National geographic photo_winners
 

Kürzlich hochgeladen

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 

Kürzlich hochgeladen (20)

Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 

Project success 123

  • 1. MIGUEL SOTO, BSME, MSSE P PROJECT MANAGEMENT KEYS TO SUCCESSFUL PROJECT EXECUTION A SOTO and SOTO Production May 2013
  • 2. CHAPTER 1 Successful Project Management Project management is an accurate procedural knowledge impacted by unforeseen conditions and negligencies that must be controlled.
  • 3. CHAPTER 2 Is Project Success Uncertain? No, project success is highly predictable; however, in project management, there is always a question of success and failure. What is in a project that brings thoughts of failing outcomes? Uncertainty. The most influential element for success is Education, (knowledge, skills, and experience).
  • 4. CHAPTER 3 Project Succeeds and Fails Why should a project face a possibility of failure? It does not seem logical, when a project evolves in a physical environmental field, build with finite quantity of material, definite resources and a set time; Yet, it fails, sometimes.
  • 5. CHAPTER 4 Can Failure be avoided? Yes, of course. Project failures can be prevented, reduced, or eliminated. It is feasible to run projects on a clean course to success more often than on a path to failure. Failures can be anticipated, detected and corrected on time.
  • 6. CHAPTER 5 Can Project Success be guaranteed? It seems that no Project Manager can guaranty the success of a project, but a Project Manager can manage it within a predetermined contingency range. Success depends on managing unforeseen Conditions, activities and events.
  • 7. CHAPTER 6 Unforeseen Conditions How can a project manager assert project execution success when its life evolves surrounded with unforeseen conditions and circumstances? True, but PMs cannot planned unforeseen conditions, thogh these are manageable in most cases. PMs can only add approved contingencies to the estimated cost and time variables.
  • 8. CHAPERT 7 Project Contingencies A contingency range in project is a percentage of cost and time added to the project as recommended by results of a careful risk analysis. How much contingency should be allowed? Contingencies should be determine by the risk analysis based on statistical data.
  • 9. CHAPTER 8 What are the Elements of Success? Reasonable initial goals and criteria Accurate Planning of the project life Exacting assessment of cost and time Logical project execution approach Sufficient experienced human resources Adequate added contingencies Education, knowledge, skills, and experience.
  • 10. CHAPTER 9 Can PM Guaranty Success? The Project Manager can only Promise bringing a project in time, budget quality, and safety within the set of contingencies allocated to a project. PM cannot promise an elimination of unforeseens.
  • 11. CHAPTER 10 Is there a set Procedure for success? Experienced project managers have integrated successful procedures to run their projects, but procedural differences may be small from one to the other. However, project management procedures are as effective as the way PMs apply them. The following suggestions could be useful if followed closely.
  • 12. CHAPTER 11 Successful Execution: Step 1  Develop one Project Work Breakdown Structure,  Implementation activity sequence, for both task blocks, estimating and scheduling.  Involve responsible field managers and foremen in the final development of the WBS;  CEO or OM must sign off WBS  Prepare the schedule and cost estimating matrix using the WBS.
  • 13. CHAPTER 12 Successful Execution: Step 2 Accurately estimate activity durations in the WBS for ground-up estimating and baseline scheduling (preliminary and final). Involve responsible field managers and foremen in the estimating of activity durations; CEO, OM, or Sr. PM must sign off WBS.
  • 14. CHAPTER 13 Successful Execution: Step 3 Develop the work-schedule based on the WBS and estimate durations; logically link activities in the way field personnel could execute the project. Involve responsible field managers and foremen in developing the logic project execution sequence; CEO, OM, or Sr. PM must sign off WBS. Test the critical path & baseline schedule implementation (what if scenarios). Perform a risk analysis on the baseline schedule. Adjust activity durations and cost (hard and soft) according to risk analysis result.
  • 15. CHAPTER 14 Successful Execution: Step 4 Create a schedule for the procurement and delivery of parts, materials and equipment according to the Baseline Schedule (this could be integrated into the BL). Identify Long Lead items in the submittal matrix and create the procurement and delivery schedule. Control procurement deliveries schedule according to the weekly look ahead schedule.
  • 16. CHAPTER 15 Successful Execution: Step 5 Control the project execution from Daily reports rather than monthly schedule progress reports. Run planned vs. actual for activities included in the daily report. Determine activity having delays Calculate time and cost at end of project, report deviations Take actions to recover activity delays.
  • 17. CHAPTER 16 Successful Execution: Step 6  Report time and costs deviations creating delays greater than a set unit of time (days) as determined in the risk analysis.  Run schedule what if scenario to determine time impact (in and out of the critical path)  Implement a responsive activity time recovery plan as necessary  Adjust (crew sizing and, or vertical or horizontal work time) for increased productivity.
  • 18. CHAPTER 17 Successful Execution: Step 7 Perform status projection for the weekly look ahead schedule calculating the situation at end of project. Calculate and report cost and time impact weekly (critical and non critical path activities). Perform montly calculation of a earned value analysis, directed to maintain zero balance. Implement a responsive activity time recovery plan as necessary.
  • 19. CHAPTER 18 Successful Execution: Step 8 Calculate time cost and time at end of project on a monthly basis. Analyze and report deviations and potential impacts as they come up Implement recovery actions immediately, when a situations arrive. Close all project cost accounts, paying last invoice. Collect all documents for project close-out.
  • 20. Miguel Angel Soto Mike@Soto-and-Soto.com Bachelor of Science in Mechanical Engineering Master of Science in Systems Engineering California Licensed General Contractor Senior Project Manager, offers over 25 years of knowledge and experience in engineering and construction project management. Mike specializes in project management system setup, design development and execution. His experience emphasizes hands on planning, structuring work breakdown, project controls; cost estimating and resource-cost loaded scheduling. He has hands-on experience in bid and award cycles, including bid's evaluation. Mike is well experienced in tools and methods; he has developed and implemented project manuals, procedures for construction execution monitoring and control aimed at delivering projects within expected time and budget. Mike has deep working knowledge and experience of cost control setup, tracking and reporting. His has worked on rail transportation, education K12 and K14 facilities, industrial, commercial, power plant, transmission and distribution, sea port facilities, petroleum refinery plants. He has ample knowledge and experience of project management software, Primavera P6, Suretrack, Contract Management (previously Expedition), including the latest MS office, power point and SQL database. He is result and detail oriented, well organized, with proven performance in engineering and project management life cycle. He enjoys mentoring other project managers and assisting construction field staff.