SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
Mafikeng
                                                                        Industrial Development Zone (Pty) Ltd




MAFIKENG INDUSTRIAL DEVELOPMENT ZONE, MAFIKENG, NORTH WEST, RSA

The Mafikeng Industrial Development Zone (MIDZ) is a purpose-built industrial park estate
linked to the Mafikeng International Airport (MIA) as its international airport of entry. It is
being watched with great interest by investors, who regard Mafikeng as a strategically located
gateway to the SADC region.

Anchor projects at the MIDZ include an agricultural park, minerals park and trading floor, all
linked to the MIA’s Customs Secure Area, which is designated for the purposes of encouraging
export manufacturing. The Mafikeng International Airport is promoted as a hub for non-
scheduled international air cargo services.

The strategic intent of the program is to facilitate and coordinate the industrial development of
Mafikeng and its surrounding areas by designing, building, operating and managing a world-
class industrial development zone.

The investment theme and sectoral investment program of the IDZ is for the MIDZ to become a
world-class hub for the manufacturing of hi-tech electronic components and systems, mineral
beneficiation and processing of agricultural products. it is also intended that the MIDZ will
support increased research and development in new technology.

The MIDZ will also be used to promote a more equitable geographic spread of economic
activity. Mafikeng would like to be the first rural IDZ and the first rural dry port connecting the
SADC states on a north-south and east-west axis. It will also open up economic opportunities for
the drier western side of South Africa. Mafikeng’s location makes it perfect for the job: it is
240km from Johannesburg and only 45km from the Botswana border, and it links South Africa’s
N14 highway at Vryburg with the N4 at Zeerust.

Infrastructure

In terms of physical infrastructure there are three distinct areas of development at the MIDZ:

      The western side, including the IDZ, container park, minerals cluster building, aviation
       support services and the airport terminal
      The eastern side, set aside for aviation training, aviation maintenance and an export hub
       for livestock and game
      Lokaleng, which includes the petroleum cluster, bulk stone staging area and new railway
       station

Work on the infrastructure (more than R105 million) for the MIDZ had been successfully
completed, and there exists now 50 sites fully serviced with the necessary municipal reticulation.


                                                                                             1|P a ge
Mafikeng International Airport

The expansion and refurbishment of the MIA is also at an advanced stage. It has undergone
extensive renovation to its terminal buildings and surrounding infrastructure, and today stands as
one of the best-looking airports in South Africa. Its runway is the sixth longest runway in the
world and is the fourth longest runway in Africa. These facilities have already generated a great
deal of interest from the aviation field and the airport has hosted various international aviation
events. The airport also hosts the annual Mafikeng International Airshow.

Management and Organizational Structure:

Currently the airport management falls under the Department of Public Works, Roads and
Transport (Directorate: Public Freight and Transport)

The airport is operated in accordance with internationally accepted norms and standards set
down by the International Civil Aviation Authority (ICAO)
Runway:

The runway orientation, 04-22, is 4500 meters long, 45 meters wide with 7,5 meters shoulders

Apron and Taxiways:

 The necessary taxiways (23meters wide with 10,5 meters shoulders, link the runway and apron
at the airport terminal building and the former air force base now used as an aviation school.
Specifications and markings although in need of remarking, confirm with International standards
stipulated in annexure 14 of the Chicago Convention of 1944.
Buildings:

The facilities at Mafikeng Airport consist of:

      main terminal building
      technical block
      fire station
      water tower and pump house
      electricity – standby power center
      maintenance workshops
      general aviation hangars and apron
      technical hangars, training academy and accommodation block(old air force base) with
       separate apron
      aero club buildings




                                                                                        2|P a ge
International Status

In 2005 an application was made to National Cabinet to return the International Status from
Pilanesburg International Airport to Mafikeng Airport. In 2008 Cabinet made the decision to
return the International status to Mafikeng Airport subject to the condition that the status must
remain with Pilanesburg Airport until the end of the 2010 FIFA World cup with the condition
that the Department must support Pilanesburg with this event.

The World Cup has passed, and Mafikeng Airport is now an International Airport, but not an
international port of entry.

For the Airport to be an International Port of entry it must be issued with an international port of
entry license. Getting this license is subject to meeting a list of requirements as set out by the
Border Control Operations Coordinating Committee (BCOCC).

The department is currently addressing this list of requirements. Once the requirements are met,
Mafikeng International Airport will be issued with a license to operate as an International Port of
Entry.

Pilanesburg Airport will then be converted into a Regional Airport.



PROJECTS FOR THE MIDZ

   a. Logistic Hub/Freight
          The possibility to establish a Logistic Support Base for the United Nations relief
             operations into Africa.
          Possibility to establish a logistic and supply chain hub, transporting raw material
             into and out of the IDZ (Road & Air Transportation).

   b. Industrial Sites
          Seven (7) fully serviced industrial sites (measuring 2600m2 each) could be made
             available for development of superstructure on concessionary basis.

   c. Food processing & Cold storage Facilities
          Construction and operation of food processing and cold storage facilities, which
            could be rented out to exporters and importers of perishable goods, e.g.
            vegetables, fish, meat and meat products, etc.

   d. Container Park
          Operate a Container Park within a Custom Control Area (CCA), inclusive of
            container manufacturing and repairs.

                                                                                          3|P a ge
e. Bonded Warehouse
          Operate a bonded warehouse as a distribution point of household, industrial and
           agricultural equipments into Africa.

   f. Office Park
          Construction of a state-of-the-art Office Park, which would house MIDZ offices,
             SARS, SAPS, Home Affairs, etc.

   g. Hotel & Conference Facility
      Possibilities of establishing a hotel within the precincts of the IDZ.

   h. Sporting Complex (Corporate Social Responsibility Program)
    A Social responsibility Project to construct a Sporting Complex which among others will
      house the following sporting codes: Tennis; Soccer; Cricket; Golf; Horse Riding etc. It
      would also have food courts.

   i. Business & Trade Centre
    Establishment of a one-stop business and trade hub to enable business export success by
      providing, sustainable and inclusive trade and development solutions to all businesses
      and trade support institutions.

   j. Game & Livestock Handling Facility
    Facilities for Game & Livestock intended for export/import.
    Auctioneering of game as well.

   k. Fuel Depot/ Fuel Farm
    Fuel depot for both local and export market.
    Fuel could be railed in and out of the Fuel Farm.



TOURISM PROJECTs

a. Lotlamoreng Dam Developments

The project involves the construction of the following:

     Cultural Village with amenities
After intensive community and professional stakeholders meeting and input workshop the
following concept came to light, to redevelop the cultural village into a self catering
accommodation facility with an 80% Tswana background and a 20% combined cultural
background made up from the rest of the South African cultures. The cultural village will also

                                                                                    4|P a ge
provide Mafikeng with the dear needed accommodation facilities and introduce working
opportunities for the local people of the area. There will also be specific stands/units allocated to
local craftsmen to sell artifact to the visiting tourist. There will be adequate parking provided
along the main road driving through the cultural village for visitor staying in the cultural village.
A tribal Kgotla in the shape of a small amphitheater will be provided for local tribal dancing or
shows as a mains for entertainment to visitors.

     Office Park
There was provision made for commercial facilities specifically offices (Two office building
close to the main entrance of approx 1200m² in extent) for part of a greater harmonious whole.
These facilities will provide for the great need for office rental space for both the private sector
and the public sector by means of a long term lease.

      Accommodation (Lodging) & Ablution Facilities
It is proposed to provide a residential lodge and camping facilities to the north of the property,
which will further provide for the accommodation need in Mafikeng. The lodge will have an
internal restaurant and entertainment facilities, there will also be provision for tent camps and
caravan stands. The lodge will be managed by an Investing company on a 99 year lease
agreement.

      Restaurant & Gazebo
There was provided for a restaurant close to the waterfront of the dam. The idea behind the
location of the restaurant is to enjoy the splendor of the natural beauty of the surrounding area to
its full potential (The restaurant and entertainment area extend over approx 300m²).

     Kiosks
Kiosks will strategically be provided as fast food vendors when moving between restaurants on
the interlinked pathways.

      Musical and Educational
It is intended to provide a natural slope amphitheater design with a stand allocated to the stage
and seating arrangement for up to 30,000 people. The seating arrangement will face the dam to
the north east. There will also be made provision for small braai areas at selected spots in the
natural amphitheater. The current lecture hall and educational centre will be refurbished
according to the building style of the greater development (Thatched roofs, new facade etc.).

     Recreational Facilities
There will be several recreation facilities created for the community residing in close proximity
to Lotlamoreng Dam. It is proposed to start-off with picnic and braai areas strategically situated
in the whole area, also to provide for canoeing jetties and a soccer, volleyball & Tennis court. A
site was identified for an Investor to implement a water world theme park, which will include
waterslides, swimming pools etc. To determine whether this option is viable will need further in
detail assessment.

                                                                                          5|P a ge
b. The Bloemhof Dam Developments
The Bloemhof Dam is one of the largest dams in South Africa, covering an area of some 25 000
ha and reaching over 100 km upstream from the dam wall. The dam lies between the North West
and Free State Provinces and is fed by the Vaal River and the Vet River. Six broad development
initiatives are proposed:
      Golf course with clubhouse,
      Hunting camp/Youth camp,
      Recreational activities for day-visitors,
      Hospitality facilities;
      Angling facilities;
      Harbor and surface water use.


The following present the details for development at the Bloemhof Dam:

      Conference facility
          o 30 chalets
          o Accommodating 60 people
          o 4 bed/ 2 bed chalets
          o Conference centre accommodating 120 people
          o Kitchen / catering facility
          o Restrooms

      Hydro-spa
         o 10 chalets
         o 2 bed chalets

      Hunting Camp / Youth camp / Team building venue
         o 20 chalets
         o Accommodating 30 or 60 people
         o 4 bed / 6 bed chalets
         o 24 single beds, remainder bunk beds
         o Area has existing kitchen facility
         o Area has existing accommodation for 18 people (needs to be upgraded to 30 or
             60)
         o Area has existing boma area

      Main resort
      150 chalets, of which:
          o ~ 20 chalets to be 2 bed / 4 bed
          o ~ 30 chalets to be 12 bed
          o ~ 50 chalets to be 8 bed
          o ~ 50 chalets to be 4 bed / 6 bed




                                                                                    6|P a ge
   Day visitor area
       o 10 ablution blocks, accommodating 200 people each for a total of 2000
       o General use hall (for e.g. aerobics)
       o Small rentable buildings for fast foods and/ or agricultural showground’s
       o Animal pens for agricultural show – holds 100 animals in pens of 2 to 5 animals
       o Picnic spots with braai – 100 places
       o Roof Lapa areas close to ablution – 5 with water and electricity

   Water entertainment area – close to but separate from general picnic areas
      o Water entertainment facility for approximately 200 people - similar to Splash at
          Centurion
      o 100 caravans to be accommodated
      o Ablution facilities for 400 – 600 people (showers & toilets)
      o Small retail area

   Jetties
        o 2 jetties at the harbor
        o 1 jetty at main fishing area
        o 1 jetty at conference area

   Main entrance
      o Entrance gate with roof
      o Restroom
      o ± 100m2

   Golf area
       o 18 hole golf course
       o Club house
       o Restaurant
       o Swimming pool
       o Tennis court

   Landing strip
       o 1,8m long
       o constructed of gravel
       o Shade net structure to accommodate 4 small aircraft
       o No fuelling facilities

   Fish farming & processing
       o Slanted concrete cleaning table with roof/ shade net

   Harbour
       o Accommodating for large motorboats & trailers
       o 20 mooring points
       o Restaurant
       o Booze-cruise opportunity

                                                                                7|P a ge
   Approximate number of visitors:
      o ~ Every weekend: ± 400 people
      o ~ 8 x per year: ± 500 - 1000 people
      o ~ 2 x per year: ± 2000 people
      o ~ 1 x per year: ± 5000 people




                                              8|P a ge

Weitere ähnliche Inhalte

Was ist angesagt?

Dubai World Central Business park presentation
Dubai World Central Business park presentationDubai World Central Business park presentation
Dubai World Central Business park presentationShivani Tannir
 
Mon Tresor smart city
Mon Tresor smart city Mon Tresor smart city
Mon Tresor smart city Mon Tresor
 
15 of the Most Notable Ahmadiah Portfolio Projects in Kuwait
15 of the Most Notable Ahmadiah Portfolio Projects in Kuwait15 of the Most Notable Ahmadiah Portfolio Projects in Kuwait
15 of the Most Notable Ahmadiah Portfolio Projects in KuwaitDr. Ehsan Bayat
 
MIDZ Presentation - Ready For Take Off
MIDZ Presentation - Ready For Take OffMIDZ Presentation - Ready For Take Off
MIDZ Presentation - Ready For Take Offldavids
 
Randhill Singh - Session 1: Understanding the Importance of Stakeholder Align...
Randhill Singh - Session 1: Understanding the Importance of Stakeholder Align...Randhill Singh - Session 1: Understanding the Importance of Stakeholder Align...
Randhill Singh - Session 1: Understanding the Importance of Stakeholder Align...Global Airport Cities
 

Was ist angesagt? (8)

Dubai World Central Business park presentation
Dubai World Central Business park presentationDubai World Central Business park presentation
Dubai World Central Business park presentation
 
Mon Tresor smart city
Mon Tresor smart city Mon Tresor smart city
Mon Tresor smart city
 
15 of the Most Notable Ahmadiah Portfolio Projects in Kuwait
15 of the Most Notable Ahmadiah Portfolio Projects in Kuwait15 of the Most Notable Ahmadiah Portfolio Projects in Kuwait
15 of the Most Notable Ahmadiah Portfolio Projects in Kuwait
 
Free Zone Nouadhibou Mauritania
Free Zone Nouadhibou MauritaniaFree Zone Nouadhibou Mauritania
Free Zone Nouadhibou Mauritania
 
MIDZ Presentation - Ready For Take Off
MIDZ Presentation - Ready For Take OffMIDZ Presentation - Ready For Take Off
MIDZ Presentation - Ready For Take Off
 
Randhill Singh - Session 1: Understanding the Importance of Stakeholder Align...
Randhill Singh - Session 1: Understanding the Importance of Stakeholder Align...Randhill Singh - Session 1: Understanding the Importance of Stakeholder Align...
Randhill Singh - Session 1: Understanding the Importance of Stakeholder Align...
 
RAMI EL HACHEM
RAMI EL HACHEMRAMI EL HACHEM
RAMI EL HACHEM
 
Martinair
MartinairMartinair
Martinair
 

Ähnlich wie Midz Projects

Bintan Industrial Estate E-brochure.pdf (Latest)
Bintan Industrial Estate E-brochure.pdf (Latest)Bintan Industrial Estate E-brochure.pdf (Latest)
Bintan Industrial Estate E-brochure.pdf (Latest)Jeremy Chen
 
The West African development project (English)
The West African development project (English)The West African development project (English)
The West African development project (English)HUNG LIN HUANG
 
Polaris international industrial parks , october City , Giza
Polaris international industrial parks , october City , GizaPolaris international industrial parks , october City , Giza
Polaris international industrial parks , october City , GizaZayed Home
 
Agriculture Opportunities.pdf123
Agriculture Opportunities.pdf123Agriculture Opportunities.pdf123
Agriculture Opportunities.pdf123Mwape Mulila
 
경제자유구역 리플렛 (영문)
경제자유구역 리플렛 (영문)경제자유구역 리플렛 (영문)
경제자유구역 리플렛 (영문)Kihwan Song
 
Africa Singapore Business Forum 2018 | Ghana
Africa Singapore Business Forum 2018 | GhanaAfrica Singapore Business Forum 2018 | Ghana
Africa Singapore Business Forum 2018 | GhanaEnterprise Singapore
 
Sustainable Complex Mar de Cortez.pdf
Sustainable Complex Mar de Cortez.pdfSustainable Complex Mar de Cortez.pdf
Sustainable Complex Mar de Cortez.pdfjoseluissomalo1
 
Dube agri zone call for proposals 2016
Dube agri zone   call for proposals 2016Dube agri zone   call for proposals 2016
Dube agri zone call for proposals 2016Abius Akwaake
 
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...IOSR Journals
 
All about KIZAD | Khalifa Industrial Zone, Abu Dhabi
All about KIZAD | Khalifa Industrial Zone, Abu DhabiAll about KIZAD | Khalifa Industrial Zone, Abu Dhabi
All about KIZAD | Khalifa Industrial Zone, Abu DhabiNR Doshi and Partners
 
SIDC Presentation
SIDC PresentationSIDC Presentation
SIDC Presentationghadakotb
 
Major projects WA presentation outer harbour
Major projects WA presentation outer harbourMajor projects WA presentation outer harbour
Major projects WA presentation outer harbourCameron Edwards 北极熊
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart CityMon Tresor
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart CityMon Tresor
 
Mon tersor smart city mauritius
Mon tersor smart city mauritiusMon tersor smart city mauritius
Mon tersor smart city mauritiusMon Tresor
 

Ähnlich wie Midz Projects (20)

Dtpc and action miit brochure
Dtpc and action miit brochureDtpc and action miit brochure
Dtpc and action miit brochure
 
Bintan Industrial Estate E-brochure.pdf (Latest)
Bintan Industrial Estate E-brochure.pdf (Latest)Bintan Industrial Estate E-brochure.pdf (Latest)
Bintan Industrial Estate E-brochure.pdf (Latest)
 
The West African development project (English)
The West African development project (English)The West African development project (English)
The West African development project (English)
 
Polaris international industrial parks , october City , Giza
Polaris international industrial parks , october City , GizaPolaris international industrial parks , october City , Giza
Polaris international industrial parks , october City , Giza
 
Oasis of calm
Oasis of calmOasis of calm
Oasis of calm
 
Dube trade port property brochure 2014 (for email)
Dube trade port   property brochure 2014 (for email)Dube trade port   property brochure 2014 (for email)
Dube trade port property brochure 2014 (for email)
 
Agriculture Opportunities.pdf123
Agriculture Opportunities.pdf123Agriculture Opportunities.pdf123
Agriculture Opportunities.pdf123
 
경제자유구역 리플렛 (영문)
경제자유구역 리플렛 (영문)경제자유구역 리플렛 (영문)
경제자유구역 리플렛 (영문)
 
Africa Singapore Business Forum 2018 | Ghana
Africa Singapore Business Forum 2018 | GhanaAfrica Singapore Business Forum 2018 | Ghana
Africa Singapore Business Forum 2018 | Ghana
 
Sustainable Complex Mar de Cortez.pdf
Sustainable Complex Mar de Cortez.pdfSustainable Complex Mar de Cortez.pdf
Sustainable Complex Mar de Cortez.pdf
 
Dube agri zone call for proposals 2016
Dube agri zone   call for proposals 2016Dube agri zone   call for proposals 2016
Dube agri zone call for proposals 2016
 
Kizad
Kizad Kizad
Kizad
 
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
Measurement of Efficiency Level in Nigerian Seaport after Reform Policy Imple...
 
All about KIZAD | Khalifa Industrial Zone, Abu Dhabi
All about KIZAD | Khalifa Industrial Zone, Abu DhabiAll about KIZAD | Khalifa Industrial Zone, Abu Dhabi
All about KIZAD | Khalifa Industrial Zone, Abu Dhabi
 
SIDC Presentation
SIDC PresentationSIDC Presentation
SIDC Presentation
 
invester guide
invester guide invester guide
invester guide
 
Major projects WA presentation outer harbour
Major projects WA presentation outer harbourMajor projects WA presentation outer harbour
Major projects WA presentation outer harbour
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart City
 
Mon Tresor Smart City
Mon Tresor Smart CityMon Tresor Smart City
Mon Tresor Smart City
 
Mon tersor smart city mauritius
Mon tersor smart city mauritiusMon tersor smart city mauritius
Mon tersor smart city mauritius
 

Midz Projects

  • 1. Mafikeng Industrial Development Zone (Pty) Ltd MAFIKENG INDUSTRIAL DEVELOPMENT ZONE, MAFIKENG, NORTH WEST, RSA The Mafikeng Industrial Development Zone (MIDZ) is a purpose-built industrial park estate linked to the Mafikeng International Airport (MIA) as its international airport of entry. It is being watched with great interest by investors, who regard Mafikeng as a strategically located gateway to the SADC region. Anchor projects at the MIDZ include an agricultural park, minerals park and trading floor, all linked to the MIA’s Customs Secure Area, which is designated for the purposes of encouraging export manufacturing. The Mafikeng International Airport is promoted as a hub for non- scheduled international air cargo services. The strategic intent of the program is to facilitate and coordinate the industrial development of Mafikeng and its surrounding areas by designing, building, operating and managing a world- class industrial development zone. The investment theme and sectoral investment program of the IDZ is for the MIDZ to become a world-class hub for the manufacturing of hi-tech electronic components and systems, mineral beneficiation and processing of agricultural products. it is also intended that the MIDZ will support increased research and development in new technology. The MIDZ will also be used to promote a more equitable geographic spread of economic activity. Mafikeng would like to be the first rural IDZ and the first rural dry port connecting the SADC states on a north-south and east-west axis. It will also open up economic opportunities for the drier western side of South Africa. Mafikeng’s location makes it perfect for the job: it is 240km from Johannesburg and only 45km from the Botswana border, and it links South Africa’s N14 highway at Vryburg with the N4 at Zeerust. Infrastructure In terms of physical infrastructure there are three distinct areas of development at the MIDZ:  The western side, including the IDZ, container park, minerals cluster building, aviation support services and the airport terminal  The eastern side, set aside for aviation training, aviation maintenance and an export hub for livestock and game  Lokaleng, which includes the petroleum cluster, bulk stone staging area and new railway station Work on the infrastructure (more than R105 million) for the MIDZ had been successfully completed, and there exists now 50 sites fully serviced with the necessary municipal reticulation. 1|P a ge
  • 2. Mafikeng International Airport The expansion and refurbishment of the MIA is also at an advanced stage. It has undergone extensive renovation to its terminal buildings and surrounding infrastructure, and today stands as one of the best-looking airports in South Africa. Its runway is the sixth longest runway in the world and is the fourth longest runway in Africa. These facilities have already generated a great deal of interest from the aviation field and the airport has hosted various international aviation events. The airport also hosts the annual Mafikeng International Airshow. Management and Organizational Structure: Currently the airport management falls under the Department of Public Works, Roads and Transport (Directorate: Public Freight and Transport) The airport is operated in accordance with internationally accepted norms and standards set down by the International Civil Aviation Authority (ICAO) Runway: The runway orientation, 04-22, is 4500 meters long, 45 meters wide with 7,5 meters shoulders Apron and Taxiways: The necessary taxiways (23meters wide with 10,5 meters shoulders, link the runway and apron at the airport terminal building and the former air force base now used as an aviation school. Specifications and markings although in need of remarking, confirm with International standards stipulated in annexure 14 of the Chicago Convention of 1944. Buildings: The facilities at Mafikeng Airport consist of:  main terminal building  technical block  fire station  water tower and pump house  electricity – standby power center  maintenance workshops  general aviation hangars and apron  technical hangars, training academy and accommodation block(old air force base) with separate apron  aero club buildings 2|P a ge
  • 3. International Status In 2005 an application was made to National Cabinet to return the International Status from Pilanesburg International Airport to Mafikeng Airport. In 2008 Cabinet made the decision to return the International status to Mafikeng Airport subject to the condition that the status must remain with Pilanesburg Airport until the end of the 2010 FIFA World cup with the condition that the Department must support Pilanesburg with this event. The World Cup has passed, and Mafikeng Airport is now an International Airport, but not an international port of entry. For the Airport to be an International Port of entry it must be issued with an international port of entry license. Getting this license is subject to meeting a list of requirements as set out by the Border Control Operations Coordinating Committee (BCOCC). The department is currently addressing this list of requirements. Once the requirements are met, Mafikeng International Airport will be issued with a license to operate as an International Port of Entry. Pilanesburg Airport will then be converted into a Regional Airport. PROJECTS FOR THE MIDZ a. Logistic Hub/Freight  The possibility to establish a Logistic Support Base for the United Nations relief operations into Africa.  Possibility to establish a logistic and supply chain hub, transporting raw material into and out of the IDZ (Road & Air Transportation). b. Industrial Sites  Seven (7) fully serviced industrial sites (measuring 2600m2 each) could be made available for development of superstructure on concessionary basis. c. Food processing & Cold storage Facilities  Construction and operation of food processing and cold storage facilities, which could be rented out to exporters and importers of perishable goods, e.g. vegetables, fish, meat and meat products, etc. d. Container Park  Operate a Container Park within a Custom Control Area (CCA), inclusive of container manufacturing and repairs. 3|P a ge
  • 4. e. Bonded Warehouse  Operate a bonded warehouse as a distribution point of household, industrial and agricultural equipments into Africa. f. Office Park  Construction of a state-of-the-art Office Park, which would house MIDZ offices, SARS, SAPS, Home Affairs, etc. g. Hotel & Conference Facility Possibilities of establishing a hotel within the precincts of the IDZ. h. Sporting Complex (Corporate Social Responsibility Program)  A Social responsibility Project to construct a Sporting Complex which among others will house the following sporting codes: Tennis; Soccer; Cricket; Golf; Horse Riding etc. It would also have food courts. i. Business & Trade Centre  Establishment of a one-stop business and trade hub to enable business export success by providing, sustainable and inclusive trade and development solutions to all businesses and trade support institutions. j. Game & Livestock Handling Facility  Facilities for Game & Livestock intended for export/import.  Auctioneering of game as well. k. Fuel Depot/ Fuel Farm  Fuel depot for both local and export market.  Fuel could be railed in and out of the Fuel Farm. TOURISM PROJECTs a. Lotlamoreng Dam Developments The project involves the construction of the following:  Cultural Village with amenities After intensive community and professional stakeholders meeting and input workshop the following concept came to light, to redevelop the cultural village into a self catering accommodation facility with an 80% Tswana background and a 20% combined cultural background made up from the rest of the South African cultures. The cultural village will also 4|P a ge
  • 5. provide Mafikeng with the dear needed accommodation facilities and introduce working opportunities for the local people of the area. There will also be specific stands/units allocated to local craftsmen to sell artifact to the visiting tourist. There will be adequate parking provided along the main road driving through the cultural village for visitor staying in the cultural village. A tribal Kgotla in the shape of a small amphitheater will be provided for local tribal dancing or shows as a mains for entertainment to visitors.  Office Park There was provision made for commercial facilities specifically offices (Two office building close to the main entrance of approx 1200m² in extent) for part of a greater harmonious whole. These facilities will provide for the great need for office rental space for both the private sector and the public sector by means of a long term lease.  Accommodation (Lodging) & Ablution Facilities It is proposed to provide a residential lodge and camping facilities to the north of the property, which will further provide for the accommodation need in Mafikeng. The lodge will have an internal restaurant and entertainment facilities, there will also be provision for tent camps and caravan stands. The lodge will be managed by an Investing company on a 99 year lease agreement.  Restaurant & Gazebo There was provided for a restaurant close to the waterfront of the dam. The idea behind the location of the restaurant is to enjoy the splendor of the natural beauty of the surrounding area to its full potential (The restaurant and entertainment area extend over approx 300m²).  Kiosks Kiosks will strategically be provided as fast food vendors when moving between restaurants on the interlinked pathways.  Musical and Educational It is intended to provide a natural slope amphitheater design with a stand allocated to the stage and seating arrangement for up to 30,000 people. The seating arrangement will face the dam to the north east. There will also be made provision for small braai areas at selected spots in the natural amphitheater. The current lecture hall and educational centre will be refurbished according to the building style of the greater development (Thatched roofs, new facade etc.).  Recreational Facilities There will be several recreation facilities created for the community residing in close proximity to Lotlamoreng Dam. It is proposed to start-off with picnic and braai areas strategically situated in the whole area, also to provide for canoeing jetties and a soccer, volleyball & Tennis court. A site was identified for an Investor to implement a water world theme park, which will include waterslides, swimming pools etc. To determine whether this option is viable will need further in detail assessment. 5|P a ge
  • 6. b. The Bloemhof Dam Developments The Bloemhof Dam is one of the largest dams in South Africa, covering an area of some 25 000 ha and reaching over 100 km upstream from the dam wall. The dam lies between the North West and Free State Provinces and is fed by the Vaal River and the Vet River. Six broad development initiatives are proposed:  Golf course with clubhouse,  Hunting camp/Youth camp,  Recreational activities for day-visitors,  Hospitality facilities;  Angling facilities;  Harbor and surface water use. The following present the details for development at the Bloemhof Dam:  Conference facility o 30 chalets o Accommodating 60 people o 4 bed/ 2 bed chalets o Conference centre accommodating 120 people o Kitchen / catering facility o Restrooms  Hydro-spa o 10 chalets o 2 bed chalets  Hunting Camp / Youth camp / Team building venue o 20 chalets o Accommodating 30 or 60 people o 4 bed / 6 bed chalets o 24 single beds, remainder bunk beds o Area has existing kitchen facility o Area has existing accommodation for 18 people (needs to be upgraded to 30 or 60) o Area has existing boma area  Main resort  150 chalets, of which: o ~ 20 chalets to be 2 bed / 4 bed o ~ 30 chalets to be 12 bed o ~ 50 chalets to be 8 bed o ~ 50 chalets to be 4 bed / 6 bed 6|P a ge
  • 7. Day visitor area o 10 ablution blocks, accommodating 200 people each for a total of 2000 o General use hall (for e.g. aerobics) o Small rentable buildings for fast foods and/ or agricultural showground’s o Animal pens for agricultural show – holds 100 animals in pens of 2 to 5 animals o Picnic spots with braai – 100 places o Roof Lapa areas close to ablution – 5 with water and electricity  Water entertainment area – close to but separate from general picnic areas o Water entertainment facility for approximately 200 people - similar to Splash at Centurion o 100 caravans to be accommodated o Ablution facilities for 400 – 600 people (showers & toilets) o Small retail area  Jetties o 2 jetties at the harbor o 1 jetty at main fishing area o 1 jetty at conference area  Main entrance o Entrance gate with roof o Restroom o ± 100m2  Golf area o 18 hole golf course o Club house o Restaurant o Swimming pool o Tennis court  Landing strip o 1,8m long o constructed of gravel o Shade net structure to accommodate 4 small aircraft o No fuelling facilities  Fish farming & processing o Slanted concrete cleaning table with roof/ shade net  Harbour o Accommodating for large motorboats & trailers o 20 mooring points o Restaurant o Booze-cruise opportunity 7|P a ge
  • 8. Approximate number of visitors: o ~ Every weekend: ± 400 people o ~ 8 x per year: ± 500 - 1000 people o ~ 2 x per year: ± 2000 people o ~ 1 x per year: ± 5000 people 8|P a ge