Deliverables by Phase
Deliverables by Phase
                                  Possible Deliverables by Phase
                                   Concept Document
                                   Statement of Work (SOW)
                                   Project Charter
                                   RFP & Proposal

            Software
                                                     Requirements Document (Software Requirements Specification)
            Concept
                                                     Work Breakdown Structure (WBS)


                       Requirements                               Functional Specification ( Top Level Design Specification)
                                                                  Entity Relationship Diagram
                                                                  Data Flow Diagram

                                         Analysis                             Detailed Design Specification
                                                                              Object Diagrams
                                                                              Detailed Data Model
    Project Development Plan
         (Software Development Plan )                  Design                             Coding Standards
    Baseline Project Plan                                                                 Working Code
    Quality Assurance Plan                                                                Unit Tests
    Configuration Management Plan
                                                                   Coding and
    Risk Management Plan
                                                                   Debugging                            Acceptance Test Procedures
                                                                                                        Tested Application
                            Integration Plan                                      Systems
                            Detailed SQA Test Plan                                Testing                       Maintenance Specification
                            SQA Test Cases                                                                      Deployed Application

                                                                                              Deployment &
                                                     User Documentation                      Maintenance
                                                     Training Plan

                                                                                                                                              2
Risk management

Risk management is concerned with identifying
 risks and drawing up plans to minimise their
 effect on a project.
A risk is a probability that some adverse
 circumstance will occur.
   Project risks affect schedule or resources
   Product risks affect the quality or performance of the
    software being developed
   Business risks affect the organisation developing or
    procuring the software
Software risks
 Risk                      Risk type     Description
 Staff turnover            Project       Experienced staff will leave the
                                         project before it is finished.
 Management change         Project       There will be a change of
                                         organisational management with
                                         different priorities.
 Hardware unavailability   Project       Hardware which is essential for the
                                         project will not be delivered on
                                         schedule.
 Requirements change       Project and   There will be a larger number of
                           product       changes to the requirements than
                                         anticipated.
 Specification delays      Project and   Specifications of essential interfaces
                           product       are not available on schedule
 Size underestimate        Project and   The size of the system has been
                           product       underestimated.
 CASE tool under-          Product       CASE tools which support the
 performance                             project do not perform as anticipated
 Technology change         Business      The underlying technology on which
                                         the system is built is superseded by
                                         new technology.
 Product competition       Business      A competitive product is marketed
                                         before the system is completed.
The Risk Management Process

• Risk identification
  – Identify project, product and business risks
• Risk analysis
  – Assess the likelihood and consequences of these
    risks
• Risk planning
  – Draw up plans to avoid or minimise the effects of
    the risk
• Risk monitoring
  – Monitor the risks throughout the project
The risk management process



     Risk           Risk analysis      Risk planning       Risk
 identification                                          monitoring



List of potential                       Risk avoidance      Risk
                    Prioritised risk   and contingency
      risks               list                           assessment
                                             plans
Risk identification

•   Technology risks
•   People risks
•   Organisational risks
•   Requirements risks
•   Estimation risks
Risks and risk types
Risk type        Possible risks
Technology       The database used in the system cannot process as many
                 transactions per second as expected.
                 Software components which should be reused contain defects
                 which limit their functionality.
People           It is impossible to recruit staff with the skills required.
                 Key staff are ill and unavailable at critical times.
                 Required training for staff is not available.
Organisational   The organisation is restructured so that different management
                 are responsible for the project.
                 Organisational financial problems force reductions in the project
                 budget.
Tools            The code generated by CASE tools is inefficient.
                 CASE tools cannot be integrated.
Requirements     Changes to requirements which require major design rework are
                 proposed.
                 Customers fail to understand the impact of requirements
                 changes.
Estimation       The time required to develop the software is underestimated.
                 The rate of defect repair is underestimated.
                 The size of the software is underestimated.
Risk analysis
• Assess probability and seriousness of each risk
• Probability may be
  –   very low
  –   low
  –   moderate
  –   high or very high
• Risk effects might be
  –   catastrophic
  –   serious
  –   Tolerable
  –   insignificant
Risk analysis
    Risk                                                  Probability Effects
    Organisational financial problems force reductions    Low         Catastrophic
    in the project budget.
    It is impossible to recruit staff with the skills     High        Catastrophic
    required for the project.
    Key staff are ill at critical times in the project.   Moderate    Serious
    Software components which should be reused            Moderate    Serious
    contain defects which limit their functionality.
    Changes to requirements which require major           Moderate    Serious
    design rework are proposed.
    The organisation is restructured so that different    High        Serious
    management are responsible for the project.
    The database used in the system cannot process as     Moderate    Serious
    many transactions per second as expected.
    The time required to develop the software is          High        Serious
    underestimated.
    CASE tools cannot be integrated.                      High        Tolerable
    Customers fail to understand the impact of            Moderate    Tolerable
    requirements changes.
    Required training for staff is not available.         Moderate    Tolerable
    The rate of defect repair is underestimated.          Moderate    Tolerable
    The size of the software is underestimated.           High        Tolerable
    The code generated by CASE tools is inefficient.      Moderate    Insignificant
Risk planning

Consider each risk and develop a strategy to
 manage that risk
Avoidance strategies
   The probability that the risk will arise is reduced
Minimisation strategies
   The impact of the risk on the project or product will
    be reduced
Contingency plans
   If the risk arises, contingency plans are plans to
    deal with that risk
Risk management strategies

  Risk                 Strategy
  Organisational       Prepare a briefing document for senior management showing
  financial problems   how the project is making a very important contribution to the
                       goals of the business.
  Recruitment          Alert customer of potential difficulties and the possibility of
  problems             delays, investigate buying-in components.
  Staff illness        Reorganise team so that there is more overlap of work and
                       people therefore understand each other’s jobs.
  Defective            Replace potentially defective components with bought-in
  components           components of known reliability.
  Requirements         Derive traceability information to assess requirements change
  changes              impact, maximise information hiding in the design.
  Organisational       Prepare a briefing document for senior management showing
  restructuring        how the project is making a very important contribution to the
                       goals of the business.
  Database             Investigate the possibilit y of buying a higher-performance
  performance          database.
  Underestimated       Investigate buying in components, investigate use of a program
  development time     generator.
Risk monitoring

• Assess each identified risks regularly to
  decide whether or not it is becoming less or
  more probable
• Also assess whether the effects of the risk
  have changed
• Each key risk should be discussed at
  management progress meetings
Risk factors
Risk type        Potential indicators
Technology       Late delivery of hardware or support software, many
                 reported technology problems
People           Poor staff morale, poor relationships amongst team
                 member, job availability
Organisational   organisational gossip, lack of action by senior
                 management
Tools            reluctance by team members to use tools, complaints
                 about CASE tools, demands for higher-powered
                 workstations
Requirements     many requirements change requests, customer
                 complaints
Estimation       failure to meet agreed schedule, failure to clear
                 reported defects
Software Measurement &
Matrices
Software Measurement
Objectives
 – Assessing status
    •   Projects
    •   Products for a specific project or projects
    •   Processes
    •   Resources
 – Identifying trends
    • Need to be able to differentiate between a healthy project and one
      that’s in trouble
 – Determine corrective action
    • Measurements should indicate the appropriate corrective action, if
      any is required.



                                                                      16
Software Measurement Objectives

  • Types of information required to understand,
    control, and improve projects:
    – Managers
       •   What does the process cost?
       •   How productive is the staff?
       •   How good is the code?
       •   Will the customer/user be satisfied?
       •   How can we improve?
    – Engineers
       •   Are the requirements testable?
       •   Have all the faults been found?
       •   Have the product or process goals been met?
       •   What will happen in the future?
                                                         17
The Scope of Software Metrics

 –   Cost and effort estimation
 –   Productivity measures and models
 –   Data collection
 –   Quality models and measures
 –   Reliability models
 –   Performance evaluation and models
 –   Structural and complexity metrics
 –   Capability-maturity assessment
 –   Management by metrics
 –   Evaluation of methods and tools

                                         18
The Scope of Software Metrics

      • The Scope of Software Metrics – some
        details
              – Possible productivity model

                                     Productivity



                                                                        Cost
               Value


                                                     Personnel     Resources              Complexity
     Quality              Quantity

                                                    Time           HW               Env          Problem
Reliability    Defects   Size    Functionality                                      Cnstrst      difficulty
                                                           Money               SW
                                                                                                              19
The Scope of Software Metrics
• The Scope of Software Metrics – some
  details
  – Software quality model
   Use            Factor          Criteria
                                  Communicativeness
                   Usability
                                  Accuracy
   Product         Reliability
   Operatio                       Consistency

   n
                   Efficiency     Device Efficiency

                                  Accessibility
                   Reusability                           Metrics
                                  Completeness

   Product      Maintainability   Structuredness
   Revisio                        Conciseness
   n               Portability
                                  Device Independence

                   Testability     Legibility

                                  Self-descriptiveness
                                                                   20
                                  Traceability
Direct and Indirect Matrices
Measurement Basics

• Direct and Indirect Measurement
  – Direct measure – relates an attribute to a number or
    symbol without reference to no other object or attribute
    (e.g., height).
  – Indirect measure
     • Used when an attribute must be measured by combining
       several of its aspects (e.g., density)
     • Requires a model of how measures are related to each
       other



                                                               22
Measurement Basics

• Direct and Indirect Measures for Software – examples
   – Direct
       •   Length or source code (lines of code)
       •   Duration of testing process
       •   Number of defects discovered during test
       •   Time a developer spends on a project
   – Indirect
       •   Programmer productivity (LOC/workmonths of effort)
       •   Module defect density (number of defects/module size)
       •   Defect detection efficiency (# defects detected/total defects)
       •   Requirements stability (initial # requirements/total # requirements)
       •   Test effectiveness ratio (number of items covered/total number of items)
       •   System spoilage (effort spent fixing faults/total project effort)




                                                                                      23
Quality Models and Measures
Software product quality metrics


• The quality of a product:
- the “totality of characteristics that bear on its
  ability to satisfy stated or implied needs”.
 Metrics of the external quality attributes
 producer’s perspective: “conformance to
  requirements”
 customer’s perspective: “fitness for use”
  - customer’s expectations
Quality metrics



• Two levels of software product quality
  metrics:
 Intrinsic product quality

 Customer oriented metrics
Intrinsic product quality metrics:
    Reliability: number of hours the software can run
     before a failure
    Defect density (rate):
       number of defects contained in software, relative
     to its size.
Customer oriented metrics:
    Customer problems
    Customer satisfaction
Intrinsic product quality metrics

 Reliability --- Defect density


• Correlated but different!


• Both are predicted values.
• Estimated using static and dynamic models


Defect: an anomaly in the product (“bug”)

Software failure: an execution whose effect is not conform to
software specification
Reliability

Reliability metrics:

MTBF (Mean Time Between Failures)

MTTF (Man Time To Failure)
MTBF (Mean Time Between Failures):
 the expected time between two successive failures of a system
 expressed in hours
 a key reliability metric for systems that can be repaired or restored
(repairable systems)
 applicable when several system failures are expected.


For a hardware product, MTBF decreases with the its age.
MTTF (Man Time To Failure):
 the expected time to failure of a system
 in reliability engineering  metric for non-repairable systems
 non-repairable systems can fail only once; example, a satellite is not repairable.


Mean Time To Repair (MTTR): average time to restore a system after a failure

When there are no delays in repair: MTBF = MTTF + MTTR


Software products are repairable systems!

Reliability models neglect the time needed to restore the system after a failure.

with MTTR =0  MTBF = MTTF

Availability = MTTF / MTBF = MTTF / (MTTF + MTTR)
3.1.2. Defect rate (density)


 Number of defects per KLOC or per Number of Function Point,
                        in a given time unit


Example:
“The latent defect rate for this product, during next four years, is 2.0
defects per KLOC”.
 Crude metric: a defect may involve one or more lines of code
Lines Of Code
-Different counting tools
-Defect rate metric has to be completed with the counting method for LOC!
-Not recommended to compare defect rates of two products written in
different languages
Reliability or Defect Rate ?


Reliability:
 often used with safety-critical systems such as: airline traffic control systems,
avionics, weapons.
 (usage profile and scenarios are better defined)


Defect density:
 in many commercial systems (systems for commercial use)
    • there is no typical user profile
    • development organizations use defect rate for maintenance cost and
    resource estimates
    • MTTF is more difficult to implement and may not be representative of all
    customers.
Customer Oriented Metrics



  Customer Problems Metric
  Customer problems when using the product:
  valid defects, usability problems, unclear documentation, user errors.


 Problems per user month (PUM) metric:


 PUM = TNP/ TNM
 TNP: Total number of problems reported by customers for a time period
 TNM: Total number of license-months of the software during the period
       = number of install licenses of the software x number of months in the period
3.2.2. Customer satisfaction metrics

 Often measured on the five-point scale:
 1. Very satisfied
 2. Satisfied
 3. Neutral
 4. Dissatisfied
 5. Very dissatisfied
 IBM: CUPRIMDSO
    (capability/functionality, usability, performance, reliability,
    installability, maintainability, documentation /information,
    service and overall)
 Hewlett-Packard: FURPS
      (functionality, usability, reliability, performance and service)
Ishikawa’s Seven Basic Tools for
Quality Control

 •   Checklist (or Check Sheet) – to facilitate gathering data and
     to arrange data so it can be easily used later
 •   Pareto Diagram – a frequency chart of bars in descending
     order; the bars are usually associated with types of problems
 •   Histogram – a graphic representation of frequency counts of
     a sample or a population
 •   Scatter Diagram – portrays the relationship of two interval
     variables; can make outliers clear
 •   Run Chart – tracks the performance of the parameter of
     interest over time; used for trend analysis
 •   Control Chart – an advance form of a run chart for situations
     in which the process capability can be defined
 •   Cause and Effect Diagram (fishbone diagram) – it shows the
     relationship between a characteristic and the factors that
     affect that relationship
Ishikawa’s Seven Basic Tools for
Quality Control
Checklists

      • Summarize the key points of the software
        development process
      • More effective than lengthy process documents
      • Help ensure that all tasks are complete and the
        important factors or quality characteristics of each
        task are covered
      • Examples of checklists are:
         –   Design review checklist
         –   Code inspection checklist
         –   Moderator (for review and inspection) checklist
         –   Pre-code-integration checklist
         –   Entrance and exit criteria for system tests
         –   Product readiness checklist
Pareto Diagram

• Identifies areas that cause most of the problems
Pareto Analysis of Software
Defects
Pareto Diagram of Defect by
Component Problem Index
Histograms
Profile of Customer Satisfaction
with a Software Product
Scatter Diagram of Program
Complexity and Defect Level
Correlation of Defect Rates of
Reused Components Between
Two Platforms
Grouping of Reused Components
Based on Defect Rate
Relationship
Pseudo-Control Chart of Test
Defect Rate—First Iteration
Pseudo-Control Chart of Test
Defect Rate—Second Iteration
Pseudo-Control Chart of
Inspection Effectiveness
Cause-and-Effect Diagram
Cause-and-Effect Diagram of
Design Inspection
A Schematic Representation of a
Relations Diagram

Weitere ähnliche Inhalte

Was ist angesagt?

functional requirements using LPP
functional requirements using LPPfunctional requirements using LPP
functional requirements using LPPKarthika Parthasarathy
 
Carmichael.kevin
Carmichael.kevinCarmichael.kevin
Carmichael.kevinNASAPMC
 
PMP Exam Prep-ITTOs and KP
PMP Exam Prep-ITTOs and KPPMP Exam Prep-ITTOs and KP
PMP Exam Prep-ITTOs and KPAmr Miqdadi
 
Dan galorath
Dan galorathDan galorath
Dan galorathNASAPMC
 
[DSBW Spring 2009] Unit 03: WebEng Process Models
[DSBW Spring 2009] Unit 03: WebEng Process Models[DSBW Spring 2009] Unit 03: WebEng Process Models
[DSBW Spring 2009] Unit 03: WebEng Process ModelsCarles FarrĂŠ
 
Software Quality
Software QualitySoftware Quality
Software Qualitysjavaad
 
Housch
HouschHousch
HouschNASAPMC
 
Yoxel SW: Adaptive Project Management
Yoxel SW: Adaptive Project ManagementYoxel SW: Adaptive Project Management
Yoxel SW: Adaptive Project ManagementYoxel Systems
 
Stefanini.trinh
Stefanini.trinhStefanini.trinh
Stefanini.trinhNASAPMC
 
Visure Requirements for Product and Embedded Devolpment - Visure Solutions - ...
Visure Requirements for Product and Embedded Devolpment - Visure Solutions - ...Visure Requirements for Product and Embedded Devolpment - Visure Solutions - ...
Visure Requirements for Product and Embedded Devolpment - Visure Solutions - ...Visure Solutions
 
Ppg Capabilities 2010
Ppg Capabilities 2010Ppg Capabilities 2010
Ppg Capabilities 2010JimShinkle
 
Methodology
MethodologyMethodology
MethodologyGeoff Leigh
 
Managing variability in software applications - scandev12
Managing variability in software applications - scandev12Managing variability in software applications - scandev12
Managing variability in software applications - scandev12Stephan HochdĂśrfer
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsenNASAPMC
 
Offshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO SolutionsOffshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO SolutionsCAMO Solutions LLC
 
Bladwin.kristen
Bladwin.kristenBladwin.kristen
Bladwin.kristenNASAPMC
 

Was ist angesagt? (19)

functional requirements using LPP
functional requirements using LPPfunctional requirements using LPP
functional requirements using LPP
 
Carmichael.kevin
Carmichael.kevinCarmichael.kevin
Carmichael.kevin
 
PMP Exam Prep-ITTOs and KP
PMP Exam Prep-ITTOs and KPPMP Exam Prep-ITTOs and KP
PMP Exam Prep-ITTOs and KP
 
Dan galorath
Dan galorathDan galorath
Dan galorath
 
Energy and engineering services leverages growth
Energy and engineering services leverages growthEnergy and engineering services leverages growth
Energy and engineering services leverages growth
 
[DSBW Spring 2009] Unit 03: WebEng Process Models
[DSBW Spring 2009] Unit 03: WebEng Process Models[DSBW Spring 2009] Unit 03: WebEng Process Models
[DSBW Spring 2009] Unit 03: WebEng Process Models
 
Software Quality
Software QualitySoftware Quality
Software Quality
 
Housch
HouschHousch
Housch
 
Yoxel SW: Adaptive Project Management
Yoxel SW: Adaptive Project ManagementYoxel SW: Adaptive Project Management
Yoxel SW: Adaptive Project Management
 
Stefanini.trinh
Stefanini.trinhStefanini.trinh
Stefanini.trinh
 
Visure Requirements for Product and Embedded Devolpment - Visure Solutions - ...
Visure Requirements for Product and Embedded Devolpment - Visure Solutions - ...Visure Requirements for Product and Embedded Devolpment - Visure Solutions - ...
Visure Requirements for Product and Embedded Devolpment - Visure Solutions - ...
 
Camo
CamoCamo
Camo
 
Ppg Capabilities 2010
Ppg Capabilities 2010Ppg Capabilities 2010
Ppg Capabilities 2010
 
Methodology
MethodologyMethodology
Methodology
 
Managing variability in software applications - scandev12
Managing variability in software applications - scandev12Managing variability in software applications - scandev12
Managing variability in software applications - scandev12
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Product dossier touchbase automation
Product dossier touchbase automationProduct dossier touchbase automation
Product dossier touchbase automation
 
Offshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO SolutionsOffshore Software Development, Software Testing by CAMO Solutions
Offshore Software Development, Software Testing by CAMO Solutions
 
Bladwin.kristen
Bladwin.kristenBladwin.kristen
Bladwin.kristen
 

Andere mochten auch

Twelve practices of XP_Se lect5 btech
Twelve practices of XP_Se lect5 btechTwelve practices of XP_Se lect5 btech
Twelve practices of XP_Se lect5 btechIIITA
 
Software Requirements_Se lect8 btech
Software Requirements_Se lect8 btechSoftware Requirements_Se lect8 btech
Software Requirements_Se lect8 btechIIITA
 
Middletown and butler county port authority economic development strategy 201...
Middletown and butler county port authority economic development strategy 201...Middletown and butler county port authority economic development strategy 201...
Middletown and butler county port authority economic development strategy 201...SBC LLC
 
Software Evolution_Se lect3 btech
Software Evolution_Se lect3 btechSoftware Evolution_Se lect3 btech
Software Evolution_Se lect3 btechIIITA
 
Spikes nad SCRUM_Se lect6 btech
Spikes nad SCRUM_Se lect6 btechSpikes nad SCRUM_Se lect6 btech
Spikes nad SCRUM_Se lect6 btechIIITA
 
Butler county port authority 2011
Butler county port authority 2011Butler county port authority 2011
Butler county port authority 2011SBC LLC
 
JAVA GUI
JAVA GUIJAVA GUI
JAVA GUIIIITA
 
5 ways to improve your presentation
5 ways to improve your presentation5 ways to improve your presentation
5 ways to improve your presentationSBC LLC
 
Improve Your Presentation Skills and Techniques 2016
Improve Your Presentation Skills and Techniques 2016Improve Your Presentation Skills and Techniques 2016
Improve Your Presentation Skills and Techniques 2016SBC LLC
 
Se lect11 btech
Se lect11 btechSe lect11 btech
Se lect11 btechIIITA
 
Butler county commissioners office and fiber 10 a1 management improvements in...
Butler county commissioners office and fiber 10 a1 management improvements in...Butler county commissioners office and fiber 10 a1 management improvements in...
Butler county commissioners office and fiber 10 a1 management improvements in...SBC LLC
 
Bcrf 2014 one
Bcrf 2014 oneBcrf 2014 one
Bcrf 2014 oneSBC LLC
 
Images
ImagesImages
ImagesSBC LLC
 
Mountain and Coastal Pines
Mountain and Coastal PinesMountain and Coastal Pines
Mountain and Coastal PinesSBC LLC
 
Center for Innovation and Entrepreneurship at UNCW
Center for Innovation and Entrepreneurship at UNCWCenter for Innovation and Entrepreneurship at UNCW
Center for Innovation and Entrepreneurship at UNCWSBC LLC
 
Port authority financing for the future one
Port authority financing for the future onePort authority financing for the future one
Port authority financing for the future oneSBC LLC
 
Mse august13 (2/3)
Mse august13 (2/3)Mse august13 (2/3)
Mse august13 (2/3)IIITA
 
Local government innovation fund
Local government innovation fundLocal government innovation fund
Local government innovation fundSBC LLC
 

Andere mochten auch (18)

Twelve practices of XP_Se lect5 btech
Twelve practices of XP_Se lect5 btechTwelve practices of XP_Se lect5 btech
Twelve practices of XP_Se lect5 btech
 
Software Requirements_Se lect8 btech
Software Requirements_Se lect8 btechSoftware Requirements_Se lect8 btech
Software Requirements_Se lect8 btech
 
Middletown and butler county port authority economic development strategy 201...
Middletown and butler county port authority economic development strategy 201...Middletown and butler county port authority economic development strategy 201...
Middletown and butler county port authority economic development strategy 201...
 
Software Evolution_Se lect3 btech
Software Evolution_Se lect3 btechSoftware Evolution_Se lect3 btech
Software Evolution_Se lect3 btech
 
Spikes nad SCRUM_Se lect6 btech
Spikes nad SCRUM_Se lect6 btechSpikes nad SCRUM_Se lect6 btech
Spikes nad SCRUM_Se lect6 btech
 
Butler county port authority 2011
Butler county port authority 2011Butler county port authority 2011
Butler county port authority 2011
 
JAVA GUI
JAVA GUIJAVA GUI
JAVA GUI
 
5 ways to improve your presentation
5 ways to improve your presentation5 ways to improve your presentation
5 ways to improve your presentation
 
Improve Your Presentation Skills and Techniques 2016
Improve Your Presentation Skills and Techniques 2016Improve Your Presentation Skills and Techniques 2016
Improve Your Presentation Skills and Techniques 2016
 
Se lect11 btech
Se lect11 btechSe lect11 btech
Se lect11 btech
 
Butler county commissioners office and fiber 10 a1 management improvements in...
Butler county commissioners office and fiber 10 a1 management improvements in...Butler county commissioners office and fiber 10 a1 management improvements in...
Butler county commissioners office and fiber 10 a1 management improvements in...
 
Bcrf 2014 one
Bcrf 2014 oneBcrf 2014 one
Bcrf 2014 one
 
Images
ImagesImages
Images
 
Mountain and Coastal Pines
Mountain and Coastal PinesMountain and Coastal Pines
Mountain and Coastal Pines
 
Center for Innovation and Entrepreneurship at UNCW
Center for Innovation and Entrepreneurship at UNCWCenter for Innovation and Entrepreneurship at UNCW
Center for Innovation and Entrepreneurship at UNCW
 
Port authority financing for the future one
Port authority financing for the future onePort authority financing for the future one
Port authority financing for the future one
 
Mse august13 (2/3)
Mse august13 (2/3)Mse august13 (2/3)
Mse august13 (2/3)
 
Local government innovation fund
Local government innovation fundLocal government innovation fund
Local government innovation fund
 

Ähnlich wie Se lect12 btech

LeverX SAP DMS Webinar
LeverX SAP DMS WebinarLeverX SAP DMS Webinar
LeverX SAP DMS WebinarEric Stajda
 
Lanzamiento Visual Studio 2012 - Modern ALM
Lanzamiento Visual Studio 2012 - Modern ALMLanzamiento Visual Studio 2012 - Modern ALM
Lanzamiento Visual Studio 2012 - Modern ALMDebora Di Piano
 
Agile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun AgainAgile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun AgainCalen Legaspi
 
Agile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun AgainAgile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun AgainOrange and Bronze Software Labs
 
Agile Software Development - making programming fun again
Agile Software Development - making programming fun againAgile Software Development - making programming fun again
Agile Software Development - making programming fun againcalenlegaspi
 
Software engineering
Software engineeringSoftware engineering
Software engineeringh2eEdgar
 
Seii unit4 software_process
Seii unit4 software_processSeii unit4 software_process
Seii unit4 software_processAhmad sohail Kakar
 
Project design and management
Project design and managementProject design and management
Project design and managementAndrew Zolnai
 
Dvsl enterprise solutions.v1
Dvsl enterprise solutions.v1Dvsl enterprise solutions.v1
Dvsl enterprise solutions.v1dejavusolutions
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationAlithya
 
مناهج التعليم وصناعة البرمجيات
مناهج التعليم وصناعة البرمجياتمناهج التعليم وصناعة البرمجيات
مناهج التعليم وصناعة البرمجياتEiman Idris
 
Software quality
Software qualitySoftware quality
Software qualitySara Mehmood
 
Corporate profile steep graph aras innovator
Corporate profile steep graph aras innovatorCorporate profile steep graph aras innovator
Corporate profile steep graph aras innovatoranuragonline001
 
Process implementation at Droisys
Process implementation at DroisysProcess implementation at Droisys
Process implementation at DroisysDroisys Inc
 
Process implementation v_1.1
Process implementation v_1.1Process implementation v_1.1
Process implementation v_1.1Droisys Inc
 
Aras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment MethodologyAras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment MethodologyAras
 
Software project management Software economics
Software project management Software economicsSoftware project management Software economics
Software project management Software economicsREHMAT ULLAH
 
Modern Apps and App Lifecycle
Modern Apps and App LifecycleModern Apps and App Lifecycle
Modern Apps and App LifecycleMarc Hoppers
 

Ähnlich wie Se lect12 btech (20)

LeverX SAP DMS Webinar
LeverX SAP DMS WebinarLeverX SAP DMS Webinar
LeverX SAP DMS Webinar
 
Lanzamiento Visual Studio 2012 - Modern ALM
Lanzamiento Visual Studio 2012 - Modern ALMLanzamiento Visual Studio 2012 - Modern ALM
Lanzamiento Visual Studio 2012 - Modern ALM
 
Agile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun AgainAgile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun Again
 
Agile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun AgainAgile Software Development - Making Programming Fun Again
Agile Software Development - Making Programming Fun Again
 
Agile Software Development - making programming fun again
Agile Software Development - making programming fun againAgile Software Development - making programming fun again
Agile Software Development - making programming fun again
 
Software engineering
Software engineeringSoftware engineering
Software engineering
 
Seii unit4 software_process
Seii unit4 software_processSeii unit4 software_process
Seii unit4 software_process
 
Project design and management
Project design and managementProject design and management
Project design and management
 
Dvsl enterprise solutions.v1
Dvsl enterprise solutions.v1Dvsl enterprise solutions.v1
Dvsl enterprise solutions.v1
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
مناهج التعليم وصناعة البرمجيات
مناهج التعليم وصناعة البرمجياتمناهج التعليم وصناعة البرمجيات
مناهج التعليم وصناعة البرمجيات
 
Software quality
Software qualitySoftware quality
Software quality
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Corporate profile steep graph aras innovator
Corporate profile steep graph aras innovatorCorporate profile steep graph aras innovator
Corporate profile steep graph aras innovator
 
Process implementation at Droisys
Process implementation at DroisysProcess implementation at Droisys
Process implementation at Droisys
 
Process implementation v_1.1
Process implementation v_1.1Process implementation v_1.1
Process implementation v_1.1
 
Aras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment MethodologyAras Innovator PLM Deployment Methodology
Aras Innovator PLM Deployment Methodology
 
Project Mangement
Project MangementProject Mangement
Project Mangement
 
Software project management Software economics
Software project management Software economicsSoftware project management Software economics
Software project management Software economics
 
Modern Apps and App Lifecycle
Modern Apps and App LifecycleModern Apps and App Lifecycle
Modern Apps and App Lifecycle
 

KĂźrzlich hochgeladen

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A BeĂąa
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 

KĂźrzlich hochgeladen (20)

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 

Se lect12 btech

  • 2. Deliverables by Phase Possible Deliverables by Phase  Concept Document  Statement of Work (SOW)  Project Charter  RFP & Proposal Software  Requirements Document (Software Requirements Specification) Concept  Work Breakdown Structure (WBS) Requirements  Functional Specification ( Top Level Design Specification)  Entity Relationship Diagram  Data Flow Diagram Analysis  Detailed Design Specification  Object Diagrams  Detailed Data Model  Project Development Plan  (Software Development Plan ) Design  Coding Standards  Baseline Project Plan  Working Code  Quality Assurance Plan  Unit Tests  Configuration Management Plan Coding and  Risk Management Plan Debugging  Acceptance Test Procedures  Tested Application  Integration Plan Systems  Detailed SQA Test Plan Testing  Maintenance Specification  SQA Test Cases  Deployed Application Deployment &  User Documentation Maintenance  Training Plan 2
  • 3. Risk management Risk management is concerned with identifying risks and drawing up plans to minimise their effect on a project. A risk is a probability that some adverse circumstance will occur.  Project risks affect schedule or resources  Product risks affect the quality or performance of the software being developed  Business risks affect the organisation developing or procuring the software
  • 4. Software risks Risk Risk type Description Staff turnover Project Experienced staff will leave the project before it is finished. Management change Project There will be a change of organisational management with different priorities. Hardware unavailability Project Hardware which is essential for the project will not be delivered on schedule. Requirements change Project and There will be a larger number of product changes to the requirements than anticipated. Specification delays Project and Specifications of essential interfaces product are not available on schedule Size underestimate Project and The size of the system has been product underestimated. CASE tool under- Product CASE tools which support the performance project do not perform as anticipated Technology change Business The underlying technology on which the system is built is superseded by new technology. Product competition Business A competitive product is marketed before the system is completed.
  • 5. The Risk Management Process • Risk identification – Identify project, product and business risks • Risk analysis – Assess the likelihood and consequences of these risks • Risk planning – Draw up plans to avoid or minimise the effects of the risk • Risk monitoring – Monitor the risks throughout the project
  • 6. The risk management process Risk Risk analysis Risk planning Risk identification monitoring List of potential Risk avoidance Risk Prioritised risk and contingency risks list assessment plans
  • 7. Risk identification • Technology risks • People risks • Organisational risks • Requirements risks • Estimation risks
  • 8. Risks and risk types Risk type Possible risks Technology The database used in the system cannot process as many transactions per second as expected. Software components which should be reused contain defects which limit their functionality. People It is impossible to recruit staff with the skills required. Key staff are ill and unavailable at critical times. Required training for staff is not available. Organisational The organisation is restructured so that different management are responsible for the project. Organisational financial problems force reductions in the project budget. Tools The code generated by CASE tools is inefficient. CASE tools cannot be integrated. Requirements Changes to requirements which require major design rework are proposed. Customers fail to understand the impact of requirements changes. Estimation The time required to develop the software is underestimated. The rate of defect repair is underestimated. The size of the software is underestimated.
  • 9. Risk analysis • Assess probability and seriousness of each risk • Probability may be – very low – low – moderate – high or very high • Risk effects might be – catastrophic – serious – Tolerable – insignificant
  • 10. Risk analysis Risk Probability Effects Organisational financial problems force reductions Low Catastrophic in the project budget. It is impossible to recruit staff with the skills High Catastrophic required for the project. Key staff are ill at critical times in the project. Moderate Serious Software components which should be reused Moderate Serious contain defects which limit their functionality. Changes to requirements which require major Moderate Serious design rework are proposed. The organisation is restructured so that different High Serious management are responsible for the project. The database used in the system cannot process as Moderate Serious many transactions per second as expected. The time required to develop the software is High Serious underestimated. CASE tools cannot be integrated. High Tolerable Customers fail to understand the impact of Moderate Tolerable requirements changes. Required training for staff is not available. Moderate Tolerable The rate of defect repair is underestimated. Moderate Tolerable The size of the software is underestimated. High Tolerable The code generated by CASE tools is inefficient. Moderate Insignificant
  • 11. Risk planning Consider each risk and develop a strategy to manage that risk Avoidance strategies  The probability that the risk will arise is reduced Minimisation strategies  The impact of the risk on the project or product will be reduced Contingency plans  If the risk arises, contingency plans are plans to deal with that risk
  • 12. Risk management strategies Risk Strategy Organisational Prepare a briefing document for senior management showing financial problems how the project is making a very important contribution to the goals of the business. Recruitment Alert customer of potential difficulties and the possibility of problems delays, investigate buying-in components. Staff illness Reorganise team so that there is more overlap of work and people therefore understand each other’s jobs. Defective Replace potentially defective components with bought-in components components of known reliability. Requirements Derive traceability information to assess requirements change changes impact, maximise information hiding in the design. Organisational Prepare a briefing document for senior management showing restructuring how the project is making a very important contribution to the goals of the business. Database Investigate the possibilit y of buying a higher-performance performance database. Underestimated Investigate buying in components, investigate use of a program development time generator.
  • 13. Risk monitoring • Assess each identified risks regularly to decide whether or not it is becoming less or more probable • Also assess whether the effects of the risk have changed • Each key risk should be discussed at management progress meetings
  • 14. Risk factors Risk type Potential indicators Technology Late delivery of hardware or support software, many reported technology problems People Poor staff morale, poor relationships amongst team member, job availability Organisational organisational gossip, lack of action by senior management Tools reluctance by team members to use tools, complaints about CASE tools, demands for higher-powered workstations Requirements many requirements change requests, customer complaints Estimation failure to meet agreed schedule, failure to clear reported defects
  • 16. Software Measurement Objectives – Assessing status • Projects • Products for a specific project or projects • Processes • Resources – Identifying trends • Need to be able to differentiate between a healthy project and one that’s in trouble – Determine corrective action • Measurements should indicate the appropriate corrective action, if any is required. 16
  • 17. Software Measurement Objectives • Types of information required to understand, control, and improve projects: – Managers • What does the process cost? • How productive is the staff? • How good is the code? • Will the customer/user be satisfied? • How can we improve? – Engineers • Are the requirements testable? • Have all the faults been found? • Have the product or process goals been met? • What will happen in the future? 17
  • 18. The Scope of Software Metrics – Cost and effort estimation – Productivity measures and models – Data collection – Quality models and measures – Reliability models – Performance evaluation and models – Structural and complexity metrics – Capability-maturity assessment – Management by metrics – Evaluation of methods and tools 18
  • 19. The Scope of Software Metrics • The Scope of Software Metrics – some details – Possible productivity model Productivity Cost Value Personnel Resources Complexity Quality Quantity Time HW Env Problem Reliability Defects Size Functionality Cnstrst difficulty Money SW 19
  • 20. The Scope of Software Metrics • The Scope of Software Metrics – some details – Software quality model Use Factor Criteria Communicativeness Usability Accuracy Product Reliability Operatio Consistency n Efficiency Device Efficiency Accessibility Reusability Metrics Completeness Product Maintainability Structuredness Revisio Conciseness n Portability Device Independence Testability Legibility Self-descriptiveness 20 Traceability
  • 22. Measurement Basics • Direct and Indirect Measurement – Direct measure – relates an attribute to a number or symbol without reference to no other object or attribute (e.g., height). – Indirect measure • Used when an attribute must be measured by combining several of its aspects (e.g., density) • Requires a model of how measures are related to each other 22
  • 23. Measurement Basics • Direct and Indirect Measures for Software – examples – Direct • Length or source code (lines of code) • Duration of testing process • Number of defects discovered during test • Time a developer spends on a project – Indirect • Programmer productivity (LOC/workmonths of effort) • Module defect density (number of defects/module size) • Defect detection efficiency (# defects detected/total defects) • Requirements stability (initial # requirements/total # requirements) • Test effectiveness ratio (number of items covered/total number of items) • System spoilage (effort spent fixing faults/total project effort) 23
  • 24. Quality Models and Measures
  • 25. Software product quality metrics • The quality of a product: - the “totality of characteristics that bear on its ability to satisfy stated or implied needs”.  Metrics of the external quality attributes  producer’s perspective: “conformance to requirements”  customer’s perspective: “fitness for use” - customer’s expectations
  • 26. Quality metrics • Two levels of software product quality metrics:  Intrinsic product quality  Customer oriented metrics
  • 27. Intrinsic product quality metrics:  Reliability: number of hours the software can run before a failure  Defect density (rate): number of defects contained in software, relative to its size. Customer oriented metrics:  Customer problems  Customer satisfaction
  • 28. Intrinsic product quality metrics Reliability --- Defect density • Correlated but different! • Both are predicted values. • Estimated using static and dynamic models Defect: an anomaly in the product (“bug”) Software failure: an execution whose effect is not conform to software specification
  • 29. Reliability Reliability metrics: MTBF (Mean Time Between Failures) MTTF (Man Time To Failure)
  • 30. MTBF (Mean Time Between Failures):  the expected time between two successive failures of a system  expressed in hours  a key reliability metric for systems that can be repaired or restored (repairable systems)  applicable when several system failures are expected. For a hardware product, MTBF decreases with the its age.
  • 31. MTTF (Man Time To Failure):  the expected time to failure of a system  in reliability engineering  metric for non-repairable systems  non-repairable systems can fail only once; example, a satellite is not repairable. Mean Time To Repair (MTTR): average time to restore a system after a failure When there are no delays in repair: MTBF = MTTF + MTTR Software products are repairable systems! Reliability models neglect the time needed to restore the system after a failure. with MTTR =0  MTBF = MTTF Availability = MTTF / MTBF = MTTF / (MTTF + MTTR)
  • 32. 3.1.2. Defect rate (density)  Number of defects per KLOC or per Number of Function Point, in a given time unit Example: “The latent defect rate for this product, during next four years, is 2.0 defects per KLOC”. Crude metric: a defect may involve one or more lines of code Lines Of Code -Different counting tools -Defect rate metric has to be completed with the counting method for LOC! -Not recommended to compare defect rates of two products written in different languages
  • 33. Reliability or Defect Rate ? Reliability:  often used with safety-critical systems such as: airline traffic control systems, avionics, weapons. (usage profile and scenarios are better defined) Defect density:  in many commercial systems (systems for commercial use) • there is no typical user profile • development organizations use defect rate for maintenance cost and resource estimates • MTTF is more difficult to implement and may not be representative of all customers.
  • 34. Customer Oriented Metrics Customer Problems Metric Customer problems when using the product: valid defects, usability problems, unclear documentation, user errors. Problems per user month (PUM) metric: PUM = TNP/ TNM TNP: Total number of problems reported by customers for a time period TNM: Total number of license-months of the software during the period = number of install licenses of the software x number of months in the period
  • 35. 3.2.2. Customer satisfaction metrics Often measured on the five-point scale: 1. Very satisfied 2. Satisfied 3. Neutral 4. Dissatisfied 5. Very dissatisfied IBM: CUPRIMDSO (capability/functionality, usability, performance, reliability, installability, maintainability, documentation /information, service and overall) Hewlett-Packard: FURPS (functionality, usability, reliability, performance and service)
  • 36. Ishikawa’s Seven Basic Tools for Quality Control • Checklist (or Check Sheet) – to facilitate gathering data and to arrange data so it can be easily used later • Pareto Diagram – a frequency chart of bars in descending order; the bars are usually associated with types of problems • Histogram – a graphic representation of frequency counts of a sample or a population • Scatter Diagram – portrays the relationship of two interval variables; can make outliers clear • Run Chart – tracks the performance of the parameter of interest over time; used for trend analysis • Control Chart – an advance form of a run chart for situations in which the process capability can be defined • Cause and Effect Diagram (fishbone diagram) – it shows the relationship between a characteristic and the factors that affect that relationship
  • 37. Ishikawa’s Seven Basic Tools for Quality Control
  • 38. Checklists • Summarize the key points of the software development process • More effective than lengthy process documents • Help ensure that all tasks are complete and the important factors or quality characteristics of each task are covered • Examples of checklists are: – Design review checklist – Code inspection checklist – Moderator (for review and inspection) checklist – Pre-code-integration checklist – Entrance and exit criteria for system tests – Product readiness checklist
  • 39. Pareto Diagram • Identifies areas that cause most of the problems
  • 40. Pareto Analysis of Software Defects
  • 41. Pareto Diagram of Defect by Component Problem Index
  • 43. Profile of Customer Satisfaction with a Software Product
  • 44. Scatter Diagram of Program Complexity and Defect Level
  • 45. Correlation of Defect Rates of Reused Components Between Two Platforms
  • 46. Grouping of Reused Components Based on Defect Rate Relationship
  • 47. Pseudo-Control Chart of Test Defect Rate—First Iteration
  • 48. Pseudo-Control Chart of Test Defect Rate—Second Iteration
  • 52. A Schematic Representation of a Relations Diagram