JYOTIGRAM YOJANA
AND JHARKHAND
Subtitle
Jyotigram Yojana and Jharkhand
 What is jyotigram yojna
 Rural electrification status of Jharkhand
 Programs in Jharkhand for rural electrification
 Implementation of jyotigram yojna in jharkhand
Jyotigram Yojana
Jyotigram Yojana
 Jyotigram Yojana is an initiative of the Government of Gujarat to ensure availability
of 24-hour three phase quality power supply to rural areas of the state and to supply
power to farmers residing in scattered farm houses through feeders having specially
designed transformers. Under the scheme state government separated electricity
feeder lines for agricultural and nonagricultural users to make farm power rationing
effective and tamper proof. By providing a continuous, reliable full-voltage power
supply for restricted hours daily, the Jyotigram Yojana made it possible for farmers
to keep to their irrigation schedules, conserve water, save on pump maintenance
costs and use labour more efficiently.
1
1: Jyotigram Yojana 3 Raysan is a village exactly like any other of the 6.3 lakh
away free or subsidised power to agriculture, and cut the power of odd villages in
India. Population: 1700. Agriculture based the domestic and industrial sector.
families. Living in semi-thatched houses. Rearing cows and goats. Worried about
the rain and their children's education. Until Jyotigram: Nothing to put Raysan on
the forefront of our national psyche. The power supply chain from power plant to
point-of-use Except every household in Raysan gets 24/7 electricity, 365 days a
travels through stations, transformers and wires. Traditionally, year.
1
 Enabling people to pursue small-scale industries or buy TV's this transmission
system is a SINGLE UNIT from which power is and refrigerators which actually work
rather than just act as show fed to various sectors for agriculture, industry and
domestic use. pieces; allowing students to study late into the night. Just like The
Government of Gujarat SPLIT the agriculture power supply every one of Gujarat's
18,000 odd villages. Just like every one of chain from the domestic and industrial
power supply chain. In Gujarat's 10 million households. 'Let there be light' is a
reality essence, it constructed a whole new parallel transmission system here. to
feed and monitor electricity to agriculture. As a result, the Government of Gujarat
began to: How did this miracle happen? ŸIntelligently ration power supply to farmers.
For the first time Power supply is a tinderbox issue. It has been caught in a in the
country,
1
 farmers in Gujarat received 8 hours of electricity vicious political cycle for years
across the country. Governments of guaranteed voltage and timings, whereas
previously they win elections with promises of free power to the electorate. A
received 13-14 hours of irregular and unreliable supply. majority of this free power is
used by farmers to run pumps in ŸCharge farmers for power. order to access
groundwater for irrigation of crops. In fact, ŸProvide households 24/7 power
through dedicated domestic agriculture consumes close to 85% of a state's power
supply. This feeders. overuse by agriculture leaves very little power for domestic
and industrial purposes resulting in crippling power outages. Consider What made it
happen? this: if most of the power is subsidised or free, it is no wonder then, From
imbalance of power to the balance of power + irrigation: that many state electricity
boards are bankrupt. Therefore, most Gujarat saw light when the government
recognized an electricity boards have neither the funds nor the motivation to
imbalance that went unnoticed. Most governments are trapped in provide good
quality power to the farmers.
1
 The result: power the power struggle; farmers hold them ransom for more power and
supply is erratic, the quality of power is low, and the expensive governments
continue to pander to their needs. Everyone irrigation pump equipment often gets
damaged. recognizes power is needed for irrigation. And therefore they However, no
one is willing to break this vicious cycle by provide power for irrigation. However, the
Government of charging for power or by rationing supply. Because history shows,
Gujarat saw it a little differently. And this little difference began governments that
tried to charge for power, lost power instead. So the journey towards a whole new
power game. Rather than power this became a sacred covenant: to stay in or to win
power, give for irrigation, it recast the situation as a power and irrigation
2
 2Jyotigram Yojana 5 problem. Never before had anyone consciously
created this link- actual benefit on ground, their protests turned to praise
and both power and irrigation, as one. For the first time, Jyotigram as a
acceptance. And so, with intelligent rationing, there was solution, would
focus on the equation, power + irrigation for electricity for farmers and
light for all. reform.And a workable solution began to emerge.
CONVENTIONAL WAY JYOTIGRAM YOJNA Within the power + irrigation
equation, the Government of Gujarat had one more realisation: free
power without rationing Single Feeder Separate Feeders did not
guarantee irrigation. The poor quality and the interrupted Agriculture
Agriculture Domestic power created a bigger headache; Every time there
was an + 3 phase: Single Phase: Domestic 8 hours 24 hours unscheduled
power cut, the irrigation process went back to zero Impact: Impact: and
had to restart all over again. The farmer had no way of - All power drawn
for - Farmers get continuous good knowing when the power would return,
which means he wasted agriculture quality electricity on pre- much of his
time anxiously waiting for the power to come on. And - Crippling
shortage in the announced schedules.
2
 domestic sector - No damage to equipment. poor quality electricity resulted in
damage of expensive - The domestic sector gets 24 equipment. So whereas in
theory he was getting unlimited power hours uninterrupted power supply. supply, in
reality this power supply was of little help to him in irrigation. From insight to
implementation: in a record 1000 days! So how does the government charge for
what was free, The Government of Gujarat set up a complete alternate and cut the
amount of time it is supplied for, and still get transmission system of power feeders:
the heavy duty agricultural feeders that would provide 440 volts for 8 hours a day
for farmer buy-in? agricultural needs and Work executed under Jyotigram1 From the
above scenario, a promise to the farmers was regular feeders for 24/7 New High
Tension Lines 56,307 Kms born- 8 hours uninterrupted, 440 volts, and pre-
announced power domestic and industrial New Low Tension Lines 22,146 Kms
supply
2
 . The benefit for farmers: uninterrupted power supply, purposes. Where farms New
Transformers 18,724 Nos. allowed for water to be drawn and fed with maximum
force to a n d h o m e s e x i s t e d Poles erected 17,00,000 Nos. crops, without a
cease in water flow. 440 volts is the quality of SDT's Installed 3,101 Nos. together,
they provided electricity required to run pumps, so farmers did not have to
Jyotigram Feeders 1,888 Nos. special 'switch over' contend with damage to
equipment. And a pre-announced 8 hour Project Cost Rs. 1290 Crores feeders
called SDT's to Government Grant Rs. 1115 Crores schedule allowed for farmers to
plan their work without wasting switch from 3 phase 440 State Population 5.07
Crores time praying for the electricity to come. volts to 2 phase 220 volts No. of
Days 1000 The farmers protested at first, especially as the project rolled out. After
all, nobody likes the thought of rationing what 1 Beyond State Boundaries, Jyotigram
Yojana, Mr. S. Jagadeesan, Principal Secretary, was unlimited or paying for what was
free. But when they saw the Energy and PetroChemicals Department
Title and Content Layout with Chart
0
1
2
3
4
5
6
Category 1 Category 2 Category 3 Category 4
Series 1 Series 2 Series 3
Two Content Layout with Table
 First bullet point here
 Second bullet point here
 Third bullet point here
Group 1 Group 2
Class 1 82 95
Class 2 76 88
Class 3 84 90
Title and Content Layout with SmartArt
Task
description
Task
description
Task
description
Task
description
Step 1
Title Task
description
Task
description
Task
description
Step 2
Title Task
description
Task
description
Step 3
Title Task
description
Task
description
Step 4
Title
Picture with Caption Layout
Caption
Jyotigram yojana

Weitere ähnliche Inhalte

Andere mochten auch

Bab 5 - Testing dan Seleksi Pegawai
Bab 5 - Testing dan Seleksi PegawaiBab 5 - Testing dan Seleksi Pegawai
Bab 5 - Testing dan Seleksi Pegawai
msahuleka
 
Acc6ch07.ders
Acc6ch07.dersAcc6ch07.ders
Acc6ch07.ders
alper
 
Bab 9 - Inventories, Additional Valuation Issues
Bab 9 - Inventories, Additional Valuation IssuesBab 9 - Inventories, Additional Valuation Issues
Bab 9 - Inventories, Additional Valuation Issues
msahuleka
 
Bab 8 - Mengelola SDM dan Hubungan Tenaga Kerja
Bab 8 - Mengelola SDM dan Hubungan Tenaga KerjaBab 8 - Mengelola SDM dan Hubungan Tenaga Kerja
Bab 8 - Mengelola SDM dan Hubungan Tenaga Kerja
msahuleka
 
Bab 7 - Strategi pemasaran yang digerakkan oleh pelanggan menciptakan nilai b...
Bab 7 - Strategi pemasaran yang digerakkan oleh pelanggan menciptakan nilai b...Bab 7 - Strategi pemasaran yang digerakkan oleh pelanggan menciptakan nilai b...
Bab 7 - Strategi pemasaran yang digerakkan oleh pelanggan menciptakan nilai b...
msahuleka
 
Bab 3 - The Accounting Information System
Bab 3 - The Accounting Information SystemBab 3 - The Accounting Information System
Bab 3 - The Accounting Information System
msahuleka
 
Bab 6 - Accounting and the Time Value of Money
Bab 6 - Accounting and the Time Value of MoneyBab 6 - Accounting and the Time Value of Money
Bab 6 - Accounting and the Time Value of Money
msahuleka
 
Electricity Generation
Electricity GenerationElectricity Generation
Electricity Generation
guestf9c414
 

Andere mochten auch (20)

Mc leod9e ch07 systems development
Mc leod9e ch07 systems developmentMc leod9e ch07 systems development
Mc leod9e ch07 systems development
 
Bab 5 - Testing dan Seleksi Pegawai
Bab 5 - Testing dan Seleksi PegawaiBab 5 - Testing dan Seleksi Pegawai
Bab 5 - Testing dan Seleksi Pegawai
 
Control&accounting information system
Control&accounting information systemControl&accounting information system
Control&accounting information system
 
Accounting information system introduction
Accounting information system introductionAccounting information system introduction
Accounting information system introduction
 
Multinational accounting
Multinational accountingMultinational accounting
Multinational accounting
 
Scada ptmp narrowband radio for electricity utilities
Scada  ptmp narrowband  radio for electricity utilitiesScada  ptmp narrowband  radio for electricity utilities
Scada ptmp narrowband radio for electricity utilities
 
Acc6ch07.ders
Acc6ch07.dersAcc6ch07.ders
Acc6ch07.ders
 
Bab 9 - Inventories, Additional Valuation Issues
Bab 9 - Inventories, Additional Valuation IssuesBab 9 - Inventories, Additional Valuation Issues
Bab 9 - Inventories, Additional Valuation Issues
 
Bab 8 - Mengelola SDM dan Hubungan Tenaga Kerja
Bab 8 - Mengelola SDM dan Hubungan Tenaga KerjaBab 8 - Mengelola SDM dan Hubungan Tenaga Kerja
Bab 8 - Mengelola SDM dan Hubungan Tenaga Kerja
 
Purchasing & cash disbursement
Purchasing & cash disbursementPurchasing & cash disbursement
Purchasing & cash disbursement
 
Bab 7 - Strategi pemasaran yang digerakkan oleh pelanggan menciptakan nilai b...
Bab 7 - Strategi pemasaran yang digerakkan oleh pelanggan menciptakan nilai b...Bab 7 - Strategi pemasaran yang digerakkan oleh pelanggan menciptakan nilai b...
Bab 7 - Strategi pemasaran yang digerakkan oleh pelanggan menciptakan nilai b...
 
Bab 3 - The Accounting Information System
Bab 3 - The Accounting Information SystemBab 3 - The Accounting Information System
Bab 3 - The Accounting Information System
 
Accounting information system
Accounting information systemAccounting information system
Accounting information system
 
2010 11 - Indian Energy Sector by ibef
2010 11 - Indian Energy Sector by ibef2010 11 - Indian Energy Sector by ibef
2010 11 - Indian Energy Sector by ibef
 
Accounting information system
Accounting information systemAccounting information system
Accounting information system
 
Bab 6 - Accounting and the Time Value of Money
Bab 6 - Accounting and the Time Value of MoneyBab 6 - Accounting and the Time Value of Money
Bab 6 - Accounting and the Time Value of Money
 
Electricity Generation
Electricity GenerationElectricity Generation
Electricity Generation
 
Hidrocentralet
HidrocentraletHidrocentralet
Hidrocentralet
 
Energjia dhe Burimet e Energjisë
Energjia dhe Burimet e EnergjisëEnergjia dhe Burimet e Energjisë
Energjia dhe Burimet e Energjisë
 
Revolucioni i II industrial
Revolucioni i II industrial Revolucioni i II industrial
Revolucioni i II industrial
 

Ähnlich wie Jyotigram yojana

Final Policy Document
Final Policy DocumentFinal Policy Document
Final Policy Document
Raunak Mittal
 
Report on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal PradeshReport on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal Pradesh
Anuradha Goswami
 
PGVCL Training Report
PGVCL Training ReportPGVCL Training Report
PGVCL Training Report
Priten Vasa
 
Bs agri-e-13-14
Bs agri-e-13-14Bs agri-e-13-14
Bs agri-e-13-14
hyderabad
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)
Anirudh Sharma
 

Ähnlich wie Jyotigram yojana (20)

Jyoti Gram Yojana and Rural electrification in north eastern states of india
Jyoti Gram Yojana and Rural electrification in north eastern states of indiaJyoti Gram Yojana and Rural electrification in north eastern states of india
Jyoti Gram Yojana and Rural electrification in north eastern states of india
 
Final Policy Document
Final Policy DocumentFinal Policy Document
Final Policy Document
 
Jyotigram - Innovation for India Award winner
Jyotigram - Innovation for India Award winnerJyotigram - Innovation for India Award winner
Jyotigram - Innovation for India Award winner
 
Transition from flat to metered electricity tariff in agriculture
Transition from flat to metered electricity tariff in agricultureTransition from flat to metered electricity tariff in agriculture
Transition from flat to metered electricity tariff in agriculture
 
Rural Finance - Rural Electrification (2).pptx
Rural Finance - Rural Electrification (2).pptxRural Finance - Rural Electrification (2).pptx
Rural Finance - Rural Electrification (2).pptx
 
Dr shelat conference climate change and groundwater
Dr shelat conference climate change and groundwaterDr shelat conference climate change and groundwater
Dr shelat conference climate change and groundwater
 
Deen dayal upadhyaya gram jyoti yojana
Deen dayal upadhyaya gram jyoti yojanaDeen dayal upadhyaya gram jyoti yojana
Deen dayal upadhyaya gram jyoti yojana
 
Report on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal PradeshReport on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal Pradesh
 
Deen dayal upadhyaya gram jyoti yojana
Deen dayal upadhyaya gram jyoti yojanaDeen dayal upadhyaya gram jyoti yojana
Deen dayal upadhyaya gram jyoti yojana
 
PGVCL Training Report
PGVCL Training ReportPGVCL Training Report
PGVCL Training Report
 
100 days of Andhra Pradesh
100 days of Andhra Pradesh100 days of Andhra Pradesh
100 days of Andhra Pradesh
 
Hydro Energy in Agriculture
Hydro Energy in AgricultureHydro Energy in Agriculture
Hydro Energy in Agriculture
 
Expansion of the Energy Grid - Transforming Rural India
Expansion of the Energy Grid - Transforming Rural IndiaExpansion of the Energy Grid - Transforming Rural India
Expansion of the Energy Grid - Transforming Rural India
 
Bs agri-e-13-14
Bs agri-e-13-14Bs agri-e-13-14
Bs agri-e-13-14
 
saivinay
saivinaysaivinay
saivinay
 
ARJUN MALHOTRA BEST PRACTICE US-GLOBAL POC POB ADILABAD 1
ARJUN MALHOTRA BEST PRACTICE US-GLOBAL POC POB ADILABAD 1ARJUN MALHOTRA BEST PRACTICE US-GLOBAL POC POB ADILABAD 1
ARJUN MALHOTRA BEST PRACTICE US-GLOBAL POC POB ADILABAD 1
 
Solar Irrigation Pumps in India: Can Electricity Buy-Back Curb Groundwater Ov...
Solar Irrigation Pumps in India: Can Electricity Buy-Back Curb Groundwater Ov...Solar Irrigation Pumps in India: Can Electricity Buy-Back Curb Groundwater Ov...
Solar Irrigation Pumps in India: Can Electricity Buy-Back Curb Groundwater Ov...
 
Solar energy and poverty alleviation financing model
Solar energy and poverty alleviation financing modelSolar energy and poverty alleviation financing model
Solar energy and poverty alleviation financing model
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)
 
Power scenerio in india
Power scenerio in indiaPower scenerio in india
Power scenerio in india
 

Kürzlich hochgeladen

Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
HyderabadDolls
 

Kürzlich hochgeladen (20)

NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
Spring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive SufferingSpring 2024 Issue Punitive and Productive Suffering
Spring 2024 Issue Punitive and Productive Suffering
 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final Presentation
 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
 
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
 
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar 👉👉 9777949614 Top Class Call Girl Service ...
 
independent Call Girls Tiruvannamalai 9332606886Call Girls Advance Cash On D...
independent Call Girls Tiruvannamalai  9332606886Call Girls Advance Cash On D...independent Call Girls Tiruvannamalai  9332606886Call Girls Advance Cash On D...
independent Call Girls Tiruvannamalai 9332606886Call Girls Advance Cash On D...
 

Jyotigram yojana

  • 2. Jyotigram Yojana and Jharkhand  What is jyotigram yojna  Rural electrification status of Jharkhand  Programs in Jharkhand for rural electrification  Implementation of jyotigram yojna in jharkhand
  • 4. Jyotigram Yojana  Jyotigram Yojana is an initiative of the Government of Gujarat to ensure availability of 24-hour three phase quality power supply to rural areas of the state and to supply power to farmers residing in scattered farm houses through feeders having specially designed transformers. Under the scheme state government separated electricity feeder lines for agricultural and nonagricultural users to make farm power rationing effective and tamper proof. By providing a continuous, reliable full-voltage power supply for restricted hours daily, the Jyotigram Yojana made it possible for farmers to keep to their irrigation schedules, conserve water, save on pump maintenance costs and use labour more efficiently.
  • 5. 1 1: Jyotigram Yojana 3 Raysan is a village exactly like any other of the 6.3 lakh away free or subsidised power to agriculture, and cut the power of odd villages in India. Population: 1700. Agriculture based the domestic and industrial sector. families. Living in semi-thatched houses. Rearing cows and goats. Worried about the rain and their children's education. Until Jyotigram: Nothing to put Raysan on the forefront of our national psyche. The power supply chain from power plant to point-of-use Except every household in Raysan gets 24/7 electricity, 365 days a travels through stations, transformers and wires. Traditionally, year.
  • 6. 1  Enabling people to pursue small-scale industries or buy TV's this transmission system is a SINGLE UNIT from which power is and refrigerators which actually work rather than just act as show fed to various sectors for agriculture, industry and domestic use. pieces; allowing students to study late into the night. Just like The Government of Gujarat SPLIT the agriculture power supply every one of Gujarat's 18,000 odd villages. Just like every one of chain from the domestic and industrial power supply chain. In Gujarat's 10 million households. 'Let there be light' is a reality essence, it constructed a whole new parallel transmission system here. to feed and monitor electricity to agriculture. As a result, the Government of Gujarat began to: How did this miracle happen? ŸIntelligently ration power supply to farmers. For the first time Power supply is a tinderbox issue. It has been caught in a in the country,
  • 7. 1  farmers in Gujarat received 8 hours of electricity vicious political cycle for years across the country. Governments of guaranteed voltage and timings, whereas previously they win elections with promises of free power to the electorate. A received 13-14 hours of irregular and unreliable supply. majority of this free power is used by farmers to run pumps in ŸCharge farmers for power. order to access groundwater for irrigation of crops. In fact, ŸProvide households 24/7 power through dedicated domestic agriculture consumes close to 85% of a state's power supply. This feeders. overuse by agriculture leaves very little power for domestic and industrial purposes resulting in crippling power outages. Consider What made it happen? this: if most of the power is subsidised or free, it is no wonder then, From imbalance of power to the balance of power + irrigation: that many state electricity boards are bankrupt. Therefore, most Gujarat saw light when the government recognized an electricity boards have neither the funds nor the motivation to imbalance that went unnoticed. Most governments are trapped in provide good quality power to the farmers.
  • 8. 1  The result: power the power struggle; farmers hold them ransom for more power and supply is erratic, the quality of power is low, and the expensive governments continue to pander to their needs. Everyone irrigation pump equipment often gets damaged. recognizes power is needed for irrigation. And therefore they However, no one is willing to break this vicious cycle by provide power for irrigation. However, the Government of charging for power or by rationing supply. Because history shows, Gujarat saw it a little differently. And this little difference began governments that tried to charge for power, lost power instead. So the journey towards a whole new power game. Rather than power this became a sacred covenant: to stay in or to win power, give for irrigation, it recast the situation as a power and irrigation
  • 9. 2  2Jyotigram Yojana 5 problem. Never before had anyone consciously created this link- actual benefit on ground, their protests turned to praise and both power and irrigation, as one. For the first time, Jyotigram as a acceptance. And so, with intelligent rationing, there was solution, would focus on the equation, power + irrigation for electricity for farmers and light for all. reform.And a workable solution began to emerge. CONVENTIONAL WAY JYOTIGRAM YOJNA Within the power + irrigation equation, the Government of Gujarat had one more realisation: free power without rationing Single Feeder Separate Feeders did not guarantee irrigation. The poor quality and the interrupted Agriculture Agriculture Domestic power created a bigger headache; Every time there was an + 3 phase: Single Phase: Domestic 8 hours 24 hours unscheduled power cut, the irrigation process went back to zero Impact: Impact: and had to restart all over again. The farmer had no way of - All power drawn for - Farmers get continuous good knowing when the power would return, which means he wasted agriculture quality electricity on pre- much of his time anxiously waiting for the power to come on. And - Crippling shortage in the announced schedules.
  • 10. 2  domestic sector - No damage to equipment. poor quality electricity resulted in damage of expensive - The domestic sector gets 24 equipment. So whereas in theory he was getting unlimited power hours uninterrupted power supply. supply, in reality this power supply was of little help to him in irrigation. From insight to implementation: in a record 1000 days! So how does the government charge for what was free, The Government of Gujarat set up a complete alternate and cut the amount of time it is supplied for, and still get transmission system of power feeders: the heavy duty agricultural feeders that would provide 440 volts for 8 hours a day for farmer buy-in? agricultural needs and Work executed under Jyotigram1 From the above scenario, a promise to the farmers was regular feeders for 24/7 New High Tension Lines 56,307 Kms born- 8 hours uninterrupted, 440 volts, and pre- announced power domestic and industrial New Low Tension Lines 22,146 Kms supply
  • 11. 2  . The benefit for farmers: uninterrupted power supply, purposes. Where farms New Transformers 18,724 Nos. allowed for water to be drawn and fed with maximum force to a n d h o m e s e x i s t e d Poles erected 17,00,000 Nos. crops, without a cease in water flow. 440 volts is the quality of SDT's Installed 3,101 Nos. together, they provided electricity required to run pumps, so farmers did not have to Jyotigram Feeders 1,888 Nos. special 'switch over' contend with damage to equipment. And a pre-announced 8 hour Project Cost Rs. 1290 Crores feeders called SDT's to Government Grant Rs. 1115 Crores schedule allowed for farmers to plan their work without wasting switch from 3 phase 440 State Population 5.07 Crores time praying for the electricity to come. volts to 2 phase 220 volts No. of Days 1000 The farmers protested at first, especially as the project rolled out. After all, nobody likes the thought of rationing what 1 Beyond State Boundaries, Jyotigram Yojana, Mr. S. Jagadeesan, Principal Secretary, was unlimited or paying for what was free. But when they saw the Energy and PetroChemicals Department
  • 12. Title and Content Layout with Chart 0 1 2 3 4 5 6 Category 1 Category 2 Category 3 Category 4 Series 1 Series 2 Series 3
  • 13. Two Content Layout with Table  First bullet point here  Second bullet point here  Third bullet point here Group 1 Group 2 Class 1 82 95 Class 2 76 88 Class 3 84 90
  • 14. Title and Content Layout with SmartArt Task description Task description Task description Task description Step 1 Title Task description Task description Task description Step 2 Title Task description Task description Step 3 Title Task description Task description Step 4 Title
  • 15. Picture with Caption Layout Caption