9. Notes The currently active resource plan does not enforce allocation limits until CPU usage is at 100%. When limits are enforced, unused allocation by any consumer group can be used by other consumer groups It is possible for a subplan or consumer group to have more than one parent. No more than 31 resource consumer groups in any active plan At most, a plan can have 31children Plans and resource consumer groups cannot have the same name.
18. How to Enable/Disiable Manually By default the Resource Manager is not enabled ALTER SYSTEM SET RESOURCE_MANAGER_PLAN = 'mydb_plan'; DBMS_RESOURCE_MANAGER.SWITCH_PLAN By using Scheduler Windows Enable: By Oracle Scheduler Disable: ALTER SYSTEM SET RESOURCE_MANAGER_PLAN = 'FORCE:mydb_plan';