• Introduction
• Dewatering methods
• Suitability of different dewatering methods
Introduction
• Dewatering means removal of excess water from saturated
soil.
• Dewatering is a necessary process when it comes to
many construction projects, particularly when the
construction is for underground projects.
Dewatering Methods
• Factors such as the type of soil and the nature of the construction
site will all influence which dewatering method will be best suited
to the project.
1. Sumps And Ditches 6. Cement Grouting
2. Shallow Well System 7. Chemical Process
3. Deep Well System 8. Freezing Process
4. Well Point System 9. Electro-Osmosis Method
5. Vacuum Method
Sumps and Ditches
• It is the simplest and most commonly used
form of dewatering.
• In this method, shallow pits, called sumps are
dug along the periphery of the area and
connected by drains of semicircular in shape
and 20 cm diameter.
• The water from the slopes flows under
gravity and is collected in sumps from
which it is pumped out.
Shallow Well Dewatering
 A hole of 30 cm diameter or more is bored into the ground to a
depth not more than 10 m below the pump level. A strainer tube of 15 cm
diameter is lowered in the bore hole having a casing tube.
 A gravel filter is formed around the strainer tube by gradually
removing the casing tube and simultaneously pouring the filter well so
formed.
 The suction pipe from a number of such wells may be connected to one
common header connected to the pumping unit.
Shallow Well Dewatering
[A typical layout of a shallow well
system]
Deep Well Dewatering (Bored well system)
 This system is more suitable when the depth of excavation is more than the
16m or where artesian water is present.
 In this, 15 to 16 cm diameter hole is bored and a casing with a large screen is
provided. A row of well points is frequently installed at the toe of the side
slope of the deep excavation.
 A submersible pump is installed at the bottom of the well, of which the
casing generally has a minimum diameter of 150 mm. The discharge pipes
from the submersible pumps of a number of adjacent wells are connected to
a common delivery main. The water is raised from the well by a multi-staged
pump.
Deep Well Dewatering
[A typical layout of a deep well
system]
Well Point System
• The main components of a well-point system are:
1. well points
2. Riser pipe
3. Swinger arm
4. Header pipe
5. pumps
Well Point System
• The well point is perforated pipe 5 to 8 CM in dia & 1m long
covered by cylindrical wire gauge screen known as strainer.
 Pipes are jetted in the ground 1 to 2mt a part.
 Well point → riser pipe → swinger arm → header.
 It is suitable for lowering water table by 5 to 6 m in soil.
13
SINGLE WELLPOINT SYSTEM
14
Multi-Stage Well Point System
Multi-stage well point system is suitable for excavations up to 15
m.
When water table is greater than 6 m this method will use.
 In this method 2 or more rows of well point are installed at different
elevation.
 In this method wells are installed in 2 stages.
 In 1st stage water table lowered by 5 m.
 If required, then 3rd stage of well point can also be installed for further
lower water table.
 This method useful for up to 15 m. For up to 15th m deep well system
will use.
Multi-Stage Well Point System
17
MuLTI WELL POINT SYSTEM
Well Point System
Advantages:
•Installation is very rapid. The equipment is reasonably simple
and cheap.
•As water is filtered while removing from the ground, soil particles are
not washed away. Hence, there is no danger of subsidence of the
surrounding ground.
•As the water is drawn away by well points from the excavation, the
sides of excavation are stabilized and steeper side slopes can be
permitted.
Well Point System
Disadvantages:
•Single stage well point system is suitable for lowering water table by 5 to 6 m
only. For deeper excavations, where water table is to be lowered for a depth
greater than 6 m, multi-stage well point system is required.
•It is essential to continue pumping once it has been started until the
excavation is complete. If it is stopped in between, it may prove to be
disastrous.
•In case of the ground consisting of stiff clay, gravel or boulders, well points
are installed in drilled holes, which increases the installation cost.
Vacuum System
When draining is required for silt or clay which have size less than
0.05mm. That time vacuum pump system will require.
The process is as follows:
 The well-points are driven and 25 CM dia is provided around the well
point.
 Installed in the ground by forcing a jet of water under sufficient
pressure.
 The sand of medium to coarse size is then forced into
this hole as rapidly as possible. This sand forms the filter medium.
Vacuum System
In the upper most 600 mm to 900 mm, an impervious material
such as clay is tamped to form the seal the upper portion.
 The pumping is then carried out by means of equipment capable
of maintaining a vacuum in the well-points and the surrounding
filter.
 In this way, the pressure around the well-points is reduced to a
small fraction of the atmospheric pressure. The ground is acted
upon by the atmospheric pressure. Thus the soil becomes
consolidated under a pressure which is very nearly equal to the
atmospheric.
Vacuum System
In highly permeable cohesionless soil, the safety of the side slopes may be
endangered through the application of severe pumping. In such cases, especially if
control of the groundwater is required permanently, the methods of grouting can
be used.
The main idea is to insert fine materials or chemicals around the excavation in
order to reduce the hydraulic conductivity of the surrounding soil to a minimum.
In other words, the grouting process creates an almost impervious curtain around
the excavation. The grouting is conducted using movable pipes with holes. The
grout material is injected under pressure as it flows outside the pipes through the
holes to fill the voids of the surrounding soil.
The material used for grouting may be clay, cement or special chemical
compounds.
Control of Groundwater by Grouting
Cement Grouting
Cement Grouting
• The material commonly used for grout include:
1) Cement And Water
2) Cement, Rock Flour and Water
3) Cement, Clay and Water
4) Cement, Clay, Sand and Water
5) Asphalt
6) Clay And Water
7) Chemicals
Chemical Grouting
• The desirable properties of chemical grouts:
1)It must be able to modify the properties of soil as desired
2)It may either increase the strength or decrease the permeability of
soil
3)It must be cheap, non-toxic, non-explosive
4)It must be in the form of a liquid with low viscosity so that it can be
readily placed in the soil
5)It must be non-corrosive, so that it can be handled with
common pumps and piping
6)It must be possible to control the gel time by suitable means
Chemical Grouting
Inorganic chemicals
•Sodium silicate
•Calcium chloride
•Ligno-chrome
•Ligno sulphate
•They are called silicate grouts
•They are cheaper
Organic chemicals
•Epoxy resins
•Polyester resins
•They are also called resin grouts
•They possess advantage of low
viscosity, precise control of gel
time and high strength
 Soils that will not drain using conventional methods Typically a ground
freezing system consists of an array of freeze pipes.
 That are installed into the ground around the perimeter of the
excavation, usually in a circular pattern.
 A supermodel brine solution is pump through to freeze the pipes, which
freezes the water bearing soils around the pipes to create a frozen wall.
Extreme care must be taken to make sure that the freeze is complete
because any groundwater seepage though the wall or from below the
excavation depth will have a sliding effect.
FREEZING
PROCESS
GROUND FREEZING
34
GROUND FREEZING
The procedure:
 A refrigeration plant of required installed near the site of work.
 The large pipes of 100 mm to 150 mm diameter.
 The distance between the pipes is about 1 m to 1.50 m.
 The pipes are closed at the bottom.
 The small pipes of 25 mm to 50 mm diameter are inserted into the
large pipes.
 open at the bottom.
 The cold liquid at a temperature of about -23°C to -30°C is then
circulated through the circuit. The liquid comes through the small pipe
and goes up through the large pipe.
 This causes the ground to freeze around the pipes.
Electro-Osmosis Process
• This method is used for fine grained cohesive soils (such as clay), which can
be drained or stabilized using electric current. The method was developed by
L. Casagrande (1952).
• If direct current is passed between two electrodes driven into natural soil
mass, the soil water will travel` from the positive electrode (anode) to the
negative electrode (cathode). The cathode is made in the form of well point
or metal tube for pumping out the seeping form of well point or a metal tube
for pumping out the seeping water.
• A steel rod, a pipe or steel piling of excavation can serve as the cathode. The
arrangement of electrodes is done in such a way that the natural direction of
flow of water is reversed away from the excavation, thereby increasing the
strength of the soil and stability of the slope. The potentials generally used in
the process are from 40 to 180 volts, with electrode spacing of 4 to 5 meters.
Electro-Osmosis Process
The vibroflot is inserted into the ground and typically can be used to improve soil up
to depths of 150 feet. Vibroflotation utilizes water and the mechanical vibrations of
the vibroflot to move the particles into a denser state. Typical radial distances
affected range from 5 to 15 feet (Bauer Maschinen GmbH, 2012).
The vibroflot is suspended from a crane and seats on the surface of the ground that is
to be improved. To penetrate the material, the bottom jet is activated and the
vibration begins. The water saturates the material to create a “quick sand” condition
(i.e. temporarily liquefying the material), which allows the vibroflot to sink to the
desired depth of improvement.
At that point, the bottom jet is stopped and the water is transferred to the upper jet.
This is done to create a saturated environment surrounding the vibroflot, thereby
enhancing the compaction of the material. The vibroflot remains at the desired depth
of improvement until the material reaches adequate density.
Vibro flotation Process
The density of the soil is measured by using the power input (via the
electric current or hydraulic pressure) as an index. As the material
densifies, the vibroflot requires more power to continue vibrating at which
point pressure gauge displays a peak in required power.
Once this point is reached, the vibroflot is raised one lift (generally
ranging from 1 to 3 feet) and compaction ensues until the peak amperage
or hydraulic pressure is reached once again.
The vibroflotation process can offer the following benefits:
•When the process is done properly, it will reduce the possibility of differential settlements that
will improve the foundation condition of the proposed structure.
•It is the fastest and easiest way to improve soil when bottom layers of soil will not provide
good load bearing capacity.
•It is a great technology to improve harbor bottoms.
•On a cost-related standpoint, it helps improve thousands of cubic meters per day. It is faster
than piling.
•It can be done around existing structures without damaging them .
•It does not harm the environment. It improves the soil strata using its own characteristic
•No excavations are needed, reducing the hazards, contamination of soils and hauling material
out from the site.
Advantages
Suitability of Different Methods of Ground
Water Conditions
METHOD CONDITIONS FOR SUITABILITY
1. Sumps and Ditches For shallow excavations in coarse
grained soils.
2. Well point system Suitable for lowering water table by 5-6 m
in soils
3. Bored well system For coarse grained soils and depth of
excavation more than 16 m
4. Vacuum method Draining silty sands and fine sands
5. Cement grouting For coarse materials or rocks with
cracks
6. Freezing process Suitable for excavations in water logged
soils
7. Electro-osmosis process Suitable for fine grained cohesive soils
such as clays
Chapter 4 control of ground water in excavations

Weitere ähnliche Inhalte

Was ist angesagt?

Highway drainage
 Highway drainage Highway drainage
Highway drainageRaju Bhele
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundationsDar Hilal
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavementspradip dangar
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-pptDYPCET
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of explorationjagadish108
 
Groundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingGroundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingMartin Preene
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundationsKHUSHBU SHAH
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSramgsvhce
 
Bitumen and modified bitumen
Bitumen and modified bitumenBitumen and modified bitumen
Bitumen and modified bitumenpradip dangar
 
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONSDEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONSTejaswiniNarayane
 
Standard penetration test (spt)
Standard penetration test (spt)Standard penetration test (spt)
Standard penetration test (spt)Faizan Tanoli
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating EquipmentsTulsi Makwana
 

Was ist angesagt? (20)

Compaction of concrete
Compaction of concreteCompaction of concrete
Compaction of concrete
 
Highway drainage
 Highway drainage Highway drainage
Highway drainage
 
Grouting Methods
Grouting Methods Grouting Methods
Grouting Methods
 
Tunnel Engineering.pptx
Tunnel Engineering.pptxTunnel Engineering.pptx
Tunnel Engineering.pptx
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundations
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of exploration
 
Groundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft SinkingGroundwater Control Techniques for Tunnelling and Shaft Sinking
Groundwater Control Techniques for Tunnelling and Shaft Sinking
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
 
Caisson
CaissonCaisson
Caisson
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
 
GROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODSGROUND IMPROVEMENT-DENSIFICATION METHODS
GROUND IMPROVEMENT-DENSIFICATION METHODS
 
Bitumen and modified bitumen
Bitumen and modified bitumenBitumen and modified bitumen
Bitumen and modified bitumen
 
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONSDEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
DEWATERING METHODS IN DIFFERENT SOIL CONDITIONS
 
Standard penetration test (spt)
Standard penetration test (spt)Standard penetration test (spt)
Standard penetration test (spt)
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating Equipments
 

Ähnlich wie Chapter 4 control of ground water in excavations

5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTUVATSAL PATEL
 
Excavation and Ground water control1.pptx
Excavation and Ground water control1.pptxExcavation and Ground water control1.pptx
Excavation and Ground water control1.pptxssusercbae26
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptxCarolTumaneng
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniquesjamali husain
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point systemAnshuman Tyagi
 
Subsurface drainage
Subsurface drainageSubsurface drainage
Subsurface drainageChethan B J
 
Design, layout and installation of drip and fertigation in precision farming
Design, layout and installation of drip and fertigation in precision farmingDesign, layout and installation of drip and fertigation in precision farming
Design, layout and installation of drip and fertigation in precision farmingDr. M. Kumaresan Hort.
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Controlnik kin
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques GAURAV. H .TANDON
 
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining EngineeringSpecial Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining EngineeringVenkata Sai Kari
 
Control of ground water in excavations_Advanced Construction Technology (Seme...
Control of ground water in excavations_Advanced Construction Technology (Seme...Control of ground water in excavations_Advanced Construction Technology (Seme...
Control of ground water in excavations_Advanced Construction Technology (Seme...A Makwana
 
ppt foundation.pptx
ppt foundation.pptxppt foundation.pptx
ppt foundation.pptxAnshuBarmase
 
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxSewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxPriyaTalwar8
 

Ähnlich wie Chapter 4 control of ground water in excavations (20)

5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
5. CONTROL OF GROUND WATER IN EXCAVATION (ACE) 2160601 GTU
 
Excavation and Ground water control1.pptx
Excavation and Ground water control1.pptxExcavation and Ground water control1.pptx
Excavation and Ground water control1.pptx
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
BCT Module 5 ground water excavation PART 4
BCT Module 5 ground water excavation PART 4BCT Module 5 ground water excavation PART 4
BCT Module 5 ground water excavation PART 4
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
 
Subsurface drainage
Subsurface drainageSubsurface drainage
Subsurface drainage
 
Dewatering
DewateringDewatering
Dewatering
 
Design, layout and installation of drip and fertigation in precision farming
Design, layout and installation of drip and fertigation in precision farmingDesign, layout and installation of drip and fertigation in precision farming
Design, layout and installation of drip and fertigation in precision farming
 
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water ControlWeek 01 Preliminaries Works, Soil Investigate & Ground Water Control
Week 01 Preliminaries Works, Soil Investigate & Ground Water Control
 
UNIT 1a.pdf
UNIT 1a.pdfUNIT 1a.pdf
UNIT 1a.pdf
 
De watering-ppt
De watering-pptDe watering-ppt
De watering-ppt
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
 
5. Dewatering.pdf
5. Dewatering.pdf5. Dewatering.pdf
5. Dewatering.pdf
 
Methods of Dewatering
Methods of DewateringMethods of Dewatering
Methods of Dewatering
 
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining EngineeringSpecial Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
 
Control of ground water in excavations_Advanced Construction Technology (Seme...
Control of ground water in excavations_Advanced Construction Technology (Seme...Control of ground water in excavations_Advanced Construction Technology (Seme...
Control of ground water in excavations_Advanced Construction Technology (Seme...
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
 
ppt foundation.pptx
ppt foundation.pptxppt foundation.pptx
ppt foundation.pptx
 
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptxSewer joints of pipes, sewer appurtenances, storm water drainage.pptx
Sewer joints of pipes, sewer appurtenances, storm water drainage.pptx
 

Mehr von KHUSHBU SHAH

PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEYKHUSHBU SHAH
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKKHUSHBU SHAH
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWAREKHUSHBU SHAH
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge EngineeringKHUSHBU SHAH
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsKHUSHBU SHAH
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railwayKHUSHBU SHAH
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadKHUSHBU SHAH
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometricsKHUSHBU SHAH
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to roadKHUSHBU SHAH
 
Equipment management
Equipment managementEquipment management
Equipment managementKHUSHBU SHAH
 
Material management
Material managementMaterial management
Material managementKHUSHBU SHAH
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsKHUSHBU SHAH
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-damKHUSHBU SHAH
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 
Chapter 13 green building
Chapter 13 green buildingChapter 13 green building
Chapter 13 green buildingKHUSHBU SHAH
 
Chapter 12 special treatments
Chapter 12 special treatmentsChapter 12 special treatments
Chapter 12 special treatmentsKHUSHBU SHAH
 

Mehr von KHUSHBU SHAH (20)

PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEY
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORK
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yards
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of road
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometrics
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 
Equipment management
Equipment managementEquipment management
Equipment management
 
Labour management
Labour managementLabour management
Labour management
 
Material management
Material managementMaterial management
Material management
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipments
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Chapter 13 green building
Chapter 13 green buildingChapter 13 green building
Chapter 13 green building
 
Chapter 12 special treatments
Chapter 12 special treatmentsChapter 12 special treatments
Chapter 12 special treatments
 

Kürzlich hochgeladen

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 

Kürzlich hochgeladen (20)

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 

Chapter 4 control of ground water in excavations

  • 1. Control of Ground Water in exCavation S.S.A.S.I.T, SURAT GTU advanCed ConStruCtion & eQuiPMentSadvanCed ConStruCtion & eQuiPMentS (2160601)(2160601) PrePared by:-PrePared by:- MiSS. KhuShbu K. ShahMiSS. KhuShbu K. Shah aSSt. ProfaSSt. Prof S.S.a.S.i.t, SuratS.S.a.S.i.t, Surat
  • 2. Content… • Introduction • Dewatering methods • Suitability of different dewatering methods
  • 3. Introduction • Dewatering means removal of excess water from saturated soil. • Dewatering is a necessary process when it comes to many construction projects, particularly when the construction is for underground projects.
  • 4. Dewatering Methods • Factors such as the type of soil and the nature of the construction site will all influence which dewatering method will be best suited to the project. 1. Sumps And Ditches 6. Cement Grouting 2. Shallow Well System 7. Chemical Process 3. Deep Well System 8. Freezing Process 4. Well Point System 9. Electro-Osmosis Method 5. Vacuum Method
  • 5. Sumps and Ditches • It is the simplest and most commonly used form of dewatering. • In this method, shallow pits, called sumps are dug along the periphery of the area and connected by drains of semicircular in shape and 20 cm diameter. • The water from the slopes flows under gravity and is collected in sumps from which it is pumped out.
  • 6. Shallow Well Dewatering  A hole of 30 cm diameter or more is bored into the ground to a depth not more than 10 m below the pump level. A strainer tube of 15 cm diameter is lowered in the bore hole having a casing tube.  A gravel filter is formed around the strainer tube by gradually removing the casing tube and simultaneously pouring the filter well so formed.  The suction pipe from a number of such wells may be connected to one common header connected to the pumping unit.
  • 7. Shallow Well Dewatering [A typical layout of a shallow well system]
  • 8. Deep Well Dewatering (Bored well system)  This system is more suitable when the depth of excavation is more than the 16m or where artesian water is present.  In this, 15 to 16 cm diameter hole is bored and a casing with a large screen is provided. A row of well points is frequently installed at the toe of the side slope of the deep excavation.  A submersible pump is installed at the bottom of the well, of which the casing generally has a minimum diameter of 150 mm. The discharge pipes from the submersible pumps of a number of adjacent wells are connected to a common delivery main. The water is raised from the well by a multi-staged pump.
  • 9. Deep Well Dewatering [A typical layout of a deep well system]
  • 10.
  • 11. Well Point System • The main components of a well-point system are: 1. well points 2. Riser pipe 3. Swinger arm 4. Header pipe 5. pumps
  • 12. Well Point System • The well point is perforated pipe 5 to 8 CM in dia & 1m long covered by cylindrical wire gauge screen known as strainer.  Pipes are jetted in the ground 1 to 2mt a part.  Well point → riser pipe → swinger arm → header.  It is suitable for lowering water table by 5 to 6 m in soil.
  • 14. 14
  • 15. Multi-Stage Well Point System Multi-stage well point system is suitable for excavations up to 15 m.
  • 16. When water table is greater than 6 m this method will use.  In this method 2 or more rows of well point are installed at different elevation.  In this method wells are installed in 2 stages.  In 1st stage water table lowered by 5 m.  If required, then 3rd stage of well point can also be installed for further lower water table.  This method useful for up to 15 m. For up to 15th m deep well system will use. Multi-Stage Well Point System
  • 18. Well Point System Advantages: •Installation is very rapid. The equipment is reasonably simple and cheap. •As water is filtered while removing from the ground, soil particles are not washed away. Hence, there is no danger of subsidence of the surrounding ground. •As the water is drawn away by well points from the excavation, the sides of excavation are stabilized and steeper side slopes can be permitted.
  • 19. Well Point System Disadvantages: •Single stage well point system is suitable for lowering water table by 5 to 6 m only. For deeper excavations, where water table is to be lowered for a depth greater than 6 m, multi-stage well point system is required. •It is essential to continue pumping once it has been started until the excavation is complete. If it is stopped in between, it may prove to be disastrous. •In case of the ground consisting of stiff clay, gravel or boulders, well points are installed in drilled holes, which increases the installation cost.
  • 21. When draining is required for silt or clay which have size less than 0.05mm. That time vacuum pump system will require. The process is as follows:  The well-points are driven and 25 CM dia is provided around the well point.  Installed in the ground by forcing a jet of water under sufficient pressure.  The sand of medium to coarse size is then forced into this hole as rapidly as possible. This sand forms the filter medium. Vacuum System
  • 22. In the upper most 600 mm to 900 mm, an impervious material such as clay is tamped to form the seal the upper portion.  The pumping is then carried out by means of equipment capable of maintaining a vacuum in the well-points and the surrounding filter.  In this way, the pressure around the well-points is reduced to a small fraction of the atmospheric pressure. The ground is acted upon by the atmospheric pressure. Thus the soil becomes consolidated under a pressure which is very nearly equal to the atmospheric. Vacuum System
  • 23. In highly permeable cohesionless soil, the safety of the side slopes may be endangered through the application of severe pumping. In such cases, especially if control of the groundwater is required permanently, the methods of grouting can be used. The main idea is to insert fine materials or chemicals around the excavation in order to reduce the hydraulic conductivity of the surrounding soil to a minimum. In other words, the grouting process creates an almost impervious curtain around the excavation. The grouting is conducted using movable pipes with holes. The grout material is injected under pressure as it flows outside the pipes through the holes to fill the voids of the surrounding soil. The material used for grouting may be clay, cement or special chemical compounds. Control of Groundwater by Grouting
  • 24.
  • 26.
  • 27. Cement Grouting • The material commonly used for grout include: 1) Cement And Water 2) Cement, Rock Flour and Water 3) Cement, Clay and Water 4) Cement, Clay, Sand and Water 5) Asphalt 6) Clay And Water 7) Chemicals
  • 28.
  • 29. Chemical Grouting • The desirable properties of chemical grouts: 1)It must be able to modify the properties of soil as desired 2)It may either increase the strength or decrease the permeability of soil 3)It must be cheap, non-toxic, non-explosive 4)It must be in the form of a liquid with low viscosity so that it can be readily placed in the soil 5)It must be non-corrosive, so that it can be handled with common pumps and piping 6)It must be possible to control the gel time by suitable means
  • 30.
  • 31. Chemical Grouting Inorganic chemicals •Sodium silicate •Calcium chloride •Ligno-chrome •Ligno sulphate •They are called silicate grouts •They are cheaper Organic chemicals •Epoxy resins •Polyester resins •They are also called resin grouts •They possess advantage of low viscosity, precise control of gel time and high strength
  • 32.  Soils that will not drain using conventional methods Typically a ground freezing system consists of an array of freeze pipes.  That are installed into the ground around the perimeter of the excavation, usually in a circular pattern.  A supermodel brine solution is pump through to freeze the pipes, which freezes the water bearing soils around the pipes to create a frozen wall. Extreme care must be taken to make sure that the freeze is complete because any groundwater seepage though the wall or from below the excavation depth will have a sliding effect. FREEZING PROCESS
  • 34. 34
  • 35. GROUND FREEZING The procedure:  A refrigeration plant of required installed near the site of work.  The large pipes of 100 mm to 150 mm diameter.  The distance between the pipes is about 1 m to 1.50 m.  The pipes are closed at the bottom.  The small pipes of 25 mm to 50 mm diameter are inserted into the large pipes.  open at the bottom.  The cold liquid at a temperature of about -23°C to -30°C is then circulated through the circuit. The liquid comes through the small pipe and goes up through the large pipe.  This causes the ground to freeze around the pipes.
  • 37. • This method is used for fine grained cohesive soils (such as clay), which can be drained or stabilized using electric current. The method was developed by L. Casagrande (1952). • If direct current is passed between two electrodes driven into natural soil mass, the soil water will travel` from the positive electrode (anode) to the negative electrode (cathode). The cathode is made in the form of well point or metal tube for pumping out the seeping form of well point or a metal tube for pumping out the seeping water. • A steel rod, a pipe or steel piling of excavation can serve as the cathode. The arrangement of electrodes is done in such a way that the natural direction of flow of water is reversed away from the excavation, thereby increasing the strength of the soil and stability of the slope. The potentials generally used in the process are from 40 to 180 volts, with electrode spacing of 4 to 5 meters. Electro-Osmosis Process
  • 38. The vibroflot is inserted into the ground and typically can be used to improve soil up to depths of 150 feet. Vibroflotation utilizes water and the mechanical vibrations of the vibroflot to move the particles into a denser state. Typical radial distances affected range from 5 to 15 feet (Bauer Maschinen GmbH, 2012). The vibroflot is suspended from a crane and seats on the surface of the ground that is to be improved. To penetrate the material, the bottom jet is activated and the vibration begins. The water saturates the material to create a “quick sand” condition (i.e. temporarily liquefying the material), which allows the vibroflot to sink to the desired depth of improvement. At that point, the bottom jet is stopped and the water is transferred to the upper jet. This is done to create a saturated environment surrounding the vibroflot, thereby enhancing the compaction of the material. The vibroflot remains at the desired depth of improvement until the material reaches adequate density. Vibro flotation Process
  • 39. The density of the soil is measured by using the power input (via the electric current or hydraulic pressure) as an index. As the material densifies, the vibroflot requires more power to continue vibrating at which point pressure gauge displays a peak in required power. Once this point is reached, the vibroflot is raised one lift (generally ranging from 1 to 3 feet) and compaction ensues until the peak amperage or hydraulic pressure is reached once again.
  • 40.
  • 41. The vibroflotation process can offer the following benefits: •When the process is done properly, it will reduce the possibility of differential settlements that will improve the foundation condition of the proposed structure. •It is the fastest and easiest way to improve soil when bottom layers of soil will not provide good load bearing capacity. •It is a great technology to improve harbor bottoms. •On a cost-related standpoint, it helps improve thousands of cubic meters per day. It is faster than piling. •It can be done around existing structures without damaging them . •It does not harm the environment. It improves the soil strata using its own characteristic •No excavations are needed, reducing the hazards, contamination of soils and hauling material out from the site. Advantages
  • 42. Suitability of Different Methods of Ground Water Conditions METHOD CONDITIONS FOR SUITABILITY 1. Sumps and Ditches For shallow excavations in coarse grained soils. 2. Well point system Suitable for lowering water table by 5-6 m in soils 3. Bored well system For coarse grained soils and depth of excavation more than 16 m 4. Vacuum method Draining silty sands and fine sands 5. Cement grouting For coarse materials or rocks with cracks 6. Freezing process Suitable for excavations in water logged soils 7. Electro-osmosis process Suitable for fine grained cohesive soils such as clays