Effective Ways of preparing for the
Introduction of Road User Charging
Approaches and Tools
14 April 2008
ITS Arab Bahrain
Gunnar Landfester, Dornier Consulting
Gunnar Landfester / 14.04.2008/ Page 2 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Agenda
1. Electronic toll collection: huge demand, but many risks
2. Need for cost transparency
3. The Dutch cost monitor process: a silver bullet?
4. Cost Comparison for everyone
5. Your questions
Gunnar Landfester / 14.04.2008/ Page 3 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
ETC in operation
Plans for country-wide ETC
ETC erection in progress
System extension planned
Current projects
 Czech Republic (satellite technology
for national roads)
Concrete plans
 France (Toll on national roads)
 Netherlands (Nationwide tolling)
 UK (Start of operation: 2015 est.)
 Slovakia (Implementation: 2008 est.)
 Hungary (Implementation: 2008 est.)
 Sweden (start of operation: 2012 est.)
 Austria (toll for passenger cars)
 Poland (feasibility study)
 Germany (light trucks: 2012 est.)
 Bulgaria
Country-wide toll systems are planned virtually all across Europe
ETC: Demand and Risks
Gunnar Landfester / 14.04.2008/ Page 4 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
ETC-introduction can be both lengthy and risky
ETC: Demand and Risks
Infrastructure
demand
Financing options
ETC Feasibility
ETC Trials
Privat/Public choice
Public consultation
demand
Legislation
Tender process
Public realization
process
Research &
Planning
Implementation
Impact of feedback-loops
20-30 years
(e.g. Germany, Austria,
Netherlands)
Supervision &
adjustment
Gunnar Landfester / 14.04.2008/ Page 5 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Associated risks rise with system complexity
 Political risks: new administration to change
targets or stop realization process
 Tender risks: complex bid evaluation
procedures are vulnerable to legal actions
(e.g. Germany, Czech Republic, Taiwan)
 Implementation risks:
 Non-availability of infrastructure (e.g.
power, fixed line or mobile networks)
 Technical risks with new technology
(Big bang)
 Project management (e.g. roll-out)
 Future all roads / all vehicle projects will be
even more challenging in the preparation
and implementation phases
ETC: Demand and Risks
Gunnar Landfester / 14.04.2008/ Page 6 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Ubiquitous cost transparency speeds up realization, thus lowering total costs
Need for cost transparency
Capex
Opex
Studies
Pilot trials
Tender
process
Negotiation
process
Supervision
Lost
revenues
cost awareness / visibility
Totalcosts
Direct
system costs
Development
Development costs
Steering
Side costs Delay costs
Graphic proportions do not
reflect cost proportions
high low
Gunnar Landfester / 14.04.2008/ Page 7 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Wide choice of system concepts makes decision-finding complex
Technologies
Operational solutions
System concepts
Need for road financing
Schedule restrictions
Acceptable system costs
A perfect solution?
Stationary
enforcement
Mobile
enforcement
GPS
Thin Client
Video tolling
Network tolling
Trucks
Passenger Cars
Area tolling
DSRC
Mobile
enforcement
Fat Client
Need for cost transparency
Gunnar Landfester / 14.04.2008/ Page 8 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Dutch Cost Monitor supports the legislation and implementation process
Run-up story
 Long track record of trials and studies
 Public-private initiative: replace vehicle
and oil taxes by a mobility tax for all
vehicle kilometres driven
 Industry: Less fall-back solutions, no
special system for occasional users and
progress in technology leads to cheaper
system
Targets of Cost Monitor
 Verify cost progress, identify potentials
 Support solution-finding process
 Support legislation process over 5-year
period
 Optimization of policy choice
(public/private work share)
Dutch Cost Monitor
Source: Cost Monitor / Dutch Ministry of Transport
Gunnar Landfester / 14.04.2008/ Page 9 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Cost Monitor delivered detailed data on cost structures of system concepts
Approach
 Phase 1: Discussions on system
requirements and draft design (52 parties)
 Phase 2: Detailed reports from 11 parties
regarding system concepts, related costs,
alternative designs and special issues
 Bi-annual update
Major Results
 General approach verified
 Detailed information on cost categories
 Revised requirement specification
Dutch Cost Monitor
Source: Cost Monitor / Dutch Ministry of Transport
Gunnar Landfester / 14.04.2008/ Page 10 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Dutch Cost Monitor is a model for large-scale ITS projects only
Dutch Cost Monitor
A model for other projects as well?
 In terms of size and technology the
Dutch project is most ambitious so far
(8 million cars, 6 billion € project value)
 However, detailed evaluations for typical
ETC projects (200 – 800 million Euro)
with small budget is rather unlikely
 Conclusion: Alternatives are needed!
Major advantages of the Cost Monitor
 Good results, quality information
 Low costs approach
 Quick results
!
?
Gunnar Landfester / 14.04.2008/ Page 11 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Alternatives for finding the cost-optimal system solutions
Solution
 Tool-based system
cost calculation
Approach
 Life Cycle Costing approach
 Customizable reference designs for DSRC
and GNSS/CN tolling allows quick results
 Custom system designs can be easily
implemented as well
 Use of cost forecasts, based on historic
cost data from projects across Europe
(which also includes Cost Monitor data)
Area of application
For road operators / administrative bodies
 Validation of financial options
 Support in the conception phase
 Preparation of tenders
For system integrators
 Comparison of system concepts
 Preparation of bids
Cost Comparison for everyone
Gunnar Landfester / 14.04.2008/ Page 12 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
How it works - CostComparator is based on the lifecycle costing model
Life cycle phasesLife cycle phases
Product Breakdown StructureProduct Breakdown Structure
Organizationalstructure /
Cost structure (WBS/CBS)
Organizationalstructure /
Cost structure (WBS/CBS)
Cost class: e.g..: EnergyCost class: e.g..: Energy
Cost element e.g.: energy
costs of component
„A“ during operation
Cost element e.g.: energy
costs of component
„A“ during operation
Defined part of life cycle
e.g..: Operation
Component A
Defined part of life cycle
e.g..: Operation
Component A
 With changing the underlying system concept, the CostComparator can be used for any
technical system.
Cost Comparison for everyone
Gunnar Landfester / 14.04.2008/ Page 13 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Gunnar Landfester / 14.04.2008/ Page 14 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
With well defined input, the CostComparator can deliver in three steps
Capture environment
 Road network
 Number of vehicles
 Investment costs
 OBU
 Enforcement cameras
 Operational costs
 Communication
 Staff
Cost Comparison for everyone
Capture
Environment
Add/Modify
System
if necessary
ProcessLCC
Analysis &
Simulation
Capture
Environment
Add/Modify
System
if necessary
ProcessLCC
Analysis &
Simulation
1 2 3
Modify system concept
 Manual booking
de-/activated
 Replace stationary
enforcement by mobile
enforcement
 ...
Compute lifecycle costs
 Press the button!
Result: Scenario
cost estimation
 Any parameter can be
modified
 For further analysis,
costs classes can be
analysed
 Reinvestments can be
defined as well
Gunnar Landfester / 14.04.2008/ Page 15 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Thank you very much for your attention!
‫لكم‬ ‫ا‬ً ‫شكر‬!
Your questions
Gunnar Landfester / 14.04.2008/ Page 16 of 16
Effective Ways of preparing for the Introduction of
Road User Charging
Gunnar LANDFESTER
Country Director Transportation KSA
Project Office Riyadh
Saudi Arabia
Phone +966 1 4792804
Mobile +966 50 4239058
Fax +966 1 4792657
Gunnar.Landfester@Dornier-Consulting.com
Contact

Weitere ähnliche Inhalte

Was ist angesagt?

Development of Transport Scenarios for Denmark: An Iterative and Participator...
Development of Transport Scenarios for Denmark: An Iterative and Participator...Development of Transport Scenarios for Denmark: An Iterative and Participator...
Development of Transport Scenarios for Denmark: An Iterative and Participator...IEA-ETSAP
 
Electric Road Systems: a solution for the future?
Electric Road Systems: a solution for the future?Electric Road Systems: a solution for the future?
Electric Road Systems: a solution for the future?Miguel Caso Florez
 
Assessing the equity impact of the EU emission trading scheme on an African a...
Assessing the equity impact of the EU emission trading scheme on an African a...Assessing the equity impact of the EU emission trading scheme on an African a...
Assessing the equity impact of the EU emission trading scheme on an African a...Institute for Transport Studies (ITS)
 
Subject: Ex-post impact evaluations of energy efficiency policies in Europe
Subject:	Ex-post impact evaluations of energy efficiency policies in EuropeSubject:	Ex-post impact evaluations of energy efficiency policies in Europe
Subject: Ex-post impact evaluations of energy efficiency policies in EuropeLeonardo ENERGY
 
EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications The European GNSS Agency (GSA)
 
Air quality around ports and the mitigation options - Erica Powell
Air quality around ports and the mitigation options - Erica PowellAir quality around ports and the mitigation options - Erica Powell
Air quality around ports and the mitigation options - Erica PowellIES / IAQM
 
Assessment of technologies to decarbonize the transport sector
Assessment of technologies to decarbonize the transport sectorAssessment of technologies to decarbonize the transport sector
Assessment of technologies to decarbonize the transport sectorIEA-ETSAP
 
CoordiNet- Large scale demonstrations for TSO-DSO Cooperatio
CoordiNet- Large scale demonstrations for TSO-DSO CooperatioCoordiNet- Large scale demonstrations for TSO-DSO Cooperatio
CoordiNet- Large scale demonstrations for TSO-DSO CooperatioLeonardo ENERGY
 
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)The European GNSS Agency (GSA)
 
XERIC - Innovative Climate-control System to Extend Range of Electric Vehicle...
XERIC - Innovative Climate-control System to Extend Range of Electric Vehicle...XERIC - Innovative Climate-control System to Extend Range of Electric Vehicle...
XERIC - Innovative Climate-control System to Extend Range of Electric Vehicle...European Green Vehicle Initiative
 
Sahkoinen Liikenne_4-3 Pihlajatie VTT joukkoliikenne
Sahkoinen Liikenne_4-3 Pihlajatie VTT  joukkoliikenneSahkoinen Liikenne_4-3 Pihlajatie VTT  joukkoliikenne
Sahkoinen Liikenne_4-3 Pihlajatie VTT joukkoliikenneSito_Group
 
INTERPRETER – Local flexibility solutions leveraged by RD&I projects as syste...
INTERPRETER – Local flexibility solutions leveraged by RD&I projects as syste...INTERPRETER – Local flexibility solutions leveraged by RD&I projects as syste...
INTERPRETER – Local flexibility solutions leveraged by RD&I projects as syste...Leonardo ENERGY
 
BACS requirements in the revised EPBD: How to check compliance?
BACS requirements in the revised EPBD: How to check compliance?BACS requirements in the revised EPBD: How to check compliance?
BACS requirements in the revised EPBD: How to check compliance?Leonardo ENERGY
 
Time to step up performance-based energy efficiency measurement and verificat...
Time to step up performance-based energy efficiency measurement and verificat...Time to step up performance-based energy efficiency measurement and verificat...
Time to step up performance-based energy efficiency measurement and verificat...Leonardo ENERGY
 

Was ist angesagt? (20)

Development of Transport Scenarios for Denmark: An Iterative and Participator...
Development of Transport Scenarios for Denmark: An Iterative and Participator...Development of Transport Scenarios for Denmark: An Iterative and Participator...
Development of Transport Scenarios for Denmark: An Iterative and Participator...
 
Electric Road Systems: a solution for the future?
Electric Road Systems: a solution for the future?Electric Road Systems: a solution for the future?
Electric Road Systems: a solution for the future?
 
Assessing the equity impact of the EU emission trading scheme on an African a...
Assessing the equity impact of the EU emission trading scheme on an African a...Assessing the equity impact of the EU emission trading scheme on an African a...
Assessing the equity impact of the EU emission trading scheme on an African a...
 
Subject: Ex-post impact evaluations of energy efficiency policies in Europe
Subject:	Ex-post impact evaluations of energy efficiency policies in EuropeSubject:	Ex-post impact evaluations of energy efficiency policies in Europe
Subject: Ex-post impact evaluations of energy efficiency policies in Europe
 
Transport Thursday Niel van Oort
Transport Thursday Niel van OortTransport Thursday Niel van Oort
Transport Thursday Niel van Oort
 
Panagopoulos ict ppp_gr
Panagopoulos ict ppp_grPanagopoulos ict ppp_gr
Panagopoulos ict ppp_gr
 
EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications
 
GSA project roadmap summary and next steps
GSA project roadmap summary and next stepsGSA project roadmap summary and next steps
GSA project roadmap summary and next steps
 
Air quality around ports and the mitigation options - Erica Powell
Air quality around ports and the mitigation options - Erica PowellAir quality around ports and the mitigation options - Erica Powell
Air quality around ports and the mitigation options - Erica Powell
 
Assessment of technologies to decarbonize the transport sector
Assessment of technologies to decarbonize the transport sectorAssessment of technologies to decarbonize the transport sector
Assessment of technologies to decarbonize the transport sector
 
CoordiNet- Large scale demonstrations for TSO-DSO Cooperatio
CoordiNet- Large scale demonstrations for TSO-DSO CooperatioCoordiNet- Large scale demonstrations for TSO-DSO Cooperatio
CoordiNet- Large scale demonstrations for TSO-DSO Cooperatio
 
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
Enhanced GNSS Receiver/User Terminal - Webinar (Fundamental Elements Call)
 
XERIC - Innovative Climate-control System to Extend Range of Electric Vehicle...
XERIC - Innovative Climate-control System to Extend Range of Electric Vehicle...XERIC - Innovative Climate-control System to Extend Range of Electric Vehicle...
XERIC - Innovative Climate-control System to Extend Range of Electric Vehicle...
 
Sahkoinen Liikenne_4-3 Pihlajatie VTT joukkoliikenne
Sahkoinen Liikenne_4-3 Pihlajatie VTT  joukkoliikenneSahkoinen Liikenne_4-3 Pihlajatie VTT  joukkoliikenne
Sahkoinen Liikenne_4-3 Pihlajatie VTT joukkoliikenne
 
SELL - Smart Energy for Leveraging LPG use - White Paper
SELL - Smart Energy for Leveraging LPG use - White PaperSELL - Smart Energy for Leveraging LPG use - White Paper
SELL - Smart Energy for Leveraging LPG use - White Paper
 
gerdien
gerdiengerdien
gerdien
 
Smartcard and Information Programme (METRO)
Smartcard and Information Programme (METRO)Smartcard and Information Programme (METRO)
Smartcard and Information Programme (METRO)
 
INTERPRETER – Local flexibility solutions leveraged by RD&I projects as syste...
INTERPRETER – Local flexibility solutions leveraged by RD&I projects as syste...INTERPRETER – Local flexibility solutions leveraged by RD&I projects as syste...
INTERPRETER – Local flexibility solutions leveraged by RD&I projects as syste...
 
BACS requirements in the revised EPBD: How to check compliance?
BACS requirements in the revised EPBD: How to check compliance?BACS requirements in the revised EPBD: How to check compliance?
BACS requirements in the revised EPBD: How to check compliance?
 
Time to step up performance-based energy efficiency measurement and verificat...
Time to step up performance-based energy efficiency measurement and verificat...Time to step up performance-based energy efficiency measurement and verificat...
Time to step up performance-based energy efficiency measurement and verificat...
 

Ähnlich wie Michael blum effective ways for ruc

BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport ProjectBDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport ProjectBigData_Europe
 
How ITS Can Contribute To Urban Freight Efficiency
How ITS Can Contribute To Urban Freight EfficiencyHow ITS Can Contribute To Urban Freight Efficiency
How ITS Can Contribute To Urban Freight Efficiencyzjeftic
 
Imtech Cooperative ITS Platforms
Imtech Cooperative ITS PlatformsImtech Cooperative ITS Platforms
Imtech Cooperative ITS PlatformsPeter Ashley
 
Sss14duke BT Innovate Research Design
Sss14duke BT Innovate Research DesignSss14duke BT Innovate Research Design
Sss14duke BT Innovate Research DesignJustin Hayward
 
Deliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMDeliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMVirginia Fernandez
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkTexxi Global
 
Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...Global CCS Institute
 
Towards a Global System for Telematics - P Van der Perre
Towards a Global System for Telematics - P Van der PerreTowards a Global System for Telematics - P Van der Perre
Towards a Global System for Telematics - P Van der Perremfrancis
 
Opportunities for VAS in the mobility pricing market
Opportunities for VAS in the mobility pricing marketOpportunities for VAS in the mobility pricing market
Opportunities for VAS in the mobility pricing marketCambridge Mobile Telematics
 
RES-T-NEXT, IEA RETD workshop in London, 26th August 2015
RES-T-NEXT, IEA RETD workshop in London, 26th August 2015RES-T-NEXT, IEA RETD workshop in London, 26th August 2015
RES-T-NEXT, IEA RETD workshop in London, 26th August 2015IEA_RETD
 
20130319_CCC final report
20130319_CCC final report20130319_CCC final report
20130319_CCC final reportMalte Risto
 
Special Remarks José Viegas
Special Remarks José ViegasSpecial Remarks José Viegas
Special Remarks José ViegasOECD Environment
 

Ähnlich wie Michael blum effective ways for ruc (20)

The importance of Value of Time studies - a Dutch perspective
The importance of Value of Time studies - a Dutch perspectiveThe importance of Value of Time studies - a Dutch perspective
The importance of Value of Time studies - a Dutch perspective
 
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport ProjectBDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
BDE_SC4_WS3_3_Rodrigo Castineira - Transforming Transport Project
 
69 72
69 7269 72
69 72
 
B1_Reijlat
B1_ReijlatB1_Reijlat
B1_Reijlat
 
How ITS Can Contribute To Urban Freight Efficiency
How ITS Can Contribute To Urban Freight EfficiencyHow ITS Can Contribute To Urban Freight Efficiency
How ITS Can Contribute To Urban Freight Efficiency
 
Imtech Cooperative ITS Platforms
Imtech Cooperative ITS PlatformsImtech Cooperative ITS Platforms
Imtech Cooperative ITS Platforms
 
Sss14duke BT Innovate Research Design
Sss14duke BT Innovate Research DesignSss14duke BT Innovate Research Design
Sss14duke BT Innovate Research Design
 
Mazda T21040000010021 Ppte
Mazda T21040000010021 PpteMazda T21040000010021 Ppte
Mazda T21040000010021 Ppte
 
2019 04-08 ralf-willenbrock_tsystems
2019 04-08 ralf-willenbrock_tsystems2019 04-08 ralf-willenbrock_tsystems
2019 04-08 ralf-willenbrock_tsystems
 
1.3. patrick pype
1.3. patrick pype1.3. patrick pype
1.3. patrick pype
 
Intelligent infrastructure and traffic systems
Intelligent infrastructure and traffic systemsIntelligent infrastructure and traffic systems
Intelligent infrastructure and traffic systems
 
Deliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBMDeliveling Intellingent Transport Systems - IBM
Deliveling Intellingent Transport Systems - IBM
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing Work
 
Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...
 
Towards a Global System for Telematics - P Van der Perre
Towards a Global System for Telematics - P Van der PerreTowards a Global System for Telematics - P Van der Perre
Towards a Global System for Telematics - P Van der Perre
 
Opportunities for VAS in the mobility pricing market
Opportunities for VAS in the mobility pricing marketOpportunities for VAS in the mobility pricing market
Opportunities for VAS in the mobility pricing market
 
RES-T-NEXT, IEA RETD workshop in London, 26th August 2015
RES-T-NEXT, IEA RETD workshop in London, 26th August 2015RES-T-NEXT, IEA RETD workshop in London, 26th August 2015
RES-T-NEXT, IEA RETD workshop in London, 26th August 2015
 
GSA Road User Charging Conference 2015
GSA Road User Charging Conference 2015GSA Road User Charging Conference 2015
GSA Road User Charging Conference 2015
 
20130319_CCC final report
20130319_CCC final report20130319_CCC final report
20130319_CCC final report
 
Special Remarks José Viegas
Special Remarks José ViegasSpecial Remarks José Viegas
Special Remarks José Viegas
 

Kürzlich hochgeladen

Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 

Kürzlich hochgeladen (20)

Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 

Michael blum effective ways for ruc

  • 1. Effective Ways of preparing for the Introduction of Road User Charging Approaches and Tools 14 April 2008 ITS Arab Bahrain Gunnar Landfester, Dornier Consulting
  • 2. Gunnar Landfester / 14.04.2008/ Page 2 of 16 Effective Ways of preparing for the Introduction of Road User Charging Agenda 1. Electronic toll collection: huge demand, but many risks 2. Need for cost transparency 3. The Dutch cost monitor process: a silver bullet? 4. Cost Comparison for everyone 5. Your questions
  • 3. Gunnar Landfester / 14.04.2008/ Page 3 of 16 Effective Ways of preparing for the Introduction of Road User Charging ETC in operation Plans for country-wide ETC ETC erection in progress System extension planned Current projects  Czech Republic (satellite technology for national roads) Concrete plans  France (Toll on national roads)  Netherlands (Nationwide tolling)  UK (Start of operation: 2015 est.)  Slovakia (Implementation: 2008 est.)  Hungary (Implementation: 2008 est.)  Sweden (start of operation: 2012 est.)  Austria (toll for passenger cars)  Poland (feasibility study)  Germany (light trucks: 2012 est.)  Bulgaria Country-wide toll systems are planned virtually all across Europe ETC: Demand and Risks
  • 4. Gunnar Landfester / 14.04.2008/ Page 4 of 16 Effective Ways of preparing for the Introduction of Road User Charging ETC-introduction can be both lengthy and risky ETC: Demand and Risks Infrastructure demand Financing options ETC Feasibility ETC Trials Privat/Public choice Public consultation demand Legislation Tender process Public realization process Research & Planning Implementation Impact of feedback-loops 20-30 years (e.g. Germany, Austria, Netherlands) Supervision & adjustment
  • 5. Gunnar Landfester / 14.04.2008/ Page 5 of 16 Effective Ways of preparing for the Introduction of Road User Charging Associated risks rise with system complexity  Political risks: new administration to change targets or stop realization process  Tender risks: complex bid evaluation procedures are vulnerable to legal actions (e.g. Germany, Czech Republic, Taiwan)  Implementation risks:  Non-availability of infrastructure (e.g. power, fixed line or mobile networks)  Technical risks with new technology (Big bang)  Project management (e.g. roll-out)  Future all roads / all vehicle projects will be even more challenging in the preparation and implementation phases ETC: Demand and Risks
  • 6. Gunnar Landfester / 14.04.2008/ Page 6 of 16 Effective Ways of preparing for the Introduction of Road User Charging Ubiquitous cost transparency speeds up realization, thus lowering total costs Need for cost transparency Capex Opex Studies Pilot trials Tender process Negotiation process Supervision Lost revenues cost awareness / visibility Totalcosts Direct system costs Development Development costs Steering Side costs Delay costs Graphic proportions do not reflect cost proportions high low
  • 7. Gunnar Landfester / 14.04.2008/ Page 7 of 16 Effective Ways of preparing for the Introduction of Road User Charging Wide choice of system concepts makes decision-finding complex Technologies Operational solutions System concepts Need for road financing Schedule restrictions Acceptable system costs A perfect solution? Stationary enforcement Mobile enforcement GPS Thin Client Video tolling Network tolling Trucks Passenger Cars Area tolling DSRC Mobile enforcement Fat Client Need for cost transparency
  • 8. Gunnar Landfester / 14.04.2008/ Page 8 of 16 Effective Ways of preparing for the Introduction of Road User Charging Dutch Cost Monitor supports the legislation and implementation process Run-up story  Long track record of trials and studies  Public-private initiative: replace vehicle and oil taxes by a mobility tax for all vehicle kilometres driven  Industry: Less fall-back solutions, no special system for occasional users and progress in technology leads to cheaper system Targets of Cost Monitor  Verify cost progress, identify potentials  Support solution-finding process  Support legislation process over 5-year period  Optimization of policy choice (public/private work share) Dutch Cost Monitor Source: Cost Monitor / Dutch Ministry of Transport
  • 9. Gunnar Landfester / 14.04.2008/ Page 9 of 16 Effective Ways of preparing for the Introduction of Road User Charging Cost Monitor delivered detailed data on cost structures of system concepts Approach  Phase 1: Discussions on system requirements and draft design (52 parties)  Phase 2: Detailed reports from 11 parties regarding system concepts, related costs, alternative designs and special issues  Bi-annual update Major Results  General approach verified  Detailed information on cost categories  Revised requirement specification Dutch Cost Monitor Source: Cost Monitor / Dutch Ministry of Transport
  • 10. Gunnar Landfester / 14.04.2008/ Page 10 of 16 Effective Ways of preparing for the Introduction of Road User Charging Dutch Cost Monitor is a model for large-scale ITS projects only Dutch Cost Monitor A model for other projects as well?  In terms of size and technology the Dutch project is most ambitious so far (8 million cars, 6 billion € project value)  However, detailed evaluations for typical ETC projects (200 – 800 million Euro) with small budget is rather unlikely  Conclusion: Alternatives are needed! Major advantages of the Cost Monitor  Good results, quality information  Low costs approach  Quick results ! ?
  • 11. Gunnar Landfester / 14.04.2008/ Page 11 of 16 Effective Ways of preparing for the Introduction of Road User Charging Alternatives for finding the cost-optimal system solutions Solution  Tool-based system cost calculation Approach  Life Cycle Costing approach  Customizable reference designs for DSRC and GNSS/CN tolling allows quick results  Custom system designs can be easily implemented as well  Use of cost forecasts, based on historic cost data from projects across Europe (which also includes Cost Monitor data) Area of application For road operators / administrative bodies  Validation of financial options  Support in the conception phase  Preparation of tenders For system integrators  Comparison of system concepts  Preparation of bids Cost Comparison for everyone
  • 12. Gunnar Landfester / 14.04.2008/ Page 12 of 16 Effective Ways of preparing for the Introduction of Road User Charging How it works - CostComparator is based on the lifecycle costing model Life cycle phasesLife cycle phases Product Breakdown StructureProduct Breakdown Structure Organizationalstructure / Cost structure (WBS/CBS) Organizationalstructure / Cost structure (WBS/CBS) Cost class: e.g..: EnergyCost class: e.g..: Energy Cost element e.g.: energy costs of component „A“ during operation Cost element e.g.: energy costs of component „A“ during operation Defined part of life cycle e.g..: Operation Component A Defined part of life cycle e.g..: Operation Component A  With changing the underlying system concept, the CostComparator can be used for any technical system. Cost Comparison for everyone
  • 13. Gunnar Landfester / 14.04.2008/ Page 13 of 16 Effective Ways of preparing for the Introduction of Road User Charging
  • 14. Gunnar Landfester / 14.04.2008/ Page 14 of 16 Effective Ways of preparing for the Introduction of Road User Charging With well defined input, the CostComparator can deliver in three steps Capture environment  Road network  Number of vehicles  Investment costs  OBU  Enforcement cameras  Operational costs  Communication  Staff Cost Comparison for everyone Capture Environment Add/Modify System if necessary ProcessLCC Analysis & Simulation Capture Environment Add/Modify System if necessary ProcessLCC Analysis & Simulation 1 2 3 Modify system concept  Manual booking de-/activated  Replace stationary enforcement by mobile enforcement  ... Compute lifecycle costs  Press the button! Result: Scenario cost estimation  Any parameter can be modified  For further analysis, costs classes can be analysed  Reinvestments can be defined as well
  • 15. Gunnar Landfester / 14.04.2008/ Page 15 of 16 Effective Ways of preparing for the Introduction of Road User Charging Thank you very much for your attention! ‫لكم‬ ‫ا‬ً ‫شكر‬! Your questions
  • 16. Gunnar Landfester / 14.04.2008/ Page 16 of 16 Effective Ways of preparing for the Introduction of Road User Charging Gunnar LANDFESTER Country Director Transportation KSA Project Office Riyadh Saudi Arabia Phone +966 1 4792804 Mobile +966 50 4239058 Fax +966 1 4792657 Gunnar.Landfester@Dornier-Consulting.com Contact

Hinweis der Redaktion

  1. Empfehlung für Tonspur: Auch nach den Projekten in Deutschland, Österreich und Tschechien geht die Reise weiter. Wesentliche künftige Projekte sind Frankreich, Niederlande und UK Viele „kleinere“ Projekte in Mittel- und Osteuropa geplant
  2. Empfehlung für Tonspur: ETC-Projekte sind in jeden Land Flagship-Projekte, die Vorbereitung ist daher sehr intensiv Der public realization process ist durch eine hohe Beratungsintensität und zeitintensive Feedback-Loops gekennzeichnet Bei den anstehenden Projekten in Frankreich, UK und den Niederlanden werden die Herausforderungen nochmals steigen. Gründe: Einbezug von PKW, Ausdehnung auf nachrangige Netze
  3. Empfehlung für Tonspur: In der Öffentlichkeit werden oft nur die Investitions- und Betriebskosten wahrgenommen Beachtung finden sollten aber auch die Verzugskosten, die nicht bloß durch Verzug im Implementierungsauftrag (Beispiel Toll Collect) relevant sind, sondern auch wesentlich durch die beschriebenen Feedback-Loops aufgrund politischer Entscheidungsprozesse mitbestimmt werden
  4. Empfehlung für Tonspur: Speziell bei ETC-Projekten liegt eine Ursache für die regelmäßigen Verzögerungen in dem komplexen Zusammenspiel aus Finanzierungsbedarf (PKW oder LKW; Autobahnen, Städtemaut oder Gesamtnetz), technischen Möglichkeiten (Systemkonzepte, Fallback-Lösungen) und öffentlicher Akzeptanz (Komfort, Kosten)
  5. Empfehlung für Tonspur: In den Niederlanden versucht man, den komplexen Entscheidungsprozess durch intensive Einbindung der Stakeholder (Plattform „Anders betalen voor mobiliteit“, Industrie durch den „cost monitor“) zu begegnen Das hat gute Erfolgsaussichten, weil die grundsätzlichen Ziele mittlerweile klar und allgemein akzeptiert sind (Staubekämpfung durch Kilometersteuer) Jetzt geht es „nur“ noch um die richtige Form der Umsetzung, also das richtige System, zu akzeptablen Kosten mit einer sinnvollen öffentlich-privaten Arbeitsteilung
  6. Zur Grafik: Die Grafik stammt aus dem Cost-Monitor-Bericht an das niederländische Parlament und zeigt die Kostenentwicklung für die „Variante 5“ (Maut für alle Fahrzeuge auf allen Straßen). Der linke Block zeigt die im Jahr 2005 geschätzten Kosten für den Betrieb des Systems in einem pessimistischen und einem optimistischen Szenario. Rechts daneben sind die 2006er-Schätzungen von 4 Unternehmen abgebildet, die auf Basis der funktionellen Anforderungen die Betriebskosten schätzten. Außerdem ist noch eine Schätzung von Efkon abgebildet, die eine Minimumvariante entwickeln sollten. Eine ähnliche Grafik mit vergleichbaren Ergebnis gibt es auch für die Investitionskosten. Mit der Grafik zeigen wir, dass die Industrie im Hinblick auf Kosten glaubt, dass es auch billiger geht (Siemens und Efkon schlagen Varianten mit Kosten unterhalb des Minimalszenarios vor). Bösen Überraschungen ist insofern vorgebeugt. Empfehlung für Tonspur: Um diese Ziele zu erreichen wählt das Verkehrsministerium den Cost Monitor, der zweijährlich dem Parlament zur Unterstützung der Entscheidungsfindung vorgelegt wird Es zeichnet sich ab, dass der Prozess recht erfolgreich läuft. Über die Kostenstrukturen liegen nach dem ersten Cost Monitor qualitativ gute Werte vor. Ansätze zur Verbesserung einer späteren Ausschreibung wurden gefunden. OBU-Kosten sind teils deutlich niedriger als von Beratern erwartet Die Anforderung der Preissichtbarkeit im Fahrzeug sollte aus den Ausschreibungen herausgenommen werden. Alternative: Leicht verständliches Preissystem, unterstützt durch Website. Daimler und Efkon schlagen statt dem Mobilfunknetz die Datenübertragung per Tankstellen-DSRC vor Enforcement-Kosten können durch einen verminderten Einsatz von kostenintensiven Brücken verringert werden Interessant ist, dass sich große Player – trotz Öffentlichkeit - „in die Karten schauen“ ließen.
  7. Empfehlung für Tonspur: Verglichen mit der “normalen” Ochsentour aus Studien, Gegenstudien, Trials und Ausschreibungsversuchen zeigt der Prozess Vorteile in der Datengüte, den Kosten und der Prozessdauer Warum sollte man einen ähnlichen Prozess also nicht bei jeden Projekt machen? Antwort: Weil die Beteiligung der Industrie und deren Offenheit bei kleineren Projekten wahrscheinlich nicht sichergestellt werden kann. Das niederländische Projekt ist einfach weitaus interessanter als Projekte anderswo. Was man aber tun kann ist, die Informationen aus dem niederländischen Projekt für andere Projekte nutzen Zu Deinen Fragen: Zum Low-Cost-Ansatz: Öffentlich in Erscheinung getreten sind in etwa 10 Leute aus dem Ministerium. Die Summe, die für Berater zur Verfügung stehen sollte waren meiner Erinnerung nach ein 60000 – 100000, aber für alle Unternehmen zusammen. Wie schnell war der Ansatz: Am 18. April 2006: Informationsveranstaltung zu Phase 1 und 2 15. September 2006: Erster Zwischenbericht mit den Ergebnissen aus Phase 1 und 2 Soweit ich weiß, laufen vergleichbare öffentliche Projekte zwischen einem halben und einem Jahr
  8. Zur Beispielsimulation: - Als ich das vorschlug, habe ich nicht daran gedacht, dass der Cost Comparator dabei recht schlecht wegkommt. Grund: Wenn wir auf Basis des TC-Ansatzes kalkulieren, kommen extrem hohe Kosten heraus. Dann zeigen wir aber die Kosten, die sich Siemens und Co. ausgedacht haben (und die viel niedriger liegen). Daraus könnte man schlussfolgern, dass der CostComparator nicht genau rechnet.