TABLE OF CONTENTS
    .................................................................................................................................................................................. 1
INTRODUCTION TO LINK RESOURCES ............................................................................................................................4
BIOFUEL: CELLULOSIC ETHANOL ....................................................................................................................................5
    Cellulosic Ethanol from Municipal Solid Waste ......................................................................................................... 5
BIOFUEL: BIODIESEL FROM BEEF TALLOW ....................................................................................................................7
    Australian Biodiesel Group Technology Development, Plant Startup, and North American Market Penetration ... 7
    Key Issues Relevant to Transition Success ................................................................................................................ 7
        Technology Optimization: .....................................................................................................................................7
        Economic...............................................................................................................................................................8
        Marketing..............................................................................................................................................................8
        Operations and Maintenance ...............................................................................................................................8
    Link Scope re: Developing ISO-9000 Consistent Processes ....................................................................................... 8
        Level 1 Processes per ISO-9000 Quality Manual ...................................................................................................8
        Level 2 Processes ..................................................................................................................................................8
        Level 3 Processes ..................................................................................................................................................9
DEPARTMENT OF ENERGY: BIOFUELS/BIOMASS .........................................................................................................10
    Summary ................................................................................................................................................................. 10
WGS ENERGY: BIOMASS POWER PLANT .....................................................................................................................12
    Introduction ............................................................................................................................................................ 12
    Why LINK Was Selected .......................................................................................................................................... 12
    LINK Scope and Accomplishments .......................................................................................................................... 13
        Outage Philosophy and Plan ...............................................................................................................................13
        Management of Outages ....................................................................................................................................13
        Staffing ................................................................................................................................................................14
        Utilization of Outside Contractors ......................................................................................................................14
NATIONAL TRIGENERATION CHP COMPANY ...............................................................................................................15
    Introduction ............................................................................................................................................................ 15
    Link’s Role ............................................................................................................................................................... 15
        Project Description .............................................................................................................................................16
SOURCE ENERGY ..........................................................................................................................................................18
    Introduction ............................................................................................................................................................ 18
        Why LINK Was Selected ......................................................................................................................................18
        LINK Scope and Accomplishments ......................................................................................................................19
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
NATIONAL COMMERCE BANK .....................................................................................................................................22
   Introduction ............................................................................................................................................................ 22
   Why LINK Was Selected .......................................................................................................................................... 22
       LINK Scope and Accomplishments ......................................................................................................................23
NORTH BRANCH GENERATING STATION .....................................................................................................................24
   Executive Summary: ................................................................................................................................................ 24
   Facility Description .................................................................................................................................................. 24
   Link Scope and Accomplishments ........................................................................................................................... 25
BELLEMEADE GENERATING STATION: COGENERATION ..............................................................................................28
   Summary ................................................................................................................................................................. 28
   LINK Scope:.............................................................................................................................................................. 28
       Combustion Turbines/generators .......................................................................................................................28
       Heat Recovery Steam Generators .......................................................................................................................28
       Steam Turbine/generator and Cooling System ...................................................................................................29
       Fuel Supply ..........................................................................................................................................................29
       Water Supply ......................................................................................................................................................29
       Budget .................................................................................................................................................................29
INTERNATIONAL PAPER: COGENERATION ...................................................................................................................30
   Background ............................................................................................................................................................. 30
   Facility Description .................................................................................................................................................. 30
   Link’s Scope ............................................................................................................................................................. 30
PORTSMOUTH GASEOUS DIFFUSION FACILITY: TRANSITION MANAGEMENT ............................................................32
   Background ............................................................................................................................................................. 32
   Link Scope ............................................................................................................................................................... 32
   Link Accomplishments............................................................................................................................................. 34
TRANSITION MANAGEMENT: GENERAL ......................................................................................................................35
   Introduction ............................................................................................................................................................ 35




October 2012                                                                                                                                       Cellulosic Ethanol
INTRODUCTION TO LINK RESOURCES
Founded in 1994, Link Resources, Inc. (LINK) is a Service Disabled Veteran Owned Small
Business with broad operations-related capabilities in the energy space, including O&M,
commissioning, construction management, energy consulting, and so on. LINK has more
energy-related experience than any other SDVOSB.

LINK’s core competence lies in the operation and transitioning of complex facilities. We take a
holistic perspective, integrating technical, contractual, organizational, human, and operational
matters. LINK has provided full-scope facility management services to an array of diverse
clients - - both domestic and international, with turn-key responsibility for staffing, maintenance,
interface with stakeholders, and ultimate facility performance that exceeded expectations. LINK
has also executed dozens of projects relating to energy services, transition management, and
general consulting to the broadest range of clients, often focusing on designing and
implementing transition plans or portions thereof.

LINK is staffed with a team of senior personnel all of whom had experience in operations and/or
maintenance - - across a spectrum of fuels, energy technologies and contexts:

      Fuels: Coal, waste coal, natural gas, refined oils, crude oil, wood, other cellulose,
       garbage, other waste fuels, nuclear;

      Traditional Technologies: PC/stoker/CFB boilers, steam and gas turbines, combined-
       cycle, simple-cycle, tri-generation, large chillers, condensers (including air-cooled), water
       treatment, and the spectrum of associated balance-of-plant equipment;

      Renewable Technologies: Biofuels (including non-food based biodiesel and bioethanol),
       cellulosic ethanol, biomass combustion, biomass gasification, wind, and solar;

      Applications: Steam for electricity, steam for process and heating, waste heat for steam,
       electricity for cooling, waste heat for regenerative cooling, biofuel for transportation;

      Clients: Commercial, industrial, utility, Federal. Domestic and Off-shore.
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

BIOFUEL: CELLULOSIC ETHANOL
Cellulosic Ethanol from Municipal Solid Waste
In 1999 Link was awarded a project to
assist Masada Resource Group in the
development and planning of a large
cellulose-to-ethanol project using a
strong-acid approach on Municipal Solid
Waste feedstock. Link was also awarded
EPC oversight (including pilot projects
for    particularly   troublesome      sub-
systems), commissioning and long-term
operations contracts for the yet-to-be-
constructed plant in Middletown, NY. The
complex plant included MSW sorting, drying, hydrolyzation and cellulose conversion, acid
recovery, fermentation, and distillation. The plant utilized dried sewage sludge converted to
steam via a fluidized bed boiler, and had several profitable byproducts such as typical MSW
rejects (e.g. aluminum), CO2, soil treatment, and green fuel. Link’s assignments during the
project period included oversight of the prime EPC contractor, Kvaerner, during engineering and
procurement; Link’s prime focus was the constructability and the operability of the processes
and systems. Link also, in joint effort with Kvaerner, developed all O&M policies and procedures
for plant equipment and systems. The first facility has not yet been constructed due to difficulties
in obtaining investors in the $400M facility.

Link’s Full-scope O&M Contract included:

   Develop Accounting infrastructure                  Develop HazCom plan for post-Acceptance
   Develop Administrative processes                   Procure Accounting Software
   Develop Filing System for post-Acceptance          Procure Human resource software
   Develop list of Furnishings                        Procure Information management software
   Develop list of tools for Operator                 Procure Inventory & warehousing software
   Develop Operating Plan                             Procure Network and office software
   Develop Information management infrastructure      Procure Planning/scheduling software
   Develop Environmental emissions                    Procure Trending, predictive maintenance,
    documentation/reporting formats                     data analysis software
   Develop Sustainability & Environmental Mgt         Develop Operability and maintainability
    program                                             specifications
   Develop specification for Vendor manuals &         Develop Warranty program management
    documentation                                       plan for post-Acceptance



October 2012                                                                       Cellulosic Ethanol
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

   Recruiting/Interview trips & expenses                Develop manpower loading/mobilization chart
   Develop Human resource infrastructure                Develop Training program
   Develop program/list Employee recognition            Develop Performance and condition
    programs                                              monitoring plan
   Procure Predictive maintenance equipment             Develop Safety Program for Post-Acceptance
   Develop Inventory Mgt & warehousing policy           Develop Maintenance policy & programs
   Develop Spare parts inventory mgt system             Procure Procurement software
   Procure Office furnishings and equipment for         Develop Engineering Program for Post-
    operator                                              Acceptance
   Develop numbering convention: Design                 Training Video library
    equipment/system numbering convention for            Procure Timekeeping Software
    construct                                            Procure all tools
   Identify and risk mitigate possible alternate
    scenarios, including construct delays, early
    completions, and need for additional personnel,
    with resultant impact on Link staffing and
    associated costs




October 2012                                                                        Cellulosic Ethanol
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

BIOFUEL: BIODIESEL FROM BEEF
TALLOW
Australian Biodiesel Group Technology Development, Plant Startup, and
North American Market Penetration
Link Resources, Inc. was engaged by Australian Biodiesel Group (ABG) to complete the startup
of their first full-scale (40 MMgpy) biodiesel plant in Australia, and then develop and transition
their organization, processes, and technology into the North American market. The scope
included development of the entire business, administrative, process, technical, and human
infrastructure. The transition and infrastructure development had to be in compliance with the
requirements of ISO-9000.

The final organization would have approximately 120 staff at distributed facilities across North
America, requiring a comprehensive yet efficient communications and reporting process that
can support quality control requirements, team-working, regulatory compliance, and advance
economies of scale. Budgets managed by Link will exceed $200 million, and annual revenues
are anticipated at $300 million.

Australian Biodiesel Group (ABG), a subsidiary of Transfield,
initially utilized Link in the startup and commissioning of its
40 mgpy continuous transesterification facility in
Queensland. Link’s contract expanded into creating the turn-
key administrative process, financial, and administrative
infrastructure for the fleet of biodiesel facilities they intended
to build in the U.S. This infrastructure included plans and
schedules        for    EPC/commissioning/operations,         draft
specifications and contracts for EPC, all personnel and
organizational policies/procedures, all O&M policies and procedures, staffing and compensation
plans, and the Operating Plan.

Key Issues Relevant to Transition Success
Technology Optimization:
      Quality control when utilizing used oils animal fat feedstocks
      Production quality control
      Ability to quickly/smoothly switch between/blend different feedstocks (possibly including
       eventually palm oil)



October 2012                                                                              Biodiesel
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
Economic
      Quality of North American business modeling
      Feedstock delivery pricing and predictability
      Final biodiesel production cost and sensitivity to petro-diesel prices
Marketing
      Clarity of target markets
      Facility proximity to target markets
Operations and Maintenance
      Although the cost of operations and maintenance is proportionally small compare to
       feedstock costs, prudent and high-quality operating practices can reduce production
       costs and add to income. During periods where margins get squeezed, the more efficient
       plants will have the competitive edge.
      Quality control of product is critical to ABG reputation and to achieve top dollar for the
       market.
      State of the art maintenance practices lead to reduced downtime and therefore
       increased plant production.

Link Scope re: Developing ISO-9000 Consistent Processes
       Level 1 Processes per ISO-9000 Quality Manual
          Link to Quality Level 3 Processes
          Management Responsibility
          Quality System
          Internal Quality Audits
          Document and Data Control
          Control of Quality Records
          Process Control
          ID and Traceability
          Inspection and Testing
          Nonconforming Product
          Corrective and Preventive Action
          References

       Level 2 Processes
          Policies
          Link-Generated References that will fade away
          Internal Procurement Specifications
          Board Governance
          LLC Operating Agreement
          Note: Quality Policy is a "Level 1"

October 2012                                                                            Biodiesel
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES


       Level 3 Processes
          Safety & Health (SH) Processes (Manual)
          Security Processes
          Human Capital (HC) Processes
          Commercial Management (CM) Processes
          Commissioning Processes (Manual) 01 91 00
          Standard Operating Processes (SOP)
          Training Processes
          Index of Archived Processes
          Quality Program Processes (QPPs)
          Work Mgt (WM) Processes
          Material Capital (MC) Processes
          Sustainability (SU) Processes
          Information & Communications (IC) Processes




October 2012                                               Biodiesel
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

DEPARTMENT OF ENERGY:
BIOFUELS/BIOMASS
Summary
Link Resources, Inc. has been engaged by the Department of
Energy and the Department of Agriculture in several projects to
assist in the evaluation of solicitations from biofuel and/or
biomass technology companies interested in receiving Federal
grants or loans for the Demonstration pilot and demonstration
plants using technologies that could be commercially viable in
the short term. During the assignments Link provided
DOE/DOA with perspectives using a broad spectrum of
technologies and different contexts including:

              MSW (cellulosic portion) to ethanol processes using strong acids (see separate
               project description)
              Ethanol Generation from Waste Sugars using immobilized microbe bioreactor
               technology: including waste water treatment and recycling of waste carbon
               sources.
              Conversion of Agricultural residue (corn stover and other lignocellulose biomass)
               to Ethanol and Ethyl Acrylate: included pretreatment of feedstock into pellets and
               subsequent hydrolyzation of cellulosic and hemi-cellulosic fractions, as well as
               other subsequent and other chemical treatments
              Production of Cellulosic Ethanol from Corn Stover: using yeast technology for the
               fermentation of both five and six carbon sugars while simultaneously co-
               produces high value co-products such as the cellulases, hemi-cellulases, or other
               important industrial enzymes.
              Fuel Ethanol from Barley: producing parasitic electricity and thermal energy from
               available biomass (waste wood and other plant based products); recovering CO2
               from the ethanol fermentation process to produce commercial grade liquid CO2
               for the production of dry ice and to use in the on-site greenhouses. Utilizing
               waste process heat, available water, available land and CO2 in on-site
               greenhouses.
              Cellulose to Ethanol Conversion using Enzymes: implementation of 2nd
               generation technologies to improve the overall performance of existing cellulose
               to ethanol conversion using enzymes. Feedstock to be further investigated
               included bagasse, energy cane, high biomass, sorghum, wood, switchgrass, corn
               stover, and miscanthus.
              “Drop-In” Bio-refineries: improving harvest operations and maximizing the
               ethanol yield/acre of fermentation of sweet sorghum, and establishing small

October 2012                                                                 DOE Biofuel/Biomass
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
               commercially viable “drop in place” bio-refineries, combined with a decentralized
               network of fueling stations where the ethanol would be blended “at the pump”.
              Re-purposing of a Corn-based Ethanol Facilities: redesigning corn-based ethanol
               facilities to use alternative feedstocks.
              Biomass gasification: for steam generation.
              Biomass combustion: utilizing a variety of technologies including stationary and
               moving stoker grates, and fluidized beds.


                          Link’s scope included comprehensive reviews of financial, technical,
                          and commercialization plans within proposals. Reviews were followed
                          by panel discussions with cross-disciplined panelists, oral
                          summaries, written summaries and final formal evaluations.




October 2012                                                                DOE Biofuel/Biomass
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

WGS ENERGY: BIOMASS POWER PLANT
Introduction
WGS Energy builds and acquires green/sustainable energy generation and energy
transformation facilities. A representative project is the 65MW (gross) electric production facility
in Twiggs County Georgia that gasifies biomass to develop steam for direct conversion to
electricity and for heating and drying of incoming feedstock. LINK was engaged after a
competitive bidding process to select the multi-year Operator, wherein LINK offered a more
comprehensive and yet more detailed and credible than a much larger rival.


Why LINK Was Selected
Since biomass plants have a high degree of complexity, one of WGS concerns was having an
Operator who had direct experience and also the predisposition to 1) customize the plant for the
specific needs of the client, and 2) focus on maintenance and outage management. The
technology and equipment complexities include chipping the incoming organic waste, drying,
storing, conveying, feeding, gasification, gas cleaning, combustion, waste heat-to-steam
generation, large electric turbine-generators, switchyard and interconnection with grid, ash
handling and disposal, heavy truck traffic in/out leading to safety, security, and local neighbor
concerns, and so forth

One particular aspect of LINK’s “Conduct of Maintenance” approach that impressed WGS was
our planning for Short Notice Outages (SNOs). With the amount of equipment, the complexity of
the processes, and the overall lack of redundancy in design, there is no doubt that equipment
will fail; the issue is really how quickly the Operator can get it back on line at full capacity. LINK
developed a protocol for SNOs that involves:

   1. A basic Reliability Centered Maintenance (RCM) approach that utilizes the Operator’s
      experience and information from equipment vendors to identify points-of-likely-failure.

   2. A review of spare parts requirements to ensure replacement parts are available to make
      associated repairs.

   3. Storing associated sets of spare parts so that they can be immediately retrieved “as a
      package” if/when a pre-identified SNO occurs.

   4. Identification and pre-location of tools necessary to make specific SNO repairs.

   5. Preparation (and sometime even rehearsal) of the maintenance team to optimize their
      mobilization and task-performance to complete the repair in the minimum time.

October 2012                                                                    WGS Energy- Biomass
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
   6. Iteration on the above as lessons are learned.


LINK Scope and Accomplishments
In addition to the broad scope associated with a multi-year O&M contract (some elements of
which are addressed elsewhere in this document), the following focuses on Outage Philosophy
and Planning which was particularly important on the Twiggs County project.

Outage Philosophy and Plan
       Plant outages are scheduled in the Spring and Fall, to avoid peak seasons and any
       demonstration periods established by Georgia Power. The philosophy of the Spring
       outage is characterized by:

                  complete maintenance essential to operate until Fall
                  thoroughly inspect systems in order to plan for the Fall inspection
                  test and challenge the plant planning, scheduling, contracting, parts ordering,
                   and outage management skills so that an improvement plan can be
                   accomplished prior to Fall outage
                  execute the predictive maintenance program that includes boiler and turbine
                   predictions based on inspection & test criteria.


               The philosophy of the Fall outage is:

                  complete all maintenance necessary to operate for 18 months without
                   another outage
                  double-check inspection to ensure spring outage inspection process was
                   adequate
                  again test & challenge the outage management system & try to improve
                  prepare for winter (i.e. plant winterization)


Management of Outages
       The formality of the maintenance planning and scheduled activities warrants attention.
       For example, planning for major scheduled outages begin 18 months in advance, with
       very clear accountabilities established. Major vendors are notified and invited to
       participate in the planning exercise, and requested to justify their cost-effectiveness on
       the outage. Depending on the specific skills of the management team, planning and
       scheduling software may be appropriate for outages.

       Pending maintenance for equipment that can only be accomplished during shutdowns
       are closely managed and preparations made such that the facility can effectively utilize
       any unscheduled outage to complete such maintenance. Additionally, the maintenance

October 2012                                                                 WGS Energy- Biomass
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
       department continually plans routine maintenance, inspections, and predictive
       maintenance that can only be performed when equipment is off-line, so that it will be
       performed during periods when the plant is dispatched off-line

Staffing
       Major OEM vendors are urged to provide maximum input regarding their experiences
       and lessons learned in their recent outage support roles. Refractory deterioration
       remains a major concern OEMs are closely consulted to ensure cost-effective
       management of the high cost and high impact problems. The entire staff is utilized to
       maximum potential in order to reduce the requirements for outside contractors and
       temporary employees.

Utilization of Outside Contractors
   Reliance on contractors can readily become excessive. In particular, mechanical
       contractors, welding, and cleaning/vacuum services can often be reduced given the
       capabilities of the work force; and the money that is saved can be better spent the
       capital purchase a vacuum/cleaning truck.

   LINK’s philosophy on the use on contractors is clear. They are necessary only when: 1)
      personnel on site have no additional capacity to perform the function, and failure to
      complete the work will or could likely result in expenditures or loss of revenues in excess
      of the cost of the contractor; or 2) when the work to be done in accordance with the
      Operating Plan requires skills, tools, or licenses not held by the facility.

   LINK’s contractor selection process/criteria includes a solid program for competitive bidding,
      closely assessing experience, resources, price, responsiveness, and risk-sharing
      concepts.    Value is considered more important than low price. Disadvantaged
      businesses are seriously considered for all subcontracted work.

   LINK believes that general services agreements can frequently be a cost-saving mechanism
      for frequently utilized services and such contracts will be pursued for construction,
      welding, civil work, etc. The client’s resources are considered at all stages of the
      purchasing and contracting process to ensure that the client’s resources are utilized if
      cost effective and appropriate.




October 2012                                                                WGS Energy- Biomass
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

NATIONAL TRIGENERATION CHP
COMPANY
Introduction
NTCC is a leading energy services company in the Middle East, delivering reliable and
environment-friendly cooling, heating, and power (CHP) to commercial, industrial and
governmental organizations. NTCC is at the forefront of the Middle East in acquiring inefficient
energy facilities and improving the performance by adding cogeneration and trigeneration
solutions. NTCC also builds energy efficient facilities at greenfield and brownfield sites. They
offer build-own-transfer (BOT), as well as build-own-operate (BOO) solutions in power,
cooling/steam, and water desalination.

Although NTCC is a relatively young company, NTCC is now either managing or in the process
of assuming control of 100,000 tons of cooling, 80 MW of electrical generation, and 59,000 lb/hr
steam. LINK has been a partner with NTCC since 2008 since NTCC recognized they had
neither the O&M skillsets nor infrastructure to operate and maintain their facilities.


Link’s Role
LINK was engaged to develop NTCC’s entire organizational, process, and administrative
infrastructure for its O&M division while it operated and maintained current and imminent energy
facilities. LINK is included as a “partner on NTCC’s web page
http://www.ntcc.com.sa/index.php?option=com_content&view=category&id=69&Itemid=91&lang=en).

NTCC’s traditional energy generation/transformation technologies utilized at facilities:

      Electric chillers
      Regenerative chillers (using waste heat input)
      Steam Boilers
      Power generation
      Plus balance of plant to include of course cooling
       towers, condensers, piping, valves, motors,
       pumps, motor control centers, transformers,
       programmable logic controllers (PLCs),                               Aerial View of KKMC
       distributed control systems (DCS including Mark V, WDPF &
       Emerson Delta V), compressed air, water purification, etc.



October 2012                                                                      Source Energy-CHP
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
With the award of the King Khalid Military City contract, additional larger frame technologies
include a (CHP) plant consisting of 200MW of Westinghouse 251B Gas Turbine electricity
generation, eight 6,500 ton chillers, GE/Woodward DCS controls, 10 CW pumps, and a
distributed CW/HW pipe feed and return system to over 80 buildings on the 5000-man KKMC
military city. Gas Turbines are being upgraded to combined cycle with Heat Recovery Steam
Generators (HRSGs).

Project Description
As part of LINK’s broad scope to operate and maintain existing and future facilities, it was
necessary for Link to establish a standard corporate-wide O&M program; and operated and
maintained existing and newly acquired/built CHP energy facilities. Total scope included:

     Identified, recruited and hired operators, technicians, and manual labor
     Developed and executed transition plans that optimized the assumption of O&M
      responsibilities of existing facilities
     Developed and implemented Operating Plans
     Provided management and supervision as necessary
     Provided recruiting, policies/procedures;
     Developed and implemented QC programs
     Developed and implemented safety training programs
     Developed and implemented commissioning plans and services
     Prepared O&M budgets for existing plants as well as in proposals for new plants
     Developed transition budgets
     Designed and set-up Computerized Maintenance Management Systems (CMMS)
     Assisted the client in the preparation of proposals for new projects
     Working with Performance Improvements (PI) Ltd, designed and installed PI control
      system remote monitoring system that interfaced with control systems including Mark V,
      WPDF, and Emerson Delta V
     Managed environmental compliance
     Assumed direct interface with on-site clients which was essential to the customer
      relationship management (CRM)
     Performed numerous other tasks

LINK built a world class O&M organization and infrastructure that became an effective part of
the NTCC business model. NTCC energy facilities have high operational demands; in other
words, NTCC clients expect cooling, heating, and power 24/7/365 and failure to provide such
services is not an option. In the exacting environment, LINK’s O&M services exceeded
expectations by delivering 24/7 CHP even during severe circumstances (e.g. weather), that
otherwise could have been claimed as force majeure.




October 2012                                                                   Source Energy-CHP
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES




October 2012                                       Source Energy-CHP
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

SOURCE ENERGY
Introduction
In partnership with its customers, Source Energy (SE) finances, develops, builds, operates and
maintains advanced power technologies that serve the long-term heating, cooling, and power
requirements of commerce, industry, and government. Backed by significant financial resources
and an extensive network of influential relationships, Source Energy takes full responsibility for
ensuring customers efficient, sustainable and reliable district energy and district cooling
services, tailored to custom needs, from a single outsourced provider.

Source Energy provides cooling, heating and power solutions on a Build-Own-Operate-Transfer
(BOOT) basis. Source Energy recently won a Saudi Arabian Riyal (SAR)1 BILLION Saudi
Arabian contract from for providing the 2nd Industrial City in Jeddah with central cooling &
power services. It will supply the industrial city with about cooling and electrical power. The
district cooling network will be operated by Source Energy for 30 years. LINK is under contract
to operate and maintain projects engaged by Source Energy.

Source Energy provides cooling, heating and power solutions on a Build-Operate-Transfer
basis. An example of one large project includes:

      Jeddah Industrial City 2: A SAR 1 billion contract from MODON provides the 2nd
       Industrial City in Jeddah with a central CHP facility. Source Energy supplies the City with
       approximately 80,000 tons of cooling, and produces over 50 MW of electrical power.


                              Smaller projects include:

                                     Al Anoud Tower in Riyadh
                                     King Road Tower CHP Plant in Jeddah,
                                     Al Khobar Lakes Power Plant in Al Khobar.

                              Each of which has either electric chillers, and/or regenerative
                              chillers, and/or steam boilers, and/or power generation (e.g.
diesels), plus extensive balance of plant, water treatment, and large cooling towers.


Why LINK Was Selected
LINK was engaged for some of the same reasons elaborated in the NTCC section above. The
selection was also heavily influenced by LINK’s operating philosophy and culture, since SE was


October 2012                                                                    Source Energy-CHP
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
convinced that the following critical components must form the basis of any contractual
operator-client relationship for a multi-year engagement:

   1. a willingness to “partner” and work in an honest, trusting environment to achieve mutual
      goals

   2. flexibility, since over the long term it is not possible to consider all the combinations of
      events that may occur; agreements don’t govern good relationships as much as good
      relationships govern the agreements, and

   3. sufficient depth to provide necessary scope: for example, there has been a general
      tendency for many companies to undervalue the administrative, human resource, and
      security skills that are required to ensure compliance with law as well as maintain a
      workforce that can provide the exceptional levels of service

Source Energy was also impressed with LINK’s focus on developing comprehensive Operating
Plans for existing and new CHP projects, which would comprehensively address operating
formality, maintenance skillsets, compliance with policy and procedure, training,
planning/scheduling/budgeting, safety, and response to emergency/non-routine situations.
LINK's initial assessment of existing SE facilities led to the conclusion that, in order to attain the
largest short-term improvement in plant reliability, the first year's focus of investment should be
on safety training, and programmatic maintenance.

LINK Scope and Accomplishments
LINK was initially hired to provide elements of SE’s operational infrastructure and scope
expanded into LINK’s provision of complete O&M services. Since then it has managed the
development of the infrastructure and functionality of the entire Operations Division of Source
Energy.

With respect to safety, the focus that LINK stressed to SE centered around two equally
important factors: 1) an emotional investment in safety, and 2) the the lack of a safe work
environment is an unaffordable cost. Thus LINK developed a Safety Program encompassing:

   1.   a monthly newsletter on safety issues and/or lessons learned
   2.   safety training for all employees during first 30 days
   3.   a required safety review course for each new employee and each employee annually
   4.   periodic safety drills for each shift, such as fire drills, at least quarterly
   5.   management and supervisory safety goals with bonus and/or salary impact
   6.   a modified work recovery program to return injured employees to work sooner.

In the safety training arena, LINK developed:

       Training Requirements and Guidelines


October 2012                                                                        Source Energy-CHP
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
      Safety Program Self-Evaluation
      Safety Inspection Checklists
      Record-keeping Handbook
      Safety Presentation for Classroom Training
      Safety Procedures (e.g. hotwork, electrical, lockout/tagout, confined space entry, etc.)


LINK’s maintenance program upgrade consisted of a focus on optimization-centered
maintenance. In other words, LINK utilized the concepts of reliability centered maintenance
where there are critical components that are likely to affect availability or safety. However, not
all aspects of RCM were used due to the fact that it is seldom cost-effective to perform the
degree of analysis often required in a true RCM program. The optimization-centered program
also integrated equipment history, event recording, trending, and root cause analysis into the
program to improve performance. The real key to the successful maintenance program,
however, was the basic due diligence from managers and supervisors, rather than the level of
sophistication of the program.

LINK’s goal for the Source Energy plants was to be the most reliable CHP producer in its
category in a safe and socially responsible manner. LINK achieved these objectives by setting
short and long term goals for each facility in the following areas:

      improved profitability,
      enhanced reliability,
      low cost production,
      environmental and safety consciousness,
      cooperative working relationships with each client/steam host,
      a rewarding work environment,
      and responsible corporate citizenship.
                 At King Road Tower in Jeddah, LINK was asked to come in and rescue a
                 failing construction project. LINK re-organized the construction staff and
                 refined the plan leading to the accomplishment of a 1 August 2011
                 construction milestone, thus avoiding a multimillion dollar construction penalty.
                 LINK prepared budgets, managed construction crews, provided liaison service
                 with main building contractor, hired new contractors and staff, and managed
                 the procurement of all supplies including interfacing with delinquent suppliers
                 to force delivery completion.

At Al Anoud Tower, LINK provided design input along with equipment and supply
recommendations during construction process and managed the facility into commercial
operations. LINK organized and recruited new facility staff to include new equipment training at
Broad in China and with Emerson in Riyadh.

October 2012                                                                     Source Energy-CHP
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
At Al Khobar Lakes power project, LINK took over control of the construction process at the
25% stage of completion. LINK recruited and deployed staff to the site including managing all
HR and admin tasks to support the staff living requirements in Al Khobar. LINK managed all
phases of the project, taking it to commercial operation. LINK connected this sites’ DCS
(Emerson Delta V) into its remote control and monitoring capabilities for Source Energy.

LINK’s administrative scope included:

      operating procedures,
      training,
      safety,
      environmental compliance,
      transition management,
      recruiting,
      proposal preparation,
      budgeting,
      construction management,
      commissioning,
      warehousing protocols,
      preventive & predictive maintenance, and
      major unplanned and planned outage management.




October 2012                                                                  Source Energy-CHP
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

NATIONAL COMMERCE BANK
Introduction
The National Commerce Bank is the largest bank in the Kingdom of
Saudi Arabia. NCB has multiple facilities including bank buildings,
administrative buildings, and a large IT center where proper cooling
and/or heating is critical to servicing the bank’s customers,
maintaining continuity of bank operations, and indeed security. Most
of the NCB complex has its own CHP facility yet reliability was poor,
and since the local electric utility grid was unreliable it was essential
for NCB to improve the capacity and the reliability of its energy
facilities.


Why LINK Was Selected
LINK was selected for some of the same reasons expressed elsewhere in this document - - for
the sake of brevity not repeated in this section. Yet after LINK made a preliminary assessment
that NCB’s reliability and capacity concerns were primarily driven by poor maintenance, LINK
developed a Maintenance Rejuvenation Approach that impressed NCB:

   immediate "conduct of maintenance" training in order to address maintenance philosophy
    and motivational issues, and communicate that each discipline shares a role in
    maintenance, followed by technical/skills training in deficient areas for maintenance
    personnel
   realignment of preventive & routine maintenance responsibilities for roving operators
   endorsement of reliability centered maintenance (RCM) where there are critical components
    that are likely to affect availability or safety
   transition equipment history, event recording, trending, and root cause analysis to improve
    performance
   management training to identify accountabilities for preventive and predictive maintenance
    at the shift supervisors, operations manager, and maintenance manager levels
   evolutionary execution of a cost-effective predictive maintenance program to include (in
    order of priority) vibration analysis on critical components, lubricant analysis, thermographic
    analysis, motor circuit testing, on-line performance monitoring, ultrasonic detection, and gas
    analysis
   progress toward a maintenance mix goal of 45%/35%/20% for corrective/
    preventive/predictive maintenance, respectively
   evaluation of the functionality of the CMMS system, including unused capabilities
   increased formality of the maintenance planning and scheduling activities
   invitation to major vendors to participate in the maintenance planning.

October 2012                                                                National Commerce Bank-CHP
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
LINK Scope and Accomplishments
LINK provided operations and maintenance services for the Saudi National Commercial Bank in
both Riyadh and Jeddah. Through initial audits, LINK established the need for and executed
multiple improvement projects:

   1. Efficiency Project…results were a reduction in 2009 of 241,777 kwh for a savings of
      $25,000 with a reduction of 1,370,214 kg /yr less Green House Gas emissions.

   2. Reliability Project - NCB IT Center and Regional Office- 24 months without a service
      interruption. Maintenance improvements resulted in the elimination of a planned
      equipment replacement project costing in excess of $3 million.

   3. Housekeeping Project - Facilities cleaned, organized, and maintained to a higher
      standard. All facility walls and floors cleaned and re-painted. Tools, parts, and supplies
      were categorized and organized.

   4. Safety Project – OSHA based Safety procedures were written and tailored for each sites’
      equipment and hazards. Safety Showers, eyewash stations, first aid kits, fall protection,
      PPE, Fire protection upgrades were implemented and a safety culture was cultivated
      thru training and program implementation.

   5. Remote Monitoring Project - SECURE Offsite Control Performance & Diagnostic Center
      implemented in Riyadh to manage both facilities. Night Shift was eliminated at all NCB
      Facilities upon project completion.

   6. Client Management Project – A re-focus on client relationship management resulted in a
      successful PR campaign centered around 2 years of project upgrades, customer
      satisfaction, and facility performance improvements which culminated with the facilities
      considered to be the best maintained at NCB. During the 2011 Jeddah floods…LINK’s
      facility staff was pivotal in assisting NCB manage the devastation wrought on their
      facilities, even though this was outside of LINK’s scope of work.

   7. Staff Training Project – Vendor training, Safety Training, Environmental Training and On
      the Job Training culminated in a $600,000 savings in 12 months. All personnel were re-
      trained to be a multi-skilled work force resulting in a 75% drop in contract labor.

   8. CMMS Project – LINK implemented 2 CMMS systems. A temporary CMMS within 30
      days while a managing the implementation of a million dollar Oracle suite. Electronic
      rounds were integrated to give staff technological flexibility in data and maintenance
      record keeping. Digital Thumbprint Scanners were also implemented to log & track
      employees work hours.



October 2012                                                         National Commerce Bank-CHP
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

NORTH BRANCH GENERATING STATION

Executive Summary:
Dominion Virginia Power awarded LINK this multi-year full-scope
operations and maintenance agreement after a competitive
solicitation that included Bechtel, Babcock & Wilcox, and Stone &
Webster (subsidiary of Shaw Group) among others. North Branch
was an existing 80 MW waste-coal fired electric generation
station utilizing two circulating fluidized boilers (395,000 lb/hr
steam each), a single turbine generator, an air-cooled
condenser, and a staff of originally sixty-five (65). LINK
dramatically cut costs from $35/mwhr to $25/mwhr - - reducing
staff to 46.


Facility Description
Electrical generating equipment consist of two 1770 psi, 395,000 lb/hr, natural circulation,
circulating fluidized bed (CFB) boilers (coal fired) and one ABB VAX type steam turbine
generator rated at 93,500 KW. The station can generate approximately eighty megawatts net
power. The boiler and steam turbine is controlled by a Bailey INFI 90 distributed control system.

Station cold start-up power is supplied through a 69000/4160 volt, 6,250 KVA step-down
transformer. After the steam turbine generator is placed on line, station power is supplied
through two 13800/4160 volt, 10000 KVA step-down transformers feeding two separate 4160
volt bus bars. Power is delivered to the utility grid through a 13,800/115,000 volt step-up
transformer.

Steam exiting from the steam turbine passes through horizontal ductwork to an air-cooled
condenser. Hogging and a holding ejector system removes non-condensables from the
condenser. The condensate drains by gravity to a collection hotwell tank. A 200 HP vertical
turbine pump takes suction on the hotwell tank and pumps the condensate through two low
pressure feedwater heaters to the deaerating/storage tank. A 1500 HP electric driven feedwater
pump takes suction on the deaerating/storage tank and pumps the feedwater through two high
pressure feedwater heaters to the boilers. Auxiliary cooling water for pumps, coolers, seals, and
bearings is supplied from a 2 cell cooling tower located on the roof.

Waste coal (gob) burned in the boilers is delivered to the station by truck and is purchased from
Buffalo Coal Company and Mettiki Company. The gob is sized in a Pennsylvania Crusher


October 2012                                                            North Branch-Electric Plant
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
Hammermill and is stored in one of four storage bins (800 ton capacity each). Normally, three
days worth of coal is kept on premises.

The circulating fluidized bed (CFB) boilers operate on the principle that limestone fed into the
combustion chamber will reduce sulfur dioxide (SO2) emissions to the atmosphere. The
limestone is delivered to the station by truck, sized in a Williams DFM crusher and stored in a
1250 ton capacity storage tank. The crushed limestone is fed into the boiler’s combustion
chamber and burned with the coal. Two cyclones circulate the burned coal and limestone in the
combustion chamber. Propane is used as start-up fuel for the boilers. It is stored in six 30,000
gallon capacity storage tanks. Each boiler requires 94,200 SCFM of propane, feeding four
start-up burners. The waste-coal is very poor quality (as low as 5000 btu/lb, 60% ash, and 35%
moisture) and added considerable complexities to the conveyance (1 mile), hogging, storage,
and feeding, and combustion.

Station service and control air is supplied by three direct driven rotary screw air compressors.
Each compressor can deliver 411 SCFM of air at a pressure of 125 psi.


Link Scope and Accomplishments
Link had turn-key accountability for all staff, operations, maintenance, security, procurement,
accounting, reporting, environmental and regulatory compliance, and interface with dispatch.
Link successfully planned and managed a comprehensive Transition Plan to assume
accountability for the people, processes, and equipment from an incumbent O&M contractor, as
well as to rejuvenate the performance of the below-par facility. The following charts are
representative of the performance improvement:




October 2012                                                             North Branch-Electric Plant
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES




October 2012                                   North Branch-Electric Plant
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
       Purchase Order BKF 496399




October 2012                                   North Branch-Electric Plant
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

BELLEMEADE GENERATING STATION:
COGENERATION
Summary
Link had the full-scope, turnkey contract to operate and
maintain the Bellemeade Facility was a 225 MW (net) /
250 MW (gross) electric gas/oil fired cogeneration
system. The facility consisted of turbine systems with
heat recovery steam generators that produced steam for
steam turbines as well as for cogeneration purposes. The
offsite steam host was a cardboard recycling facility that
required a continuous high-quality and predictable 150#
steam supply, and included an extensive array steam
piping, condensate return, and condensing systems. Twin
gas/oil fired package boilers were capable of supplying
steam needs if the larger plant was shut down.

Major equipment at the facility consists of two (2) combustion turbines/generators, two (2) heat
recovery steam generators with integrated Selective Catalytic Reduction (SCR) for NOx control, one
(1) steam turbine/generator, mechanical draft cooling tower, demineralizer, auxiliary boiler, and
various support equipment.


LINK Scope:
Combustion Turbines/generators
The combustion turbines are two ABB Model GT-11 N machines each driving a Brush Electric
generator normally rated at 88 MW each. Each machine has on line fuel switching capabilities
between distillate oil and natural gas.

Heat Recovery Steam Generators
The HRSG’s consist of two triple pressure ENTEC heat recovery boilers capable of 475,000 pounds
per hour of steam flow. Each HRSG is equipped with duct burners (natural gas only) to provide
supplemental heat and a Hiatachi Selective Catalytic Reduction (SCR) system for NOx control. The
SCR catalyst base material is titanium oxide with a substrate material of stainless steel 430. The
SCR system also utilizes a 18,000 gallon anhydrous ammonia feed system.




October 2012                                            Bellemeade Generation Plant: Cogeneration
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
Steam Turbine/generator and Cooling System
The HRSGs provide steam to drive one ABB Vax model condensing extraction steam turbine
nominally rated at 75 MW. This is the same model turbine that is in use at the North Branch and
Morgantown projects. The cooling system is a closed loop utilizing a Yuba horizontal in-line
condenser and a Thermal Dynamic Towers three cell cooling tower with three Ingersoll-Rand 400
horsepower, 200 gpm circulating pumps.

Fuel Supply
The natural gas system consists of one 10 inch and one 4 inch gas main, owned by the City of
Richmond, at 300 psi gas pressure to the site. There are also two Ingersoll-Rand 600 horsepower
gas compressors owned by the project that have never been used. The distillate oil system includes
an on-site 50,000 gallon storage tank which provides approximately one day of fuel supply to both
units. The day tank is supplied through a nearby oil storage tank farm facility (several storage tanks
are leased from the Little Oil Company) utilizing a pipeline and fuel forwarding facility.

                                                            Water Supply
                                                            All water is supplied from the City of
                                                            Richmond water supply system and is
                                                            stored in a 1,000,000 gallon storage
                                                            tank. Process makeup water is purified
                                                            through an on-site Glegg deminer-
                                                            alization system and stored in a 500,000
                                                            gallon storage tank. All waste water from
                                                            the site is discharged, after neutralization
                                                            treatment and oil separation, into the City
                                                            of Richmond’s waste water treatment
                                                            system.

                                                            Budget
Link’s budget requirements to operate this facility at or near requisite capacity factors were
$4,293,515 per year for normal operation and maintenance.



       Purchase Order BKF 496475




October 2012                                              Bellemeade Generation Plant: Cogeneration
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

INTERNATIONAL PAPER:
COGENERATION
Background
International Paper operates substantial power generation facilities at multiple mill locations in
Eastover, SC, Franklin, VA, Prattville AL, and Savannah, GA. Each was originally developed as
an integral part of pulp and paper operations, employing a reasonably balanced, efficient
cogeneration cycle producing electricity and steam for the plant. Wood waste is used as a fuel
to the extent available. Black liquor recovery boilers are utilized for chemical recovery as well
as steam production. Environmental equipment has been installed consistent with the
increasing demands for clean air and water discharges. Some locations such as Franklin have
expanded the power facility off-site, and furthermore have introduced natural gas as a non-
traditional fuel source.

After considerable delays in the construction and startup of the new gas/oil fired cogeneration
plant at the Franklin mill, Link was engaged to get the commissioning and startup program back
on schedule. Link mobilized an experienced staff within 14 days to replace the commissioning
staff of the EPC contractor; and subsequently mobilized an O&M staff to operate and maintain
the facility, with the ultimate objective to train unionized labor staff employed by International
Paper.


Facility Description
International Paper’s “910 Facility” in Franklin, VA consisted of a 55 MW
(gross) and 45MW (net) gas/oil-fired turbine generator with a heat
recovery steam generator providing process steam to the adjacent
paper mill. The system additionally included cooling towers, water
purification, condensers, emissions controls, laboratory, and traditional
balance-of-plant systems such as air compressors, PLC’s leading to the
distributed control system (DCS), building and grounds maintenance,
and so forth.


Link’s Scope
Link’s scope included:

       oversight of EPC completion


October 2012                                                      International Paper: Cogeneration
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
       system walkdowns
       punch-list generation, and management to correction
       system turnover checklists
            o mitigation of risks associated with walk-downs, including
                      alignment and calibration checks
                      hydros/pressurizations/NDT
                      equipment startup readings (e.g. volts, amps, etc.)
       O&M policies and procedures
            o Consistent with existing labor union contracts yet attempting to incorporate a
                  more “cross-disciplined” approach
       And of course, full-time turn-key operation and maintenance of the 910 cogeneration
        facility,
       Culminating in a seamless turnover to International Paper’s local O&M staff.




        Purchase Order 97852iP.O. Box 178, Franklin, Virginia 23851




October 2012                                                          International Paper: Cogeneration
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

PORTSMOUTH GASEOUS DIFFUSION
FACILITY: TRANSITION MANAGEMENT
Background
The Portsmouth Gaseous Diffusion Plant (part
of the Portsmouth site) is a uranium
enrichment plant that was constructed in the
mid 1950's and operated by the Department of
Energy (DOE) and its predecessor agencies to
supply both high-and low-enriched uranium for
defense purposes and commercial nuclear fuel
sales. The uranium enrichment program
utilizing the gaseous diffusion process resulted
in the generation of significant quantities of
radioactive, hazardous, and mixed waste,
which is referred to as legacy waste, and other
contaminants. Waste and contaminants at the
site include those regulated under the Resource Conservation and Recovery Act (RCRA), the
Toxic Substances Control Act (TSCA), and the Atomic Energy Act (AEA), including construction
debris, sanitary waste, hazardous waste (HW), radioactive low-level waste (LLW), and mixed
low-level waste (MLLW).

LATA/Parallax Portsmouth developed and submitted a winning proposal to the Department of
Energy in response to Request for Proposal to replace the Bechtel Jacobs Company whose
contract was expiring. The Scope included the Clean Up and Remediation/Environmental
Management Services at the Portsmouth Gaseous Diffusion Plant.


Link Scope
In support of the requirements of LPP’s efforts to respond to DOE’s RFP and to execute the
awarded contract, Link provided an estimate of all employee and labor related transition costs in
sufficient detail to be included in the target cost of this contract, and assisted determining other
transition costs. Proposed costs were broken down by the following major cost elements:

      direct labor (including labor categories, and labor hours in each category),
      relocation,
      travel,

October 2012                                                                  Portsmouth Transition
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
      materials & supplies,
      subcontracts,
      and all other costs.

Link led the development of a Transition Plan, and supported LPP to enable submittal within 3
days after any award to LPP. Detail and scope had to be sufficient to meet the requirements of
DOE. The objectives were: (1) achieve an orderly transition; (2) be fair to incumbent employees
and maintain a productive and flexible work force; (3) minimize the cost of the transition and its
impacts on other DOE programs; (4) promote those practices which will result in stable
collective bargaining relationships; (5) adhere to DOE’s Workforce Restructuring Plan for the
facility; (6) integrate ES&H into the transition phase to ensure safety and regulatory compliance;
and (7) ensure compliance with DOE’s Request for Proposal.

The Plan had to address LPP’s approach, methods and processes for the integration and
interfaces with other contactors and private corporations on site. This included LPP’s
organizational structure, strategy and understanding of respective site roles, methods of
resolving disputes and addressing issues, and approach to transition including continuation of
remediation activities, seamless transition of human resources, and strategy for assumption of
the directed or any other subcontracts. It was also understood that Link’s main focus and
responsibility as it related to the Transition Plan was focused on employee and labor related
transition activities. Link managed the Transition Team during the transition period to ensure all
Transition Objectives were achieved while also ensuring transition costs incurred are allowable,
allocable, and reasonable.

Transition Objectives can be summarized as:

      Informed incumbent employees about the transition and various stages of the review
       and hiring process through various means of communication
      Engaged Union Labor leadership to achieve mutual understanding early in the transition
      Achieved seamless transition of payroll and benefits
      Initiated alignment with DOE (PPPO and POOG) and other site contractors through a
       series of meetings and MOUs to ensure clarity of interfaces, jurisdictions, protocols, and
       continuity of support
      Maintained tight accountability of nuclear material and the security of all site assets
      Maintained safety envelope for all facilities and operations
      Ensured readiness to maintain compliance with DOE Orders, local, state, and federal
       regulations, and all remediation requirements
      Transitioned (“blue-sheeting”) all existing Policies & Procedures (several thousands) to
       ensure compliance while streamlining and adapting to a new culture
      Set the stage for future rejuvenation of people and processes to achieve DOE
       objectives.

October 2012                                                                 Portsmouth Transition
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
      Assisted LPP in conducting labor relations in accordance with applicable laws and
       DOE’s intent that labor relations policies and practices reflect the best experience of
       American industry in aiming to achieve the stable labor-management relations essential
       to successful accomplishment of DOE’s programs at reasonable cost.

Link provided assistance in recruiting, interviewing, and selecting the LPP staff. Thereafter, Link
provided ongoing labor relations and HR consultation and advice as needed.


Link Accomplishments
Link completed the transition at Portsmouth on time and under budget, allowing LPP to assume
accountability for the facility. All transition activities were completed, including an extensive risk
mitigation and opportunity rejuvenation process that led to a very successful and profitable 5-
year project for LPP.



       Steven B. Treibel, 2400 Louisiana Blvd, Albuquerque, NM, (505) 884-3800




October 2012                                                                     Portsmouth Transition
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES

TRANSITION MANAGEMENT: GENERAL
Introduction
Over the past 18 years, Link Resources has provided Transition Management1 services to well
over 100 clients - - from utilities to independent energy developers to government, industrial and
commercial companies, both domestically and offshore. Whether transitions are precipitated by
mergers, acquisitions, restructurings, or other changes in control of operation, they are complex
periods during which client objectives can be optimized - - of if not properly managed can lead
to disaster. For instance, over 75% of all M&As fail to achieve major objectives, and the hind-
sight of CEO’s generally blames failures on lack of comprehensive transition planning and
execution.

Each transition is different and requires an approach that is customized - - incorporating the
appropriate lessons-learned across the spectrum of industries and circumstances. During a
transition, staff not only expect change but also typically welcome it. In other words, there is a
window-of-opportunity that can be used to advantage if the transition is planned and executed
effectively. And it is important to note that the transition does not end on the “turnover” date, but
continues for months thereafter. Thus it is important to retain a transition team to pursue
transition objectives concurrently with day-to-day operations.

Although the transition process is complex, if can be summarized by the following stages:



                          Define the New Organizational Objectives
                                             
    Analyze and Evaluate the Current Organization, Systems, Environment & Infrastructure
                                             
                                  Develop a Transition Plan
                                             
               Implement the Transition Plan and Manage the Change Process
                                             
                           Feedback on Performance, and Iteration




1
    Link Resources’ trademark is “the Transition Company®”

October 2012                                                                       Transition: General
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES




A list of sample clients to whom Link provided transition services includes:

           American Electric Power                 Lockheed Martin Energy Systems
           Babcock & Wilcox                        Lockwood Greene
           Bechtel/B&W Idaho                       Los Alamos National Lab
           Brooklyn Energy Center                  Manitoba Hydro International
           BWX Technologies                        Masada Resource Group
           Carolina Power & Light                  McGraw-Hill
           CH2M Hill                               Merchant Energy Group
           Constellation Energy                    Mettiki Coal
           Department of Energy                    Mirant
           Dominion Virginia Power                 MyFacility.com
           Duke Engineering & Services             National Trigeneration CHP Company
           Dyplast Products, LLC                   Navigant Consulting
           Enron                                   Northeast Generation Services
           Entergy                                 NRG
           ESB International                       Oak Ridge National Lab
           Evantage                                Permatherm
           Fluor-Hanford                           Source Energy
           Foster Wheeler                          Standard Power & Light


October 2012                                                                   Transition: General
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
                    GPU International                               Step Management
                    Idaho National Energy Lab                       Synetics
                    International Paper                             Universal Resources
                    J.A. Jones Construction                         Battelle
                    LATA/Parallax                                   World Automation & Technology



    The following is a sample table of contents of a comprehensive Transition Plan:

PRE-TRANSITION ACTIVITIES                                        MOBILIZATION
   Identify and form Transition Team                               Orientation to facility and Client
   Mobilization                                                    Orientation to client
   Schedule & inform candidates re: mobilizations                  Introductions
   Plan for Airline ticket/travel mgt                              Tours
   Pre-trip briefings                                              Lodging and local essentials
   Team Organization                                               Access to computers, software, internet, cell phones, etc.
   Team member Responsibilities/Assignment Matrix                  Readiness for 1st week agenda
   Prepare 1st week schedule                                    ASSESSMENT AND REJUVENATION PLANNING
   Client Transition Preparations                                Engineering
   Identify client candidates for Transition Team                Capital upgrades, improvement planning & execution
   Pre-Transition Interfaces with client/investors               Configuration management
   Coordinate info collection from client                       Drawing upgrade, control
   Stakeholder relations plan                                    Key parameter trending & analysis
   Hardware/Software/IT plan for client                          Root Cause Analysis
   Communications/phones/internet.networks                       Engineering
   Laptop/software/printers                                      Chemistry
   "Intra-Transition-Team communications plan, including e-      Environmental Compliance
    mails"
   Set up FTP (or Basecamp) site to use for sharing files in       Code compliance requisites
    preparation of transition
   Communicate log-ins to Team                                   Certificates
   Develop e-mail distribution lists for different groups       Compliance, monitoring, reporting
    associated with transition
   Exchange names and contact information for LINK and client      Permits
    staff to be involved in Transition
   Transportation                                                  Risk Management
   Transportation to/fm client                                     General Condition Assessment
   Arrange local transportation to/fm hotel                        Inventory analysis
   Coordinate local transportation to/fm lodging                   Spare & replacement parts (equipment obsolescence, write-off,
                                                                     quantity & adequacy), condition, storage condition, pedigrees,
                                                                     re-order system, availability)
   Client Logistics                                                Tools (hand, special, shop, etc.)
   Security clearances/access for client                           Complete Equipment Condition Assessment
   Photo Badges?                                                   Visual inspection
   Introductions/tours at site                                     Operational trial
   Arrange offices at site                                         Maintenance & record review
   Coordinate local lodging                                        Equipment history review & incident reports
   Identify local restaurants                                      Assessment of adequacy of maintenance record results

    October 2012                                                                                          Transition: General
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
   Identify any local security issues                                 Fuel Procurement
    Logistics                                                         Transition Fuel procurement out of military control
   Hotel reservations                                                 Review of root cause analysis records or lesson learned records
   Hardhats for Transition Team                                       Code compliance (design, installation, maintenance, ops)
   Check into what legal resources are available and necessary        Administration
    to client?
   Prepare Transition Budgets                                         Record-keeping & retention
   Prepare O&M Budgets                                                Office Automation
   Client Transition Preparations                                     Regulatory Compliances
   Action plan for client mgt                                         IT, MIS, networking, communications
   Client transition team assignments                                 Decision Approval Matrix
   HR/Administration                                                  Business Records
   Client send announcement letter to client employees)               Filing system
   Briefing plan for client managers                                  Office Automation
   Distribute Condensed Transition Plan to client managers            Infrastructure Services
    (maybe)
   Identify HR areas requiring immediate evaluation                   Human Resources
   Set up an client document control system to start using prior      Termination (whether/how client has done this)
    and during transition
   Negotiate/Execute any Contracts                                    Outplacement services?? (interview training, resume writing,
                                                                        referral, new-skill training, etc.)
   Finalize Transition Contract                                       Employment Contracts? Severance??
   Support client/MODA Contracts                                      Job Descriptions, role definitions, Job Task Analysis
   Complete any Contracts with LINK Team                              Mgt & employee handbooks
   Check into what legal resources are available and necessary        Policies & procedures (which ones must be done before
    to client?                                                          transition complete & which one can wait?)
   Complete Guides/Checklists for Assessments                         Complete HR Audit/Checklist
ASSESSMENT AND REJUVENATION PLANNING                                   Compensation
   Review of Reliability Centered Maintenance data, if any            High vs. Low
   Emergency response (war & regional conflict, typhoons,             Overtime philosophy
    earthquake, strike, deaths, bomb-threats, terrorist attacks,
    security breaches, other)
   Agreements & interfaces (internal & external)                      Managers vs. Supervisors vs. Labor
   Equipment                                                          Shift differentials
   Relationships and pre-planned communications with                  Emergency call-out compensation
    supporters and stakeholders
   Safety & Security                                                  Skill based pay consideration
   Quality/accessibility of policies & procedures                     Raise & promotion philosophy
   Emergency response (see Emergency Response)                        Benefits
   Safety training (see Training)                                     Social security and benefits
   Equipment & availability (fire fighting, protective clothing,      Pension funds
    respiratory protection, etc.
   Safety code compliance                                             Staffing & Recruiting
   Perimeter security                                                 Recruitment & selection (expatriates, key managers, labor)
                                                                        (communications plan)
   Security access through military                                   Plan to retain key managers & employees
   Operations/Production                                              Personnel Records & Attention
   Role in maintenance                                                Training
   Level of formality                                                 Mgt training/orientation
   Log keeping: automation vs manual                                  Employee training/orientation

    October 2012                                                                                             Transition: General
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
   Control system: automation vs manual                            What training prior to Turnover
   Emergency roles                                                 What training is high priority after Turnover
   Laboratory work                                                 Development of priority Lesson Plans
   Training, cross-training (see Training)                         Organization
   Information management/technology, archiving, trending          Culture
   Degree of automation                                            Work ethic
   Shift Operations                                                Control system: automation vs manual
   Shift philosophy                                                Emergency roles
   Shift schedules                                                 Laboratory work
   Fuel preparation and handling                                   Training, cross-training (see Training)
   Production Reporting                                            Information management/technology, archiving, trending
   Accounting/Financial                                            Degree of automation
   Establish payroll/benefits system                               Shift Operations
   Transition payroll/benefits out of military control             Shift philosophy
   Inventory & Procurement                                         Shift schedules
   Create new Procurement system                                   Fuel preparation and handling
   Transition Procurement out of military control                  Production Reporting
   Establish accounting/cash control systems                       Accounting/Financial
   Transition Accounting out of military control                   Establish payroll/benefits system
   Revise chart of accounts as necessary                           Transition payroll/benefits out of military control
   Checks & Balances                                               Inventory & Procurement
   Cash control                                                    Create new Procurement system
   Conservatism & controls                                         Transition Procurement out of military control
   Expenditure approvals/authorities                               Establish accounting/cash control systems
   Reports                                                         Transition Accounting out of military control
   Policies & procedures                                           Revise chart of accounts as necessary
   Assess Significant policies and practices                       Checks & Balances
   Adopt/Re-write Policies & Procedures                            Cash control
   Expenditure Approval Matrix                                     Conservatism & controls
   Empowerment                                                     Expenditure approvals/authorities
   Loyalty                                                         Reports
   Organizational authority vs accountability                      Policies & procedures
   Management philosophy (clarity of role, comparison to           Assess Significant policies and practices
    superintendents and supervisors, relationship to
    subordinates, accountability, selection criteria, etc.)
   Communications & reporting (on-site, to client, to home         Adopt/Re-write Policies & Procedures
    office)
   Maintenance                                                     Expenditure Approval Matrix
   Conduct of maintenance philosophy                               Fuel Procurement
   Quality/accessibility of maintenance policies & procedures      Transition Fuel procurement out of military control
   Predictive maintenance                                          Create new Fuel procurement/management system
   Equipment history                                               Use of Contractors
   Outage planning & management                                    Capital Improvement Planning
   Contractor management                                           PRE-TURNOVER REJUVENATION
   Safety relations                                                Execute critical training, if any
   Tool management                                                 Preparation for Capital Improvements
   Inventory Management                                            Design new policies, procedures, and/or processes
   Training                                                        Engineering
   Multi-discipline philosophy & cross-training                    General Condition Assessment


    October 2012                                                                                         Transition: General
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
   Shift philosophy                                                    Administration
   Roles in emergencies                                                Human Resources
   Maintenance Support                                                 Organization
   Preventive Maintenance                                              Accounting/Financial
   Corrective Maintenance & Outage Management                          Maintenance
   Outage Management                                                   Emergency Response
   Work Order System                                                   POST-TURNOVER REJUVENATION
   Cost & man-hour tracking                                            Complete re-organization design & recruitments
   "CMMS system design, selection, configuration, input,               Initiate culture change?
    utilization, procedure for use, & training"
   Maintenance Planning & Scheduling                                   Relationship between ops, maintenance, production, etc.
   Use of Contractors                                                  Work ethic?
   Emergency Response / Action Plans                                   Empowerment?
   Policies & procedures                                               Revise or create new policies, procedures, and/or processes as
                                                                         necessary
   Emergency response (war & regional conflict, typhoons,              Engineering
    earthquake, strike, deaths, bomb-threats, terrorist attacks,
    security breaches, other)
   Agreements & interfaces (internal & external)                       General Condition Assessment
   Equipment                                                           Administration
   Relationships and pre-planned communications with                   Human Resources
    supporters and stakeholders
   Safety & Security                                                Organization
   Quality/accessibility of policies & procedures                   Maintenance
   Emergency response (see Emergency Response)                      Emergency Response
   Safety training (see Training)                                   Training
   Equipment & availability (fire fighting, protective clothing,    Safety & Security
    respiratory protection, etc.
   Safety code compliance                                              Operations
   Perimeter security                                                  Accounting/financial
   Security access through military                                    Execute Capital Improvements
   Operations/Production                                               Agenda: Balance Of First Week after Turnover
   Role in maintenance                                                 Establish goals and objectives for first year of operations
   Level of formality                                                  Safety
   Log keeping: automation vs manual                                   Safety Training
   Training                                                            Hold daily staff meetings first thing in morning with
                                                                         management staff
   Safety & Security                                                   "Commence safety & security audits, revise safety program as
                                                                         appropriate and plan training"
  Operations                                                           HR
  Develop Initial Operating Plan                                       Ensure employees have completed all administrative forms
 Develop Initial Operating Budget                                       Finalize of Operating budget
 Establish functional accounting/procurement/payroll                   Finalize all critical soft/hard systems/processes up and running
 Establish functional HR/employment process                            Vendor Continuity/Contracts
 Establish functional fuel management process                          Meet with key vendors
 Ensure all legal permits/authorities in place                         Finalize critical accounts with plant vendor
 Correct critical safety deficiencies                                  Review Capital Improvement Plans
 Correct critical operational deficiencies                             Operational Issues
 Correct any critical personnel deficiencies                           Hold daily staff meetings with management staff


    October 2012                                                                                              Transition: General
SAMPLE PAST PERFORMANCE PROJECT SUMMARIES
   Correct ""other"" critical processes to meet Turnover Day         Complete review/revision of existing operating procedures
    objectives
   Prepare Agenda for "First Day after Turnover"                     Complete review of other documents
   Otherwise prepare for Turnover                                    Continue Equipment Condition Assessment
   TURNOVER                                                          Continue Other Assessments
   Execute Agenda: First Day                                         Complete "First 30-day Agenda”
   Ensure Safety and Security                                        Agenda: First 30 Days after Turnover
   Ensure Continuity of Operations                                   Conduct Short Term Training
   Management and Supervision Meetings                               Complete training audit and finalize long-range training plan
   Conduct staff meeting with all managers and supervisors --        Complete safety and security training
    state forth in clear terms roles, responsibilities, and
    accountabilities of management team
   Clarify goals and objectives of short term plant operations;      Conduct Phase I management basic training, on
    generally discuss long term, with emphasis on continuity of        accountabilities, responsibilities, and authorities
    operations
   Discuss 90 day action plan                                        Complete Conduct of Maintenance training??
   Review what will be covered in “All Employees Meetings”           Complete Correction of Assessment Deficiencies or
                                                                       Rejuvenation Plans
   Questions and answer period                                       Complete Agenda for "First-90 Days"
   Employees Meetings                                                Agenda: First 90 Days after Turnover
   Commence meetings with all employees (why, what, when)            Training
   Time line for changeover                                          Complete Conduct of Operations training
   Philosophy and Vision                                             Commence Phase II managerial training on operating and
                                                                       administrative procedures
  Culture and Performance Expectations                               Conduct Phase III managerial training
 Commitment to operations                                             Complete other training
Commitment & plan for training                                        Finalize any revision of operating and administrative
                                                                       procedures
Question and answer period                                            Finalize 5-year capital improvement plan
Execute Safety Plan (1st day and 1st week plan)                       Finalize 5-Year Operating Plan
Execute Continuity of Operations Plan (1st day and 1st week           Finalize 5-Year Budget
plan)
Execute Communications Plan (1st week plan, internal and              Continue Implementation of Capital Improvements
external comms)
Execution of Mutual Employment Obligations
E.g. Payroll, management, etc.
Execution of Care/Custody/Control Obligations
E.g. Insurance, compliance, reporting, etc.
Initiate accounting, payroll, procurement, employment, and
other processes




    October 2012                                                                                             Transition: General

Weitere ähnliche Inhalte

Was ist angesagt?

The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012blueC 802
 
Netex learningMaker | Multipage Template v2.5.3 [En]
Netex learningMaker | Multipage Template v2.5.3 [En]Netex learningMaker | Multipage Template v2.5.3 [En]
Netex learningMaker | Multipage Template v2.5.3 [En]Netex Learning
 
Cub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manualCub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manualufjjdjkksekmd
 
Forecasting, Financing & Fast Tracking Your Business Growth
Forecasting, Financing & Fast Tracking Your Business GrowthForecasting, Financing & Fast Tracking Your Business Growth
Forecasting, Financing & Fast Tracking Your Business GrowthVenugopal Rao Pendyala
 
White Paper Oracle Subledger Accounting
White Paper Oracle Subledger AccountingWhite Paper Oracle Subledger Accounting
White Paper Oracle Subledger AccountingSandeep Vantmuriswami
 
Sap mm configuration document ramesh kamishetty
Sap mm  configuration document ramesh kamishettySap mm  configuration document ramesh kamishetty
Sap mm configuration document ramesh kamishettyRamesh Kamishetty
 
Tasacion de maquinaria_planta_y_equipo
Tasacion de maquinaria_planta_y_equipoTasacion de maquinaria_planta_y_equipo
Tasacion de maquinaria_planta_y_equipomultiproposito
 
172275575 sample-fscm-config-user-guide (2)
172275575 sample-fscm-config-user-guide (2)172275575 sample-fscm-config-user-guide (2)
172275575 sample-fscm-config-user-guide (2)Shailendra Surana
 
Subcontracting configuration
Subcontracting configurationSubcontracting configuration
Subcontracting configurationRamesh Kamishetty
 

Was ist angesagt? (12)

The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012The us-contact-center-decision-makers-guide-2012
The us-contact-center-decision-makers-guide-2012
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
Netex learningMaker | Multipage Template v2.5.3 [En]
Netex learningMaker | Multipage Template v2.5.3 [En]Netex learningMaker | Multipage Template v2.5.3 [En]
Netex learningMaker | Multipage Template v2.5.3 [En]
 
Cub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manualCub cadet 8354 tractor service repair manual
Cub cadet 8354 tractor service repair manual
 
Forecasting, Financing & Fast Tracking Your Business Growth
Forecasting, Financing & Fast Tracking Your Business GrowthForecasting, Financing & Fast Tracking Your Business Growth
Forecasting, Financing & Fast Tracking Your Business Growth
 
White Paper Oracle Subledger Accounting
White Paper Oracle Subledger AccountingWhite Paper Oracle Subledger Accounting
White Paper Oracle Subledger Accounting
 
Sap mm configuration document ramesh kamishetty
Sap mm  configuration document ramesh kamishettySap mm  configuration document ramesh kamishetty
Sap mm configuration document ramesh kamishetty
 
Tasacion de maquinaria_planta_y_equipo
Tasacion de maquinaria_planta_y_equipoTasacion de maquinaria_planta_y_equipo
Tasacion de maquinaria_planta_y_equipo
 
E elt constrproposal
E elt constrproposalE elt constrproposal
E elt constrproposal
 
172275575 sample-fscm-config-user-guide (2)
172275575 sample-fscm-config-user-guide (2)172275575 sample-fscm-config-user-guide (2)
172275575 sample-fscm-config-user-guide (2)
 
Styleguide
StyleguideStyleguide
Styleguide
 
Subcontracting configuration
Subcontracting configurationSubcontracting configuration
Subcontracting configuration
 

Andere mochten auch

Introducing DealCuaTui
Introducing DealCuaTuiIntroducing DealCuaTui
Introducing DealCuaTuivanductai
 
Energy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition ManagementEnergy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition ManagementLink Resources
 
Energy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain IndustryEnergy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain IndustryLink Resources
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE ExperienceEnergy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE ExperienceLink Resources
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsLink Resources
 
5.2 pedoman teknis-agroindustri-horti
5.2 pedoman teknis-agroindustri-horti5.2 pedoman teknis-agroindustri-horti
5.2 pedoman teknis-agroindustri-hortiAndi Firman
 
Energy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital ManagementEnergy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital ManagementLink Resources
 
Energy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition PlanningEnergy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition PlanningLink Resources
 
Energy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain UtilityEnergy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain UtilityLink Resources
 
Energy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateEnergy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateLink Resources
 
Telemarc Product Guide
Telemarc Product GuideTelemarc Product Guide
Telemarc Product GuideCharlie Stone
 
Final Presentation for Speedo HQ
Final Presentation for Speedo HQFinal Presentation for Speedo HQ
Final Presentation for Speedo HQCharlie Stone
 

Andere mochten auch (16)

Introducing DealCuaTui
Introducing DealCuaTuiIntroducing DealCuaTui
Introducing DealCuaTui
 
Energy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition ManagementEnergy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition Management
 
Harley-Davidson
Harley-DavidsonHarley-Davidson
Harley-Davidson
 
Energy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain IndustryEnergy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain Industry
 
Energy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE ExperienceEnergy Consulting SDVOSB DOE Experience
Energy Consulting SDVOSB DOE Experience
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB Projects
 
5.2 pedoman teknis-agroindustri-horti
5.2 pedoman teknis-agroindustri-horti5.2 pedoman teknis-agroindustri-horti
5.2 pedoman teknis-agroindustri-horti
 
Energy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital ManagementEnergy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital Management
 
Energy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition PlanningEnergy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition Planning
 
Energy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain UtilityEnergy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain Utility
 
Energy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateEnergy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement Corporate
 
Romaničko slikarstvo
Romaničko slikarstvoRomaničko slikarstvo
Romaničko slikarstvo
 
Company
CompanyCompany
Company
 
Telemarc Product Guide
Telemarc Product GuideTelemarc Product Guide
Telemarc Product Guide
 
эок
эокэок
эок
 
Final Presentation for Speedo HQ
Final Presentation for Speedo HQFinal Presentation for Speedo HQ
Final Presentation for Speedo HQ
 

Ähnlich wie Link Resources Past Performance Summaries

GUIA REFERENCIA EZSTEER PARA EZ250
GUIA REFERENCIA EZSTEER PARA EZ250GUIA REFERENCIA EZSTEER PARA EZ250
GUIA REFERENCIA EZSTEER PARA EZ250Pablo Cea Campos
 
AppLoader User Guide
AppLoader User GuideAppLoader User Guide
AppLoader User GuideNRG Global
 
BizTalk Practical Course Preview
BizTalk Practical Course PreviewBizTalk Practical Course Preview
BizTalk Practical Course PreviewMoustafaRefaat
 
Manual de programacion PLC Crouzet Millenium
Manual de programacion PLC Crouzet MilleniumManual de programacion PLC Crouzet Millenium
Manual de programacion PLC Crouzet MilleniumJosé Luis Lozoya Delgado
 
State of Florida Telecom Business Model
State of Florida Telecom Business ModelState of Florida Telecom Business Model
State of Florida Telecom Business ModelState of Georgia
 
Albpm60 studio reference_guide
Albpm60 studio reference_guideAlbpm60 studio reference_guide
Albpm60 studio reference_guideVibhor Rastogi
 
Soa In The Real World
Soa In The Real WorldSoa In The Real World
Soa In The Real Worldssiliveri
 
Energy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceEnergy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past Performancenatalyabelmont
 
Energy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceEnergy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceLink Resources
 
Cyp management stan
Cyp management stanCyp management stan
Cyp management stanNavy CYP
 
Instructor utilities guide
Instructor utilities guideInstructor utilities guide
Instructor utilities guideapaezgonzal
 
WebIT2 Consultants Proposal
WebIT2 Consultants ProposalWebIT2 Consultants Proposal
WebIT2 Consultants ProposalSarah Killey
 
Ventilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchensVentilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchensOsama Bekhit
 
Implementation Guidelines KQMH
Implementation Guidelines KQMHImplementation Guidelines KQMH
Implementation Guidelines KQMHgizhsp2
 
133688798 frequency-planning-guidelines-alu
133688798 frequency-planning-guidelines-alu133688798 frequency-planning-guidelines-alu
133688798 frequency-planning-guidelines-alupkamoto
 
Report on flood hazard model
Report on flood hazard modelReport on flood hazard model
Report on flood hazard modelCIRM
 
C201 candy estimating & valuations - rev 5
C201   candy estimating & valuations - rev 5C201   candy estimating & valuations - rev 5
C201 candy estimating & valuations - rev 5Self-employed
 
Greggs Financial Analysis
Greggs Financial AnalysisGreggs Financial Analysis
Greggs Financial AnalysisYang Luo
 
GDP11-Unit18_Rep090-65
GDP11-Unit18_Rep090-65GDP11-Unit18_Rep090-65
GDP11-Unit18_Rep090-65Staci Brown
 
Biblio Tech Online Services Proposal
Biblio Tech Online Services ProposalBiblio Tech Online Services Proposal
Biblio Tech Online Services Proposaljlishawa
 

Ähnlich wie Link Resources Past Performance Summaries (20)

GUIA REFERENCIA EZSTEER PARA EZ250
GUIA REFERENCIA EZSTEER PARA EZ250GUIA REFERENCIA EZSTEER PARA EZ250
GUIA REFERENCIA EZSTEER PARA EZ250
 
AppLoader User Guide
AppLoader User GuideAppLoader User Guide
AppLoader User Guide
 
BizTalk Practical Course Preview
BizTalk Practical Course PreviewBizTalk Practical Course Preview
BizTalk Practical Course Preview
 
Manual de programacion PLC Crouzet Millenium
Manual de programacion PLC Crouzet MilleniumManual de programacion PLC Crouzet Millenium
Manual de programacion PLC Crouzet Millenium
 
State of Florida Telecom Business Model
State of Florida Telecom Business ModelState of Florida Telecom Business Model
State of Florida Telecom Business Model
 
Albpm60 studio reference_guide
Albpm60 studio reference_guideAlbpm60 studio reference_guide
Albpm60 studio reference_guide
 
Soa In The Real World
Soa In The Real WorldSoa In The Real World
Soa In The Real World
 
Energy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceEnergy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past Performance
 
Energy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceEnergy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past Performance
 
Cyp management stan
Cyp management stanCyp management stan
Cyp management stan
 
Instructor utilities guide
Instructor utilities guideInstructor utilities guide
Instructor utilities guide
 
WebIT2 Consultants Proposal
WebIT2 Consultants ProposalWebIT2 Consultants Proposal
WebIT2 Consultants Proposal
 
Ventilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchensVentilation guidelines for minnesota commercial kitchens
Ventilation guidelines for minnesota commercial kitchens
 
Implementation Guidelines KQMH
Implementation Guidelines KQMHImplementation Guidelines KQMH
Implementation Guidelines KQMH
 
133688798 frequency-planning-guidelines-alu
133688798 frequency-planning-guidelines-alu133688798 frequency-planning-guidelines-alu
133688798 frequency-planning-guidelines-alu
 
Report on flood hazard model
Report on flood hazard modelReport on flood hazard model
Report on flood hazard model
 
C201 candy estimating & valuations - rev 5
C201   candy estimating & valuations - rev 5C201   candy estimating & valuations - rev 5
C201 candy estimating & valuations - rev 5
 
Greggs Financial Analysis
Greggs Financial AnalysisGreggs Financial Analysis
Greggs Financial Analysis
 
GDP11-Unit18_Rep090-65
GDP11-Unit18_Rep090-65GDP11-Unit18_Rep090-65
GDP11-Unit18_Rep090-65
 
Biblio Tech Online Services Proposal
Biblio Tech Online Services ProposalBiblio Tech Online Services Proposal
Biblio Tech Online Services Proposal
 

Mehr von Link Resources

Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...Link Resources
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentLink Resources
 
Energy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB NuclearEnergy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB NuclearLink Resources
 
Energy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS ExperienceEnergy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS ExperienceLink Resources
 
Energy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition PlanningEnergy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition PlanningLink Resources
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceLink Resources
 
Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources
 
Link Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources
 
Link Resources NAICS Experience
Link Resources NAICS ExperienceLink Resources NAICS Experience
Link Resources NAICS ExperienceLink Resources
 

Mehr von Link Resources (9)

Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Energy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB NuclearEnergy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB Nuclear
 
Energy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS ExperienceEnergy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS Experience
 
Energy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition PlanningEnergy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition Planning
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel Experience
 
Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013
 
Link Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources Nuclear Energy
Link Resources Nuclear Energy
 
Link Resources NAICS Experience
Link Resources NAICS ExperienceLink Resources NAICS Experience
Link Resources NAICS Experience
 

Kürzlich hochgeladen

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 

Kürzlich hochgeladen (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 

Link Resources Past Performance Summaries

  • 1.
  • 2. TABLE OF CONTENTS .................................................................................................................................................................................. 1 INTRODUCTION TO LINK RESOURCES ............................................................................................................................4 BIOFUEL: CELLULOSIC ETHANOL ....................................................................................................................................5 Cellulosic Ethanol from Municipal Solid Waste ......................................................................................................... 5 BIOFUEL: BIODIESEL FROM BEEF TALLOW ....................................................................................................................7 Australian Biodiesel Group Technology Development, Plant Startup, and North American Market Penetration ... 7 Key Issues Relevant to Transition Success ................................................................................................................ 7 Technology Optimization: .....................................................................................................................................7 Economic...............................................................................................................................................................8 Marketing..............................................................................................................................................................8 Operations and Maintenance ...............................................................................................................................8 Link Scope re: Developing ISO-9000 Consistent Processes ....................................................................................... 8 Level 1 Processes per ISO-9000 Quality Manual ...................................................................................................8 Level 2 Processes ..................................................................................................................................................8 Level 3 Processes ..................................................................................................................................................9 DEPARTMENT OF ENERGY: BIOFUELS/BIOMASS .........................................................................................................10 Summary ................................................................................................................................................................. 10 WGS ENERGY: BIOMASS POWER PLANT .....................................................................................................................12 Introduction ............................................................................................................................................................ 12 Why LINK Was Selected .......................................................................................................................................... 12 LINK Scope and Accomplishments .......................................................................................................................... 13 Outage Philosophy and Plan ...............................................................................................................................13 Management of Outages ....................................................................................................................................13 Staffing ................................................................................................................................................................14 Utilization of Outside Contractors ......................................................................................................................14 NATIONAL TRIGENERATION CHP COMPANY ...............................................................................................................15 Introduction ............................................................................................................................................................ 15 Link’s Role ............................................................................................................................................................... 15 Project Description .............................................................................................................................................16 SOURCE ENERGY ..........................................................................................................................................................18 Introduction ............................................................................................................................................................ 18 Why LINK Was Selected ......................................................................................................................................18 LINK Scope and Accomplishments ......................................................................................................................19
  • 3. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES NATIONAL COMMERCE BANK .....................................................................................................................................22 Introduction ............................................................................................................................................................ 22 Why LINK Was Selected .......................................................................................................................................... 22 LINK Scope and Accomplishments ......................................................................................................................23 NORTH BRANCH GENERATING STATION .....................................................................................................................24 Executive Summary: ................................................................................................................................................ 24 Facility Description .................................................................................................................................................. 24 Link Scope and Accomplishments ........................................................................................................................... 25 BELLEMEADE GENERATING STATION: COGENERATION ..............................................................................................28 Summary ................................................................................................................................................................. 28 LINK Scope:.............................................................................................................................................................. 28 Combustion Turbines/generators .......................................................................................................................28 Heat Recovery Steam Generators .......................................................................................................................28 Steam Turbine/generator and Cooling System ...................................................................................................29 Fuel Supply ..........................................................................................................................................................29 Water Supply ......................................................................................................................................................29 Budget .................................................................................................................................................................29 INTERNATIONAL PAPER: COGENERATION ...................................................................................................................30 Background ............................................................................................................................................................. 30 Facility Description .................................................................................................................................................. 30 Link’s Scope ............................................................................................................................................................. 30 PORTSMOUTH GASEOUS DIFFUSION FACILITY: TRANSITION MANAGEMENT ............................................................32 Background ............................................................................................................................................................. 32 Link Scope ............................................................................................................................................................... 32 Link Accomplishments............................................................................................................................................. 34 TRANSITION MANAGEMENT: GENERAL ......................................................................................................................35 Introduction ............................................................................................................................................................ 35 October 2012 Cellulosic Ethanol
  • 4. INTRODUCTION TO LINK RESOURCES Founded in 1994, Link Resources, Inc. (LINK) is a Service Disabled Veteran Owned Small Business with broad operations-related capabilities in the energy space, including O&M, commissioning, construction management, energy consulting, and so on. LINK has more energy-related experience than any other SDVOSB. LINK’s core competence lies in the operation and transitioning of complex facilities. We take a holistic perspective, integrating technical, contractual, organizational, human, and operational matters. LINK has provided full-scope facility management services to an array of diverse clients - - both domestic and international, with turn-key responsibility for staffing, maintenance, interface with stakeholders, and ultimate facility performance that exceeded expectations. LINK has also executed dozens of projects relating to energy services, transition management, and general consulting to the broadest range of clients, often focusing on designing and implementing transition plans or portions thereof. LINK is staffed with a team of senior personnel all of whom had experience in operations and/or maintenance - - across a spectrum of fuels, energy technologies and contexts:  Fuels: Coal, waste coal, natural gas, refined oils, crude oil, wood, other cellulose, garbage, other waste fuels, nuclear;  Traditional Technologies: PC/stoker/CFB boilers, steam and gas turbines, combined- cycle, simple-cycle, tri-generation, large chillers, condensers (including air-cooled), water treatment, and the spectrum of associated balance-of-plant equipment;  Renewable Technologies: Biofuels (including non-food based biodiesel and bioethanol), cellulosic ethanol, biomass combustion, biomass gasification, wind, and solar;  Applications: Steam for electricity, steam for process and heating, waste heat for steam, electricity for cooling, waste heat for regenerative cooling, biofuel for transportation;  Clients: Commercial, industrial, utility, Federal. Domestic and Off-shore.
  • 5. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES BIOFUEL: CELLULOSIC ETHANOL Cellulosic Ethanol from Municipal Solid Waste In 1999 Link was awarded a project to assist Masada Resource Group in the development and planning of a large cellulose-to-ethanol project using a strong-acid approach on Municipal Solid Waste feedstock. Link was also awarded EPC oversight (including pilot projects for particularly troublesome sub- systems), commissioning and long-term operations contracts for the yet-to-be- constructed plant in Middletown, NY. The complex plant included MSW sorting, drying, hydrolyzation and cellulose conversion, acid recovery, fermentation, and distillation. The plant utilized dried sewage sludge converted to steam via a fluidized bed boiler, and had several profitable byproducts such as typical MSW rejects (e.g. aluminum), CO2, soil treatment, and green fuel. Link’s assignments during the project period included oversight of the prime EPC contractor, Kvaerner, during engineering and procurement; Link’s prime focus was the constructability and the operability of the processes and systems. Link also, in joint effort with Kvaerner, developed all O&M policies and procedures for plant equipment and systems. The first facility has not yet been constructed due to difficulties in obtaining investors in the $400M facility. Link’s Full-scope O&M Contract included:  Develop Accounting infrastructure  Develop HazCom plan for post-Acceptance  Develop Administrative processes  Procure Accounting Software  Develop Filing System for post-Acceptance  Procure Human resource software  Develop list of Furnishings  Procure Information management software  Develop list of tools for Operator  Procure Inventory & warehousing software  Develop Operating Plan  Procure Network and office software  Develop Information management infrastructure  Procure Planning/scheduling software  Develop Environmental emissions  Procure Trending, predictive maintenance, documentation/reporting formats data analysis software  Develop Sustainability & Environmental Mgt  Develop Operability and maintainability program specifications  Develop specification for Vendor manuals &  Develop Warranty program management documentation plan for post-Acceptance October 2012 Cellulosic Ethanol
  • 6. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  Recruiting/Interview trips & expenses  Develop manpower loading/mobilization chart  Develop Human resource infrastructure  Develop Training program  Develop program/list Employee recognition  Develop Performance and condition programs monitoring plan  Procure Predictive maintenance equipment  Develop Safety Program for Post-Acceptance  Develop Inventory Mgt & warehousing policy  Develop Maintenance policy & programs  Develop Spare parts inventory mgt system  Procure Procurement software  Procure Office furnishings and equipment for  Develop Engineering Program for Post- operator Acceptance  Develop numbering convention: Design  Training Video library equipment/system numbering convention for  Procure Timekeeping Software construct  Procure all tools  Identify and risk mitigate possible alternate scenarios, including construct delays, early completions, and need for additional personnel, with resultant impact on Link staffing and associated costs October 2012 Cellulosic Ethanol
  • 7. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES BIOFUEL: BIODIESEL FROM BEEF TALLOW Australian Biodiesel Group Technology Development, Plant Startup, and North American Market Penetration Link Resources, Inc. was engaged by Australian Biodiesel Group (ABG) to complete the startup of their first full-scale (40 MMgpy) biodiesel plant in Australia, and then develop and transition their organization, processes, and technology into the North American market. The scope included development of the entire business, administrative, process, technical, and human infrastructure. The transition and infrastructure development had to be in compliance with the requirements of ISO-9000. The final organization would have approximately 120 staff at distributed facilities across North America, requiring a comprehensive yet efficient communications and reporting process that can support quality control requirements, team-working, regulatory compliance, and advance economies of scale. Budgets managed by Link will exceed $200 million, and annual revenues are anticipated at $300 million. Australian Biodiesel Group (ABG), a subsidiary of Transfield, initially utilized Link in the startup and commissioning of its 40 mgpy continuous transesterification facility in Queensland. Link’s contract expanded into creating the turn- key administrative process, financial, and administrative infrastructure for the fleet of biodiesel facilities they intended to build in the U.S. This infrastructure included plans and schedules for EPC/commissioning/operations, draft specifications and contracts for EPC, all personnel and organizational policies/procedures, all O&M policies and procedures, staffing and compensation plans, and the Operating Plan. Key Issues Relevant to Transition Success Technology Optimization:  Quality control when utilizing used oils animal fat feedstocks  Production quality control  Ability to quickly/smoothly switch between/blend different feedstocks (possibly including eventually palm oil) October 2012 Biodiesel
  • 8. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES Economic  Quality of North American business modeling  Feedstock delivery pricing and predictability  Final biodiesel production cost and sensitivity to petro-diesel prices Marketing  Clarity of target markets  Facility proximity to target markets Operations and Maintenance  Although the cost of operations and maintenance is proportionally small compare to feedstock costs, prudent and high-quality operating practices can reduce production costs and add to income. During periods where margins get squeezed, the more efficient plants will have the competitive edge.  Quality control of product is critical to ABG reputation and to achieve top dollar for the market.  State of the art maintenance practices lead to reduced downtime and therefore increased plant production. Link Scope re: Developing ISO-9000 Consistent Processes Level 1 Processes per ISO-9000 Quality Manual  Link to Quality Level 3 Processes  Management Responsibility  Quality System  Internal Quality Audits  Document and Data Control  Control of Quality Records  Process Control  ID and Traceability  Inspection and Testing  Nonconforming Product  Corrective and Preventive Action  References Level 2 Processes  Policies  Link-Generated References that will fade away  Internal Procurement Specifications  Board Governance  LLC Operating Agreement  Note: Quality Policy is a "Level 1" October 2012 Biodiesel
  • 9. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES Level 3 Processes  Safety & Health (SH) Processes (Manual)  Security Processes  Human Capital (HC) Processes  Commercial Management (CM) Processes  Commissioning Processes (Manual) 01 91 00  Standard Operating Processes (SOP)  Training Processes  Index of Archived Processes  Quality Program Processes (QPPs)  Work Mgt (WM) Processes  Material Capital (MC) Processes  Sustainability (SU) Processes  Information & Communications (IC) Processes October 2012 Biodiesel
  • 10. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES DEPARTMENT OF ENERGY: BIOFUELS/BIOMASS Summary Link Resources, Inc. has been engaged by the Department of Energy and the Department of Agriculture in several projects to assist in the evaluation of solicitations from biofuel and/or biomass technology companies interested in receiving Federal grants or loans for the Demonstration pilot and demonstration plants using technologies that could be commercially viable in the short term. During the assignments Link provided DOE/DOA with perspectives using a broad spectrum of technologies and different contexts including:  MSW (cellulosic portion) to ethanol processes using strong acids (see separate project description)  Ethanol Generation from Waste Sugars using immobilized microbe bioreactor technology: including waste water treatment and recycling of waste carbon sources.  Conversion of Agricultural residue (corn stover and other lignocellulose biomass) to Ethanol and Ethyl Acrylate: included pretreatment of feedstock into pellets and subsequent hydrolyzation of cellulosic and hemi-cellulosic fractions, as well as other subsequent and other chemical treatments  Production of Cellulosic Ethanol from Corn Stover: using yeast technology for the fermentation of both five and six carbon sugars while simultaneously co- produces high value co-products such as the cellulases, hemi-cellulases, or other important industrial enzymes.  Fuel Ethanol from Barley: producing parasitic electricity and thermal energy from available biomass (waste wood and other plant based products); recovering CO2 from the ethanol fermentation process to produce commercial grade liquid CO2 for the production of dry ice and to use in the on-site greenhouses. Utilizing waste process heat, available water, available land and CO2 in on-site greenhouses.  Cellulose to Ethanol Conversion using Enzymes: implementation of 2nd generation technologies to improve the overall performance of existing cellulose to ethanol conversion using enzymes. Feedstock to be further investigated included bagasse, energy cane, high biomass, sorghum, wood, switchgrass, corn stover, and miscanthus.  “Drop-In” Bio-refineries: improving harvest operations and maximizing the ethanol yield/acre of fermentation of sweet sorghum, and establishing small October 2012 DOE Biofuel/Biomass
  • 11. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES commercially viable “drop in place” bio-refineries, combined with a decentralized network of fueling stations where the ethanol would be blended “at the pump”.  Re-purposing of a Corn-based Ethanol Facilities: redesigning corn-based ethanol facilities to use alternative feedstocks.  Biomass gasification: for steam generation.  Biomass combustion: utilizing a variety of technologies including stationary and moving stoker grates, and fluidized beds. Link’s scope included comprehensive reviews of financial, technical, and commercialization plans within proposals. Reviews were followed by panel discussions with cross-disciplined panelists, oral summaries, written summaries and final formal evaluations. October 2012 DOE Biofuel/Biomass
  • 12. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES WGS ENERGY: BIOMASS POWER PLANT Introduction WGS Energy builds and acquires green/sustainable energy generation and energy transformation facilities. A representative project is the 65MW (gross) electric production facility in Twiggs County Georgia that gasifies biomass to develop steam for direct conversion to electricity and for heating and drying of incoming feedstock. LINK was engaged after a competitive bidding process to select the multi-year Operator, wherein LINK offered a more comprehensive and yet more detailed and credible than a much larger rival. Why LINK Was Selected Since biomass plants have a high degree of complexity, one of WGS concerns was having an Operator who had direct experience and also the predisposition to 1) customize the plant for the specific needs of the client, and 2) focus on maintenance and outage management. The technology and equipment complexities include chipping the incoming organic waste, drying, storing, conveying, feeding, gasification, gas cleaning, combustion, waste heat-to-steam generation, large electric turbine-generators, switchyard and interconnection with grid, ash handling and disposal, heavy truck traffic in/out leading to safety, security, and local neighbor concerns, and so forth One particular aspect of LINK’s “Conduct of Maintenance” approach that impressed WGS was our planning for Short Notice Outages (SNOs). With the amount of equipment, the complexity of the processes, and the overall lack of redundancy in design, there is no doubt that equipment will fail; the issue is really how quickly the Operator can get it back on line at full capacity. LINK developed a protocol for SNOs that involves: 1. A basic Reliability Centered Maintenance (RCM) approach that utilizes the Operator’s experience and information from equipment vendors to identify points-of-likely-failure. 2. A review of spare parts requirements to ensure replacement parts are available to make associated repairs. 3. Storing associated sets of spare parts so that they can be immediately retrieved “as a package” if/when a pre-identified SNO occurs. 4. Identification and pre-location of tools necessary to make specific SNO repairs. 5. Preparation (and sometime even rehearsal) of the maintenance team to optimize their mobilization and task-performance to complete the repair in the minimum time. October 2012 WGS Energy- Biomass
  • 13. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES 6. Iteration on the above as lessons are learned. LINK Scope and Accomplishments In addition to the broad scope associated with a multi-year O&M contract (some elements of which are addressed elsewhere in this document), the following focuses on Outage Philosophy and Planning which was particularly important on the Twiggs County project. Outage Philosophy and Plan Plant outages are scheduled in the Spring and Fall, to avoid peak seasons and any demonstration periods established by Georgia Power. The philosophy of the Spring outage is characterized by:  complete maintenance essential to operate until Fall  thoroughly inspect systems in order to plan for the Fall inspection  test and challenge the plant planning, scheduling, contracting, parts ordering, and outage management skills so that an improvement plan can be accomplished prior to Fall outage  execute the predictive maintenance program that includes boiler and turbine predictions based on inspection & test criteria. The philosophy of the Fall outage is:  complete all maintenance necessary to operate for 18 months without another outage  double-check inspection to ensure spring outage inspection process was adequate  again test & challenge the outage management system & try to improve  prepare for winter (i.e. plant winterization) Management of Outages The formality of the maintenance planning and scheduled activities warrants attention. For example, planning for major scheduled outages begin 18 months in advance, with very clear accountabilities established. Major vendors are notified and invited to participate in the planning exercise, and requested to justify their cost-effectiveness on the outage. Depending on the specific skills of the management team, planning and scheduling software may be appropriate for outages. Pending maintenance for equipment that can only be accomplished during shutdowns are closely managed and preparations made such that the facility can effectively utilize any unscheduled outage to complete such maintenance. Additionally, the maintenance October 2012 WGS Energy- Biomass
  • 14. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES department continually plans routine maintenance, inspections, and predictive maintenance that can only be performed when equipment is off-line, so that it will be performed during periods when the plant is dispatched off-line Staffing Major OEM vendors are urged to provide maximum input regarding their experiences and lessons learned in their recent outage support roles. Refractory deterioration remains a major concern OEMs are closely consulted to ensure cost-effective management of the high cost and high impact problems. The entire staff is utilized to maximum potential in order to reduce the requirements for outside contractors and temporary employees. Utilization of Outside Contractors Reliance on contractors can readily become excessive. In particular, mechanical contractors, welding, and cleaning/vacuum services can often be reduced given the capabilities of the work force; and the money that is saved can be better spent the capital purchase a vacuum/cleaning truck. LINK’s philosophy on the use on contractors is clear. They are necessary only when: 1) personnel on site have no additional capacity to perform the function, and failure to complete the work will or could likely result in expenditures or loss of revenues in excess of the cost of the contractor; or 2) when the work to be done in accordance with the Operating Plan requires skills, tools, or licenses not held by the facility. LINK’s contractor selection process/criteria includes a solid program for competitive bidding, closely assessing experience, resources, price, responsiveness, and risk-sharing concepts. Value is considered more important than low price. Disadvantaged businesses are seriously considered for all subcontracted work. LINK believes that general services agreements can frequently be a cost-saving mechanism for frequently utilized services and such contracts will be pursued for construction, welding, civil work, etc. The client’s resources are considered at all stages of the purchasing and contracting process to ensure that the client’s resources are utilized if cost effective and appropriate. October 2012 WGS Energy- Biomass
  • 15. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES NATIONAL TRIGENERATION CHP COMPANY Introduction NTCC is a leading energy services company in the Middle East, delivering reliable and environment-friendly cooling, heating, and power (CHP) to commercial, industrial and governmental organizations. NTCC is at the forefront of the Middle East in acquiring inefficient energy facilities and improving the performance by adding cogeneration and trigeneration solutions. NTCC also builds energy efficient facilities at greenfield and brownfield sites. They offer build-own-transfer (BOT), as well as build-own-operate (BOO) solutions in power, cooling/steam, and water desalination. Although NTCC is a relatively young company, NTCC is now either managing or in the process of assuming control of 100,000 tons of cooling, 80 MW of electrical generation, and 59,000 lb/hr steam. LINK has been a partner with NTCC since 2008 since NTCC recognized they had neither the O&M skillsets nor infrastructure to operate and maintain their facilities. Link’s Role LINK was engaged to develop NTCC’s entire organizational, process, and administrative infrastructure for its O&M division while it operated and maintained current and imminent energy facilities. LINK is included as a “partner on NTCC’s web page http://www.ntcc.com.sa/index.php?option=com_content&view=category&id=69&Itemid=91&lang=en). NTCC’s traditional energy generation/transformation technologies utilized at facilities:  Electric chillers  Regenerative chillers (using waste heat input)  Steam Boilers  Power generation  Plus balance of plant to include of course cooling towers, condensers, piping, valves, motors, pumps, motor control centers, transformers, programmable logic controllers (PLCs), Aerial View of KKMC distributed control systems (DCS including Mark V, WDPF & Emerson Delta V), compressed air, water purification, etc. October 2012 Source Energy-CHP
  • 16. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES With the award of the King Khalid Military City contract, additional larger frame technologies include a (CHP) plant consisting of 200MW of Westinghouse 251B Gas Turbine electricity generation, eight 6,500 ton chillers, GE/Woodward DCS controls, 10 CW pumps, and a distributed CW/HW pipe feed and return system to over 80 buildings on the 5000-man KKMC military city. Gas Turbines are being upgraded to combined cycle with Heat Recovery Steam Generators (HRSGs). Project Description As part of LINK’s broad scope to operate and maintain existing and future facilities, it was necessary for Link to establish a standard corporate-wide O&M program; and operated and maintained existing and newly acquired/built CHP energy facilities. Total scope included:  Identified, recruited and hired operators, technicians, and manual labor  Developed and executed transition plans that optimized the assumption of O&M responsibilities of existing facilities  Developed and implemented Operating Plans  Provided management and supervision as necessary  Provided recruiting, policies/procedures;  Developed and implemented QC programs  Developed and implemented safety training programs  Developed and implemented commissioning plans and services  Prepared O&M budgets for existing plants as well as in proposals for new plants  Developed transition budgets  Designed and set-up Computerized Maintenance Management Systems (CMMS)  Assisted the client in the preparation of proposals for new projects  Working with Performance Improvements (PI) Ltd, designed and installed PI control system remote monitoring system that interfaced with control systems including Mark V, WPDF, and Emerson Delta V  Managed environmental compliance  Assumed direct interface with on-site clients which was essential to the customer relationship management (CRM)  Performed numerous other tasks LINK built a world class O&M organization and infrastructure that became an effective part of the NTCC business model. NTCC energy facilities have high operational demands; in other words, NTCC clients expect cooling, heating, and power 24/7/365 and failure to provide such services is not an option. In the exacting environment, LINK’s O&M services exceeded expectations by delivering 24/7 CHP even during severe circumstances (e.g. weather), that otherwise could have been claimed as force majeure. October 2012 Source Energy-CHP
  • 17. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES October 2012 Source Energy-CHP
  • 18. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES SOURCE ENERGY Introduction In partnership with its customers, Source Energy (SE) finances, develops, builds, operates and maintains advanced power technologies that serve the long-term heating, cooling, and power requirements of commerce, industry, and government. Backed by significant financial resources and an extensive network of influential relationships, Source Energy takes full responsibility for ensuring customers efficient, sustainable and reliable district energy and district cooling services, tailored to custom needs, from a single outsourced provider. Source Energy provides cooling, heating and power solutions on a Build-Own-Operate-Transfer (BOOT) basis. Source Energy recently won a Saudi Arabian Riyal (SAR)1 BILLION Saudi Arabian contract from for providing the 2nd Industrial City in Jeddah with central cooling & power services. It will supply the industrial city with about cooling and electrical power. The district cooling network will be operated by Source Energy for 30 years. LINK is under contract to operate and maintain projects engaged by Source Energy. Source Energy provides cooling, heating and power solutions on a Build-Operate-Transfer basis. An example of one large project includes:  Jeddah Industrial City 2: A SAR 1 billion contract from MODON provides the 2nd Industrial City in Jeddah with a central CHP facility. Source Energy supplies the City with approximately 80,000 tons of cooling, and produces over 50 MW of electrical power. Smaller projects include:  Al Anoud Tower in Riyadh  King Road Tower CHP Plant in Jeddah,  Al Khobar Lakes Power Plant in Al Khobar. Each of which has either electric chillers, and/or regenerative chillers, and/or steam boilers, and/or power generation (e.g. diesels), plus extensive balance of plant, water treatment, and large cooling towers. Why LINK Was Selected LINK was engaged for some of the same reasons elaborated in the NTCC section above. The selection was also heavily influenced by LINK’s operating philosophy and culture, since SE was October 2012 Source Energy-CHP
  • 19. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES convinced that the following critical components must form the basis of any contractual operator-client relationship for a multi-year engagement: 1. a willingness to “partner” and work in an honest, trusting environment to achieve mutual goals 2. flexibility, since over the long term it is not possible to consider all the combinations of events that may occur; agreements don’t govern good relationships as much as good relationships govern the agreements, and 3. sufficient depth to provide necessary scope: for example, there has been a general tendency for many companies to undervalue the administrative, human resource, and security skills that are required to ensure compliance with law as well as maintain a workforce that can provide the exceptional levels of service Source Energy was also impressed with LINK’s focus on developing comprehensive Operating Plans for existing and new CHP projects, which would comprehensively address operating formality, maintenance skillsets, compliance with policy and procedure, training, planning/scheduling/budgeting, safety, and response to emergency/non-routine situations. LINK's initial assessment of existing SE facilities led to the conclusion that, in order to attain the largest short-term improvement in plant reliability, the first year's focus of investment should be on safety training, and programmatic maintenance. LINK Scope and Accomplishments LINK was initially hired to provide elements of SE’s operational infrastructure and scope expanded into LINK’s provision of complete O&M services. Since then it has managed the development of the infrastructure and functionality of the entire Operations Division of Source Energy. With respect to safety, the focus that LINK stressed to SE centered around two equally important factors: 1) an emotional investment in safety, and 2) the the lack of a safe work environment is an unaffordable cost. Thus LINK developed a Safety Program encompassing: 1. a monthly newsletter on safety issues and/or lessons learned 2. safety training for all employees during first 30 days 3. a required safety review course for each new employee and each employee annually 4. periodic safety drills for each shift, such as fire drills, at least quarterly 5. management and supervisory safety goals with bonus and/or salary impact 6. a modified work recovery program to return injured employees to work sooner. In the safety training arena, LINK developed:  Training Requirements and Guidelines October 2012 Source Energy-CHP
  • 20. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  Safety Program Self-Evaluation  Safety Inspection Checklists  Record-keeping Handbook  Safety Presentation for Classroom Training  Safety Procedures (e.g. hotwork, electrical, lockout/tagout, confined space entry, etc.) LINK’s maintenance program upgrade consisted of a focus on optimization-centered maintenance. In other words, LINK utilized the concepts of reliability centered maintenance where there are critical components that are likely to affect availability or safety. However, not all aspects of RCM were used due to the fact that it is seldom cost-effective to perform the degree of analysis often required in a true RCM program. The optimization-centered program also integrated equipment history, event recording, trending, and root cause analysis into the program to improve performance. The real key to the successful maintenance program, however, was the basic due diligence from managers and supervisors, rather than the level of sophistication of the program. LINK’s goal for the Source Energy plants was to be the most reliable CHP producer in its category in a safe and socially responsible manner. LINK achieved these objectives by setting short and long term goals for each facility in the following areas:  improved profitability,  enhanced reliability,  low cost production,  environmental and safety consciousness,  cooperative working relationships with each client/steam host,  a rewarding work environment,  and responsible corporate citizenship. At King Road Tower in Jeddah, LINK was asked to come in and rescue a failing construction project. LINK re-organized the construction staff and refined the plan leading to the accomplishment of a 1 August 2011 construction milestone, thus avoiding a multimillion dollar construction penalty. LINK prepared budgets, managed construction crews, provided liaison service with main building contractor, hired new contractors and staff, and managed the procurement of all supplies including interfacing with delinquent suppliers to force delivery completion. At Al Anoud Tower, LINK provided design input along with equipment and supply recommendations during construction process and managed the facility into commercial operations. LINK organized and recruited new facility staff to include new equipment training at Broad in China and with Emerson in Riyadh. October 2012 Source Energy-CHP
  • 21. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES At Al Khobar Lakes power project, LINK took over control of the construction process at the 25% stage of completion. LINK recruited and deployed staff to the site including managing all HR and admin tasks to support the staff living requirements in Al Khobar. LINK managed all phases of the project, taking it to commercial operation. LINK connected this sites’ DCS (Emerson Delta V) into its remote control and monitoring capabilities for Source Energy. LINK’s administrative scope included:  operating procedures,  training,  safety,  environmental compliance,  transition management,  recruiting,  proposal preparation,  budgeting,  construction management,  commissioning,  warehousing protocols,  preventive & predictive maintenance, and  major unplanned and planned outage management. October 2012 Source Energy-CHP
  • 22. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES NATIONAL COMMERCE BANK Introduction The National Commerce Bank is the largest bank in the Kingdom of Saudi Arabia. NCB has multiple facilities including bank buildings, administrative buildings, and a large IT center where proper cooling and/or heating is critical to servicing the bank’s customers, maintaining continuity of bank operations, and indeed security. Most of the NCB complex has its own CHP facility yet reliability was poor, and since the local electric utility grid was unreliable it was essential for NCB to improve the capacity and the reliability of its energy facilities. Why LINK Was Selected LINK was selected for some of the same reasons expressed elsewhere in this document - - for the sake of brevity not repeated in this section. Yet after LINK made a preliminary assessment that NCB’s reliability and capacity concerns were primarily driven by poor maintenance, LINK developed a Maintenance Rejuvenation Approach that impressed NCB:  immediate "conduct of maintenance" training in order to address maintenance philosophy and motivational issues, and communicate that each discipline shares a role in maintenance, followed by technical/skills training in deficient areas for maintenance personnel  realignment of preventive & routine maintenance responsibilities for roving operators  endorsement of reliability centered maintenance (RCM) where there are critical components that are likely to affect availability or safety  transition equipment history, event recording, trending, and root cause analysis to improve performance  management training to identify accountabilities for preventive and predictive maintenance at the shift supervisors, operations manager, and maintenance manager levels  evolutionary execution of a cost-effective predictive maintenance program to include (in order of priority) vibration analysis on critical components, lubricant analysis, thermographic analysis, motor circuit testing, on-line performance monitoring, ultrasonic detection, and gas analysis  progress toward a maintenance mix goal of 45%/35%/20% for corrective/ preventive/predictive maintenance, respectively  evaluation of the functionality of the CMMS system, including unused capabilities  increased formality of the maintenance planning and scheduling activities  invitation to major vendors to participate in the maintenance planning. October 2012 National Commerce Bank-CHP
  • 23. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES LINK Scope and Accomplishments LINK provided operations and maintenance services for the Saudi National Commercial Bank in both Riyadh and Jeddah. Through initial audits, LINK established the need for and executed multiple improvement projects: 1. Efficiency Project…results were a reduction in 2009 of 241,777 kwh for a savings of $25,000 with a reduction of 1,370,214 kg /yr less Green House Gas emissions. 2. Reliability Project - NCB IT Center and Regional Office- 24 months without a service interruption. Maintenance improvements resulted in the elimination of a planned equipment replacement project costing in excess of $3 million. 3. Housekeeping Project - Facilities cleaned, organized, and maintained to a higher standard. All facility walls and floors cleaned and re-painted. Tools, parts, and supplies were categorized and organized. 4. Safety Project – OSHA based Safety procedures were written and tailored for each sites’ equipment and hazards. Safety Showers, eyewash stations, first aid kits, fall protection, PPE, Fire protection upgrades were implemented and a safety culture was cultivated thru training and program implementation. 5. Remote Monitoring Project - SECURE Offsite Control Performance & Diagnostic Center implemented in Riyadh to manage both facilities. Night Shift was eliminated at all NCB Facilities upon project completion. 6. Client Management Project – A re-focus on client relationship management resulted in a successful PR campaign centered around 2 years of project upgrades, customer satisfaction, and facility performance improvements which culminated with the facilities considered to be the best maintained at NCB. During the 2011 Jeddah floods…LINK’s facility staff was pivotal in assisting NCB manage the devastation wrought on their facilities, even though this was outside of LINK’s scope of work. 7. Staff Training Project – Vendor training, Safety Training, Environmental Training and On the Job Training culminated in a $600,000 savings in 12 months. All personnel were re- trained to be a multi-skilled work force resulting in a 75% drop in contract labor. 8. CMMS Project – LINK implemented 2 CMMS systems. A temporary CMMS within 30 days while a managing the implementation of a million dollar Oracle suite. Electronic rounds were integrated to give staff technological flexibility in data and maintenance record keeping. Digital Thumbprint Scanners were also implemented to log & track employees work hours. October 2012 National Commerce Bank-CHP
  • 24. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES NORTH BRANCH GENERATING STATION Executive Summary: Dominion Virginia Power awarded LINK this multi-year full-scope operations and maintenance agreement after a competitive solicitation that included Bechtel, Babcock & Wilcox, and Stone & Webster (subsidiary of Shaw Group) among others. North Branch was an existing 80 MW waste-coal fired electric generation station utilizing two circulating fluidized boilers (395,000 lb/hr steam each), a single turbine generator, an air-cooled condenser, and a staff of originally sixty-five (65). LINK dramatically cut costs from $35/mwhr to $25/mwhr - - reducing staff to 46. Facility Description Electrical generating equipment consist of two 1770 psi, 395,000 lb/hr, natural circulation, circulating fluidized bed (CFB) boilers (coal fired) and one ABB VAX type steam turbine generator rated at 93,500 KW. The station can generate approximately eighty megawatts net power. The boiler and steam turbine is controlled by a Bailey INFI 90 distributed control system. Station cold start-up power is supplied through a 69000/4160 volt, 6,250 KVA step-down transformer. After the steam turbine generator is placed on line, station power is supplied through two 13800/4160 volt, 10000 KVA step-down transformers feeding two separate 4160 volt bus bars. Power is delivered to the utility grid through a 13,800/115,000 volt step-up transformer. Steam exiting from the steam turbine passes through horizontal ductwork to an air-cooled condenser. Hogging and a holding ejector system removes non-condensables from the condenser. The condensate drains by gravity to a collection hotwell tank. A 200 HP vertical turbine pump takes suction on the hotwell tank and pumps the condensate through two low pressure feedwater heaters to the deaerating/storage tank. A 1500 HP electric driven feedwater pump takes suction on the deaerating/storage tank and pumps the feedwater through two high pressure feedwater heaters to the boilers. Auxiliary cooling water for pumps, coolers, seals, and bearings is supplied from a 2 cell cooling tower located on the roof. Waste coal (gob) burned in the boilers is delivered to the station by truck and is purchased from Buffalo Coal Company and Mettiki Company. The gob is sized in a Pennsylvania Crusher October 2012 North Branch-Electric Plant
  • 25. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES Hammermill and is stored in one of four storage bins (800 ton capacity each). Normally, three days worth of coal is kept on premises. The circulating fluidized bed (CFB) boilers operate on the principle that limestone fed into the combustion chamber will reduce sulfur dioxide (SO2) emissions to the atmosphere. The limestone is delivered to the station by truck, sized in a Williams DFM crusher and stored in a 1250 ton capacity storage tank. The crushed limestone is fed into the boiler’s combustion chamber and burned with the coal. Two cyclones circulate the burned coal and limestone in the combustion chamber. Propane is used as start-up fuel for the boilers. It is stored in six 30,000 gallon capacity storage tanks. Each boiler requires 94,200 SCFM of propane, feeding four start-up burners. The waste-coal is very poor quality (as low as 5000 btu/lb, 60% ash, and 35% moisture) and added considerable complexities to the conveyance (1 mile), hogging, storage, and feeding, and combustion. Station service and control air is supplied by three direct driven rotary screw air compressors. Each compressor can deliver 411 SCFM of air at a pressure of 125 psi. Link Scope and Accomplishments Link had turn-key accountability for all staff, operations, maintenance, security, procurement, accounting, reporting, environmental and regulatory compliance, and interface with dispatch. Link successfully planned and managed a comprehensive Transition Plan to assume accountability for the people, processes, and equipment from an incumbent O&M contractor, as well as to rejuvenate the performance of the below-par facility. The following charts are representative of the performance improvement: October 2012 North Branch-Electric Plant
  • 26. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES October 2012 North Branch-Electric Plant
  • 27. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES Purchase Order BKF 496399 October 2012 North Branch-Electric Plant
  • 28. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES BELLEMEADE GENERATING STATION: COGENERATION Summary Link had the full-scope, turnkey contract to operate and maintain the Bellemeade Facility was a 225 MW (net) / 250 MW (gross) electric gas/oil fired cogeneration system. The facility consisted of turbine systems with heat recovery steam generators that produced steam for steam turbines as well as for cogeneration purposes. The offsite steam host was a cardboard recycling facility that required a continuous high-quality and predictable 150# steam supply, and included an extensive array steam piping, condensate return, and condensing systems. Twin gas/oil fired package boilers were capable of supplying steam needs if the larger plant was shut down. Major equipment at the facility consists of two (2) combustion turbines/generators, two (2) heat recovery steam generators with integrated Selective Catalytic Reduction (SCR) for NOx control, one (1) steam turbine/generator, mechanical draft cooling tower, demineralizer, auxiliary boiler, and various support equipment. LINK Scope: Combustion Turbines/generators The combustion turbines are two ABB Model GT-11 N machines each driving a Brush Electric generator normally rated at 88 MW each. Each machine has on line fuel switching capabilities between distillate oil and natural gas. Heat Recovery Steam Generators The HRSG’s consist of two triple pressure ENTEC heat recovery boilers capable of 475,000 pounds per hour of steam flow. Each HRSG is equipped with duct burners (natural gas only) to provide supplemental heat and a Hiatachi Selective Catalytic Reduction (SCR) system for NOx control. The SCR catalyst base material is titanium oxide with a substrate material of stainless steel 430. The SCR system also utilizes a 18,000 gallon anhydrous ammonia feed system. October 2012 Bellemeade Generation Plant: Cogeneration
  • 29. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES Steam Turbine/generator and Cooling System The HRSGs provide steam to drive one ABB Vax model condensing extraction steam turbine nominally rated at 75 MW. This is the same model turbine that is in use at the North Branch and Morgantown projects. The cooling system is a closed loop utilizing a Yuba horizontal in-line condenser and a Thermal Dynamic Towers three cell cooling tower with three Ingersoll-Rand 400 horsepower, 200 gpm circulating pumps. Fuel Supply The natural gas system consists of one 10 inch and one 4 inch gas main, owned by the City of Richmond, at 300 psi gas pressure to the site. There are also two Ingersoll-Rand 600 horsepower gas compressors owned by the project that have never been used. The distillate oil system includes an on-site 50,000 gallon storage tank which provides approximately one day of fuel supply to both units. The day tank is supplied through a nearby oil storage tank farm facility (several storage tanks are leased from the Little Oil Company) utilizing a pipeline and fuel forwarding facility. Water Supply All water is supplied from the City of Richmond water supply system and is stored in a 1,000,000 gallon storage tank. Process makeup water is purified through an on-site Glegg deminer- alization system and stored in a 500,000 gallon storage tank. All waste water from the site is discharged, after neutralization treatment and oil separation, into the City of Richmond’s waste water treatment system. Budget Link’s budget requirements to operate this facility at or near requisite capacity factors were $4,293,515 per year for normal operation and maintenance. Purchase Order BKF 496475 October 2012 Bellemeade Generation Plant: Cogeneration
  • 30. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES INTERNATIONAL PAPER: COGENERATION Background International Paper operates substantial power generation facilities at multiple mill locations in Eastover, SC, Franklin, VA, Prattville AL, and Savannah, GA. Each was originally developed as an integral part of pulp and paper operations, employing a reasonably balanced, efficient cogeneration cycle producing electricity and steam for the plant. Wood waste is used as a fuel to the extent available. Black liquor recovery boilers are utilized for chemical recovery as well as steam production. Environmental equipment has been installed consistent with the increasing demands for clean air and water discharges. Some locations such as Franklin have expanded the power facility off-site, and furthermore have introduced natural gas as a non- traditional fuel source. After considerable delays in the construction and startup of the new gas/oil fired cogeneration plant at the Franklin mill, Link was engaged to get the commissioning and startup program back on schedule. Link mobilized an experienced staff within 14 days to replace the commissioning staff of the EPC contractor; and subsequently mobilized an O&M staff to operate and maintain the facility, with the ultimate objective to train unionized labor staff employed by International Paper. Facility Description International Paper’s “910 Facility” in Franklin, VA consisted of a 55 MW (gross) and 45MW (net) gas/oil-fired turbine generator with a heat recovery steam generator providing process steam to the adjacent paper mill. The system additionally included cooling towers, water purification, condensers, emissions controls, laboratory, and traditional balance-of-plant systems such as air compressors, PLC’s leading to the distributed control system (DCS), building and grounds maintenance, and so forth. Link’s Scope Link’s scope included:  oversight of EPC completion October 2012 International Paper: Cogeneration
  • 31. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  system walkdowns  punch-list generation, and management to correction  system turnover checklists o mitigation of risks associated with walk-downs, including  alignment and calibration checks  hydros/pressurizations/NDT  equipment startup readings (e.g. volts, amps, etc.)  O&M policies and procedures o Consistent with existing labor union contracts yet attempting to incorporate a more “cross-disciplined” approach  And of course, full-time turn-key operation and maintenance of the 910 cogeneration facility,  Culminating in a seamless turnover to International Paper’s local O&M staff. Purchase Order 97852iP.O. Box 178, Franklin, Virginia 23851 October 2012 International Paper: Cogeneration
  • 32. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES PORTSMOUTH GASEOUS DIFFUSION FACILITY: TRANSITION MANAGEMENT Background The Portsmouth Gaseous Diffusion Plant (part of the Portsmouth site) is a uranium enrichment plant that was constructed in the mid 1950's and operated by the Department of Energy (DOE) and its predecessor agencies to supply both high-and low-enriched uranium for defense purposes and commercial nuclear fuel sales. The uranium enrichment program utilizing the gaseous diffusion process resulted in the generation of significant quantities of radioactive, hazardous, and mixed waste, which is referred to as legacy waste, and other contaminants. Waste and contaminants at the site include those regulated under the Resource Conservation and Recovery Act (RCRA), the Toxic Substances Control Act (TSCA), and the Atomic Energy Act (AEA), including construction debris, sanitary waste, hazardous waste (HW), radioactive low-level waste (LLW), and mixed low-level waste (MLLW). LATA/Parallax Portsmouth developed and submitted a winning proposal to the Department of Energy in response to Request for Proposal to replace the Bechtel Jacobs Company whose contract was expiring. The Scope included the Clean Up and Remediation/Environmental Management Services at the Portsmouth Gaseous Diffusion Plant. Link Scope In support of the requirements of LPP’s efforts to respond to DOE’s RFP and to execute the awarded contract, Link provided an estimate of all employee and labor related transition costs in sufficient detail to be included in the target cost of this contract, and assisted determining other transition costs. Proposed costs were broken down by the following major cost elements:  direct labor (including labor categories, and labor hours in each category),  relocation,  travel, October 2012 Portsmouth Transition
  • 33. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  materials & supplies,  subcontracts,  and all other costs. Link led the development of a Transition Plan, and supported LPP to enable submittal within 3 days after any award to LPP. Detail and scope had to be sufficient to meet the requirements of DOE. The objectives were: (1) achieve an orderly transition; (2) be fair to incumbent employees and maintain a productive and flexible work force; (3) minimize the cost of the transition and its impacts on other DOE programs; (4) promote those practices which will result in stable collective bargaining relationships; (5) adhere to DOE’s Workforce Restructuring Plan for the facility; (6) integrate ES&H into the transition phase to ensure safety and regulatory compliance; and (7) ensure compliance with DOE’s Request for Proposal. The Plan had to address LPP’s approach, methods and processes for the integration and interfaces with other contactors and private corporations on site. This included LPP’s organizational structure, strategy and understanding of respective site roles, methods of resolving disputes and addressing issues, and approach to transition including continuation of remediation activities, seamless transition of human resources, and strategy for assumption of the directed or any other subcontracts. It was also understood that Link’s main focus and responsibility as it related to the Transition Plan was focused on employee and labor related transition activities. Link managed the Transition Team during the transition period to ensure all Transition Objectives were achieved while also ensuring transition costs incurred are allowable, allocable, and reasonable. Transition Objectives can be summarized as:  Informed incumbent employees about the transition and various stages of the review and hiring process through various means of communication  Engaged Union Labor leadership to achieve mutual understanding early in the transition  Achieved seamless transition of payroll and benefits  Initiated alignment with DOE (PPPO and POOG) and other site contractors through a series of meetings and MOUs to ensure clarity of interfaces, jurisdictions, protocols, and continuity of support  Maintained tight accountability of nuclear material and the security of all site assets  Maintained safety envelope for all facilities and operations  Ensured readiness to maintain compliance with DOE Orders, local, state, and federal regulations, and all remediation requirements  Transitioned (“blue-sheeting”) all existing Policies & Procedures (several thousands) to ensure compliance while streamlining and adapting to a new culture  Set the stage for future rejuvenation of people and processes to achieve DOE objectives. October 2012 Portsmouth Transition
  • 34. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  Assisted LPP in conducting labor relations in accordance with applicable laws and DOE’s intent that labor relations policies and practices reflect the best experience of American industry in aiming to achieve the stable labor-management relations essential to successful accomplishment of DOE’s programs at reasonable cost. Link provided assistance in recruiting, interviewing, and selecting the LPP staff. Thereafter, Link provided ongoing labor relations and HR consultation and advice as needed. Link Accomplishments Link completed the transition at Portsmouth on time and under budget, allowing LPP to assume accountability for the facility. All transition activities were completed, including an extensive risk mitigation and opportunity rejuvenation process that led to a very successful and profitable 5- year project for LPP. Steven B. Treibel, 2400 Louisiana Blvd, Albuquerque, NM, (505) 884-3800 October 2012 Portsmouth Transition
  • 35. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES TRANSITION MANAGEMENT: GENERAL Introduction Over the past 18 years, Link Resources has provided Transition Management1 services to well over 100 clients - - from utilities to independent energy developers to government, industrial and commercial companies, both domestically and offshore. Whether transitions are precipitated by mergers, acquisitions, restructurings, or other changes in control of operation, they are complex periods during which client objectives can be optimized - - of if not properly managed can lead to disaster. For instance, over 75% of all M&As fail to achieve major objectives, and the hind- sight of CEO’s generally blames failures on lack of comprehensive transition planning and execution. Each transition is different and requires an approach that is customized - - incorporating the appropriate lessons-learned across the spectrum of industries and circumstances. During a transition, staff not only expect change but also typically welcome it. In other words, there is a window-of-opportunity that can be used to advantage if the transition is planned and executed effectively. And it is important to note that the transition does not end on the “turnover” date, but continues for months thereafter. Thus it is important to retain a transition team to pursue transition objectives concurrently with day-to-day operations. Although the transition process is complex, if can be summarized by the following stages: Define the New Organizational Objectives  Analyze and Evaluate the Current Organization, Systems, Environment & Infrastructure  Develop a Transition Plan  Implement the Transition Plan and Manage the Change Process  Feedback on Performance, and Iteration 1 Link Resources’ trademark is “the Transition Company®” October 2012 Transition: General
  • 36. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES A list of sample clients to whom Link provided transition services includes:  American Electric Power  Lockheed Martin Energy Systems  Babcock & Wilcox  Lockwood Greene  Bechtel/B&W Idaho  Los Alamos National Lab  Brooklyn Energy Center  Manitoba Hydro International  BWX Technologies  Masada Resource Group  Carolina Power & Light  McGraw-Hill  CH2M Hill  Merchant Energy Group  Constellation Energy  Mettiki Coal  Department of Energy  Mirant  Dominion Virginia Power  MyFacility.com  Duke Engineering & Services  National Trigeneration CHP Company  Dyplast Products, LLC  Navigant Consulting  Enron  Northeast Generation Services  Entergy  NRG  ESB International  Oak Ridge National Lab  Evantage  Permatherm  Fluor-Hanford  Source Energy  Foster Wheeler  Standard Power & Light October 2012 Transition: General
  • 37. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  GPU International  Step Management  Idaho National Energy Lab  Synetics  International Paper  Universal Resources  J.A. Jones Construction  Battelle  LATA/Parallax  World Automation & Technology The following is a sample table of contents of a comprehensive Transition Plan: PRE-TRANSITION ACTIVITIES MOBILIZATION  Identify and form Transition Team  Orientation to facility and Client  Mobilization  Orientation to client  Schedule & inform candidates re: mobilizations  Introductions  Plan for Airline ticket/travel mgt  Tours  Pre-trip briefings  Lodging and local essentials  Team Organization  Access to computers, software, internet, cell phones, etc.  Team member Responsibilities/Assignment Matrix  Readiness for 1st week agenda  Prepare 1st week schedule ASSESSMENT AND REJUVENATION PLANNING  Client Transition Preparations  Engineering  Identify client candidates for Transition Team  Capital upgrades, improvement planning & execution  Pre-Transition Interfaces with client/investors  Configuration management  Coordinate info collection from client Drawing upgrade, control  Stakeholder relations plan  Key parameter trending & analysis  Hardware/Software/IT plan for client  Root Cause Analysis  Communications/phones/internet.networks  Engineering  Laptop/software/printers  Chemistry  "Intra-Transition-Team communications plan, including e-  Environmental Compliance mails"  Set up FTP (or Basecamp) site to use for sharing files in  Code compliance requisites preparation of transition  Communicate log-ins to Team  Certificates  Develop e-mail distribution lists for different groups Compliance, monitoring, reporting associated with transition  Exchange names and contact information for LINK and client  Permits staff to be involved in Transition  Transportation  Risk Management  Transportation to/fm client  General Condition Assessment  Arrange local transportation to/fm hotel  Inventory analysis  Coordinate local transportation to/fm lodging  Spare & replacement parts (equipment obsolescence, write-off, quantity & adequacy), condition, storage condition, pedigrees, re-order system, availability)  Client Logistics  Tools (hand, special, shop, etc.)  Security clearances/access for client  Complete Equipment Condition Assessment  Photo Badges?  Visual inspection  Introductions/tours at site  Operational trial  Arrange offices at site  Maintenance & record review  Coordinate local lodging  Equipment history review & incident reports  Identify local restaurants  Assessment of adequacy of maintenance record results October 2012 Transition: General
  • 38. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  Identify any local security issues  Fuel Procurement  Logistics  Transition Fuel procurement out of military control  Hotel reservations  Review of root cause analysis records or lesson learned records  Hardhats for Transition Team  Code compliance (design, installation, maintenance, ops)  Check into what legal resources are available and necessary  Administration to client?  Prepare Transition Budgets  Record-keeping & retention  Prepare O&M Budgets  Office Automation  Client Transition Preparations  Regulatory Compliances  Action plan for client mgt  IT, MIS, networking, communications  Client transition team assignments  Decision Approval Matrix  HR/Administration  Business Records  Client send announcement letter to client employees)  Filing system  Briefing plan for client managers  Office Automation  Distribute Condensed Transition Plan to client managers  Infrastructure Services (maybe)  Identify HR areas requiring immediate evaluation  Human Resources  Set up an client document control system to start using prior  Termination (whether/how client has done this) and during transition  Negotiate/Execute any Contracts  Outplacement services?? (interview training, resume writing, referral, new-skill training, etc.)  Finalize Transition Contract  Employment Contracts? Severance??  Support client/MODA Contracts  Job Descriptions, role definitions, Job Task Analysis  Complete any Contracts with LINK Team  Mgt & employee handbooks  Check into what legal resources are available and necessary  Policies & procedures (which ones must be done before to client? transition complete & which one can wait?)  Complete Guides/Checklists for Assessments  Complete HR Audit/Checklist ASSESSMENT AND REJUVENATION PLANNING  Compensation  Review of Reliability Centered Maintenance data, if any  High vs. Low  Emergency response (war & regional conflict, typhoons,  Overtime philosophy earthquake, strike, deaths, bomb-threats, terrorist attacks, security breaches, other)  Agreements & interfaces (internal & external)  Managers vs. Supervisors vs. Labor  Equipment  Shift differentials  Relationships and pre-planned communications with  Emergency call-out compensation supporters and stakeholders  Safety & Security  Skill based pay consideration  Quality/accessibility of policies & procedures  Raise & promotion philosophy  Emergency response (see Emergency Response)  Benefits  Safety training (see Training)  Social security and benefits  Equipment & availability (fire fighting, protective clothing,  Pension funds respiratory protection, etc.  Safety code compliance  Staffing & Recruiting  Perimeter security  Recruitment & selection (expatriates, key managers, labor) (communications plan)  Security access through military  Plan to retain key managers & employees  Operations/Production  Personnel Records & Attention  Role in maintenance  Training  Level of formality  Mgt training/orientation  Log keeping: automation vs manual  Employee training/orientation October 2012 Transition: General
  • 39. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  Control system: automation vs manual  What training prior to Turnover  Emergency roles  What training is high priority after Turnover  Laboratory work  Development of priority Lesson Plans  Training, cross-training (see Training)  Organization  Information management/technology, archiving, trending  Culture  Degree of automation  Work ethic  Shift Operations  Control system: automation vs manual  Shift philosophy  Emergency roles  Shift schedules  Laboratory work  Fuel preparation and handling  Training, cross-training (see Training)  Production Reporting  Information management/technology, archiving, trending  Accounting/Financial  Degree of automation  Establish payroll/benefits system  Shift Operations  Transition payroll/benefits out of military control  Shift philosophy  Inventory & Procurement  Shift schedules  Create new Procurement system  Fuel preparation and handling  Transition Procurement out of military control  Production Reporting  Establish accounting/cash control systems  Accounting/Financial  Transition Accounting out of military control  Establish payroll/benefits system  Revise chart of accounts as necessary  Transition payroll/benefits out of military control  Checks & Balances  Inventory & Procurement  Cash control  Create new Procurement system  Conservatism & controls  Transition Procurement out of military control  Expenditure approvals/authorities  Establish accounting/cash control systems  Reports  Transition Accounting out of military control  Policies & procedures  Revise chart of accounts as necessary  Assess Significant policies and practices  Checks & Balances  Adopt/Re-write Policies & Procedures  Cash control  Expenditure Approval Matrix  Conservatism & controls  Empowerment  Expenditure approvals/authorities  Loyalty  Reports  Organizational authority vs accountability  Policies & procedures  Management philosophy (clarity of role, comparison to  Assess Significant policies and practices superintendents and supervisors, relationship to subordinates, accountability, selection criteria, etc.)  Communications & reporting (on-site, to client, to home  Adopt/Re-write Policies & Procedures office)  Maintenance  Expenditure Approval Matrix  Conduct of maintenance philosophy  Fuel Procurement  Quality/accessibility of maintenance policies & procedures  Transition Fuel procurement out of military control  Predictive maintenance  Create new Fuel procurement/management system  Equipment history  Use of Contractors  Outage planning & management  Capital Improvement Planning  Contractor management  PRE-TURNOVER REJUVENATION  Safety relations  Execute critical training, if any  Tool management  Preparation for Capital Improvements  Inventory Management  Design new policies, procedures, and/or processes  Training  Engineering  Multi-discipline philosophy & cross-training  General Condition Assessment October 2012 Transition: General
  • 40. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  Shift philosophy  Administration  Roles in emergencies  Human Resources  Maintenance Support  Organization  Preventive Maintenance  Accounting/Financial  Corrective Maintenance & Outage Management  Maintenance  Outage Management  Emergency Response  Work Order System POST-TURNOVER REJUVENATION  Cost & man-hour tracking  Complete re-organization design & recruitments  "CMMS system design, selection, configuration, input,  Initiate culture change? utilization, procedure for use, & training"  Maintenance Planning & Scheduling  Relationship between ops, maintenance, production, etc.  Use of Contractors  Work ethic?  Emergency Response / Action Plans  Empowerment?  Policies & procedures  Revise or create new policies, procedures, and/or processes as necessary  Emergency response (war & regional conflict, typhoons,  Engineering earthquake, strike, deaths, bomb-threats, terrorist attacks, security breaches, other)  Agreements & interfaces (internal & external)  General Condition Assessment  Equipment  Administration  Relationships and pre-planned communications with  Human Resources supporters and stakeholders  Safety & Security  Organization  Quality/accessibility of policies & procedures Maintenance  Emergency response (see Emergency Response)  Emergency Response  Safety training (see Training)  Training  Equipment & availability (fire fighting, protective clothing,  Safety & Security respiratory protection, etc.  Safety code compliance  Operations  Perimeter security  Accounting/financial  Security access through military  Execute Capital Improvements  Operations/Production  Agenda: Balance Of First Week after Turnover  Role in maintenance  Establish goals and objectives for first year of operations  Level of formality  Safety  Log keeping: automation vs manual  Safety Training  Training  Hold daily staff meetings first thing in morning with management staff  Safety & Security  "Commence safety & security audits, revise safety program as appropriate and plan training"  Operations  HR  Develop Initial Operating Plan  Ensure employees have completed all administrative forms Develop Initial Operating Budget  Finalize of Operating budget  Establish functional accounting/procurement/payroll  Finalize all critical soft/hard systems/processes up and running  Establish functional HR/employment process  Vendor Continuity/Contracts  Establish functional fuel management process  Meet with key vendors  Ensure all legal permits/authorities in place  Finalize critical accounts with plant vendor  Correct critical safety deficiencies  Review Capital Improvement Plans  Correct critical operational deficiencies  Operational Issues  Correct any critical personnel deficiencies  Hold daily staff meetings with management staff October 2012 Transition: General
  • 41. SAMPLE PAST PERFORMANCE PROJECT SUMMARIES  Correct ""other"" critical processes to meet Turnover Day  Complete review/revision of existing operating procedures objectives  Prepare Agenda for "First Day after Turnover"  Complete review of other documents  Otherwise prepare for Turnover  Continue Equipment Condition Assessment  TURNOVER  Continue Other Assessments  Execute Agenda: First Day  Complete "First 30-day Agenda”  Ensure Safety and Security  Agenda: First 30 Days after Turnover  Ensure Continuity of Operations  Conduct Short Term Training  Management and Supervision Meetings  Complete training audit and finalize long-range training plan  Conduct staff meeting with all managers and supervisors --  Complete safety and security training state forth in clear terms roles, responsibilities, and accountabilities of management team  Clarify goals and objectives of short term plant operations;  Conduct Phase I management basic training, on generally discuss long term, with emphasis on continuity of accountabilities, responsibilities, and authorities operations  Discuss 90 day action plan  Complete Conduct of Maintenance training??  Review what will be covered in “All Employees Meetings”  Complete Correction of Assessment Deficiencies or Rejuvenation Plans  Questions and answer period  Complete Agenda for "First-90 Days"  Employees Meetings  Agenda: First 90 Days after Turnover  Commence meetings with all employees (why, what, when)  Training  Time line for changeover  Complete Conduct of Operations training  Philosophy and Vision  Commence Phase II managerial training on operating and administrative procedures  Culture and Performance Expectations  Conduct Phase III managerial training Commitment to operations  Complete other training Commitment & plan for training  Finalize any revision of operating and administrative procedures Question and answer period  Finalize 5-year capital improvement plan Execute Safety Plan (1st day and 1st week plan)  Finalize 5-Year Operating Plan Execute Continuity of Operations Plan (1st day and 1st week  Finalize 5-Year Budget plan) Execute Communications Plan (1st week plan, internal and  Continue Implementation of Capital Improvements external comms) Execution of Mutual Employment Obligations E.g. Payroll, management, etc. Execution of Care/Custody/Control Obligations E.g. Insurance, compliance, reporting, etc. Initiate accounting, payroll, procurement, employment, and other processes October 2012 Transition: General