JOB REFERENCE
ALLOW FOR NEW 100mm UPVC PIPES
CONNECTED INTO ALL NEW SANITARYWARE
INTO NEW STUB STACK WITH AIR ADMITANCE
VALVE. ALLOW FOR NEW EXTERNAL BELOW
GROUND DRAINAGE TO EXISTING MANHOLE.
(SUBJECT TO SITE INSPECTION)

ALLOW TO REPLACE
EXISTING GLAZING WITH
NEW OBSCURE
FOR TOILET DETAILS REFER
GLAZING.
TO DWG 012.

ALLOW
TO FORM
NEW
WALLS IN
STUDWORK
AS
SHOWN.

ALLOW TO
FORM NEW
OPENING
ALLOW TO FORM NEW
THROUGH,
STUDWORK WALLS AS
MAKE
SHOWN, SKIMMED PLASTER
GOOD FOR
FINISH.
NEW DOOR.

GENTS

ALLOW TO FORM
NEW OPENING
THROUGH, MAKE
GOOD FOR NEW
DOOR.

REMOVE DOOR
AND BLOCK UP
EXISTING OPENING,
PREPARE TO
RECEIVE NEW DECS

REMOVE DOOR
AND BLOCK UP
EXISTING OPENING,
PREPARE TO
RECEIVE NEW DECS

AREA 5

ALLOW TO STRIP
OUT ALL
REDUNDANT
SANITARYWARE
AND CAP OFF
REDUNDANT
SERVICES.

NEW SCREEN,
REFER TO DWG 010.

AREA 4
NEW PLINTH, REFER
TO DWG 010.
ALLOW TO
REMOVE EXISTING
SCREENS & MAKE
GOOD.

NEW PLINTHS, REFER
TO DWG 010.

ALLOW TO FORM
NEW STUDWORK
WALLS AS SHOWN,
SKIMMED PLASTER
FINISH.

PART H-DRAINAGE

EXTRACT FAN WITH PLASTIC DUCTING AS REQUIRED TO TOILETS.

WASHBASIN

ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.

3 AIR CHANGES PER HOUR.

SINK

50mm DIA 4M MAX RUN

BATH

50mm DIA 4M MAX RUN

TRADING AREA:MECHANICAL ENGINEER TO ADVISE UPON
PROVISION AND CAPACITY OF EXTRACT FANS.

SHOWER

EXISTING FIRE ESCAPE
RETAINED, ALLOW TO
REPLACE EXISTING
DOORS.

HOOD FOR COOKER AND VENTILATION FANS.

URINALS

MANAGERS BATHROOM:ELECTRICAL CONTRACTOR TO SUPPLY

PIPEWORK TO BE IN UPVC TO BS 4514.WASTE RUNS TO BE

AND FIX EXTRACT FAN ,AND PLASTIC DUCTING AS REQUIRED

CONNECTED TO 100mm DIA SOIL AND VENT STACK EXTENDED

FAN TO BE PULL CORD OPERATED AND TO EXTRACTAT A RATE

UP MIN 900mm ABOVE ANY OPENING WITHIN 3M AND FINISHED

OF 15 LITRES/SECOND.

NEW SCREEN, REFER
TO DWG 010.
ALLOW TO BUILD NEW
RECLAIMED BRICKWORK
WALLS AS SHOWN.

ENTRANCE

ALLOW TO DEMOLISH
SECTIONS OF EXISTING
COLUMNS AS SHOWN
AND MAKE GOOD.

AREA 8

NEW SCREEN,
REFER TO DWG
010.

ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.

ALLOW TO REMOVE
EXISTING NIB AND
MAKE GOOD.

FOR INTEGRITY ,IN PARTICULAR THE DOOR CLOSER AND
INTUMESCENT STRIP.

ALL APPLIANCES TO HAVE MIN 75mm DEEP SEAL TRAPS.

FAN TO BE CORD OPERATED AND TO EXTRACT AT A RATE OF

APPLIANCE WASTES TO BE TAKEN TO A TRAPPED GULLY IN

PART H-DRAINAGE

NEW WINDOWS TO MANAGERS FLAT TO HAVE TRICKLE

NEW DRAINAGE IN GROUND TO BE VITREOUS CLAY PIPEWORK

VENTILATOR FREE AREA MIN 4000mmSQ.

ALLOW TO FIT
SOLID ASH SHELF
TO REAR GAP
BEHIND FIXED
SEATING.

BAR TO OPEN" NOTICE
N6
H

SMOKE DETECTOR

E

THREE HOUR NON-MAINTAINED EMERGENCY LIGHT FITTING.

"FIRE DOOR KEEP SHUT"NOTICE
CONSTRUCT NEW
FEATURE LOG STORE IN
STUD FRAME AND
PLASTERBOARD CLAD
WALLS TO RECEIVE
SKIM AND DECS.
SINGLE HEIGHT BRICK
PLINTH AND 250mm
DEEP PB CLAD SOFFIT.

HEAT DETECTOR

IP

N1

N5

WHERE PIPE PASSES THROUGH WALL OR FOUNDATION FORM
OPENING THROUGH AND LINTEL OVER.PIPE TO HAVE MIN 50mm

FIRE ALARM INDICATOR PANEL

GENERAL FIRE NOTICE(FIRE
EVENT PROCEDURES)

CLEAR SPACE AROUND.MASK EACH SIDE OF OPENING WITH RIGID

NEW GLAZING TO WINDOWS TO BE 6mm TOUGHENED SAFETY

SHEETING AS RODENT BARRIER.

PIPE RUN IN OPEN GROUND TO HAVE MIN 150mm PEA GRAVEL
BED AND SURROUND.

PARTICULAR DETAILS TO HANDRAILS AND TACTILE

MANHOLES CONSTRUCTED OF 215mm SEMI-ENGINEERING
BRICKWORK TO BS 3921,BUILT OFF 150mm CONCRETE SLAB
WITH CONCRETE FLAUNCHING TO PIPEWORK.
INTERNAL PIPEWORK TO HAVE DOUBLE SEAL COVER WITH

DISABLED TOILET TO DIMENSIONS SHOWN BELOW.

Gateway, Eastleigh

"FINAL FIRE EXIT"
"EXIT"

9 LITRE WATER EXTINGUISHER

"FIRE EXIT"

DRAWING TITLE

"EXIT,LEFT"
AFFF FOAM EXTINGUISHER

"FIRE EXIT,LEFT"
"EXIT,RIGHT"

B

2
1m FIRE BLANKET

"FIRE EXIT,RIGHT"

NEOPRENE GASKET.COVER TO BE RECESSED TO ACCEPT FLOOR
ILLUMINATED 3 HOUR MAINTAINED

TIMBER STUD PARTITION-30 MINUTES
NEW PARTITION OF 89x38mm SW HEAD AND SOLE PLATES
NOGGINS @ 1200mm c/c.FACE EACH SIDE WITH ONE LAYER

WET CHEMICAL

12.5mm GYPROC WALLBOARD PLASTERBOARD,JOINTS TO BE TAPED

TO BS 5499 PART 1 (THE GREEN MOVING

CEILING

CONTRACTOR TO DEMOLISH EXISTING STRUCTURE AS INDICATED

WHERE DOWNLIGHTERS ARE TO BE USED.

AND FOR TEMPORARY SUPPORT OF STRUCTURE AS REQUIRED BY

ALLOW FOR AT LEAST 130-140mm DROP.

FINISH WITH SKIM PLASTER TO RECEIVE DECORATION.

PERSON),EUROPEAN DIRECTIVE.

ACHIEVES HALF HOUR FIRE RESISTANCE.
WHERE RUN OF STUD PARTITION IS PARALLEL WITH JOIST

STRUCTURAL ENGINEER.CART AWAY DEBRIS AND MAKE GOOD TO
AFFECTED SURFACES.

SCALE

1:50

SHEET

A1

RUN ON TIMBER FLOOR EXPOSE FLOOR AND DOUBLE UP

ALLOW FOR A SACRIFICIAL CEILING TO ALL AREAS OF CEILING

BY BROKEN LINE.ALLOW FOR PROTECTION OF REMAINING FABRIC,

Proposed Builders Work

WITH 89x38mm SW STUDS @ 600mm c/c AND 89x38mm SW
w c

EMERGENCY EXIT SIGN.LEGENDS TO BE

DEMOLITION

Whitbread Plc.

4.5kg DRY POWDER EXTINGUISHER

NEW MANHOLES TO MIN INTERNAL SIZE OF 1200x750mm WITH
MIN 600x600mm COVER.EXACT SIZE AS DRAWING.

CLIENT

CARBON DIOXIDE FIRE EXTINGUISHER
"FINAL EXIT"

FOUNDATION UNDERSIDE.

ADS DESIGN & BRAND DEVELOPMENT
King John's Gallery, Mythe Road, Tewkesbury, GL20 6EB
Tel: +44 (0) 1684 851299 Fax: +44 (0) 1684 851298
email: info@ads-design.co.uk

PROJECT

SERVICEABILITY

PIPE WITH 150mm CONCRETE BED AND SURROUND TO LEVEL OF

KJA

"FIRE DOORS KEEP CLEAR" NOTICE

BE CHECKED AND CERTIFIED (QUALIFIED ELECTRICIAN) FOR

REF TO DOOR SCHEDULE FOR FULL DETAILS

SHEET OF TOUGHENED GLASS.

11/7/07

ALLOW TO INFILL GAP WITH SW
FRAMEWORK CLAD IN
PLASTERBOARD SKIMMED AND
PAINTED FINISH TO MATCH
ELSEWHERE.

BREAK GLASS FIRE ALARM CALL POINT.

GLASS TO BS6206 1981, TO A MINIMUM HEIGHT OF 1500mm

GLAZED SCREENS WITH LEADED GLASS TO BE BACKED WITH

DISABLED WC LAYOUT REVISED, NEW
WINDOW IN AREA 5 OMITTED, EXISTING
RETAINED WITH WORKS, SCREEN IN AREA 13
REVISED TO INCORPORATE EXISTING
SERVICES DUCT, DOOR INTO FIRE EXIT
STAIRS BLOCKED UP, REVISIONS TO GENTS
WC.

ADSDESIGN

ALL EXISTING EMERGENCY LIGHTING WHICH IS REMAINING TO

WHERE PIPE RUNS WITHIN 1M OF BUILDING FOUNDATION,ENCASE

KJA

LOBBY

PANIC BOLT EMERGENCY DOOR IRONMONGERY,WITH"PUSH

NEW GLAZING TO DOORS TO BE OF 6mm TOUGHENED SAFETY

GLASS AS BEFORE TO MIN HEIGHT OF 800mm

13/7/07

VISION PANEL TO DOOR OF 6mm GEORGIAN WIRED POLISHED

OF 100mm DIA LAID TO FALL 1:80 (UNLESS OTHERWISE NOTED
PIPE WORK IN FLOOR TO HAVE MIN 150mm CONCRETE BED AND

LOG STORE ADDED TO LOBBY. SCREENS IN
AREAS 12,4 & 9 AMENDED.

A

BELOW GROUND

ON DRAWING).CLAY PIPES TO BS 85

KJA

INTERIORS ARCHITECTURE

VP

TRICKLE VENTILATOR FREE AREA MIN 4000mmSQ.

FANS,TOGETHER WITH LINTELS,DPCS AND CAVITY TRAY.

19/7/07

PLATE GLASS,OR PILKINGTON "PYRAN" FIRE RESISTANT

S

FLOOR /GROUND, TO BE FITTED WITH A SEALING PLATE.

AMENDMENT TO FIXED SEATING BY MAIN
ENTRANCE.

B

NEW PLINTH,
REFER TO DWG
010.

GLASS,SET IN INTUMESCENT PUTTY WITH HARDWOOD BEADS.

VALVE TO A BBA CERTIFICATE.

MINIMUM DIMENSIONS OF LOBBIES AND RAMPS AND OF

C

AND DETECTORS SUBJECT TO FIRE OFFICERS REPORT.

AND FIX EXTRACT FAN AND PLASTIC DUCTING AS REQUIRED.

REFER TO DRAWINGS FOR PROVISION OF ACCESS INCLUDING

RETAIN EXISTING SERVICE
DUCT AND STUDWORK.

NEW PLINTH, REFER
TO DWG 010.

ALL EXISTING FD30S,AND FD60S FIRE DOORS TO BE CHECKED

PB

LIVING ROOM

ALLOW TO REMOVE
EXISTING SCREENS AND
MAKE GOOD TO WALLS &
FLOOR.

NOTE THAT THE EXACT LOCATION OF EMERGENCY LIGHTING

MANAGERS KITCHEN:ELECTRICAL CONTRACTOR TO SUPPLY

PART M-DISABLED

ALLOW TO STRIP OUT ALL
EXISTING RAISED LEVEL
AND MAKE GOOD TO
AFFECTED AREAS. ALLOW
TO MAKE GOOD FLOOR
READY TO RECEIVE NEW
FLOOR FINISH.

UPON COMPLETION OF TREATMENT.

50mm DIA 4M MAX RUN

100mmSTUB STACKS TO BE FITTED WITH AN AIR ADMITTANCE

PART N-GLAZING

NEW SCREEN, REFER
TO DWG 010.

STANDARD.CONTRACTOR TO SUPPLY FIRE TEST CERTIFICATE

WITH BALLOON GRATE.

MAIN CONTRACTOR TO FORM OPENINGS INWALLS/ROOFS FOR

KITCHEN

WITH PROPRIETRY TREATMENT TO A BBA CERTIFICATE

DOOR KEEP SHUT" NOTICE BOTH SIDES AT EYE LEVEL.

50mm DIA 4M MAX RUN

KITCHEN
LOBBY

UPHOLSTERY ETC) TO BE UPGRADED TO CLASS"1" STANDARD

IF PLANTED).POSITIVE OVERHEAD DOOR CLOSER."FIRE

GLASSWASH

NEW CABINETRY
REFER DRAWING No11

CLASS "0".CLASS "3" ITEMS(EG CURTAINS,DRAPES,TIMBER,

AT 300mm CENTRES MAX WITH COUNTER SUNK SCREWS

WASHMACHINE 50mm DIA 4M MAX RUN

3. The contractor is responsible for ensuring that all works comply with Local Authority
requirements and national regulations.

SURFACE SPREAD OF FLAME:WALLS AND CEILINGS TO BE

FRAME /LINING TO HAVE MINIMUM 38x15mm STOPS(FIXED

50mm DIA 4M MAX RUN

2. This drawing should be read in conjunction with relevant specifications and documentation
issued by ADS Design or third parties. the contractor is responsible for assimilating the
information and reporting descrepancies to ADS Design prior to commencement of works.

NEW PLINTH, REFER
TO DWG 010.

NEW PLINTHS, REFER
TO DWG 010.

ALLOW TO REPLACE
EXISTING GLAZING WITH
NEW OPAQUE GLAZING
TO DESIGNERS
APPROVAL.

INTUMESCENT STRIPS AND COLD SMOKE SEAL BRUSHES.

KITCHEN:CATERING CONTRACTOR TO ADVISE UPON EXTRACTION

60 LITRES/SECOND.MAIN CONTRACTOR TO SUPPLY AND FIX

NEW SCREEN,
REFER TO DWG
010.

FIRE DOOR TO HALF HOUR FIRE RESISTANCE WITH

FD30S

40mm DIA 3M MAX RUN

ALLOW TO FORM NEW
STUDWORK NIB FOR NEW PLINTHS,
REFER TO DWG 010 FOR DETAILS.

NEW SCREENS, REFER
TO DWG 010.

AREA 9

PART B-FIRE NOTES

PLUMBING SIZES:

FAN TO BE SWITCHED TO TOILET LIGHTS AND TO ACHIEVE

ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.

ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.

ALLOW TO FORM
NEW STUD WALL AS
SHOWN, SKIMMED
PLASTER FINISH.
ALLOW FOR NEW
DOORWAY.

ALLOW TO
CAREFULLY DEMOLISH
EXISTING WALL AS
SHOWN AND MAKE
GOOD.

AREA 1

NEW PLINTH, REFER
TO DWG 010.

NEW SOLID STUD
WALL PREPARED TO
RECEIVE NEW DECS

ABOVE GROUND

NEW
SCREEN,
REFER TO
DWG 010.

1. Do not scale from this drawing. All dimensions should be checked on site prior to
commencement of work or associated manufacturing.

ALLOW TO REMOVE
EXISTING DOOR &
FRAME AND MAKE
GOOD.

ALLOW TO FORM
NEW STUDWORK
WALLS AS SHOWN,
SKIMMED PLASTER
FINISH.

ALLOW TO FORM NEW
STUDWORK WALLS AS
SHOWN, WITH SKIMMED
PLASTER FINISH.

ALLOW TO
FORM NEW
COLUMN FROM
BRADSTONE.

ALLOW TO REMOVE
EXISTING SCREEN AND
MAKE GOOD.

PURPLE ROOM

TOILETS:ELECTRICAL CONTRACTOR TO SUPPLY AND FIX

AREA 7

ALLOW TO
FORM NEW
COLUMN FROM
BRADSTONE.

NEW SCREENS,
REFER TO DWG
010.
ALLOW TO FORM NEW
STUDWORK WALLS AS
SHOWN WITH SKIMMED
PLASTER FINISH.

NEW SCREEN REFER TO
DWG 010. ALLOW TO
FORM 2NO. NEW
STUDWORK PIERS AS
SHOWN.

Copyright of this drawing is owned soley by ADS Design & Brand Development Ltd.This
document is confidential and as such its contents should be treated with the utmost care
and consideration, and in no circumstances should it be disclosed, distributed, published or
copied whether in part or in whole, without the prior consent of ADS Design and Brand
Development Ltd in writing.

NEW SCREEN,
REFER TO DWG
010.

AREA 10

PART F-VENTILATION

ALLOW TO INFILL GAP WITH
STUDWORK, SKIMMED
PLASTER FINISH.

NEW SCREEN,
REFER TO DWG
010.

ALLOW TO CAREFULLY
DEMOLISH EXISTING WALLS
AS SHOWN, MAKE GOOD
TO AFFECTED AREAS.

NEW SCREENS,
REFER TO DWG
010.

ALLOW TO CAREFULLY
REMOVE EXISTING
COLUMN AND MAKE
GOOD.

AREA 2

ALLOW TO FORM NEW STUDWORK
NIB FOR NEW SCREEN & PLINTH, REFER
TO DWG 010 FOR DETAILS.

NEW SCREEN,
REFER TO DWG
010.

APPROXIMATE
POSITION OF NEW
WHB, ALLOW FOR
CONNECTION INTO
DRAINAGE RUN.

ALLOW TO REMOVE ALL
EXISTING BAR SERVERY
AND MAKE GOOD TO
AFFECTED AREAS.
NEW SCREEN AND
DRINKSHELF,
ALLOW TO
REFER TO DWG
REMOVE
010.
EXISTING
SCREEN AND
MAKE GOOD.

NEW FIREPLACE,
REFER TO DWG
013.

ALLOW TO REMOVE
EXISTING SCREEN &
MAKE GOOD.

NEW PLINTH,
REFER TO DWG
010.

ALLOW TO FORM
NEW COLUMN
FROM BRADSTONE,
TO ENCLOSE NEW
STRUCTURAL STEEL

ALLOW TO
CAREFULLY
DEMOLISH EXISTING
WALL AS SHOWN
REMOVE DOOR &
FRAME, MAKE
GOOD TO
AFFECTED AREAS.

BLUE ROOM
AREA 11

NEW SCREEN,
REFER TO DWG
010.

ALLOW TO REMOVE ALL
EXISTING BAR SERVERY
AND MAKE GOOD TO
AFFECTED AREAS.

BAR SERVERY

ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.

NEW ATM
ENCLOSURE REFER
DRAWING No 11

AREA 6

NEW WALLS TO
COMPLETELY
ENCLOSE NEW
STRUCTURAL STEEL
COLUMNS AS PER
ENGINEERS SPEC

ALLOW TO CAREFULLY REMOVE EXISTING
COLUMN AND MAKE GOOD.

NEW BAR SERVERY AND
BACKFITTING, REFER TO
DWGS 07 & 08.

BAR

AREA 6

NEW SCREEN, REFER
TO DWG 010.
ALLOW TO DEMOLISH
EXISTING SCREEN & WALLS
AND MAKE GOOD. REROUT
EXISTING SEVICES INTO NEW
STUD WALL

ALLOW TO
CAREFULLY DEMOLISH
EXISTING WALLS AS
SHOWN AND MAKE
GOOD.

ALLOW TO DEMOLISH
EXISTING WALLS AS
SHOWN & MAKE GOOD.

ALLOW TO STRIP OUT ALL
REDUNDANT
SANITARYWARE AND CAP
OFF REDUNDANT SERVICES.

ALLOW TO DEMOLISH EXISTING WALLS
AND SERVICE DUCT AS SHOWN.
ALLOW TO RE-ROUTE SERVICES.

AREA 12
RED ROOM

ALLOW TO REMOVE ALL EXISTING
BAR SERVERY AND MAKE GOOD
TO AFFECTED AREAS.

ALLOW TO FORM
2NO NEW
RECLAIMED
BRICKWORK PIERS
AS SHOWN.

AREA 13
ALLOW TO STRIP
OUT EXISTING
BATHROOM AND
CAP OFF EXISTING
SERVICES,
CAREFULLY
DEMOLISH EXISTING
WALLS AS SHOWN
AND MAKE GOOD.

BAR

ALLOW TO REMOVE
EXISTING SCREENS &
MAKE GOOD.

NEW SCREEN,
REFER TO DWG 010.

ALLOW TO INFILL REDUNDANT DOORWAY
WITH STUDWORK, SKIMMED PLASTER FINISH.

NEW STUD WALLS TO
COMPLETELY
ENCLOSE NEW
STRUCTURAL STEEL
COLUMNS AS PER
ALLOW TO FORM
ENGINEERS SPEC
NEW WALL FROM
BRADSTONE
STONEWORK.

NEW POSEUR
DINING SHELF, REFER
TO DWG 011.

ALLOW TO
DEMOLISH EXISTING
WALLS AS SHOWN &
MAKE GOOD.

NEW STUDWORK WALLS AS
SHOWN, SKIMMED PLASTER
FINISH.

ALLOW TO FORM
NEW STUDWORK
COLUMN AS
SHOWN, SKIMMED
PLASTER FINISH.

ALLOW TO FORM
NEW WALLS IN
STUDWORK AS
SHOWN.

AREA 4

ALLOW TO REMOVE
EXISTING DOOR &
FRAME AND MAKE
GOOD

ALLOW TO INFILL
REDUNDANT
DOORWAY WITH
NEW STUDWORK,
SKIMMED PLASTER
FINISH.

BROWN ROOM

NEW SCREENS,
REFER TO DWG 010.

LADIES

DISABLED
WC

ALLOW TO STRIP OUT ALL
REDUNDANT
SANITARYWARE AND CAP
OFF REDUNDANT SERVICES.

FOR TOILET DETAILS
REFER TO DWG 012.

NEW DRAINAGE AS
PER NOTE ABOVE.

07041

RETAIN EXISTING WINDOW, REGLAZE
WITH BLACK GLASS. BLOCK UP
INTERNALLY WITH STUD FRAME AND
PB CLADDING. SKIM ENTIRE WALL IN
PREP FOR NEW DECS

FIRE PROTECTION-STEELWORK
PROTECT STEELWORK WITH ONE
LAYER OF GYPROC 12.5MM FIRELINE
PLASTERBOARD FIXED TO GYPROC
Gyplyner "ENCASE" STEEL CLIP
SYSTEM FIXED IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS.

JOIST UNDER.

DATE

June 07

DRAWN

Autocad2000/

DRAWING NUMBER

016

C

Weitere ähnliche Inhalte

Was ist angesagt?

Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
grahamelanders
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
Mark Thornton
 
Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1
Vincent Doherty
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
David Dinsdale
 
1371-Scarewater Vean - Sections
1371-Scarewater Vean - Sections1371-Scarewater Vean - Sections
1371-Scarewater Vean - Sections
Malcolm Sargeant
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 Building
Maja Myall
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
Danny Chiverton
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport Development
Trevain Bechan
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton Portfolio
Mark Thornton
 

Was ist angesagt? (18)

Ktrimbee A-6
Ktrimbee A-6Ktrimbee A-6
Ktrimbee A-6
 
India’s !st & only Hollywood benchmarked studio facility
India’s !st & only Hollywood benchmarked studio facilityIndia’s !st & only Hollywood benchmarked studio facility
India’s !st & only Hollywood benchmarked studio facility
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
7545 102 final elevations as proposed
7545 102 final elevations as proposed7545 102 final elevations as proposed
7545 102 final elevations as proposed
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
 
3D
3D3D
3D
 
Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1
 
7545 104 final sections as proposed
7545 104 final sections as proposed7545 104 final sections as proposed
7545 104 final sections as proposed
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
1371-Scarewater Vean - Sections
1371-Scarewater Vean - Sections1371-Scarewater Vean - Sections
1371-Scarewater Vean - Sections
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 Building
 
ERDENEBAT 374-3
ERDENEBAT 374-3ERDENEBAT 374-3
ERDENEBAT 374-3
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
 
LD-MP-01 @ issue C
LD-MP-01 @ issue CLD-MP-01 @ issue C
LD-MP-01 @ issue C
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport Development
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton Portfolio
 
FloodBreak Installation Guide
FloodBreak Installation Guide   FloodBreak Installation Guide
FloodBreak Installation Guide
 

Ähnlich wie Proposed Builder's Work Plan for Pub/Restaurant

1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
Mark Daly
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
Luciano D'Amico Rebord
 
Vent-Top X 1 and X 2 2005
Vent-Top X 1 and X 2 2005Vent-Top X 1 and X 2 2005
Vent-Top X 1 and X 2 2005
Mike Coughlin
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Sin Byrne
 
BR06 Existing and Proposed Elevation
BR06 Existing and Proposed ElevationBR06 Existing and Proposed Elevation
BR06 Existing and Proposed Elevation
sarah ralphs
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson Portfolio
Katie Johnson
 

Ähnlich wie Proposed Builder's Work Plan for Pub/Restaurant (20)

1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
 
15-106 3
15-106 315-106 3
15-106 3
 
Ceramic Liners brochure
Ceramic Liners brochureCeramic Liners brochure
Ceramic Liners brochure
 
Ceramic Brochure
Ceramic BrochureCeramic Brochure
Ceramic Brochure
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
Isokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsIsokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructions
 
Placing Reference.pdf
Placing Reference.pdfPlacing Reference.pdf
Placing Reference.pdf
 
ICS Brochure
ICS BrochureICS Brochure
ICS Brochure
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
Vent-Top X 1 and X 2 2005
Vent-Top X 1 and X 2 2005Vent-Top X 1 and X 2 2005
Vent-Top X 1 and X 2 2005
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
Flex Brochure
Flex BrochureFlex Brochure
Flex Brochure
 
BR06 Existing and Proposed Elevation
BR06 Existing and Proposed ElevationBR06 Existing and Proposed Elevation
BR06 Existing and Proposed Elevation
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson Portfolio
 
Colin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project WorkColin Harkin_Final Year - Project Work
Colin Harkin_Final Year - Project Work
 
Pearce avenue
Pearce avenuePearce avenue
Pearce avenue
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Project
 
Lesoma Farm Houses
Lesoma Farm HousesLesoma Farm Houses
Lesoma Farm Houses
 

Proposed Builder's Work Plan for Pub/Restaurant

  • 1. JOB REFERENCE ALLOW FOR NEW 100mm UPVC PIPES CONNECTED INTO ALL NEW SANITARYWARE INTO NEW STUB STACK WITH AIR ADMITANCE VALVE. ALLOW FOR NEW EXTERNAL BELOW GROUND DRAINAGE TO EXISTING MANHOLE. (SUBJECT TO SITE INSPECTION) ALLOW TO REPLACE EXISTING GLAZING WITH NEW OBSCURE FOR TOILET DETAILS REFER GLAZING. TO DWG 012. ALLOW TO FORM NEW WALLS IN STUDWORK AS SHOWN. ALLOW TO FORM NEW OPENING ALLOW TO FORM NEW THROUGH, STUDWORK WALLS AS MAKE SHOWN, SKIMMED PLASTER GOOD FOR FINISH. NEW DOOR. GENTS ALLOW TO FORM NEW OPENING THROUGH, MAKE GOOD FOR NEW DOOR. REMOVE DOOR AND BLOCK UP EXISTING OPENING, PREPARE TO RECEIVE NEW DECS REMOVE DOOR AND BLOCK UP EXISTING OPENING, PREPARE TO RECEIVE NEW DECS AREA 5 ALLOW TO STRIP OUT ALL REDUNDANT SANITARYWARE AND CAP OFF REDUNDANT SERVICES. NEW SCREEN, REFER TO DWG 010. AREA 4 NEW PLINTH, REFER TO DWG 010. ALLOW TO REMOVE EXISTING SCREENS & MAKE GOOD. NEW PLINTHS, REFER TO DWG 010. ALLOW TO FORM NEW STUDWORK WALLS AS SHOWN, SKIMMED PLASTER FINISH. PART H-DRAINAGE EXTRACT FAN WITH PLASTIC DUCTING AS REQUIRED TO TOILETS. WASHBASIN ALLOW TO REMOVE EXISTING SCREEN AND MAKE GOOD. 3 AIR CHANGES PER HOUR. SINK 50mm DIA 4M MAX RUN BATH 50mm DIA 4M MAX RUN TRADING AREA:MECHANICAL ENGINEER TO ADVISE UPON PROVISION AND CAPACITY OF EXTRACT FANS. SHOWER EXISTING FIRE ESCAPE RETAINED, ALLOW TO REPLACE EXISTING DOORS. HOOD FOR COOKER AND VENTILATION FANS. URINALS MANAGERS BATHROOM:ELECTRICAL CONTRACTOR TO SUPPLY PIPEWORK TO BE IN UPVC TO BS 4514.WASTE RUNS TO BE AND FIX EXTRACT FAN ,AND PLASTIC DUCTING AS REQUIRED CONNECTED TO 100mm DIA SOIL AND VENT STACK EXTENDED FAN TO BE PULL CORD OPERATED AND TO EXTRACTAT A RATE UP MIN 900mm ABOVE ANY OPENING WITHIN 3M AND FINISHED OF 15 LITRES/SECOND. NEW SCREEN, REFER TO DWG 010. ALLOW TO BUILD NEW RECLAIMED BRICKWORK WALLS AS SHOWN. ENTRANCE ALLOW TO DEMOLISH SECTIONS OF EXISTING COLUMNS AS SHOWN AND MAKE GOOD. AREA 8 NEW SCREEN, REFER TO DWG 010. ALLOW TO REMOVE EXISTING SCREEN AND MAKE GOOD. ALLOW TO REMOVE EXISTING NIB AND MAKE GOOD. FOR INTEGRITY ,IN PARTICULAR THE DOOR CLOSER AND INTUMESCENT STRIP. ALL APPLIANCES TO HAVE MIN 75mm DEEP SEAL TRAPS. FAN TO BE CORD OPERATED AND TO EXTRACT AT A RATE OF APPLIANCE WASTES TO BE TAKEN TO A TRAPPED GULLY IN PART H-DRAINAGE NEW WINDOWS TO MANAGERS FLAT TO HAVE TRICKLE NEW DRAINAGE IN GROUND TO BE VITREOUS CLAY PIPEWORK VENTILATOR FREE AREA MIN 4000mmSQ. ALLOW TO FIT SOLID ASH SHELF TO REAR GAP BEHIND FIXED SEATING. BAR TO OPEN" NOTICE N6 H SMOKE DETECTOR E THREE HOUR NON-MAINTAINED EMERGENCY LIGHT FITTING. "FIRE DOOR KEEP SHUT"NOTICE CONSTRUCT NEW FEATURE LOG STORE IN STUD FRAME AND PLASTERBOARD CLAD WALLS TO RECEIVE SKIM AND DECS. SINGLE HEIGHT BRICK PLINTH AND 250mm DEEP PB CLAD SOFFIT. HEAT DETECTOR IP N1 N5 WHERE PIPE PASSES THROUGH WALL OR FOUNDATION FORM OPENING THROUGH AND LINTEL OVER.PIPE TO HAVE MIN 50mm FIRE ALARM INDICATOR PANEL GENERAL FIRE NOTICE(FIRE EVENT PROCEDURES) CLEAR SPACE AROUND.MASK EACH SIDE OF OPENING WITH RIGID NEW GLAZING TO WINDOWS TO BE 6mm TOUGHENED SAFETY SHEETING AS RODENT BARRIER. PIPE RUN IN OPEN GROUND TO HAVE MIN 150mm PEA GRAVEL BED AND SURROUND. PARTICULAR DETAILS TO HANDRAILS AND TACTILE MANHOLES CONSTRUCTED OF 215mm SEMI-ENGINEERING BRICKWORK TO BS 3921,BUILT OFF 150mm CONCRETE SLAB WITH CONCRETE FLAUNCHING TO PIPEWORK. INTERNAL PIPEWORK TO HAVE DOUBLE SEAL COVER WITH DISABLED TOILET TO DIMENSIONS SHOWN BELOW. Gateway, Eastleigh "FINAL FIRE EXIT" "EXIT" 9 LITRE WATER EXTINGUISHER "FIRE EXIT" DRAWING TITLE "EXIT,LEFT" AFFF FOAM EXTINGUISHER "FIRE EXIT,LEFT" "EXIT,RIGHT" B 2 1m FIRE BLANKET "FIRE EXIT,RIGHT" NEOPRENE GASKET.COVER TO BE RECESSED TO ACCEPT FLOOR ILLUMINATED 3 HOUR MAINTAINED TIMBER STUD PARTITION-30 MINUTES NEW PARTITION OF 89x38mm SW HEAD AND SOLE PLATES NOGGINS @ 1200mm c/c.FACE EACH SIDE WITH ONE LAYER WET CHEMICAL 12.5mm GYPROC WALLBOARD PLASTERBOARD,JOINTS TO BE TAPED TO BS 5499 PART 1 (THE GREEN MOVING CEILING CONTRACTOR TO DEMOLISH EXISTING STRUCTURE AS INDICATED WHERE DOWNLIGHTERS ARE TO BE USED. AND FOR TEMPORARY SUPPORT OF STRUCTURE AS REQUIRED BY ALLOW FOR AT LEAST 130-140mm DROP. FINISH WITH SKIM PLASTER TO RECEIVE DECORATION. PERSON),EUROPEAN DIRECTIVE. ACHIEVES HALF HOUR FIRE RESISTANCE. WHERE RUN OF STUD PARTITION IS PARALLEL WITH JOIST STRUCTURAL ENGINEER.CART AWAY DEBRIS AND MAKE GOOD TO AFFECTED SURFACES. SCALE 1:50 SHEET A1 RUN ON TIMBER FLOOR EXPOSE FLOOR AND DOUBLE UP ALLOW FOR A SACRIFICIAL CEILING TO ALL AREAS OF CEILING BY BROKEN LINE.ALLOW FOR PROTECTION OF REMAINING FABRIC, Proposed Builders Work WITH 89x38mm SW STUDS @ 600mm c/c AND 89x38mm SW w c EMERGENCY EXIT SIGN.LEGENDS TO BE DEMOLITION Whitbread Plc. 4.5kg DRY POWDER EXTINGUISHER NEW MANHOLES TO MIN INTERNAL SIZE OF 1200x750mm WITH MIN 600x600mm COVER.EXACT SIZE AS DRAWING. CLIENT CARBON DIOXIDE FIRE EXTINGUISHER "FINAL EXIT" FOUNDATION UNDERSIDE. ADS DESIGN & BRAND DEVELOPMENT King John's Gallery, Mythe Road, Tewkesbury, GL20 6EB Tel: +44 (0) 1684 851299 Fax: +44 (0) 1684 851298 email: info@ads-design.co.uk PROJECT SERVICEABILITY PIPE WITH 150mm CONCRETE BED AND SURROUND TO LEVEL OF KJA "FIRE DOORS KEEP CLEAR" NOTICE BE CHECKED AND CERTIFIED (QUALIFIED ELECTRICIAN) FOR REF TO DOOR SCHEDULE FOR FULL DETAILS SHEET OF TOUGHENED GLASS. 11/7/07 ALLOW TO INFILL GAP WITH SW FRAMEWORK CLAD IN PLASTERBOARD SKIMMED AND PAINTED FINISH TO MATCH ELSEWHERE. BREAK GLASS FIRE ALARM CALL POINT. GLASS TO BS6206 1981, TO A MINIMUM HEIGHT OF 1500mm GLAZED SCREENS WITH LEADED GLASS TO BE BACKED WITH DISABLED WC LAYOUT REVISED, NEW WINDOW IN AREA 5 OMITTED, EXISTING RETAINED WITH WORKS, SCREEN IN AREA 13 REVISED TO INCORPORATE EXISTING SERVICES DUCT, DOOR INTO FIRE EXIT STAIRS BLOCKED UP, REVISIONS TO GENTS WC. ADSDESIGN ALL EXISTING EMERGENCY LIGHTING WHICH IS REMAINING TO WHERE PIPE RUNS WITHIN 1M OF BUILDING FOUNDATION,ENCASE KJA LOBBY PANIC BOLT EMERGENCY DOOR IRONMONGERY,WITH"PUSH NEW GLAZING TO DOORS TO BE OF 6mm TOUGHENED SAFETY GLASS AS BEFORE TO MIN HEIGHT OF 800mm 13/7/07 VISION PANEL TO DOOR OF 6mm GEORGIAN WIRED POLISHED OF 100mm DIA LAID TO FALL 1:80 (UNLESS OTHERWISE NOTED PIPE WORK IN FLOOR TO HAVE MIN 150mm CONCRETE BED AND LOG STORE ADDED TO LOBBY. SCREENS IN AREAS 12,4 & 9 AMENDED. A BELOW GROUND ON DRAWING).CLAY PIPES TO BS 85 KJA INTERIORS ARCHITECTURE VP TRICKLE VENTILATOR FREE AREA MIN 4000mmSQ. FANS,TOGETHER WITH LINTELS,DPCS AND CAVITY TRAY. 19/7/07 PLATE GLASS,OR PILKINGTON "PYRAN" FIRE RESISTANT S FLOOR /GROUND, TO BE FITTED WITH A SEALING PLATE. AMENDMENT TO FIXED SEATING BY MAIN ENTRANCE. B NEW PLINTH, REFER TO DWG 010. GLASS,SET IN INTUMESCENT PUTTY WITH HARDWOOD BEADS. VALVE TO A BBA CERTIFICATE. MINIMUM DIMENSIONS OF LOBBIES AND RAMPS AND OF C AND DETECTORS SUBJECT TO FIRE OFFICERS REPORT. AND FIX EXTRACT FAN AND PLASTIC DUCTING AS REQUIRED. REFER TO DRAWINGS FOR PROVISION OF ACCESS INCLUDING RETAIN EXISTING SERVICE DUCT AND STUDWORK. NEW PLINTH, REFER TO DWG 010. ALL EXISTING FD30S,AND FD60S FIRE DOORS TO BE CHECKED PB LIVING ROOM ALLOW TO REMOVE EXISTING SCREENS AND MAKE GOOD TO WALLS & FLOOR. NOTE THAT THE EXACT LOCATION OF EMERGENCY LIGHTING MANAGERS KITCHEN:ELECTRICAL CONTRACTOR TO SUPPLY PART M-DISABLED ALLOW TO STRIP OUT ALL EXISTING RAISED LEVEL AND MAKE GOOD TO AFFECTED AREAS. ALLOW TO MAKE GOOD FLOOR READY TO RECEIVE NEW FLOOR FINISH. UPON COMPLETION OF TREATMENT. 50mm DIA 4M MAX RUN 100mmSTUB STACKS TO BE FITTED WITH AN AIR ADMITTANCE PART N-GLAZING NEW SCREEN, REFER TO DWG 010. STANDARD.CONTRACTOR TO SUPPLY FIRE TEST CERTIFICATE WITH BALLOON GRATE. MAIN CONTRACTOR TO FORM OPENINGS INWALLS/ROOFS FOR KITCHEN WITH PROPRIETRY TREATMENT TO A BBA CERTIFICATE DOOR KEEP SHUT" NOTICE BOTH SIDES AT EYE LEVEL. 50mm DIA 4M MAX RUN KITCHEN LOBBY UPHOLSTERY ETC) TO BE UPGRADED TO CLASS"1" STANDARD IF PLANTED).POSITIVE OVERHEAD DOOR CLOSER."FIRE GLASSWASH NEW CABINETRY REFER DRAWING No11 CLASS "0".CLASS "3" ITEMS(EG CURTAINS,DRAPES,TIMBER, AT 300mm CENTRES MAX WITH COUNTER SUNK SCREWS WASHMACHINE 50mm DIA 4M MAX RUN 3. The contractor is responsible for ensuring that all works comply with Local Authority requirements and national regulations. SURFACE SPREAD OF FLAME:WALLS AND CEILINGS TO BE FRAME /LINING TO HAVE MINIMUM 38x15mm STOPS(FIXED 50mm DIA 4M MAX RUN 2. This drawing should be read in conjunction with relevant specifications and documentation issued by ADS Design or third parties. the contractor is responsible for assimilating the information and reporting descrepancies to ADS Design prior to commencement of works. NEW PLINTH, REFER TO DWG 010. NEW PLINTHS, REFER TO DWG 010. ALLOW TO REPLACE EXISTING GLAZING WITH NEW OPAQUE GLAZING TO DESIGNERS APPROVAL. INTUMESCENT STRIPS AND COLD SMOKE SEAL BRUSHES. KITCHEN:CATERING CONTRACTOR TO ADVISE UPON EXTRACTION 60 LITRES/SECOND.MAIN CONTRACTOR TO SUPPLY AND FIX NEW SCREEN, REFER TO DWG 010. FIRE DOOR TO HALF HOUR FIRE RESISTANCE WITH FD30S 40mm DIA 3M MAX RUN ALLOW TO FORM NEW STUDWORK NIB FOR NEW PLINTHS, REFER TO DWG 010 FOR DETAILS. NEW SCREENS, REFER TO DWG 010. AREA 9 PART B-FIRE NOTES PLUMBING SIZES: FAN TO BE SWITCHED TO TOILET LIGHTS AND TO ACHIEVE ALLOW TO REMOVE EXISTING SCREEN AND MAKE GOOD. ALLOW TO REMOVE EXISTING SCREEN AND MAKE GOOD. ALLOW TO FORM NEW STUD WALL AS SHOWN, SKIMMED PLASTER FINISH. ALLOW FOR NEW DOORWAY. ALLOW TO CAREFULLY DEMOLISH EXISTING WALL AS SHOWN AND MAKE GOOD. AREA 1 NEW PLINTH, REFER TO DWG 010. NEW SOLID STUD WALL PREPARED TO RECEIVE NEW DECS ABOVE GROUND NEW SCREEN, REFER TO DWG 010. 1. Do not scale from this drawing. All dimensions should be checked on site prior to commencement of work or associated manufacturing. ALLOW TO REMOVE EXISTING DOOR & FRAME AND MAKE GOOD. ALLOW TO FORM NEW STUDWORK WALLS AS SHOWN, SKIMMED PLASTER FINISH. ALLOW TO FORM NEW STUDWORK WALLS AS SHOWN, WITH SKIMMED PLASTER FINISH. ALLOW TO FORM NEW COLUMN FROM BRADSTONE. ALLOW TO REMOVE EXISTING SCREEN AND MAKE GOOD. PURPLE ROOM TOILETS:ELECTRICAL CONTRACTOR TO SUPPLY AND FIX AREA 7 ALLOW TO FORM NEW COLUMN FROM BRADSTONE. NEW SCREENS, REFER TO DWG 010. ALLOW TO FORM NEW STUDWORK WALLS AS SHOWN WITH SKIMMED PLASTER FINISH. NEW SCREEN REFER TO DWG 010. ALLOW TO FORM 2NO. NEW STUDWORK PIERS AS SHOWN. Copyright of this drawing is owned soley by ADS Design & Brand Development Ltd.This document is confidential and as such its contents should be treated with the utmost care and consideration, and in no circumstances should it be disclosed, distributed, published or copied whether in part or in whole, without the prior consent of ADS Design and Brand Development Ltd in writing. NEW SCREEN, REFER TO DWG 010. AREA 10 PART F-VENTILATION ALLOW TO INFILL GAP WITH STUDWORK, SKIMMED PLASTER FINISH. NEW SCREEN, REFER TO DWG 010. ALLOW TO CAREFULLY DEMOLISH EXISTING WALLS AS SHOWN, MAKE GOOD TO AFFECTED AREAS. NEW SCREENS, REFER TO DWG 010. ALLOW TO CAREFULLY REMOVE EXISTING COLUMN AND MAKE GOOD. AREA 2 ALLOW TO FORM NEW STUDWORK NIB FOR NEW SCREEN & PLINTH, REFER TO DWG 010 FOR DETAILS. NEW SCREEN, REFER TO DWG 010. APPROXIMATE POSITION OF NEW WHB, ALLOW FOR CONNECTION INTO DRAINAGE RUN. ALLOW TO REMOVE ALL EXISTING BAR SERVERY AND MAKE GOOD TO AFFECTED AREAS. NEW SCREEN AND DRINKSHELF, ALLOW TO REFER TO DWG REMOVE 010. EXISTING SCREEN AND MAKE GOOD. NEW FIREPLACE, REFER TO DWG 013. ALLOW TO REMOVE EXISTING SCREEN & MAKE GOOD. NEW PLINTH, REFER TO DWG 010. ALLOW TO FORM NEW COLUMN FROM BRADSTONE, TO ENCLOSE NEW STRUCTURAL STEEL ALLOW TO CAREFULLY DEMOLISH EXISTING WALL AS SHOWN REMOVE DOOR & FRAME, MAKE GOOD TO AFFECTED AREAS. BLUE ROOM AREA 11 NEW SCREEN, REFER TO DWG 010. ALLOW TO REMOVE ALL EXISTING BAR SERVERY AND MAKE GOOD TO AFFECTED AREAS. BAR SERVERY ALLOW TO REMOVE EXISTING SCREEN AND MAKE GOOD. NEW ATM ENCLOSURE REFER DRAWING No 11 AREA 6 NEW WALLS TO COMPLETELY ENCLOSE NEW STRUCTURAL STEEL COLUMNS AS PER ENGINEERS SPEC ALLOW TO CAREFULLY REMOVE EXISTING COLUMN AND MAKE GOOD. NEW BAR SERVERY AND BACKFITTING, REFER TO DWGS 07 & 08. BAR AREA 6 NEW SCREEN, REFER TO DWG 010. ALLOW TO DEMOLISH EXISTING SCREEN & WALLS AND MAKE GOOD. REROUT EXISTING SEVICES INTO NEW STUD WALL ALLOW TO CAREFULLY DEMOLISH EXISTING WALLS AS SHOWN AND MAKE GOOD. ALLOW TO DEMOLISH EXISTING WALLS AS SHOWN & MAKE GOOD. ALLOW TO STRIP OUT ALL REDUNDANT SANITARYWARE AND CAP OFF REDUNDANT SERVICES. ALLOW TO DEMOLISH EXISTING WALLS AND SERVICE DUCT AS SHOWN. ALLOW TO RE-ROUTE SERVICES. AREA 12 RED ROOM ALLOW TO REMOVE ALL EXISTING BAR SERVERY AND MAKE GOOD TO AFFECTED AREAS. ALLOW TO FORM 2NO NEW RECLAIMED BRICKWORK PIERS AS SHOWN. AREA 13 ALLOW TO STRIP OUT EXISTING BATHROOM AND CAP OFF EXISTING SERVICES, CAREFULLY DEMOLISH EXISTING WALLS AS SHOWN AND MAKE GOOD. BAR ALLOW TO REMOVE EXISTING SCREENS & MAKE GOOD. NEW SCREEN, REFER TO DWG 010. ALLOW TO INFILL REDUNDANT DOORWAY WITH STUDWORK, SKIMMED PLASTER FINISH. NEW STUD WALLS TO COMPLETELY ENCLOSE NEW STRUCTURAL STEEL COLUMNS AS PER ALLOW TO FORM ENGINEERS SPEC NEW WALL FROM BRADSTONE STONEWORK. NEW POSEUR DINING SHELF, REFER TO DWG 011. ALLOW TO DEMOLISH EXISTING WALLS AS SHOWN & MAKE GOOD. NEW STUDWORK WALLS AS SHOWN, SKIMMED PLASTER FINISH. ALLOW TO FORM NEW STUDWORK COLUMN AS SHOWN, SKIMMED PLASTER FINISH. ALLOW TO FORM NEW WALLS IN STUDWORK AS SHOWN. AREA 4 ALLOW TO REMOVE EXISTING DOOR & FRAME AND MAKE GOOD ALLOW TO INFILL REDUNDANT DOORWAY WITH NEW STUDWORK, SKIMMED PLASTER FINISH. BROWN ROOM NEW SCREENS, REFER TO DWG 010. LADIES DISABLED WC ALLOW TO STRIP OUT ALL REDUNDANT SANITARYWARE AND CAP OFF REDUNDANT SERVICES. FOR TOILET DETAILS REFER TO DWG 012. NEW DRAINAGE AS PER NOTE ABOVE. 07041 RETAIN EXISTING WINDOW, REGLAZE WITH BLACK GLASS. BLOCK UP INTERNALLY WITH STUD FRAME AND PB CLADDING. SKIM ENTIRE WALL IN PREP FOR NEW DECS FIRE PROTECTION-STEELWORK PROTECT STEELWORK WITH ONE LAYER OF GYPROC 12.5MM FIRELINE PLASTERBOARD FIXED TO GYPROC Gyplyner "ENCASE" STEEL CLIP SYSTEM FIXED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. JOIST UNDER. DATE June 07 DRAWN Autocad2000/ DRAWING NUMBER 016 C