SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Parent Communications Notes
February 6, 2014

Textbook Adoption
Dr. Sallie Armstrong, Curriculum and Instruction Director, talked to the group about the
textbook adoption process which regulated by the State Department of Education. The public
is invited to view the textbooks that are on the adoption list for this upcoming year and provide
feedback. The local Textbook Committee, which is made up of teachers, will meet and review
input from the public and other instructors. Social studies textbooks for grades 6-12 that are on
the state adoption list may be reviewed on February 12 from 1-3 p.m. in the Board room at
central office.
Zoning Plan for 2014-15
Chief Operations Officer Jim Sumrell presented information on the process used each year to
consider zoning for the district. Reviews are done each year by a project team and are based
on enrollment for the 40th day of school, which historically averages the highest point for the
year. The capacity of each school (how many students the building was planned to house) is
compared to the enrollment experienced on the 40th day. If enrollment exceeds capacity, the
group looks at how best to resolve that issue. Last year thirteen portable classrooms were
added to Rossview Elementary. The project team knew already at the beginning of this year
that Rossview Elementary would be over capacity. Other areas needing attention include St.
Bethlehem Elementary, Barkers Mill, and Northeast Elementary. As the team studied the
problem, several “unknowns” came into play including a land purchase made by Dow Chemical
as well as Hankook Tire announcing a new plant opening in Clarksville which could affect
enrollment in this area in the near future. In addition, CMCSS is planning to construct Oakland
Elementary to open in the same area within the next two years. The project team determined it
would not be in the best interest of students and families to adjust zone lines this upcoming
year and possibly be faced with rezoning again in the following year or two.
Rather than change any zone lines, the recommendation for the 2014-2015 school year is to
move 5th grade from Rossview Elementary and house them at Rossview Middle. The students
would be in a separate wing and would still be considered part of Rossview Elementary.
Portables would be added to Rossview Middle if needed. In addition, 3rd grade will move from
St. Bethlehem Elementary to Burt School. The project team feels the zoning recommendation
addresses the following concerns:
• limits disruptions to students and families
• minimizes the possibility of multiple re-zonings
• balances capacity in the specified school zones
• addresses student safety
• provides additional time to understand impending industrial and residential growth

1
Open Enrollment
Dr. Worthington talked briefly about open enrollment. Applications for open enrollment are
available now for the next school year. Open enrollment is only available in schools that have
room, not at every school. Details are on the CMCSS website.
Substitute Teacher Program
Human Resources Director Cydney Miller discussed the proposed plan to bring the substitute
staffing program back into the CMCSS Human Resources Department. Substitute staffing was
handled by the district prior to 2005. In March 2005 the process was outsourced to Kelly
Services. Mrs. Miller explained that due to changes in technology and administrative changes
at Kelly Services, it would now be not only feasible for the district to provide their own
substitute program, but would save the district money. Plans are underway to allow the district
to initiate an in-house substitute staffing program beginning in August of 2014. This will include
the addition of four staff members. It is estimated that CMCSS could see cost savings in excess
of $600,000 over the first two years.
Inclement Weather and Makeup Days
Dr. Worthington discussed the process used to determine the number of snow days and the
plan to make up days as needed. Students are required by law to attend 180 days. CMCSS
students stockpile 13 days by going 30 extra minutes per day. Four of those days are used for
staff development, and the three early-release days equal one additional staff development
day. That leaves 8 remaining days. The School Board “forgives” or allows for 3 days to not be
made up. That leaves the 5 days that a plan is established to make up. February 17 will now be
a school day rather than a day out of school.
Dr. Worthington explained that the decision to close schools due to inclement weather
situations is not made by just one person. There are a number of people that actually go out
and drive the roads in all areas of the county to see conditions first hand. The decision is made
as early as possible, even the night before if appropriate. Dr. Worthington stressed that
school/student safety is always a priority along with considering parent and family situations in
planning for school closures.
The extreme cold this year has added new areas of concern. Dr. Worthington described how
the very cold weather this year had affected the operation of buses and buildings and was a
contributing factor in some of the school closing decisions. He discussed what the district has
learned about how it can help conserve energy for the power grid. The district learned that
buildings can start being heated less than two hours ahead of opening time and still be warm
enough for students and help conserve energy. There had been some concerned calls about
the day the message was sent to schools to turn off unnecessary lights and other electronic
equipment. This was at the request of CDE as they reported a tremendous strain on the power
grid. With the cooperation of the schools and district buildings, CDE reported the situation
turned around within an hour and probable power outages were avoided. Dr. Worthington
2
stated his belief that it is important for the school system to be part of the larger community
and assist when possible.
School Year Calendar
There was brief discussion of the criteria used in planning a school year calendar. The calendar
criteria are looked at each year by CMCSS communication groups. Dr. Worthington stated that
it is very important to high school students to have exams before Christmas break. Semester
exam dates then drive the school starting date. He also noted keeping a fall break in the
calendar has become important to all groups.

3

Weitere ähnliche Inhalte

Ähnlich wie Parent communications notes february 6, 2014

1 10-13 parent communications meeting
1 10-13 parent communications meeting1 10-13 parent communications meeting
1 10-13 parent communications meetingDeon Lucke
 
The Year-Round School Debate
The Year-Round School DebateThe Year-Round School Debate
The Year-Round School DebateSheila Guy
 
Parent communications notes 4-07-13
Parent communications notes   4-07-13Parent communications notes   4-07-13
Parent communications notes 4-07-13Deon Lucke
 
Student Completion - Background information
Student Completion - Background informationStudent Completion - Background information
Student Completion - Background informationHigherEdUtah
 
March 13 2014 parent communications notes
March 13 2014 parent communications notesMarch 13 2014 parent communications notes
March 13 2014 parent communications notesDeon Lucke
 
Letter to congress re flexibilities needed 041320
Letter to congress re flexibilities needed 041320Letter to congress re flexibilities needed 041320
Letter to congress re flexibilities needed 041320Rupen R. Fofaria
 
Report in IE514 - Challenges of Grades 11 and 12 to Public and Private HEIs
Report in IE514 - Challenges of Grades 11 and 12 to Public and Private HEIsReport in IE514 - Challenges of Grades 11 and 12 to Public and Private HEIs
Report in IE514 - Challenges of Grades 11 and 12 to Public and Private HEIsMerly Furio
 
ExcelinEd reopening schools considerations
ExcelinEd reopening schools considerationsExcelinEd reopening schools considerations
ExcelinEd reopening schools considerationsEducationNC
 
Hermosa Beach School District Long Range Facilities Master Plan
Hermosa Beach School District Long Range Facilities Master PlanHermosa Beach School District Long Range Facilities Master Plan
Hermosa Beach School District Long Range Facilities Master Planhermosahero
 
09 04-14 parent communications notes
09 04-14 parent communications notes09 04-14 parent communications notes
09 04-14 parent communications notesDeon Lucke
 
Cleveland Cluster Proposal Hs Redesign 120209
Cleveland Cluster Proposal Hs Redesign 120209Cleveland Cluster Proposal Hs Redesign 120209
Cleveland Cluster Proposal Hs Redesign 120209katzpdx
 
Willowbrook School Case StudyOverviewWillowbrook School is a s.docx
Willowbrook School Case StudyOverviewWillowbrook School is a s.docxWillowbrook School Case StudyOverviewWillowbrook School is a s.docx
Willowbrook School Case StudyOverviewWillowbrook School is a s.docxambersalomon88660
 
PTM points during ptm on parent teacher .pptx
PTM points during ptm on parent teacher .pptxPTM points during ptm on parent teacher .pptx
PTM points during ptm on parent teacher .pptxKANUPRIYA314618
 

Ähnlich wie Parent communications notes february 6, 2014 (20)

1 10-13 parent communications meeting
1 10-13 parent communications meeting1 10-13 parent communications meeting
1 10-13 parent communications meeting
 
The Year-Round School Debate
The Year-Round School DebateThe Year-Round School Debate
The Year-Round School Debate
 
Parent communications notes 4-07-13
Parent communications notes   4-07-13Parent communications notes   4-07-13
Parent communications notes 4-07-13
 
Student Completion - Background information
Student Completion - Background informationStudent Completion - Background information
Student Completion - Background information
 
March 13 2014 parent communications notes
March 13 2014 parent communications notesMarch 13 2014 parent communications notes
March 13 2014 parent communications notes
 
Presentation1
Presentation1Presentation1
Presentation1
 
Letter to congress re flexibilities needed 041320
Letter to congress re flexibilities needed 041320Letter to congress re flexibilities needed 041320
Letter to congress re flexibilities needed 041320
 
Chapte 1 Over
Chapte  1 OverChapte  1 Over
Chapte 1 Over
 
Rotherham tbnp
Rotherham tbnpRotherham tbnp
Rotherham tbnp
 
Report in IE514 - Challenges of Grades 11 and 12 to Public and Private HEIs
Report in IE514 - Challenges of Grades 11 and 12 to Public and Private HEIsReport in IE514 - Challenges of Grades 11 and 12 to Public and Private HEIs
Report in IE514 - Challenges of Grades 11 and 12 to Public and Private HEIs
 
ACS Newsletter February
ACS Newsletter FebruaryACS Newsletter February
ACS Newsletter February
 
ExcelinEd reopening schools considerations
ExcelinEd reopening schools considerationsExcelinEd reopening schools considerations
ExcelinEd reopening schools considerations
 
Year Round Schooling Essay
Year Round Schooling EssayYear Round Schooling Essay
Year Round Schooling Essay
 
Hermosa Beach School District Long Range Facilities Master Plan
Hermosa Beach School District Long Range Facilities Master PlanHermosa Beach School District Long Range Facilities Master Plan
Hermosa Beach School District Long Range Facilities Master Plan
 
09 04-14 parent communications notes
09 04-14 parent communications notes09 04-14 parent communications notes
09 04-14 parent communications notes
 
Cleveland Cluster Proposal Hs Redesign 120209
Cleveland Cluster Proposal Hs Redesign 120209Cleveland Cluster Proposal Hs Redesign 120209
Cleveland Cluster Proposal Hs Redesign 120209
 
Willowbrook School Case StudyOverviewWillowbrook School is a s.docx
Willowbrook School Case StudyOverviewWillowbrook School is a s.docxWillowbrook School Case StudyOverviewWillowbrook School is a s.docx
Willowbrook School Case StudyOverviewWillowbrook School is a s.docx
 
Roadshow
RoadshowRoadshow
Roadshow
 
Roadshow
RoadshowRoadshow
Roadshow
 
PTM points during ptm on parent teacher .pptx
PTM points during ptm on parent teacher .pptxPTM points during ptm on parent teacher .pptx
PTM points during ptm on parent teacher .pptx
 

Mehr von kuekerh

RMS PTO Volunteer Info 01 oct 2015
RMS PTO Volunteer Info 01 oct 2015RMS PTO Volunteer Info 01 oct 2015
RMS PTO Volunteer Info 01 oct 2015kuekerh
 
RoMS PTO support flyer
RoMS PTO support flyerRoMS PTO support flyer
RoMS PTO support flyerkuekerh
 
Rossfit and Hawkbotics application for after school clubs
Rossfit and Hawkbotics application for after school clubsRossfit and Hawkbotics application for after school clubs
Rossfit and Hawkbotics application for after school clubskuekerh
 
RMS After School Club JR Civitan Application
RMS After School Club JR Civitan ApplicationRMS After School Club JR Civitan Application
RMS After School Club JR Civitan Applicationkuekerh
 
RMS After School Club Applications 2015 2016
RMS After School Club Applications 2015 2016RMS After School Club Applications 2015 2016
RMS After School Club Applications 2015 2016kuekerh
 
Rossview After School Club Handouts 2014
Rossview After School Club Handouts 2014Rossview After School Club Handouts 2014
Rossview After School Club Handouts 2014kuekerh
 
February 11 2014 pto agenda and minutes
February 11 2014 pto agenda and minutesFebruary 11 2014 pto agenda and minutes
February 11 2014 pto agenda and minuteskuekerh
 
March question
March questionMarch question
March questionkuekerh
 
ROMS Annual Budget Jan 2014
ROMS Annual Budget Jan 2014ROMS Annual Budget Jan 2014
ROMS Annual Budget Jan 2014kuekerh
 

Mehr von kuekerh (9)

RMS PTO Volunteer Info 01 oct 2015
RMS PTO Volunteer Info 01 oct 2015RMS PTO Volunteer Info 01 oct 2015
RMS PTO Volunteer Info 01 oct 2015
 
RoMS PTO support flyer
RoMS PTO support flyerRoMS PTO support flyer
RoMS PTO support flyer
 
Rossfit and Hawkbotics application for after school clubs
Rossfit and Hawkbotics application for after school clubsRossfit and Hawkbotics application for after school clubs
Rossfit and Hawkbotics application for after school clubs
 
RMS After School Club JR Civitan Application
RMS After School Club JR Civitan ApplicationRMS After School Club JR Civitan Application
RMS After School Club JR Civitan Application
 
RMS After School Club Applications 2015 2016
RMS After School Club Applications 2015 2016RMS After School Club Applications 2015 2016
RMS After School Club Applications 2015 2016
 
Rossview After School Club Handouts 2014
Rossview After School Club Handouts 2014Rossview After School Club Handouts 2014
Rossview After School Club Handouts 2014
 
February 11 2014 pto agenda and minutes
February 11 2014 pto agenda and minutesFebruary 11 2014 pto agenda and minutes
February 11 2014 pto agenda and minutes
 
March question
March questionMarch question
March question
 
ROMS Annual Budget Jan 2014
ROMS Annual Budget Jan 2014ROMS Annual Budget Jan 2014
ROMS Annual Budget Jan 2014
 

Parent communications notes february 6, 2014

  • 1. Parent Communications Notes February 6, 2014 Textbook Adoption Dr. Sallie Armstrong, Curriculum and Instruction Director, talked to the group about the textbook adoption process which regulated by the State Department of Education. The public is invited to view the textbooks that are on the adoption list for this upcoming year and provide feedback. The local Textbook Committee, which is made up of teachers, will meet and review input from the public and other instructors. Social studies textbooks for grades 6-12 that are on the state adoption list may be reviewed on February 12 from 1-3 p.m. in the Board room at central office. Zoning Plan for 2014-15 Chief Operations Officer Jim Sumrell presented information on the process used each year to consider zoning for the district. Reviews are done each year by a project team and are based on enrollment for the 40th day of school, which historically averages the highest point for the year. The capacity of each school (how many students the building was planned to house) is compared to the enrollment experienced on the 40th day. If enrollment exceeds capacity, the group looks at how best to resolve that issue. Last year thirteen portable classrooms were added to Rossview Elementary. The project team knew already at the beginning of this year that Rossview Elementary would be over capacity. Other areas needing attention include St. Bethlehem Elementary, Barkers Mill, and Northeast Elementary. As the team studied the problem, several “unknowns” came into play including a land purchase made by Dow Chemical as well as Hankook Tire announcing a new plant opening in Clarksville which could affect enrollment in this area in the near future. In addition, CMCSS is planning to construct Oakland Elementary to open in the same area within the next two years. The project team determined it would not be in the best interest of students and families to adjust zone lines this upcoming year and possibly be faced with rezoning again in the following year or two. Rather than change any zone lines, the recommendation for the 2014-2015 school year is to move 5th grade from Rossview Elementary and house them at Rossview Middle. The students would be in a separate wing and would still be considered part of Rossview Elementary. Portables would be added to Rossview Middle if needed. In addition, 3rd grade will move from St. Bethlehem Elementary to Burt School. The project team feels the zoning recommendation addresses the following concerns: • limits disruptions to students and families • minimizes the possibility of multiple re-zonings • balances capacity in the specified school zones • addresses student safety • provides additional time to understand impending industrial and residential growth 1
  • 2. Open Enrollment Dr. Worthington talked briefly about open enrollment. Applications for open enrollment are available now for the next school year. Open enrollment is only available in schools that have room, not at every school. Details are on the CMCSS website. Substitute Teacher Program Human Resources Director Cydney Miller discussed the proposed plan to bring the substitute staffing program back into the CMCSS Human Resources Department. Substitute staffing was handled by the district prior to 2005. In March 2005 the process was outsourced to Kelly Services. Mrs. Miller explained that due to changes in technology and administrative changes at Kelly Services, it would now be not only feasible for the district to provide their own substitute program, but would save the district money. Plans are underway to allow the district to initiate an in-house substitute staffing program beginning in August of 2014. This will include the addition of four staff members. It is estimated that CMCSS could see cost savings in excess of $600,000 over the first two years. Inclement Weather and Makeup Days Dr. Worthington discussed the process used to determine the number of snow days and the plan to make up days as needed. Students are required by law to attend 180 days. CMCSS students stockpile 13 days by going 30 extra minutes per day. Four of those days are used for staff development, and the three early-release days equal one additional staff development day. That leaves 8 remaining days. The School Board “forgives” or allows for 3 days to not be made up. That leaves the 5 days that a plan is established to make up. February 17 will now be a school day rather than a day out of school. Dr. Worthington explained that the decision to close schools due to inclement weather situations is not made by just one person. There are a number of people that actually go out and drive the roads in all areas of the county to see conditions first hand. The decision is made as early as possible, even the night before if appropriate. Dr. Worthington stressed that school/student safety is always a priority along with considering parent and family situations in planning for school closures. The extreme cold this year has added new areas of concern. Dr. Worthington described how the very cold weather this year had affected the operation of buses and buildings and was a contributing factor in some of the school closing decisions. He discussed what the district has learned about how it can help conserve energy for the power grid. The district learned that buildings can start being heated less than two hours ahead of opening time and still be warm enough for students and help conserve energy. There had been some concerned calls about the day the message was sent to schools to turn off unnecessary lights and other electronic equipment. This was at the request of CDE as they reported a tremendous strain on the power grid. With the cooperation of the schools and district buildings, CDE reported the situation turned around within an hour and probable power outages were avoided. Dr. Worthington 2
  • 3. stated his belief that it is important for the school system to be part of the larger community and assist when possible. School Year Calendar There was brief discussion of the criteria used in planning a school year calendar. The calendar criteria are looked at each year by CMCSS communication groups. Dr. Worthington stated that it is very important to high school students to have exams before Christmas break. Semester exam dates then drive the school starting date. He also noted keeping a fall break in the calendar has become important to all groups. 3