RIG PDSI #15.3/N110-M
PT PERTAMINA DRILLING SERVICES
INDONESIA
AREA JAWA
BLOWOUT PREVENTER SYSTEM
Kreshna wisnu brata
12010133
TEKNIK PERMINYAKAN
*WHY THIS HAPPENS ?
* WHAT CAUSES IT?
*COULD IT IN PREVENT?
SHOULD BOP ?
*The Background
Blow Out
Pf >> Ph
Blow Out
Equipment
*Kick Indication
Drilling
Break
The
weight of
mud
down
Temperatur
mud and
pressure
abnormal
rise
Pressure
down
Volume of
mud thank
rise
Current
speed in
flow line rise
Rig Crew Less Training
Pressure Hidrostatik Down
Pressure Abnormal Formation
Tools not good function
Late Handled Kick
Rig Crew Less Training For Close and Kill Whel
Factor Kick
Factor Blow Out
*Bop Stuck 13 5/8’’- 5000 psi
Trayek Casing 7’’
BLOWOUT PREVENTER (BOP) EQP.
FUNCTION
BOP EQP.
Close well at situation there a pipe or not pipe
stripping in or stripping out
Withstand pressure well that arise and can be passed all the
equipment who were used to operating the drilling / rework
Control well pressure and can be used for work
circulation kill kick
Hang (hanging off) and cut the drill pipe in an emergency.
Having a system backup equipment if one breaks down, specifically
for high pressure wells
BOP
EQUIPMENT
BOP Stack
Type
1. Annular Type
BOP
2. Ram Type
BOP
3. Diverter
BOP In a pipe
1. Upper Kelly
Cock
2. Lower Kelly
Cock
3. Inside BOP
4. Drill Pipe
Float Valve
Control
System
1. Accumulator
Unit
2. Driller
Remote
Control
Panel
Line Control
Systeml
1. Drilling Spool
2. Killing Line
3. Choke Line
4. Choke
Manifold
5. Manual
Choke &
Super Choke
*Annular Preventer
HYDRIL Type GK
13- 5/8 ‘’
Flexible Closing Tools
Closing the Hole In Pipe Nor
There
Ways of working ?
Packing Element
Pressing piston powered
Rubber Nitrogen Fluid From
Accumulator Unit
*WORKING ANNULAR
CLOSE OPENNETRAL
Accumulator
Bank
*Ram Preventer
o The workings of Ram uses
hydraulic fluid from the
accumulator unit to open
and close the wild bursts
Pipe Ram
Blind Ram
Shear Ram
*KERJA RAM
13
Closing
Drillpipe
Opening
SICP
Leak while closed
*BOP inside pipe
*Upper Kelly Cock 3- ½ ‘’
Between the swivel and the kelly
joint to isolate the mud from the drill
string with a swivel, rotary house and
stand pipe in the event of a leak
Lower Kelly cock 3- ½ ‘’
under kelly
To prevent mud from falling apart as a
freelance kelly kelly, which
accommodated the pressure of 5000 psi
*INSIDE BOP
*close / withstand pressure
from the string during a
kick or bursts.
*Inside bop should be
available on the rig floor
position Standby
Drilling Spools
CONNECTION
Kill Line
Choke
Line
Kill line 2 1/8” x 10.000 psi Choke line 3-1/8’’ x 10.000 psi
* Kill line
serves as a conduit to the injection of fluid into the well if
necessary to shut down wells
Choke line
To stream high pressure fluid to the manifold in case of kick
*Back Pressure
Manifold
CHOKE MANIFOLD OR BACK PRESSURE MANIFOLD
serves as a flow divider in the event kick by dividing the flow
of appropriate safety procedures
Accumulator Unit
o Accumulator unit steel
which contains high-
pressure nitrogen
o Known for Closing Unit
has the main function to
close the BOP during a
kick
o Accumulator unit
produksi ABS 80
o 3000 Psi
o 3 unit Air Pump, 1 unit
Triplex
o 20 Botol
* BOP Remote Control Panel
Operation
Drilling
Rig FLoorDriller
*Prosedur Closed Well
1. Soft Closed
Open choke line valve
Closed BOP
Closed choke slowly
Read and record the
pressure cap drill pipe
and casing
2. Hard Closed
Closed BOP
Open choke line slowly
Read and record the
pressure cap drill pipe
and casing
* Metode Killing Well
Wait and
Weight
Driller Concurrent
*
*BOP (Blowout Preventer) is a tool used to
cover / hold kick or the flow of formation fluids
into the wellbore uncontrolled
*Source of power Acummulator is the water
pump and Electric pump
*Back Pressure Manifold serves to mud to mud
gas to separator, reserve pit, or flare
*BOP handling system on RIG PDSI
#15.3/N110-M wells relatively good, as long as
the drilling does not problem

Weitere ähnliche Inhalte

Was ist angesagt?

Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdfTinaMarey
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA DesignM.T.H Group
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEAmir Rafati
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1Elsayed Amer
 
Tech drilling-coil tubing
Tech drilling-coil tubingTech drilling-coil tubing
Tech drilling-coil tubingTito Pétro Fac
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)Mubarik Rao
 
unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxunlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxWaledFekry1
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2Elsayed Amer
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementingKamel Elsayed
 
Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipplesElsayed Amer
 

Was ist angesagt? (20)

Well Control
Well ControlWell Control
Well Control
 
Well intervention
Well  interventionWell  intervention
Well intervention
 
Casing design
Casing designCasing design
Casing design
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Drilling tools
Drilling toolsDrilling tools
Drilling tools
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
Casing design
Casing designCasing design
Casing design
 
Drill string
Drill stringDrill string
Drill string
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1
 
Tech drilling-coil tubing
Tech drilling-coil tubingTech drilling-coil tubing
Tech drilling-coil tubing
 
Production packer
Production packerProduction packer
Production packer
 
Drill stem testing
Drill stem testingDrill stem testing
Drill stem testing
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)
 
unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxunlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementing
 
Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipples
 

Andere mochten auch

Bop cameron
Bop cameronBop cameron
Bop cameronjaoliver
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsAFATous
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well ControlM.T.H Group
 
Well control
Well controlWell control
Well controlSaba Saif
 
Transocean well control
Transocean  well controlTransocean  well control
Transocean well controlSteffones K
 
PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0Shanice Sua
 
Oil and Gas Solutions v2
Oil and Gas Solutions v2Oil and Gas Solutions v2
Oil and Gas Solutions v2Mel Chaar
 
Drilling Tools Technology - Threaded Connections
Drilling Tools Technology - Threaded ConnectionsDrilling Tools Technology - Threaded Connections
Drilling Tools Technology - Threaded ConnectionsRobert Smith
 
Advanced blowout and well control robert d. grace
Advanced blowout and well control   robert d. graceAdvanced blowout and well control   robert d. grace
Advanced blowout and well control robert d. graceThần Chết Nụ Hôn
 
Maersk Training Presentation
Maersk Training Presentation Maersk Training Presentation
Maersk Training Presentation Chittra Koman
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )guest521158
 
IADC Aberdeen 2014 BOP presentation 0.1
IADC Aberdeen 2014 BOP presentation 0.1IADC Aberdeen 2014 BOP presentation 0.1
IADC Aberdeen 2014 BOP presentation 0.1Pieter van Asten
 
Offshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentationOffshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentationRAJESH KUMAR YESO
 
ISEN 459 real Final Poster
ISEN 459 real Final PosterISEN 459 real Final Poster
ISEN 459 real Final PosterIskander El Amri
 

Andere mochten auch (20)

Bop cameron
Bop cameronBop cameron
Bop cameron
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
 
Well control
Well controlWell control
Well control
 
Transocean well control
Transocean  well controlTransocean  well control
Transocean well control
 
Well control
Well control Well control
Well control
 
PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0
 
BOP
BOPBOP
BOP
 
Oil and Gas Solutions v2
Oil and Gas Solutions v2Oil and Gas Solutions v2
Oil and Gas Solutions v2
 
T3 EUROPEAN PRESENTATION
T3 EUROPEAN PRESENTATIONT3 EUROPEAN PRESENTATION
T3 EUROPEAN PRESENTATION
 
Bop cameron type u parts
Bop cameron type u partsBop cameron type u parts
Bop cameron type u parts
 
Drilling Tools Technology - Threaded Connections
Drilling Tools Technology - Threaded ConnectionsDrilling Tools Technology - Threaded Connections
Drilling Tools Technology - Threaded Connections
 
Dk well control
Dk well controlDk well control
Dk well control
 
Advanced blowout and well control robert d. grace
Advanced blowout and well control   robert d. graceAdvanced blowout and well control   robert d. grace
Advanced blowout and well control robert d. grace
 
Maersk Training Presentation
Maersk Training Presentation Maersk Training Presentation
Maersk Training Presentation
 
Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )Drilling Rig Components ( Illustrated Glossary )
Drilling Rig Components ( Illustrated Glossary )
 
IADC Aberdeen 2014 BOP presentation 0.1
IADC Aberdeen 2014 BOP presentation 0.1IADC Aberdeen 2014 BOP presentation 0.1
IADC Aberdeen 2014 BOP presentation 0.1
 
Offshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentationOffshore Drilling equipment Technical documentation
Offshore Drilling equipment Technical documentation
 
ISEN 459 real Final Poster
ISEN 459 real Final PosterISEN 459 real Final Poster
ISEN 459 real Final Poster
 
Bomba koomey cgba-slide share
Bomba koomey cgba-slide shareBomba koomey cgba-slide share
Bomba koomey cgba-slide share
 

Ähnlich wie blow out preventer system

Winding step-4.ppt
Winding step-4.pptWinding step-4.ppt
Winding step-4.pptABSHISHKUMAR
 
Tooling Equipment Terminology Training
Tooling Equipment Terminology TrainingTooling Equipment Terminology Training
Tooling Equipment Terminology TrainingWilliam Grohs
 
Installation and Drive Pipe Construction of the Bamford Hi-Ram Pump
Installation and Drive Pipe Construction of the Bamford Hi-Ram PumpInstallation and Drive Pipe Construction of the Bamford Hi-Ram Pump
Installation and Drive Pipe Construction of the Bamford Hi-Ram PumpFatin62c
 
2018 pumster english catalog
2018 pumster english catalog2018 pumster english catalog
2018 pumster english catalogpumster
 
12 drilling preventers
12 drilling preventers12 drilling preventers
12 drilling preventersAvinash B
 
20200116 tvn3- onesheet of piling works-rv5
20200116  tvn3- onesheet of piling works-rv520200116  tvn3- onesheet of piling works-rv5
20200116 tvn3- onesheet of piling works-rv5Thang234
 
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson UniversityHydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson UniversityFatin62c
 
How a Hydraulic Ram Pump Works - Clemson University
How a Hydraulic Ram Pump Works - Clemson UniversityHow a Hydraulic Ram Pump Works - Clemson University
How a Hydraulic Ram Pump Works - Clemson UniversityFatin62c
 
Magnum Pump Saver - Worldwide Oilfield Machine
Magnum Pump Saver - Worldwide Oilfield MachineMagnum Pump Saver - Worldwide Oilfield Machine
Magnum Pump Saver - Worldwide Oilfield Machinewomgroup
 
Subsea Intervention System (SIS) - Worldwide Oilfield Machine
Subsea Intervention System (SIS) - Worldwide Oilfield MachineSubsea Intervention System (SIS) - Worldwide Oilfield Machine
Subsea Intervention System (SIS) - Worldwide Oilfield Machinewomgroup
 
Mini Pipe Sprayer
 Mini Pipe Sprayer Mini Pipe Sprayer
Mini Pipe Sprayer3M
 
Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger   Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger Vibropac
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series Vibropac
 
Extruder or Injection Molding Machine Startup and Shutdown Article
Extruder or Injection Molding Machine Startup and Shutdown ArticleExtruder or Injection Molding Machine Startup and Shutdown Article
Extruder or Injection Molding Machine Startup and Shutdown ArticleR&B Plastics Machinery
 
Tentec hydraulic tensioner data sheet
Tentec hydraulic tensioner data sheet Tentec hydraulic tensioner data sheet
Tentec hydraulic tensioner data sheet Peter Prins
 

Ähnlich wie blow out preventer system (20)

Winding step-4.ppt
Winding step-4.pptWinding step-4.ppt
Winding step-4.ppt
 
Tooling Equipment Terminology Training
Tooling Equipment Terminology TrainingTooling Equipment Terminology Training
Tooling Equipment Terminology Training
 
Installation and Drive Pipe Construction of the Bamford Hi-Ram Pump
Installation and Drive Pipe Construction of the Bamford Hi-Ram PumpInstallation and Drive Pipe Construction of the Bamford Hi-Ram Pump
Installation and Drive Pipe Construction of the Bamford Hi-Ram Pump
 
The Bamford Hi-Ram Pump
The Bamford Hi-Ram PumpThe Bamford Hi-Ram Pump
The Bamford Hi-Ram Pump
 
2018 pumster english catalog
2018 pumster english catalog2018 pumster english catalog
2018 pumster english catalog
 
12 drilling preventers
12 drilling preventers12 drilling preventers
12 drilling preventers
 
20200116 tvn3- onesheet of piling works-rv5
20200116  tvn3- onesheet of piling works-rv520200116  tvn3- onesheet of piling works-rv5
20200116 tvn3- onesheet of piling works-rv5
 
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson UniversityHydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
Hydraulic Ram Pump: Plans, Assembly and Notes - Clemson University
 
How a Hydraulic Ram Pump Works - Clemson University
How a Hydraulic Ram Pump Works - Clemson UniversityHow a Hydraulic Ram Pump Works - Clemson University
How a Hydraulic Ram Pump Works - Clemson University
 
Blowout preventer
Blowout preventerBlowout preventer
Blowout preventer
 
Magnum Pump Saver - Worldwide Oilfield Machine
Magnum Pump Saver - Worldwide Oilfield MachineMagnum Pump Saver - Worldwide Oilfield Machine
Magnum Pump Saver - Worldwide Oilfield Machine
 
[HIFLUX] Total catalog - Eng.
[HIFLUX] Total catalog - Eng.[HIFLUX] Total catalog - Eng.
[HIFLUX] Total catalog - Eng.
 
Hydraulic Ram Made from Standard Plumbing Parts
Hydraulic Ram Made from Standard Plumbing PartsHydraulic Ram Made from Standard Plumbing Parts
Hydraulic Ram Made from Standard Plumbing Parts
 
Subsea Intervention System (SIS) - Worldwide Oilfield Machine
Subsea Intervention System (SIS) - Worldwide Oilfield MachineSubsea Intervention System (SIS) - Worldwide Oilfield Machine
Subsea Intervention System (SIS) - Worldwide Oilfield Machine
 
Mini Pipe Sprayer
 Mini Pipe Sprayer Mini Pipe Sprayer
Mini Pipe Sprayer
 
Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger   Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series
 
Extruder or Injection Molding Machine Startup and Shutdown Article
Extruder or Injection Molding Machine Startup and Shutdown ArticleExtruder or Injection Molding Machine Startup and Shutdown Article
Extruder or Injection Molding Machine Startup and Shutdown Article
 
Tentec hydraulic tensioner data sheet
Tentec hydraulic tensioner data sheet Tentec hydraulic tensioner data sheet
Tentec hydraulic tensioner data sheet
 
Home Made Hydraulic Ram Pump - Part 1
Home Made Hydraulic Ram Pump - Part 1Home Made Hydraulic Ram Pump - Part 1
Home Made Hydraulic Ram Pump - Part 1
 

Kürzlich hochgeladen

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 

Kürzlich hochgeladen (20)

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 

blow out preventer system

  • 1. RIG PDSI #15.3/N110-M PT PERTAMINA DRILLING SERVICES INDONESIA AREA JAWA BLOWOUT PREVENTER SYSTEM Kreshna wisnu brata 12010133 TEKNIK PERMINYAKAN
  • 2. *WHY THIS HAPPENS ? * WHAT CAUSES IT? *COULD IT IN PREVENT?
  • 4. *The Background Blow Out Pf >> Ph Blow Out Equipment
  • 5. *Kick Indication Drilling Break The weight of mud down Temperatur mud and pressure abnormal rise Pressure down Volume of mud thank rise Current speed in flow line rise
  • 6. Rig Crew Less Training Pressure Hidrostatik Down Pressure Abnormal Formation Tools not good function Late Handled Kick Rig Crew Less Training For Close and Kill Whel Factor Kick Factor Blow Out
  • 7. *Bop Stuck 13 5/8’’- 5000 psi Trayek Casing 7’’
  • 8. BLOWOUT PREVENTER (BOP) EQP. FUNCTION BOP EQP. Close well at situation there a pipe or not pipe stripping in or stripping out Withstand pressure well that arise and can be passed all the equipment who were used to operating the drilling / rework Control well pressure and can be used for work circulation kill kick Hang (hanging off) and cut the drill pipe in an emergency. Having a system backup equipment if one breaks down, specifically for high pressure wells
  • 9. BOP EQUIPMENT BOP Stack Type 1. Annular Type BOP 2. Ram Type BOP 3. Diverter BOP In a pipe 1. Upper Kelly Cock 2. Lower Kelly Cock 3. Inside BOP 4. Drill Pipe Float Valve Control System 1. Accumulator Unit 2. Driller Remote Control Panel Line Control Systeml 1. Drilling Spool 2. Killing Line 3. Choke Line 4. Choke Manifold 5. Manual Choke & Super Choke
  • 10. *Annular Preventer HYDRIL Type GK 13- 5/8 ‘’ Flexible Closing Tools Closing the Hole In Pipe Nor There Ways of working ? Packing Element Pressing piston powered Rubber Nitrogen Fluid From Accumulator Unit
  • 12. *Ram Preventer o The workings of Ram uses hydraulic fluid from the accumulator unit to open and close the wild bursts Pipe Ram Blind Ram Shear Ram
  • 14. *BOP inside pipe *Upper Kelly Cock 3- ½ ‘’ Between the swivel and the kelly joint to isolate the mud from the drill string with a swivel, rotary house and stand pipe in the event of a leak Lower Kelly cock 3- ½ ‘’ under kelly To prevent mud from falling apart as a freelance kelly kelly, which accommodated the pressure of 5000 psi
  • 15. *INSIDE BOP *close / withstand pressure from the string during a kick or bursts. *Inside bop should be available on the rig floor position Standby
  • 17. Kill line 2 1/8” x 10.000 psi Choke line 3-1/8’’ x 10.000 psi * Kill line serves as a conduit to the injection of fluid into the well if necessary to shut down wells Choke line To stream high pressure fluid to the manifold in case of kick
  • 18. *Back Pressure Manifold CHOKE MANIFOLD OR BACK PRESSURE MANIFOLD serves as a flow divider in the event kick by dividing the flow of appropriate safety procedures
  • 19. Accumulator Unit o Accumulator unit steel which contains high- pressure nitrogen o Known for Closing Unit has the main function to close the BOP during a kick o Accumulator unit produksi ABS 80 o 3000 Psi o 3 unit Air Pump, 1 unit Triplex o 20 Botol
  • 20. * BOP Remote Control Panel Operation Drilling Rig FLoorDriller
  • 21. *Prosedur Closed Well 1. Soft Closed Open choke line valve Closed BOP Closed choke slowly Read and record the pressure cap drill pipe and casing 2. Hard Closed Closed BOP Open choke line slowly Read and record the pressure cap drill pipe and casing
  • 22. * Metode Killing Well Wait and Weight Driller Concurrent
  • 23. * *BOP (Blowout Preventer) is a tool used to cover / hold kick or the flow of formation fluids into the wellbore uncontrolled *Source of power Acummulator is the water pump and Electric pump *Back Pressure Manifold serves to mud to mud gas to separator, reserve pit, or flare *BOP handling system on RIG PDSI #15.3/N110-M wells relatively good, as long as the drilling does not problem