Technical Report
(To investigate the structural condition of the commercial bank building at the intersection of the pool)
Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
Beneficiary: Commercial Bank
Issue/ 615
Implementing agency (examination and evaluation): Al-Waha Tower Company for Trade and General Contracting / the consulting engineering cadre and the cadres
of the approved structural laboratory
Date of preparation of the report: Sunday, 2021-JUNE-20
Total project duration:
Four months (120 working days) only.
Project location: Baghdad Governorate, near the intersection of Al-Masbah - Al-Arasat
Project name: Construction investigation project - repair - and reinforcement for the building of the Commercial Bank in Eastern Karada
(not yet approved)
Estimated project cost:
Representative of the implementing agency for the restoration: SOLUTIONS ENGINEERING ALPHA
Responsible for the restoration (constructive): SOLUTIONS ENGINEERING ALPHA
Kamal Abdel Hamid, representative of the beneficiary: Eng.
Date/06/20/2021
Machine Translated by Google
Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
Asserted Structural Laboratory Sampling Collecting, Assesment,
Issue/ 615
3. Technical documents for the initial structural checks (from the entity carrying out the structural checks - the engineering consulting office).
Drawing
3. Detailed structural calculations (Calculations Verification & Modeling Design Structural) were prepared (for a period of no less
than two weeks (14 working days).
Structural Design shop drawings with full detailing) 4
For two weeks (14 working days).
2. Technical documents of the structural restoration project (from the executing agency for the initial restoration - Alfa Company) Workshop Repearing
Drawings
Three weeks (21 working days).
1. Technical documents of the project (from the designer - Al-Wathiq Engineering Consulting Office) Workshop Orginal
2. A work plan for the field trials of the building (Testing & Sampling Assessments Structural) was implemented for a period of no less than
Required documents: (for the purpose of completing the examination and evaluation requirements)
1. Initial visits to the building site for the purpose of conducting an investigation field for a period of no less than five working days.
Date/06/20/2021
Documented site visits:
& Testing Results
Machine Translated by Google
(Building Basement)
3
Neighboring by select stations
The second phase
final processing.
Other locations within the building for the purpose
of requirements
To Be Approved by
Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
T
Inspection of building foundations and basement
Complementary check-ups
Conducting checks on the basement floor for
implementation (columns, bridges, and the roof
5
Work plan and project schedule:
Electing other points for the purpose of
conducting new examinations based on the report
approved.
to select spaces
Obtained from the second stage
Station Total . Local elevations
Examination of the implemented treatments
(for the water-damaged site) by the company
Third week
To Be Approved by
stats
Consulting Engineering
6 Inspection of buildings adjacent to the site
Inspection of building foundations and basement
Al-Hasiri basis.
For concrete strength checks
For the purpose of completing the examination and inspection requirements, a three-stage work method (ProJECT PHASE THREE) has been adopted.
Examination of the external surfaces of the
implementation site (second floor).
Other sites inside the building for the purpose
of checking for cracks (vertical and horizontal)
due to damage from water and precipitation
rooftop
For a period not exceeding three weeks (21 working days), as shown in the following table:
Inspection and inspection of the basement of
the implementation (columns, bridges, and roof).
To Be Approved by
Permeable antennas and water tanks
1st stage
To Be Approved by
To Be Approved by
second week
Consulting Engineering
Issue/ 615
Inspection of the external surfaces of the
implementation site (second floor).
(Building Basement)
Measurements
Depending on the results
Inspection of the site affected by
groundwater and the time limitation of the origin
uneven.
third level
2
Consulting Engineering
wind loading on Arial (there is
first week
Consulting Engineering
Consulting Engineering
Investigation
7
Date/06/20/2021
1
4
Additional checking of the field weight
measurements on the roof of the building by
means of synchronous height-determination stations
primacy
and previously implemented processes.
Additional checking of the height of the buildings
Machine Translated by Google
Synchronized
Actual local via satellite
Consulting Engineering
real-time
To Be Approved by
Issue/ 615
Consulting Engineering
Additional check for lateral deflections
actual
TESTS
9
SELECTIVE STRUCTURAL
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
To Be Approved by
Measuring
displacement
Antenna, satellite dishes,
elevations
Actual satellite (GPS .)
Subsequent structural examinations
10
Measurements
(
Station
GPS Station actual
by altitude stations
Measuring
Consulting Engineering
Date/06/20/2021
To Be Approved by
Measuring the heights of the building during the
additional construction operations to ensure
regular precipitation of the supporting soil.
lateral
TESTS
Additional checking of the height of the
building by means of height-fixing stations
real-time
Station
ADDITIONAL STRUCTURAL
)and water tanks
8
Measurement of the lateral deflections built during
the additional construction operations and its
exposure to wind loads to ensure that no significant
variation occurs during implementation.
Selected structural examinations
Machine Translated by Google
Date/06/20/2021
For field examination work similar to the current project
Quality control ( for on-site inspections and repairs ):
Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
2 Appendix No. 2 photos
All engineering tests were carried out in laboratories officially registered with the Iraqi Ministry of Planning and Development Cooperation and under the direct
supervision of our consulting engineering staff (with specializations: Structural Engineering, Foundation Engineering, Water Resources Engineering, Structural
Materials Engineering and Project Management Engineering), which includes the following works:
. 3. Annex No. 3 Detailed construction plans for the project.
attachments:
1. Field inspection and initial examination. 2.
Studying the project’s engineering documents (supplied by the designer - Al-Wathiq Engineering Consulting Office). 3. Conducting and implementing
a program of on-site inspections of the building (Annex No. 1) and direct supervision during implementation. 4. Completing
engineering studies (for the purpose of analyzing test results) and providing the necessary engineering treatments. 5. Direct
engineering supervision on the implementation of repairs (for the purpose of ensuring the quality of implementation and its compliance with technical specifications).
Issue/ 615
1. Annex No. 1 on-site examination program for the implementation of the project.
Machine Translated by Google
On-site inspection program for the implementation of the project (according to the American Standard ACI 201)
Supplement No. (1)
ASTM.C42
indicator
Non
Examination name
Content of holes, density of concrete and components
2
4
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Test Type
ASTM C-597
B
Concrete compressive and
B
ACI318-08, ASTM
Destructive
Determining the ability of concrete to active rust (as a result
of its exposure to heat):
Determination of the thickness of the concrete cover of the
rebar (as a result of spalling by heat):
ASTM
Destructive
Practice of petrographic
Test Name And
concrete mix:
Non
Test to identify loses in concrete
concrete reinforcement.
tensile strength
concrete
Electrical potential
cover.
A
Non
Destructive
Inspection type Standard No.
1
Destructive
& Non
examination of hardened
Ultrasonic measuring
3
Code Reference Number
Destructive
Issue/ 615
Test Description
Determining the condition of surface cracks in concrete,
using mechanical movement indication devices:
Pachometer survey for
Modulus of rupture test
ASTM C-856
measuring equipment
Examination type
Extraction and testing of concrete core samples to determine
A
Destructive
No.
equipment
Test to identify active corrosive in
Destructive
cover.
Date/06/20/2021
Extraction and testing of concrete core samples to determine
the compressive and tensile strength of concrete:
Determining the state of internal cracks in
concrete, using ultrasound devices:
determination of concrete
ACI 318.08, BS1881,
Mechanical movement
ASTM
Machine Translated by Google
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Destructive
Determination of the content of chloride ions in concrete (for the
purpose of determining the durability of concrete due to aging):
Destructive
Pictures showing the on-site field examinations of the project:
ACI 222, ACI318-08
Destructive
Supplement No. (2)
concrete 5
6
Chloride ions content in
According to ASTM.
Date/06/20/2021
Additional tests if needed.
Issue/ 615
& Non
Other tests determined when needed
Machine Translated by Google
Supplement No. (2)
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Date/06/20/2021
Pictures showing the on-site field examinations of the project:
Issue/ 615
Machine Translated by Google
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Issue/ 615
Pictures showing the on-site field examinations of the project:
Date/06/20/2021
Supplement No. (2)
Machine Translated by Google
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Issue/ 615
Date/06/20/2021
Machine Translated by Google
Supplement No. -3-
Pictures of the reality of the building - third
Issue/ 615
Date/06/20/2021
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Machine Translated by Google
Supplement No. -3-
Issue/ 615 Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Pictures of the reality of the building - three floors
Date/06/20/2021
Machine Translated by Google
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Issue/ 615
Date/06/20/2021
Annex No. 3 - Pictures of the current situation of the building - three floors
Machine Translated by Google
Annex No. 3 - Pictures of the current situation of the building - third
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Date/06/20/2021
Issue/ 615
Machine Translated by Google
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Issue/ 615
Pictures of the reality of the building - three floors
Date/06/20/2021
Supplement No. -3-
Machine Translated by Google
Supplement No. -3-
Alpha Engineering Company
Engineering Consultant Office
Accredited Structural Laboratories
Date/06/20/2021
Pictures of the reality of the building - three floors
Issue/ 615
Machine Translated by Google
Date/06/20/2021
20-06-2021
Abstract
Alpha Engineering Company Engineering
Consultant Office Accredited Structural
Laboratories
End of Technical Report
After checking the results of the structural tests and engineering calculations for the additional weights (adding two floors), it was found that the structure is
structurally sound. In order to increase the safety factor of the structure, it was decided to add structural reinforcement to the columns and thresholds on the ground
floors and basement (and as indicated in the attached construction plans (25-21 page).) The reinforcement also includes Making cross braces (page - bracing steel cross .)
with respect....
20) to ensure achieving the highest safety and efficiency coefficients to resist seismic loads and side winds.
Issue/ 615
Engineering office representative
Machine Translated by Google

Weitere ähnliche Inhalte

Ähnlich wie Technical Report - Building Structural Assessment Rehabilitation.pdf

CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCAnil Singh
 
Example of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complexExample of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complexSibilike K. Makhanu
 
Brief Profile Sanjeev Kadam - 2016
Brief Profile Sanjeev Kadam -    2016Brief Profile Sanjeev Kadam -    2016
Brief Profile Sanjeev Kadam - 2016sanjeev kadam
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
sonu jaiswal resume 17.02.2017
sonu jaiswal resume  17.02.2017sonu jaiswal resume  17.02.2017
sonu jaiswal resume 17.02.2017sonu jaiswal
 
Subin singh steel_structural_engineer
Subin singh steel_structural_engineerSubin singh steel_structural_engineer
Subin singh steel_structural_engineerSubin Singh
 
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSubin Singh
 
BALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDBALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDP. Balaji
 

Ähnlich wie Technical Report - Building Structural Assessment Rehabilitation.pdf (20)

CV Updated
CV UpdatedCV Updated
CV Updated
 
LECT 2a.ppt
LECT 2a.pptLECT 2a.ppt
LECT 2a.ppt
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
 
Ahmed.Lepda
Ahmed.LepdaAhmed.Lepda
Ahmed.Lepda
 
PMC 1.1- 22jul16
PMC 1.1- 22jul16PMC 1.1- 22jul16
PMC 1.1- 22jul16
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Example of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complexExample of engineering specification for an engineering laboratory complex
Example of engineering specification for an engineering laboratory complex
 
Brief Profile Sanjeev Kadam - 2016
Brief Profile Sanjeev Kadam -    2016Brief Profile Sanjeev Kadam -    2016
Brief Profile Sanjeev Kadam - 2016
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Eugene Jose
Eugene JoseEugene Jose
Eugene Jose
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
sonu jaiswal resume 17.02.2017
sonu jaiswal resume  17.02.2017sonu jaiswal resume  17.02.2017
sonu jaiswal resume 17.02.2017
 
Subin singh steel_structural_engineer
Subin singh steel_structural_engineerSubin singh steel_structural_engineer
Subin singh steel_structural_engineer
 
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDFSUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
SUBIN_SINGH_STEEL_STRUCTURAL_ENGINEER.PDF
 
BALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDBALAJI RESUME. UPDATED
BALAJI RESUME. UPDATED
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
CV
CVCV
CV
 
QC
QCQC
QC
 

Mehr von Adnan Lazem

HighWay_Gateway_Structure-1st_August_2022_Rev.06.pdf
HighWay_Gateway_Structure-1st_August_2022_Rev.06.pdfHighWay_Gateway_Structure-1st_August_2022_Rev.06.pdf
HighWay_Gateway_Structure-1st_August_2022_Rev.06.pdfAdnan Lazem
 
Zafarania RC Multistory Building.pdf
Zafarania RC Multistory Building.pdfZafarania RC Multistory Building.pdf
Zafarania RC Multistory Building.pdfAdnan Lazem
 
Beams on Elastic Foundation using Winkler Model.docx
Beams on Elastic Foundation using Winkler Model.docxBeams on Elastic Foundation using Winkler Model.docx
Beams on Elastic Foundation using Winkler Model.docxAdnan Lazem
 
Analysis and Design of Plate Girder Bridges_.docx
Analysis and Design of Plate Girder Bridges_.docxAnalysis and Design of Plate Girder Bridges_.docx
Analysis and Design of Plate Girder Bridges_.docxAdnan Lazem
 
Analysis and Design of Power Transmission Lines Steel Towers.docx
Analysis and Design of Power Transmission Lines Steel Towers.docxAnalysis and Design of Power Transmission Lines Steel Towers.docx
Analysis and Design of Power Transmission Lines Steel Towers.docxAdnan Lazem
 
Foundations_Underpining_Post_Graduate_Presentations.pptx
Foundations_Underpining_Post_Graduate_Presentations.pptxFoundations_Underpining_Post_Graduate_Presentations.pptx
Foundations_Underpining_Post_Graduate_Presentations.pptxAdnan Lazem
 
Analysis of Beams Resting on Nonlinear Elastic Half Sapce Foundation.docx
Analysis of Beams Resting on Nonlinear Elastic Half Sapce Foundation.docxAnalysis of Beams Resting on Nonlinear Elastic Half Sapce Foundation.docx
Analysis of Beams Resting on Nonlinear Elastic Half Sapce Foundation.docxAdnan Lazem
 
التقرير الفني لشركة نبع زمزم.docx
التقرير الفني لشركة نبع زمزم.docxالتقرير الفني لشركة نبع زمزم.docx
التقرير الفني لشركة نبع زمزم.docxAdnan Lazem
 
Analysis and Design of Composite Beams with Composite Deck Slab.docx
Analysis and Design of Composite Beams with Composite Deck Slab.docxAnalysis and Design of Composite Beams with Composite Deck Slab.docx
Analysis and Design of Composite Beams with Composite Deck Slab.docxAdnan Lazem
 
Technical_Report-Building_Structural_Assessment_&_Rehabilitation.pdf
Technical_Report-Building_Structural_Assessment_&_Rehabilitation.pdfTechnical_Report-Building_Structural_Assessment_&_Rehabilitation.pdf
Technical_Report-Building_Structural_Assessment_&_Rehabilitation.pdfAdnan Lazem
 
Technical_Report_STEEL_FRAMED_BUILDING-Seismic_Analysis.pdf
Technical_Report_STEEL_FRAMED_BUILDING-Seismic_Analysis.pdfTechnical_Report_STEEL_FRAMED_BUILDING-Seismic_Analysis.pdf
Technical_Report_STEEL_FRAMED_BUILDING-Seismic_Analysis.pdfAdnan Lazem
 
Technical_Report_Rigid_Pavement_[Slab_Floor_on_Grade].pdf
Technical_Report_Rigid_Pavement_[Slab_Floor_on_Grade].pdfTechnical_Report_Rigid_Pavement_[Slab_Floor_on_Grade].pdf
Technical_Report_Rigid_Pavement_[Slab_Floor_on_Grade].pdfAdnan Lazem
 
Analysis and Design of Open Web Steel Joist-Girders.docx
Analysis and Design of Open Web Steel Joist-Girders.docxAnalysis and Design of Open Web Steel Joist-Girders.docx
Analysis and Design of Open Web Steel Joist-Girders.docxAdnan Lazem
 
تقرير فني -تدعيم المبنى مع الرسوم ضد الزلازل.docx
تقرير فني -تدعيم المبنى مع الرسوم ضد الزلازل.docxتقرير فني -تدعيم المبنى مع الرسوم ضد الزلازل.docx
تقرير فني -تدعيم المبنى مع الرسوم ضد الزلازل.docxAdnan Lazem
 
Soil_Structure_Interaction-1-.pptx
Soil_Structure_Interaction-1-.pptxSoil_Structure_Interaction-1-.pptx
Soil_Structure_Interaction-1-.pptxAdnan Lazem
 
Soil_constitutive_model-2-.pptx
Soil_constitutive_model-2-.pptxSoil_constitutive_model-2-.pptx
Soil_constitutive_model-2-.pptxAdnan Lazem
 
Thesis [MSc 2003] Abstract.pdf
Thesis [MSc 2003] Abstract.pdfThesis [MSc 2003] Abstract.pdf
Thesis [MSc 2003] Abstract.pdfAdnan Lazem
 
التقرير الفني لشركة نبع زمزم.pdf
التقرير الفني لشركة نبع زمزم.pdfالتقرير الفني لشركة نبع زمزم.pdf
التقرير الفني لشركة نبع زمزم.pdfAdnan Lazem
 
- الدائرة الهندسية في وزارة التعليم العالي - تقرير فني.pdf
- الدائرة الهندسية في وزارة التعليم العالي - تقرير فني.pdf- الدائرة الهندسية في وزارة التعليم العالي - تقرير فني.pdf
- الدائرة الهندسية في وزارة التعليم العالي - تقرير فني.pdfAdnan Lazem
 
التقرير الفني لشركة زين للاتصالات.pdf
التقرير الفني لشركة زين للاتصالات.pdfالتقرير الفني لشركة زين للاتصالات.pdf
التقرير الفني لشركة زين للاتصالات.pdfAdnan Lazem
 

Mehr von Adnan Lazem (20)

HighWay_Gateway_Structure-1st_August_2022_Rev.06.pdf
HighWay_Gateway_Structure-1st_August_2022_Rev.06.pdfHighWay_Gateway_Structure-1st_August_2022_Rev.06.pdf
HighWay_Gateway_Structure-1st_August_2022_Rev.06.pdf
 
Zafarania RC Multistory Building.pdf
Zafarania RC Multistory Building.pdfZafarania RC Multistory Building.pdf
Zafarania RC Multistory Building.pdf
 
Beams on Elastic Foundation using Winkler Model.docx
Beams on Elastic Foundation using Winkler Model.docxBeams on Elastic Foundation using Winkler Model.docx
Beams on Elastic Foundation using Winkler Model.docx
 
Analysis and Design of Plate Girder Bridges_.docx
Analysis and Design of Plate Girder Bridges_.docxAnalysis and Design of Plate Girder Bridges_.docx
Analysis and Design of Plate Girder Bridges_.docx
 
Analysis and Design of Power Transmission Lines Steel Towers.docx
Analysis and Design of Power Transmission Lines Steel Towers.docxAnalysis and Design of Power Transmission Lines Steel Towers.docx
Analysis and Design of Power Transmission Lines Steel Towers.docx
 
Foundations_Underpining_Post_Graduate_Presentations.pptx
Foundations_Underpining_Post_Graduate_Presentations.pptxFoundations_Underpining_Post_Graduate_Presentations.pptx
Foundations_Underpining_Post_Graduate_Presentations.pptx
 
Analysis of Beams Resting on Nonlinear Elastic Half Sapce Foundation.docx
Analysis of Beams Resting on Nonlinear Elastic Half Sapce Foundation.docxAnalysis of Beams Resting on Nonlinear Elastic Half Sapce Foundation.docx
Analysis of Beams Resting on Nonlinear Elastic Half Sapce Foundation.docx
 
التقرير الفني لشركة نبع زمزم.docx
التقرير الفني لشركة نبع زمزم.docxالتقرير الفني لشركة نبع زمزم.docx
التقرير الفني لشركة نبع زمزم.docx
 
Analysis and Design of Composite Beams with Composite Deck Slab.docx
Analysis and Design of Composite Beams with Composite Deck Slab.docxAnalysis and Design of Composite Beams with Composite Deck Slab.docx
Analysis and Design of Composite Beams with Composite Deck Slab.docx
 
Technical_Report-Building_Structural_Assessment_&_Rehabilitation.pdf
Technical_Report-Building_Structural_Assessment_&_Rehabilitation.pdfTechnical_Report-Building_Structural_Assessment_&_Rehabilitation.pdf
Technical_Report-Building_Structural_Assessment_&_Rehabilitation.pdf
 
Technical_Report_STEEL_FRAMED_BUILDING-Seismic_Analysis.pdf
Technical_Report_STEEL_FRAMED_BUILDING-Seismic_Analysis.pdfTechnical_Report_STEEL_FRAMED_BUILDING-Seismic_Analysis.pdf
Technical_Report_STEEL_FRAMED_BUILDING-Seismic_Analysis.pdf
 
Technical_Report_Rigid_Pavement_[Slab_Floor_on_Grade].pdf
Technical_Report_Rigid_Pavement_[Slab_Floor_on_Grade].pdfTechnical_Report_Rigid_Pavement_[Slab_Floor_on_Grade].pdf
Technical_Report_Rigid_Pavement_[Slab_Floor_on_Grade].pdf
 
Analysis and Design of Open Web Steel Joist-Girders.docx
Analysis and Design of Open Web Steel Joist-Girders.docxAnalysis and Design of Open Web Steel Joist-Girders.docx
Analysis and Design of Open Web Steel Joist-Girders.docx
 
تقرير فني -تدعيم المبنى مع الرسوم ضد الزلازل.docx
تقرير فني -تدعيم المبنى مع الرسوم ضد الزلازل.docxتقرير فني -تدعيم المبنى مع الرسوم ضد الزلازل.docx
تقرير فني -تدعيم المبنى مع الرسوم ضد الزلازل.docx
 
Soil_Structure_Interaction-1-.pptx
Soil_Structure_Interaction-1-.pptxSoil_Structure_Interaction-1-.pptx
Soil_Structure_Interaction-1-.pptx
 
Soil_constitutive_model-2-.pptx
Soil_constitutive_model-2-.pptxSoil_constitutive_model-2-.pptx
Soil_constitutive_model-2-.pptx
 
Thesis [MSc 2003] Abstract.pdf
Thesis [MSc 2003] Abstract.pdfThesis [MSc 2003] Abstract.pdf
Thesis [MSc 2003] Abstract.pdf
 
التقرير الفني لشركة نبع زمزم.pdf
التقرير الفني لشركة نبع زمزم.pdfالتقرير الفني لشركة نبع زمزم.pdf
التقرير الفني لشركة نبع زمزم.pdf
 
- الدائرة الهندسية في وزارة التعليم العالي - تقرير فني.pdf
- الدائرة الهندسية في وزارة التعليم العالي - تقرير فني.pdf- الدائرة الهندسية في وزارة التعليم العالي - تقرير فني.pdf
- الدائرة الهندسية في وزارة التعليم العالي - تقرير فني.pdf
 
التقرير الفني لشركة زين للاتصالات.pdf
التقرير الفني لشركة زين للاتصالات.pdfالتقرير الفني لشركة زين للاتصالات.pdf
التقرير الفني لشركة زين للاتصالات.pdf
 

Kürzlich hochgeladen

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 

Kürzlich hochgeladen (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 

Technical Report - Building Structural Assessment Rehabilitation.pdf

  • 1. Technical Report (To investigate the structural condition of the commercial bank building at the intersection of the pool) Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Beneficiary: Commercial Bank Issue/ 615 Implementing agency (examination and evaluation): Al-Waha Tower Company for Trade and General Contracting / the consulting engineering cadre and the cadres of the approved structural laboratory Date of preparation of the report: Sunday, 2021-JUNE-20 Total project duration: Four months (120 working days) only. Project location: Baghdad Governorate, near the intersection of Al-Masbah - Al-Arasat Project name: Construction investigation project - repair - and reinforcement for the building of the Commercial Bank in Eastern Karada (not yet approved) Estimated project cost: Representative of the implementing agency for the restoration: SOLUTIONS ENGINEERING ALPHA Responsible for the restoration (constructive): SOLUTIONS ENGINEERING ALPHA Kamal Abdel Hamid, representative of the beneficiary: Eng. Date/06/20/2021 Machine Translated by Google
  • 2. Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Asserted Structural Laboratory Sampling Collecting, Assesment, Issue/ 615 3. Technical documents for the initial structural checks (from the entity carrying out the structural checks - the engineering consulting office). Drawing 3. Detailed structural calculations (Calculations Verification & Modeling Design Structural) were prepared (for a period of no less than two weeks (14 working days). Structural Design shop drawings with full detailing) 4 For two weeks (14 working days). 2. Technical documents of the structural restoration project (from the executing agency for the initial restoration - Alfa Company) Workshop Repearing Drawings Three weeks (21 working days). 1. Technical documents of the project (from the designer - Al-Wathiq Engineering Consulting Office) Workshop Orginal 2. A work plan for the field trials of the building (Testing & Sampling Assessments Structural) was implemented for a period of no less than Required documents: (for the purpose of completing the examination and evaluation requirements) 1. Initial visits to the building site for the purpose of conducting an investigation field for a period of no less than five working days. Date/06/20/2021 Documented site visits: & Testing Results Machine Translated by Google
  • 3. (Building Basement) 3 Neighboring by select stations The second phase final processing. Other locations within the building for the purpose of requirements To Be Approved by Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories T Inspection of building foundations and basement Complementary check-ups Conducting checks on the basement floor for implementation (columns, bridges, and the roof 5 Work plan and project schedule: Electing other points for the purpose of conducting new examinations based on the report approved. to select spaces Obtained from the second stage Station Total . Local elevations Examination of the implemented treatments (for the water-damaged site) by the company Third week To Be Approved by stats Consulting Engineering 6 Inspection of buildings adjacent to the site Inspection of building foundations and basement Al-Hasiri basis. For concrete strength checks For the purpose of completing the examination and inspection requirements, a three-stage work method (ProJECT PHASE THREE) has been adopted. Examination of the external surfaces of the implementation site (second floor). Other sites inside the building for the purpose of checking for cracks (vertical and horizontal) due to damage from water and precipitation rooftop For a period not exceeding three weeks (21 working days), as shown in the following table: Inspection and inspection of the basement of the implementation (columns, bridges, and roof). To Be Approved by Permeable antennas and water tanks 1st stage To Be Approved by To Be Approved by second week Consulting Engineering Issue/ 615 Inspection of the external surfaces of the implementation site (second floor). (Building Basement) Measurements Depending on the results Inspection of the site affected by groundwater and the time limitation of the origin uneven. third level 2 Consulting Engineering wind loading on Arial (there is first week Consulting Engineering Consulting Engineering Investigation 7 Date/06/20/2021 1 4 Additional checking of the field weight measurements on the roof of the building by means of synchronous height-determination stations primacy and previously implemented processes. Additional checking of the height of the buildings Machine Translated by Google
  • 4. Synchronized Actual local via satellite Consulting Engineering real-time To Be Approved by Issue/ 615 Consulting Engineering Additional check for lateral deflections actual TESTS 9 SELECTIVE STRUCTURAL Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories To Be Approved by Measuring displacement Antenna, satellite dishes, elevations Actual satellite (GPS .) Subsequent structural examinations 10 Measurements ( Station GPS Station actual by altitude stations Measuring Consulting Engineering Date/06/20/2021 To Be Approved by Measuring the heights of the building during the additional construction operations to ensure regular precipitation of the supporting soil. lateral TESTS Additional checking of the height of the building by means of height-fixing stations real-time Station ADDITIONAL STRUCTURAL )and water tanks 8 Measurement of the lateral deflections built during the additional construction operations and its exposure to wind loads to ensure that no significant variation occurs during implementation. Selected structural examinations Machine Translated by Google
  • 5. Date/06/20/2021 For field examination work similar to the current project Quality control ( for on-site inspections and repairs ): Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories 2 Appendix No. 2 photos All engineering tests were carried out in laboratories officially registered with the Iraqi Ministry of Planning and Development Cooperation and under the direct supervision of our consulting engineering staff (with specializations: Structural Engineering, Foundation Engineering, Water Resources Engineering, Structural Materials Engineering and Project Management Engineering), which includes the following works: . 3. Annex No. 3 Detailed construction plans for the project. attachments: 1. Field inspection and initial examination. 2. Studying the project’s engineering documents (supplied by the designer - Al-Wathiq Engineering Consulting Office). 3. Conducting and implementing a program of on-site inspections of the building (Annex No. 1) and direct supervision during implementation. 4. Completing engineering studies (for the purpose of analyzing test results) and providing the necessary engineering treatments. 5. Direct engineering supervision on the implementation of repairs (for the purpose of ensuring the quality of implementation and its compliance with technical specifications). Issue/ 615 1. Annex No. 1 on-site examination program for the implementation of the project. Machine Translated by Google
  • 6. On-site inspection program for the implementation of the project (according to the American Standard ACI 201) Supplement No. (1) ASTM.C42 indicator Non Examination name Content of holes, density of concrete and components 2 4 Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Test Type ASTM C-597 B Concrete compressive and B ACI318-08, ASTM Destructive Determining the ability of concrete to active rust (as a result of its exposure to heat): Determination of the thickness of the concrete cover of the rebar (as a result of spalling by heat): ASTM Destructive Practice of petrographic Test Name And concrete mix: Non Test to identify loses in concrete concrete reinforcement. tensile strength concrete Electrical potential cover. A Non Destructive Inspection type Standard No. 1 Destructive & Non examination of hardened Ultrasonic measuring 3 Code Reference Number Destructive Issue/ 615 Test Description Determining the condition of surface cracks in concrete, using mechanical movement indication devices: Pachometer survey for Modulus of rupture test ASTM C-856 measuring equipment Examination type Extraction and testing of concrete core samples to determine A Destructive No. equipment Test to identify active corrosive in Destructive cover. Date/06/20/2021 Extraction and testing of concrete core samples to determine the compressive and tensile strength of concrete: Determining the state of internal cracks in concrete, using ultrasound devices: determination of concrete ACI 318.08, BS1881, Mechanical movement ASTM Machine Translated by Google
  • 7. Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Destructive Determination of the content of chloride ions in concrete (for the purpose of determining the durability of concrete due to aging): Destructive Pictures showing the on-site field examinations of the project: ACI 222, ACI318-08 Destructive Supplement No. (2) concrete 5 6 Chloride ions content in According to ASTM. Date/06/20/2021 Additional tests if needed. Issue/ 615 & Non Other tests determined when needed Machine Translated by Google
  • 8. Supplement No. (2) Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Date/06/20/2021 Pictures showing the on-site field examinations of the project: Issue/ 615 Machine Translated by Google
  • 9. Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Issue/ 615 Pictures showing the on-site field examinations of the project: Date/06/20/2021 Supplement No. (2) Machine Translated by Google
  • 10. Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Issue/ 615 Date/06/20/2021 Machine Translated by Google
  • 11. Supplement No. -3- Pictures of the reality of the building - third Issue/ 615 Date/06/20/2021 Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Machine Translated by Google
  • 12. Supplement No. -3- Issue/ 615 Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Pictures of the reality of the building - three floors Date/06/20/2021 Machine Translated by Google
  • 13. Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Issue/ 615 Date/06/20/2021 Annex No. 3 - Pictures of the current situation of the building - three floors Machine Translated by Google
  • 14. Annex No. 3 - Pictures of the current situation of the building - third Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Date/06/20/2021 Issue/ 615 Machine Translated by Google
  • 15. Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Issue/ 615 Pictures of the reality of the building - three floors Date/06/20/2021 Supplement No. -3- Machine Translated by Google
  • 16. Supplement No. -3- Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories Date/06/20/2021 Pictures of the reality of the building - three floors Issue/ 615 Machine Translated by Google
  • 17. Date/06/20/2021 20-06-2021 Abstract Alpha Engineering Company Engineering Consultant Office Accredited Structural Laboratories End of Technical Report After checking the results of the structural tests and engineering calculations for the additional weights (adding two floors), it was found that the structure is structurally sound. In order to increase the safety factor of the structure, it was decided to add structural reinforcement to the columns and thresholds on the ground floors and basement (and as indicated in the attached construction plans (25-21 page).) The reinforcement also includes Making cross braces (page - bracing steel cross .) with respect.... 20) to ensure achieving the highest safety and efficiency coefficients to resist seismic loads and side winds. Issue/ 615 Engineering office representative Machine Translated by Google