SlideShare ist ein Scribd-Unternehmen logo
1 von 38
NAME 338
SHIP DESIGN PROJECT & PRESENTATION
Presented by
MD. Kifayath Chowdhury
Student No. 1112023
Mahmudur Rahman
Student No. 1112049No.
1112049
Under the supervision
of
Prof. Dr. MD. Sadiqul Baree
Assigned Project
Design of a 2900 DWT Oil Tanker
Route: Chittagong-Dhaka
Service Speed: 10 knots
Route Specifications:
Water ways distance---350 km
Maximum Draft-------3.96 m
Maximum Length-----76.2 m
Maximum Breadth ----15.0 m
PRESENTATION CONTENTS
1. Determination of Preliminary Principal
particulars
2. Preliminary lightweight, deadweight and
displacement
3. Preliminary General Arrangement
4. Preliminary Lines Plan
5. Preliminary Hydrostatic Calculations
Finding Preliminary Principal Particulars
As per “DOS” (Department Of Shipping)
Bangladesh and BIWTA:
For inland vessels we have following restrictions:
Loa will not exceed 76.2 m
B mld will not exceed 15 m
Draft mld will not exceed 3.96 m
Principal particulars:
 We have length, breadth and draft restrictions as we
have to move inland. For first assumption, we are have
taken these restrictions as our principal particulars.
 Deadweight=2900 tonnes
 Assumed Cd =0.8
 Displacement= 2900/0.8 =3625 tonnes
 Lightweight= (3625 ─ 2900) =725 tonnes
 Loa=76.2 m
Principal particulars
 Lbp= 96% of Loa = 73.152 m
 Bmld=15 m
 Draftmld=3.96 m
 Speed=10 knots
 Cb= 0.83
Preliminary Principal Particulars
LOA 76.2 m
LBP 73.152 m
Breadth mld 15m
Depth mld 5.94.m
Draught 3.96 m
Cb 0.83
Speed 10 knots
Displacement = deadweight / deadweight co efficient = 2900 / 0.8 =3625tonnes
Light weight = displacement – dead weight = 3625 – 2900= 725 tonnes
Preliminary Lightweight, Deadweight
and Displacement:
Category Quantity
Fuel 14.539tonnes
Weight of people 1.275 tonnes
Fresh water 12.58 tonnes
Provisions & stores 0.85 tonnes
Cargo oil = 2900– 29.668 = 2870.332
tonnes
ON DECK
Owner 01
Class-I Inland master 01
Class- II Inland master 01
Class- III Inland master 07
Certified Crew (Sukani) 02
Cook (Bhandary) 01
AT ENGINE
Class-I Inland Driver 01
Class-II Inland Driver 01
Greaser 01
Pump man 01
Total = 17
Manning of the Ship
Preliminary General
Arrangement
Drawing
Preliminary Lines
Plan Drawing
Offset table
Half breadth (mm)
Station tan WL-1 WL-2 WL-3 WL-4 Deck Poop/F.Castle Deck
Ap 0 0 0 0 1468.8 3893.81 5619.92
0.5 765.2 1680.1 2048.54 2086.06 2763.51 6260.02 6560.77
1 2696.63 5265 5805 6025 6225 6770.24 7034.83
1.5 4437 6502.5 6907.5 7054 7230 7373.42 7403.13
2 5756.63 7215 7372.5 7382 7492.5 7500 0
3 6375 7500 7500 7500 7500 7500 0
4 6375 7500 7500 7500 7500 7500 0
5 6375 7500 7500 7500 7500 7500 0
6 6375 7500 7500 7500 7500 7500 0
7 5907.66 7282.05 7432.5 7466.25 7500 7500 0
8 5441.43 7117.5 7365 7398.75 7432.5 7445.25 0
8.5 5139.77 6915 7162.5 7196.25 7230 7230.74 0
9 4087.56 6405 6652.5 6686.25 6720 6868.83 7044.23
9.5 1893.19 3923.83 4137.73 4301.44 4536.42 5844.81 6312.1
Fp 0 0 0 0 0 2770.2 4019.59
Height Above Base (mm)
Keel BTK A BTK B BTK C Deck At Side Poop/F.Castle Deck
3698.4 4522.43 6067.57 9957.71 6133.98 9957.71
0 1339.06 4616.75 5572.2 6002.92 9852.06
0 0 130 1533.01 5976.28 9875.2
0 0 0 227.94 5946.77 9852.28
0 0 0 0 5940 0
0 0 0 0 5940 0
0 0 0 0 5940 0
0 0 0 0` 0
0 0 0 0 5940 0
0 0 0 0 5940 0
0 0 0 24.7 5943.43 0
0 0 0 58.75 5953.53 0
0 0 0 193.12 5971.3 8951.21
0 0 634.74 5426.81 6025.41 9152.97
3960 5494.32 - - 6192.3 9410.4
Hydrostatic
calculation &
curves
Hydrostatic Particulars
 Displacement
 KB
 Longitudinal Position of Center of buoyancy, LCB
 Position of Center of flotation from amidship, LCF
 KML
 KMT
 BML
 BMT
 Water Plane Area
 Tonnes per cm immersion
 Moment to Change Trim 1 cm
 Area of midship section
 Block Coefficient, Cb
 Coefficient of fineness of Midship Section, Cm
 Prismatic Coefficient, Cp
 Coefficient of fineness of water plane
Summary of Hydrostatic Particulars
Draft
Displac
ement
Water-
plane
Area
TPC KB BMT BML KMT KML
MCT
1cm
LCB from
amid-
ship,
+ve =
fwd
LCF
from
amid-
ship,
+ve =
fwd
Am
Cb Cm Cp Cw
(m) (tonnes) (m2
)
tonnes
/cm
(m) M (m) (m) (m)
(tonnes
-m)
(m) (m) (m2
)
0.99 832.951 928.249 9.28 0.54 18.465 375.65519.007376.197 44.49 0.861 0.978
13.92
2 0.80 0.94 0.85 0.879
1.98 1772.775 950.031 9.5 1.03 9.122 185.431 10.151 186.46 46.73 0..878 0.879 28.96 0.85 0.98 0.87 0.90
2.97 2716.679 955.965 9.56 1.54 6.032 122.71 7.569 124.247 46.998 0.850 0.873 43.72 0.86 0.98 0.876 0.898
3.96 3675.898 987.144 9.87 2.03 4.594 99.689 6.628 101.723 49.328 0.86 0.046 58.65 0.83 0.99 0.84 0.885
Hydrostatic Curves
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 1000.000 2000.000 3000.000 4000.000
Draft(m)
Displacement (m^3)
T vs ▼
Manual Hydromax
Draft vs. Displacement Draft vs. Water plane area
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
920.000 940.000 960.000 980.000 1000.000
Draft(m) AW (m^2)
T vs WPA
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
9.000 9.500 10.000 10.500
Draft(m)
TPC(t/cm)
T vs TPC
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
42.000 44.000 46.000 48.000 50.000 52.000
Draft(m)
MCT 1(tonnes.m/cm)
T vs MCT1
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 0.500 1.000 1.500 2.000 2.500
Draft(m)
KB(m)
T vs KB
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 0.200 0.400 0.600 0.800 1.000 1.200
Draft(m)
LCB(m)
T vs LCB
Manual Hydromax
Draft vs.LCB from amidship
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 5.000 10.000 15.000 20.000
Draft(m)
BMT(m)
T vs BMT
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 100.000 200.000 300.000 400.000
Draft(m)
BML(m)
T vs BML
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 5.000 10.000 15.000 20.000
Draft(m)
KMT(m)
T vs KMT
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 100.000 200.000 300.000 400.000
Draft(m)
KML(m)
T vs KML
Manual Hydromax
Draft vs.LCF from amidship
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.000 0.200 0.400 0.600 0.800 1.000 1.200
Draft(m)
LCF (m)
T vs LCF
Manual Hydromax
0.000
0.313
0.625
0.938
1.250
1.563
1.875
2.188
2.500
2.813
3.125
3.438
3.750
4.063
4.375
0.920 0.940 0.960 0.980 1.000
Draft(m)
Cm
T vs CM
Manual Hydromax
0.00
0.31
0.63
0.94
1.25
1.56
1.88
2.19
2.50
2.81
3.13
3.44
3.75
4.06
4.38
0.78 0.80 0.82 0.84 0.86 0.88
Draft(m)
CB
T vs CB
Manual Hydromax
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0.86 0.87 0.88 0.89 0.9 0.91
DRAFT
Cw
DRAFT VS Cw CURVE
MANUAL MAXRUF
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
0.82 0.84 0.86 0.88
DRAFT
Cp
DRAFT VS Cp CURVE
MANUAL MAXRUF
9/15/201
5

Weitere ähnliche Inhalte

Was ist angesagt?

Introduction to Ship Resistance and Propulsion.pdf
Introduction to Ship Resistance and Propulsion.pdfIntroduction to Ship Resistance and Propulsion.pdf
Introduction to Ship Resistance and Propulsion.pdf
MUswahPawara
 
Format laporan lines plan (nsp) Ship Building Engineering 2015 Politeknik Neg...
Format laporan lines plan (nsp) Ship Building Engineering 2015 Politeknik Neg...Format laporan lines plan (nsp) Ship Building Engineering 2015 Politeknik Neg...
Format laporan lines plan (nsp) Ship Building Engineering 2015 Politeknik Neg...
politeknik negeri madura
 
TUGAS MERANCANG KAPAL III - PERHITUNGAN KEKUATAN KAPAL
TUGAS MERANCANG KAPAL III - PERHITUNGAN KEKUATAN KAPALTUGAS MERANCANG KAPAL III - PERHITUNGAN KEKUATAN KAPAL
TUGAS MERANCANG KAPAL III - PERHITUNGAN KEKUATAN KAPAL
Yogga Haw
 
propulsion engineering-02-resistance of ships
propulsion engineering-02-resistance of shipspropulsion engineering-02-resistance of ships
propulsion engineering-02-resistance of ships
fahrenheit
 

Was ist angesagt? (20)

Ship resistance in confined water
Ship resistance in confined waterShip resistance in confined water
Ship resistance in confined water
 
Chp5-part1.ppt
Chp5-part1.pptChp5-part1.ppt
Chp5-part1.ppt
 
Design of a 20,000 t double acting ice class general cargo ship of service ...
Design of a 20,000 t double acting ice class general cargo ship   of service ...Design of a 20,000 t double acting ice class general cargo ship   of service ...
Design of a 20,000 t double acting ice class general cargo ship of service ...
 
Introduction to Ship Resistance and Propulsion.pdf
Introduction to Ship Resistance and Propulsion.pdfIntroduction to Ship Resistance and Propulsion.pdf
Introduction to Ship Resistance and Propulsion.pdf
 
Ship Loads and stresses
Ship Loads and stressesShip Loads and stresses
Ship Loads and stresses
 
Tutorial #1 - SACS Basic
Tutorial #1 - SACS BasicTutorial #1 - SACS Basic
Tutorial #1 - SACS Basic
 
Ship resistance in confined water
Ship resistance in confined waterShip resistance in confined water
Ship resistance in confined water
 
Format laporan lines plan (nsp) Ship Building Engineering 2015 Politeknik Neg...
Format laporan lines plan (nsp) Ship Building Engineering 2015 Politeknik Neg...Format laporan lines plan (nsp) Ship Building Engineering 2015 Politeknik Neg...
Format laporan lines plan (nsp) Ship Building Engineering 2015 Politeknik Neg...
 
Tugas merancang kapal ii kontruksi - source (bki)
Tugas merancang kapal ii   kontruksi - source (bki)Tugas merancang kapal ii   kontruksi - source (bki)
Tugas merancang kapal ii kontruksi - source (bki)
 
TUGAS MERANCANG KAPAL III - PERHITUNGAN KEKUATAN KAPAL
TUGAS MERANCANG KAPAL III - PERHITUNGAN KEKUATAN KAPALTUGAS MERANCANG KAPAL III - PERHITUNGAN KEKUATAN KAPAL
TUGAS MERANCANG KAPAL III - PERHITUNGAN KEKUATAN KAPAL
 
Perhitungan Plat Kulit Kapal
Perhitungan Plat Kulit KapalPerhitungan Plat Kulit Kapal
Perhitungan Plat Kulit Kapal
 
Small angle stability longitudinal
Small angle stability longitudinal Small angle stability longitudinal
Small angle stability longitudinal
 
propulsion engineering-02-resistance of ships
propulsion engineering-02-resistance of shipspropulsion engineering-02-resistance of ships
propulsion engineering-02-resistance of ships
 
Hydrostatics and stability
Hydrostatics and stabilityHydrostatics and stability
Hydrostatics and stability
 
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiSHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
 
Rencana Garis (Lines Plan) - Cara Membuat Kapal Tanker
Rencana Garis (Lines Plan) - Cara Membuat Kapal TankerRencana Garis (Lines Plan) - Cara Membuat Kapal Tanker
Rencana Garis (Lines Plan) - Cara Membuat Kapal Tanker
 
Wave resistance
Wave resistanceWave resistance
Wave resistance
 
Wave resistance
Wave resistanceWave resistance
Wave resistance
 
CONTAINER SHIP DESIGN REPORT
CONTAINER SHIP DESIGN REPORTCONTAINER SHIP DESIGN REPORT
CONTAINER SHIP DESIGN REPORT
 
Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck plating
 

Ähnlich wie NAME 338 , Presentation 1

Presentasi kapal rancangan full countainer 7000 dwt
Presentasi kapal rancangan full countainer 7000 dwtPresentasi kapal rancangan full countainer 7000 dwt
Presentasi kapal rancangan full countainer 7000 dwt
Yogga Haw
 
Preliminary Design of Containership
Preliminary Design of ContainershipPreliminary Design of Containership
Preliminary Design of Containership
Ahmed Atef
 
Family Boat Design Assignment
Family Boat Design AssignmentFamily Boat Design Assignment
Family Boat Design Assignment
Godfreywang
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SUMARDIONO .
 
Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn Presentation
Steven Polowy
 

Ähnlich wie NAME 338 , Presentation 1 (20)

Presentasi kapal rancangan full countainer 7000 dwt
Presentasi kapal rancangan full countainer 7000 dwtPresentasi kapal rancangan full countainer 7000 dwt
Presentasi kapal rancangan full countainer 7000 dwt
 
2nd Presentation NAME 338
2nd Presentation NAME 3382nd Presentation NAME 338
2nd Presentation NAME 338
 
NAME 338 , Presentation 1
NAME 338 , Presentation 1NAME 338 , Presentation 1
NAME 338 , Presentation 1
 
CBG_BSc Grad
CBG_BSc GradCBG_BSc Grad
CBG_BSc Grad
 
Field Development Project : Gelama Merah
Field Development Project : Gelama MerahField Development Project : Gelama Merah
Field Development Project : Gelama Merah
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysis
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
 
Study project - Traffic engineering 2019
Study project - Traffic engineering 2019Study project - Traffic engineering 2019
Study project - Traffic engineering 2019
 
Preliminary Design of Containership
Preliminary Design of ContainershipPreliminary Design of Containership
Preliminary Design of Containership
 
Ready rackner for qs
Ready rackner for qsReady rackner for qs
Ready rackner for qs
 
Construction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.pptConstruction Aspects of Rigid Pavements.ppt
Construction Aspects of Rigid Pavements.ppt
 
Family Boat Design Assignment
Family Boat Design AssignmentFamily Boat Design Assignment
Family Boat Design Assignment
 
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSOSPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
SPECTRAL-BASED FATIGUE ASSESSMENT OF FSO
 
Gravity water supply design illustration using SW software
Gravity water supply design illustration using SW softwareGravity water supply design illustration using SW software
Gravity water supply design illustration using SW software
 
Hull form geometry
Hull form geometryHull form geometry
Hull form geometry
 
DESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRODESIGN BUILDING BY STAD PRO
DESIGN BUILDING BY STAD PRO
 
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
IRJET- Study on Different Estimation Methods of Propulsion Power for 60 Mts O...
 
Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn Presentation
 
Trawler report
Trawler reportTrawler report
Trawler report
 
Horizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptxHorizontal Alignment TOP TOP.pptx
Horizontal Alignment TOP TOP.pptx
 

Kürzlich hochgeladen

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Kürzlich hochgeladen (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 

NAME 338 , Presentation 1

  • 1. NAME 338 SHIP DESIGN PROJECT & PRESENTATION Presented by MD. Kifayath Chowdhury Student No. 1112023 Mahmudur Rahman Student No. 1112049No. 1112049 Under the supervision of Prof. Dr. MD. Sadiqul Baree
  • 2. Assigned Project Design of a 2900 DWT Oil Tanker Route: Chittagong-Dhaka Service Speed: 10 knots
  • 3. Route Specifications: Water ways distance---350 km Maximum Draft-------3.96 m Maximum Length-----76.2 m Maximum Breadth ----15.0 m
  • 4. PRESENTATION CONTENTS 1. Determination of Preliminary Principal particulars 2. Preliminary lightweight, deadweight and displacement 3. Preliminary General Arrangement 4. Preliminary Lines Plan 5. Preliminary Hydrostatic Calculations
  • 5. Finding Preliminary Principal Particulars As per “DOS” (Department Of Shipping) Bangladesh and BIWTA: For inland vessels we have following restrictions: Loa will not exceed 76.2 m B mld will not exceed 15 m Draft mld will not exceed 3.96 m
  • 6. Principal particulars:  We have length, breadth and draft restrictions as we have to move inland. For first assumption, we are have taken these restrictions as our principal particulars.  Deadweight=2900 tonnes  Assumed Cd =0.8  Displacement= 2900/0.8 =3625 tonnes  Lightweight= (3625 ─ 2900) =725 tonnes  Loa=76.2 m
  • 7. Principal particulars  Lbp= 96% of Loa = 73.152 m  Bmld=15 m  Draftmld=3.96 m  Speed=10 knots  Cb= 0.83
  • 8. Preliminary Principal Particulars LOA 76.2 m LBP 73.152 m Breadth mld 15m Depth mld 5.94.m Draught 3.96 m Cb 0.83 Speed 10 knots
  • 9. Displacement = deadweight / deadweight co efficient = 2900 / 0.8 =3625tonnes Light weight = displacement – dead weight = 3625 – 2900= 725 tonnes Preliminary Lightweight, Deadweight and Displacement: Category Quantity Fuel 14.539tonnes Weight of people 1.275 tonnes Fresh water 12.58 tonnes Provisions & stores 0.85 tonnes Cargo oil = 2900– 29.668 = 2870.332 tonnes
  • 10. ON DECK Owner 01 Class-I Inland master 01 Class- II Inland master 01 Class- III Inland master 07 Certified Crew (Sukani) 02 Cook (Bhandary) 01 AT ENGINE Class-I Inland Driver 01 Class-II Inland Driver 01 Greaser 01 Pump man 01 Total = 17 Manning of the Ship
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 20.
  • 21.
  • 22.
  • 23.
  • 25. Half breadth (mm) Station tan WL-1 WL-2 WL-3 WL-4 Deck Poop/F.Castle Deck Ap 0 0 0 0 1468.8 3893.81 5619.92 0.5 765.2 1680.1 2048.54 2086.06 2763.51 6260.02 6560.77 1 2696.63 5265 5805 6025 6225 6770.24 7034.83 1.5 4437 6502.5 6907.5 7054 7230 7373.42 7403.13 2 5756.63 7215 7372.5 7382 7492.5 7500 0 3 6375 7500 7500 7500 7500 7500 0 4 6375 7500 7500 7500 7500 7500 0 5 6375 7500 7500 7500 7500 7500 0 6 6375 7500 7500 7500 7500 7500 0 7 5907.66 7282.05 7432.5 7466.25 7500 7500 0 8 5441.43 7117.5 7365 7398.75 7432.5 7445.25 0 8.5 5139.77 6915 7162.5 7196.25 7230 7230.74 0 9 4087.56 6405 6652.5 6686.25 6720 6868.83 7044.23 9.5 1893.19 3923.83 4137.73 4301.44 4536.42 5844.81 6312.1 Fp 0 0 0 0 0 2770.2 4019.59
  • 26. Height Above Base (mm) Keel BTK A BTK B BTK C Deck At Side Poop/F.Castle Deck 3698.4 4522.43 6067.57 9957.71 6133.98 9957.71 0 1339.06 4616.75 5572.2 6002.92 9852.06 0 0 130 1533.01 5976.28 9875.2 0 0 0 227.94 5946.77 9852.28 0 0 0 0 5940 0 0 0 0 0 5940 0 0 0 0 0 5940 0 0 0 0 0` 0 0 0 0 0 5940 0 0 0 0 0 5940 0 0 0 0 24.7 5943.43 0 0 0 0 58.75 5953.53 0 0 0 0 193.12 5971.3 8951.21 0 0 634.74 5426.81 6025.41 9152.97 3960 5494.32 - - 6192.3 9410.4
  • 28. Hydrostatic Particulars  Displacement  KB  Longitudinal Position of Center of buoyancy, LCB  Position of Center of flotation from amidship, LCF  KML  KMT  BML  BMT  Water Plane Area  Tonnes per cm immersion  Moment to Change Trim 1 cm  Area of midship section  Block Coefficient, Cb  Coefficient of fineness of Midship Section, Cm  Prismatic Coefficient, Cp  Coefficient of fineness of water plane
  • 29. Summary of Hydrostatic Particulars Draft Displac ement Water- plane Area TPC KB BMT BML KMT KML MCT 1cm LCB from amid- ship, +ve = fwd LCF from amid- ship, +ve = fwd Am Cb Cm Cp Cw (m) (tonnes) (m2 ) tonnes /cm (m) M (m) (m) (m) (tonnes -m) (m) (m) (m2 ) 0.99 832.951 928.249 9.28 0.54 18.465 375.65519.007376.197 44.49 0.861 0.978 13.92 2 0.80 0.94 0.85 0.879 1.98 1772.775 950.031 9.5 1.03 9.122 185.431 10.151 186.46 46.73 0..878 0.879 28.96 0.85 0.98 0.87 0.90 2.97 2716.679 955.965 9.56 1.54 6.032 122.71 7.569 124.247 46.998 0.850 0.873 43.72 0.86 0.98 0.876 0.898 3.96 3675.898 987.144 9.87 2.03 4.594 99.689 6.628 101.723 49.328 0.86 0.046 58.65 0.83 0.99 0.84 0.885
  • 30. Hydrostatic Curves 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 1000.000 2000.000 3000.000 4000.000 Draft(m) Displacement (m^3) T vs ▼ Manual Hydromax Draft vs. Displacement Draft vs. Water plane area 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 920.000 940.000 960.000 980.000 1000.000 Draft(m) AW (m^2) T vs WPA Manual Hydromax
  • 31. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 9.000 9.500 10.000 10.500 Draft(m) TPC(t/cm) T vs TPC Manual Hydromax 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 42.000 44.000 46.000 48.000 50.000 52.000 Draft(m) MCT 1(tonnes.m/cm) T vs MCT1 Manual Hydromax
  • 32. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 0.500 1.000 1.500 2.000 2.500 Draft(m) KB(m) T vs KB Manual Hydromax 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 0.200 0.400 0.600 0.800 1.000 1.200 Draft(m) LCB(m) T vs LCB Manual Hydromax Draft vs.LCB from amidship
  • 33. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 5.000 10.000 15.000 20.000 Draft(m) BMT(m) T vs BMT Manual Hydromax 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 100.000 200.000 300.000 400.000 Draft(m) BML(m) T vs BML Manual Hydromax
  • 34. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 5.000 10.000 15.000 20.000 Draft(m) KMT(m) T vs KMT Manual Hydromax 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 100.000 200.000 300.000 400.000 Draft(m) KML(m) T vs KML Manual Hydromax
  • 35. Draft vs.LCF from amidship 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.000 0.200 0.400 0.600 0.800 1.000 1.200 Draft(m) LCF (m) T vs LCF Manual Hydromax
  • 36. 0.000 0.313 0.625 0.938 1.250 1.563 1.875 2.188 2.500 2.813 3.125 3.438 3.750 4.063 4.375 0.920 0.940 0.960 0.980 1.000 Draft(m) Cm T vs CM Manual Hydromax 0.00 0.31 0.63 0.94 1.25 1.56 1.88 2.19 2.50 2.81 3.13 3.44 3.75 4.06 4.38 0.78 0.80 0.82 0.84 0.86 0.88 Draft(m) CB T vs CB Manual Hydromax
  • 37. 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0.86 0.87 0.88 0.89 0.9 0.91 DRAFT Cw DRAFT VS Cw CURVE MANUAL MAXRUF 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 0.82 0.84 0.86 0.88 DRAFT Cp DRAFT VS Cp CURVE MANUAL MAXRUF