Six Sigma in Action




                                      BMW Program


                                        Thomas Henning
                                        Program Manager
                                        8/19/02

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                                      IMAC Process
Customer Profile – 3,000 seat Auto Manufacturing company                           Defect
                                                                                                     Before

                                                                                   10.8%         (Sigma = 3.4)
Business Problem & Impact
Installs Moves Adds and Changes process not affording consistent asset
tracking. Inconsistent database and time waited tracking down missing
equipment.

Measure & Analyze                                                                          Success
Data Collection: Installs Moves Adds and Changes completed and                              89.2%
entered into asset management data base
The existing process sigma was 3.4
Root Causes: 1. Technician did not think a blank field was critical.
2. IMAC request process not being followed by BMW customer.
3. Lack of Technician Experience/Training.
                                                                                                     After
Improve & Control                                                                Defects
Use the operational definitions to provide training to the technical staff on                    (Sigma = 3.9)
                                                                                   1%
how to properly complete the IMAC form. Set policy in place measuring
each employee on form completeness. Service Delivery Leader will
monitor employee conformity to this policy.

Results/Benefits                                                                      Success
Improved employee process knowledge and IMAC form accuracy.                             99%
Resulting in asset data base improvements which in turn save indirect
and direct dollars.




                                      A savings of US$6,048 in 2003!

Weitere ähnliche Inhalte

Mehr von Kevin Egan

Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
Kevin Egan
 

Mehr von Kevin Egan (6)

Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case Study
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case Study
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXN
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS Offerings
 

Bmw Imac Form Completeness Six Sigma Case Study

  • 1. Six Sigma in Action BMW Program Thomas Henning Program Manager 8/19/02 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action IMAC Process Customer Profile – 3,000 seat Auto Manufacturing company Defect Before 10.8% (Sigma = 3.4) Business Problem & Impact Installs Moves Adds and Changes process not affording consistent asset tracking. Inconsistent database and time waited tracking down missing equipment. Measure & Analyze Success Data Collection: Installs Moves Adds and Changes completed and 89.2% entered into asset management data base The existing process sigma was 3.4 Root Causes: 1. Technician did not think a blank field was critical. 2. IMAC request process not being followed by BMW customer. 3. Lack of Technician Experience/Training. After Improve & Control Defects Use the operational definitions to provide training to the technical staff on (Sigma = 3.9) 1% how to properly complete the IMAC form. Set policy in place measuring each employee on form completeness. Service Delivery Leader will monitor employee conformity to this policy. Results/Benefits Success Improved employee process knowledge and IMAC form accuracy. 99% Resulting in asset data base improvements which in turn save indirect and direct dollars. A savings of US$6,048 in 2003!