9. Consumption and cost reduction on both processes and flight Lean Painting: overspray, filtration, layer thickness, painter
cooperation
Reduced environmental footprint: methods, products
(nanotechnology, heavy metals, less waste)
Life Cycle Assessment vision. Ecodesign process and
operations.
Lean Repair on MRO 4ª gen Test & Learn engineering a at the machine. Senior experience.
Multioperator renting with Lead Time compression and
seasonal demand
Quick Smart Repair and Time To Market adapted to the job
needs and with flexible equipment (TROTTER product line)
Shared responsibility in lifecycle and extended guarantees
linked to the value chain
SMARTBOOTH CONNECTIVITY with contractual ties to lifecycle
cost and predictable maintenance (Trend: predictive). REMOTE
ASSISTANCE