 Passive Fire Protection (PFP) is an integral component of the three components
of structural fire protection and fire safety in a building.
 PFP includes compartmentalization of the overall building through the use
of fire-resistance rated walls and floors. Organization into smaller fire
compartments, consisting of one or more rooms or floors, prevents or slows the
spread of fire from the room of fire origin to other building spaces, limiting
building damage and providing more time to the building occupants
for emergency evacuation or to reach an area of refuge.
 Fire prevention includes minimizing ignition sources, as well as educating the
occupants and operators of the facility, ship or structure concerning operation
and maintenance of fire-related systems for correct function, and emergency
procedures including notification for fire service response and emergency
evacuation.
 The aim for PFP systems is typically demonstrated in fire testing the ability to
maintain the item or the side to be protected at or below either 140 °C (for walls,
floors and electrical circuits required to have a fire-resistance rating) or ca. 550
°C, which is considered the critical temperature for structural steel, above which
it is in danger of losing its strength, leading to collapse.
 PFP measures are intended to contain a fire in the fire compartment of origin,
thus limiting the spread of fire and smoke for a limited period of time.
 PPF measures such as fire stops, fire walls and fire doors are tested to
determine the fire resistance rating of the final assembly usually expressed in
terms of hours of fire resistance (e.g., ⅓, ¾, 1, 1½, 2, 3, 4 hour)etc.
 PFP attempts to contain fires or slow the spread, through use of fire resistant
walls, floors, and doors (amongst other examples).
 As the name suggests Passive Fire Protection (PFP) remains inactive in the
coating system until a fire occurs.
 There are mainly two types of PFP: Intumescent fire protection and
vermiculite fire protection.
Ser. Intumescent fire protection Vermiculite fire protection
1 It is a layer of paint which is applied along with the
coating system on the structural steel members.
The thickness of this intumescent coating is
dependent on the steel section used.
Structural steel members are covered with
vermiculite materials, mostly a very thick layer. This
is a cheaper option as compared to an intumescent
one, but is very crude and aesthetically unpleasant.
2 Intumescent coatings are applied as an
intermediate coat in a coating system (primer,
intermediate, and top/finish coat). Because of the
relatively low thickness of this intumescent coating
(usually in the 350- to 700-micrometer range), nice
finish and anti-corrosive nature. Intumescent
coatings are preferred on the basis of aesthetics
If the environment is corrosive in nature, then the
vermiculite option is not advisable, as there is the
possibility of water seeping into it (because of the
porous nature of vermiculite), and there it is difficult
to monitor for corrosion.
 It should be noted that in the possibility of a fire, the steel structure will
eventually collapse once the steel attains the critical core temperature
(around 550 degrees Celsius or 850 degrees Fahrenheit).
 PFP system will only delay this by creating a layer of char between the steel
and fire. Depending upon the requirement, PFP systems can provide fire
ratings in excess of 120 minutes. PFP systems are highly recommended in
infrastructure projects as they can save lives and property.
 Such protection is either provided by the materials from which the building
is constructed, or is added to the construction materials to enhance their fire
resistance. It is vital that these protection measures are correctly designed,
specified and installed if the building is to behave as expected should fire
break out.
 PFP is vital to the stability and integrity of a building or structure in case of
fire. These are designed to restrict the growth and spread of fire allowing
the occupants to escape or the fire fighters to do their job.
 By their nature they are ‘passive’ until there is a fire and only then will their
fire performance be demonstrated. The occupants of a building will attend
to their daily business, visitors will shop, be entertained, or enjoy recreation
without any knowledge of the PFP measures that will protect them in fire.
However, it is essential that these measure will work if an emergency
occurs.
PFP includes:
 Cavity barriers
 Ceiling systems
 Compartment walls
 Fire doors and furniture (e.g. self-closing devices, latches etc.)
 Fire fighting shafts and stairwells
 Fire-resisting air transfer grilles (mechanical or intumescent)
 Fire-resisting dampers (mechanical or intumescent) used in horizontal or
vertical air distribution ducts
 Fire-resisting ductwork
 Fire-resisting glazing
 Fire-resisting service ducts and shafts
 Fire-resisting walls and partitions
 Hinged or pivoted fire door sets (timber or steel)
 Industrial fire shutters (rolling or folding)
 Linear gap seals
 Penetration seals for pipes, cables and other services
 Structural frame fire protection
 Suspended ceilings
 Membrane ceilings (horizontal partitions)
 The building envelope, e.g. fire-resisting external walls, curtain walls etc.
Other elements of the building may also have a role in PFP.
 Air transfer grille: A device which allows the passage of ventilation air in
normal conditions through a fire door, wall or partition but closes automatically
to prevent the passage of fire in a fire condition for stipulated time period.
 Automatic fire and smoke damper: A device which allows the passage of
ventilation air in normal conditions through a duct, fire wall or partition but closes
automatically to prevent the passage of smoke and fire in a fire condition for a
stipulated period of time. Response to smoke is typically achieved by linking to
the automatic fire detection system.
 Building hardware: Fittings designed for incorporation in a fire-resisting door
set and which contribute to ensure that the fire-resisting door (when closed)
resists the passage of fire and/or gaseous products of combustion. Such fittings
include hinges, pivots, door closing devices, latches, locks, and door furniture
(lever handles, knobs).
 Cavity barrier: A construction provided to close a concealed space against
the penetration of smoke and flame or to restrict the movement of smoke or
flame within such a space for a stipulated time period.
 Combustibility: This assesses whether a material will burn and add to a
fire when subjected to an existing fire. Spread of flame this assesses
whether the fire will spread over the surface of the material (especially wall
linings).
 Compartment(fire): A building or part of a building, comprising one or more
rooms, spaces or floors constructed to prevent the spread of fire to or from
another part of the same building, or an adjoining building. The basis is to
provide adequate means of escape, and to provide fire separation for
adjoining buildings.
 Fire door(assembly): A door or shutter provided for the passage of
persons, air or objects which together with its frame and furniture as
installed in a building is intended when closed, to resist the passage of fire
and/or gaseous products of combustion and is capable of meeting
specified performance criteria to those ends.
 Fire-resisting door set: A complete installed door assembly comprising
door frame, door leaves, building hardware, seals and any glazing that,
when closed, is intended to resist the passage of fire and smoke in
accordance with specified performance criteria.
 Fire-resisting glazed screen: Glazed structure or window incorporating
fire-resisting glass and designed to resist the spread of fire and the
gaseous products of combustion for a stipulated period of time.
 Fire-resisting glass: A glass that demonstrates its ability to meet the
defined heating and pressure conditions specified in Fire resistance Test (or
any other National or International fire resistance test method). Typically,
the glass will be clear, textured, toughened, laminated or wired and may
incorporate special features such as coatings or laminations that enable the
glass to achieve a particular fire performance in terms of integrity and
insulation.
 Fire-resisting ductwork: Ventilation or extraction ductwork designed to
contain fire and the products of combustion in a manner that does not allow
passage to other parts of the building from the compartment of origin for a
stipulated time period.
 Fire-resisting partition: An internal non load bearing vertical dividing
structure designed to resist the spread of fire, heat, and the products of
combustion for a stipulated period of time. Such a partition can include a
glazed section or a fire door.
 Fire-resisting suspended ceiling: A suspended ceiling designed to
contribute to the overall fire resistance of a floor assembly or to prevent the
collapse of steel beams supporting a floor or roof, for a stipulated period of
time. It may also provide fire resistance as a membrane in the same way as
a partition.
 Fire-stopping: Sealing products that take up imperfections of fit or design
tolerance between the fire resisting fixed elements of a building to restrict
the passage of fire and smoke. They continue to take up the imperfections
of fit at all times and have the same fire rating as the fixed elements of
which they form a part. In reaction to a fire condition they swell, spread or
deform to achieve their performance.
 Fire-resisting luminaire: Lighting structure or fitting for suspended ceilings
designed to resist the spread of fire and the products of combustion for a
stipulated period of time. It is required to be tested for integrity when fitted
to an individual manufacturer’s suspended ceiling.
 .
Passive fire measures vs active fire measues
Passive fire measures vs active fire measues
Passive fire measures vs active fire measues
Passive fire measures vs active fire measues

Weitere ähnliche Inhalte

Was ist angesagt?

Building Code - Egress
Building Code - EgressBuilding Code - Egress
Building Code - Egress
Richard Luxenburg
 
commentry on nbc part 4
commentry on nbc part 4commentry on nbc part 4
commentry on nbc part 4
vakil jagdish
 

Was ist angesagt? (20)

1 Fire safety design principles
1  Fire safety design principles1  Fire safety design principles
1 Fire safety design principles
 
1. Means of Egress
1. Means of Egress1. Means of Egress
1. Means of Egress
 
Fire Safety on High Raise Buildings
Fire Safety on High Raise BuildingsFire Safety on High Raise Buildings
Fire Safety on High Raise Buildings
 
Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection system
 
Lifts
LiftsLifts
Lifts
 
Deisgn of Fire Escapes
Deisgn of Fire EscapesDeisgn of Fire Escapes
Deisgn of Fire Escapes
 
Fire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyFire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case study
 
fire protection
fire protectionfire protection
fire protection
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 
ACTIVE & PASSIVE PROTECTION SYSTEM & LIFE SAFETY .
ACTIVE & PASSIVE PROTECTION SYSTEM & LIFE SAFETY .ACTIVE & PASSIVE PROTECTION SYSTEM & LIFE SAFETY .
ACTIVE & PASSIVE PROTECTION SYSTEM & LIFE SAFETY .
 
Fire fighting systems
Fire fighting systemsFire fighting systems
Fire fighting systems
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildings
 
Fire Safety and Building Materials
Fire Safety and Building MaterialsFire Safety and Building Materials
Fire Safety and Building Materials
 
Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016Fire safety as per National Building Code-2016
Fire safety as per National Building Code-2016
 
Means of escape
Means of escapeMeans of escape
Means of escape
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Building Code - Egress
Building Code - EgressBuilding Code - Egress
Building Code - Egress
 
commentry on nbc part 4
commentry on nbc part 4commentry on nbc part 4
commentry on nbc part 4
 
Fire resistant materials
Fire resistant materialsFire resistant materials
Fire resistant materials
 
National Building Code : Building Services
National Building Code : Building ServicesNational Building Code : Building Services
National Building Code : Building Services
 

Ähnlich wie Passive fire measures vs active fire measues

A Complete Guide to Fire-Rated Doors
A Complete Guide to Fire-Rated DoorsA Complete Guide to Fire-Rated Doors
A Complete Guide to Fire-Rated Doors
lyndaflintof
 

Ähnlich wie Passive fire measures vs active fire measues (20)

A Beginner's Guide to Components of Passive Fire Protection
A Beginner's Guide to Components of Passive Fire ProtectionA Beginner's Guide to Components of Passive Fire Protection
A Beginner's Guide to Components of Passive Fire Protection
 
Fire Protection Notes PPT.pdf
Fire Protection Notes PPT.pdfFire Protection Notes PPT.pdf
Fire Protection Notes PPT.pdf
 
Fire pro
Fire proFire pro
Fire pro
 
Fire pro
Fire proFire pro
Fire pro
 
Fire pro
Fire proFire pro
Fire pro
 
What is passive fireproofing
What is passive fireproofing What is passive fireproofing
What is passive fireproofing
 
Fire system.pdf
Fire system.pdfFire system.pdf
Fire system.pdf
 
Fire protection system
Fire protection systemFire protection system
Fire protection system
 
Fire Protection
Fire ProtectionFire Protection
Fire Protection
 
Fire Safety and Performance of Wood
Fire Safety and Performance of WoodFire Safety and Performance of Wood
Fire Safety and Performance of Wood
 
Building services project 2 proposal report
Building services project 2 proposal reportBuilding services project 2 proposal report
Building services project 2 proposal report
 
Building service paper
Building service paperBuilding service paper
Building service paper
 
Building service paper
Building service paperBuilding service paper
Building service paper
 
Fire proof finish
Fire proof finishFire proof finish
Fire proof finish
 
2120 Ch 5 PowerPoint.pptx
2120 Ch 5 PowerPoint.pptx2120 Ch 5 PowerPoint.pptx
2120 Ch 5 PowerPoint.pptx
 
Brochure intumescent air transfer grilles gb
Brochure intumescent air transfer grilles   gbBrochure intumescent air transfer grilles   gb
Brochure intumescent air transfer grilles gb
 
Building insulation
Building insulationBuilding insulation
Building insulation
 
Bye law for architects
Bye law for architectsBye law for architects
Bye law for architects
 
Fire resistance of building
Fire resistance of buildingFire resistance of building
Fire resistance of building
 
A Complete Guide to Fire-Rated Doors
A Complete Guide to Fire-Rated DoorsA Complete Guide to Fire-Rated Doors
A Complete Guide to Fire-Rated Doors
 

Mehr von Kamran Hassan

Mehr von Kamran Hassan (20)

energy conservative and efficient technologies in industries
energy conservative and efficient technologies in industriesenergy conservative and efficient technologies in industries
energy conservative and efficient technologies in industries
 
lightening protection - Lightening arrester
lightening protection - Lightening arresterlightening protection - Lightening arrester
lightening protection - Lightening arrester
 
IP protection or ingress protection
IP protection or ingress protectionIP protection or ingress protection
IP protection or ingress protection
 
Power Supply System - Single Line Diagram
Power Supply System - Single Line DiagramPower Supply System - Single Line Diagram
Power Supply System - Single Line Diagram
 
Active and passive fire protection system
Active and passive fire protection systemActive and passive fire protection system
Active and passive fire protection system
 
Clean agents fire suppression system- fm200, novec 1230 and ecaro 25
Clean agents fire suppression system- fm200, novec 1230 and ecaro 25Clean agents fire suppression system- fm200, novec 1230 and ecaro 25
Clean agents fire suppression system- fm200, novec 1230 and ecaro 25
 
Fire detectors - Aspiratory smoke detector
Fire detectors - Aspiratory smoke detectorFire detectors - Aspiratory smoke detector
Fire detectors - Aspiratory smoke detector
 
very early smoke detection apparatus system - Vesda
very early smoke detection apparatus system - Vesdavery early smoke detection apparatus system - Vesda
very early smoke detection apparatus system - Vesda
 
Fire control panel - Cheetah xi features
Fire control panel - Cheetah xi featuresFire control panel - Cheetah xi features
Fire control panel - Cheetah xi features
 
Fire extinguishers Ecaro-25 as explosion suppression
Fire extinguishers Ecaro-25 as explosion suppression Fire extinguishers Ecaro-25 as explosion suppression
Fire extinguishers Ecaro-25 as explosion suppression
 
Fire System comparison fm ecaro-25 vs novec 1230
Fire System comparison   fm ecaro-25 vs novec 1230Fire System comparison   fm ecaro-25 vs novec 1230
Fire System comparison fm ecaro-25 vs novec 1230
 
Fire System choosing criterion
Fire System choosing criterionFire System choosing criterion
Fire System choosing criterion
 
Basic of fire protection system, fire control types and types of agents to ex...
Basic of fire protection system, fire control types and types of agents to ex...Basic of fire protection system, fire control types and types of agents to ex...
Basic of fire protection system, fire control types and types of agents to ex...
 
How to choose or select or design or install a clean agent fire protection s...
How to choose or select or design or install  a clean agent fire protection s...How to choose or select or design or install  a clean agent fire protection s...
How to choose or select or design or install a clean agent fire protection s...
 
Fire Hazard and its types
Fire Hazard and its typesFire Hazard and its types
Fire Hazard and its types
 
Different system of fire suppression
Different system of fire suppressionDifferent system of fire suppression
Different system of fire suppression
 
Basic requirement for fire suppression piping - ECARO-25
Basic requirement for fire suppression piping - ECARO-25Basic requirement for fire suppression piping - ECARO-25
Basic requirement for fire suppression piping - ECARO-25
 
Fire alarm , detection and suppression system
Fire alarm , detection and suppression systemFire alarm , detection and suppression system
Fire alarm , detection and suppression system
 
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRESCOMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
 
Cooling Method of transformer
Cooling Method of transformer  Cooling Method of transformer
Cooling Method of transformer
 

KĂźrzlich hochgeladen

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
KreezheaRecto
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

KĂźrzlich hochgeladen (20)

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 

Passive fire measures vs active fire measues

  • 1.
  • 2.  Passive Fire Protection (PFP) is an integral component of the three components of structural fire protection and fire safety in a building.  PFP includes compartmentalization of the overall building through the use of fire-resistance rated walls and floors. Organization into smaller fire compartments, consisting of one or more rooms or floors, prevents or slows the spread of fire from the room of fire origin to other building spaces, limiting building damage and providing more time to the building occupants for emergency evacuation or to reach an area of refuge.  Fire prevention includes minimizing ignition sources, as well as educating the occupants and operators of the facility, ship or structure concerning operation and maintenance of fire-related systems for correct function, and emergency procedures including notification for fire service response and emergency evacuation.
  • 3.  The aim for PFP systems is typically demonstrated in fire testing the ability to maintain the item or the side to be protected at or below either 140 °C (for walls, floors and electrical circuits required to have a fire-resistance rating) or ca. 550 °C, which is considered the critical temperature for structural steel, above which it is in danger of losing its strength, leading to collapse.  PFP measures are intended to contain a fire in the fire compartment of origin, thus limiting the spread of fire and smoke for a limited period of time.  PPF measures such as fire stops, fire walls and fire doors are tested to determine the fire resistance rating of the final assembly usually expressed in terms of hours of fire resistance (e.g., ⅓, ž, 1, 1½, 2, 3, 4 hour)etc.  PFP attempts to contain fires or slow the spread, through use of fire resistant walls, floors, and doors (amongst other examples).
  • 4.  As the name suggests Passive Fire Protection (PFP) remains inactive in the coating system until a fire occurs.  There are mainly two types of PFP: Intumescent fire protection and vermiculite fire protection. Ser. Intumescent fire protection Vermiculite fire protection 1 It is a layer of paint which is applied along with the coating system on the structural steel members. The thickness of this intumescent coating is dependent on the steel section used. Structural steel members are covered with vermiculite materials, mostly a very thick layer. This is a cheaper option as compared to an intumescent one, but is very crude and aesthetically unpleasant. 2 Intumescent coatings are applied as an intermediate coat in a coating system (primer, intermediate, and top/finish coat). Because of the relatively low thickness of this intumescent coating (usually in the 350- to 700-micrometer range), nice finish and anti-corrosive nature. Intumescent coatings are preferred on the basis of aesthetics If the environment is corrosive in nature, then the vermiculite option is not advisable, as there is the possibility of water seeping into it (because of the porous nature of vermiculite), and there it is difficult to monitor for corrosion.
  • 5.  It should be noted that in the possibility of a fire, the steel structure will eventually collapse once the steel attains the critical core temperature (around 550 degrees Celsius or 850 degrees Fahrenheit).  PFP system will only delay this by creating a layer of char between the steel and fire. Depending upon the requirement, PFP systems can provide fire ratings in excess of 120 minutes. PFP systems are highly recommended in infrastructure projects as they can save lives and property.  Such protection is either provided by the materials from which the building is constructed, or is added to the construction materials to enhance their fire resistance. It is vital that these protection measures are correctly designed, specified and installed if the building is to behave as expected should fire break out.
  • 6.  PFP is vital to the stability and integrity of a building or structure in case of fire. These are designed to restrict the growth and spread of fire allowing the occupants to escape or the fire fighters to do their job.  By their nature they are ‘passive’ until there is a fire and only then will their fire performance be demonstrated. The occupants of a building will attend to their daily business, visitors will shop, be entertained, or enjoy recreation without any knowledge of the PFP measures that will protect them in fire. However, it is essential that these measure will work if an emergency occurs.
  • 7. PFP includes:  Cavity barriers  Ceiling systems  Compartment walls  Fire doors and furniture (e.g. self-closing devices, latches etc.)  Fire fighting shafts and stairwells  Fire-resisting air transfer grilles (mechanical or intumescent)  Fire-resisting dampers (mechanical or intumescent) used in horizontal or vertical air distribution ducts  Fire-resisting ductwork  Fire-resisting glazing  Fire-resisting service ducts and shafts
  • 8.  Fire-resisting walls and partitions  Hinged or pivoted fire door sets (timber or steel)  Industrial fire shutters (rolling or folding)  Linear gap seals  Penetration seals for pipes, cables and other services  Structural frame fire protection  Suspended ceilings  Membrane ceilings (horizontal partitions)  The building envelope, e.g. fire-resisting external walls, curtain walls etc. Other elements of the building may also have a role in PFP.
  • 9.  Air transfer grille: A device which allows the passage of ventilation air in normal conditions through a fire door, wall or partition but closes automatically to prevent the passage of fire in a fire condition for stipulated time period.  Automatic fire and smoke damper: A device which allows the passage of ventilation air in normal conditions through a duct, fire wall or partition but closes automatically to prevent the passage of smoke and fire in a fire condition for a stipulated period of time. Response to smoke is typically achieved by linking to the automatic fire detection system.  Building hardware: Fittings designed for incorporation in a fire-resisting door set and which contribute to ensure that the fire-resisting door (when closed) resists the passage of fire and/or gaseous products of combustion. Such fittings include hinges, pivots, door closing devices, latches, locks, and door furniture (lever handles, knobs).
  • 10.  Cavity barrier: A construction provided to close a concealed space against the penetration of smoke and flame or to restrict the movement of smoke or flame within such a space for a stipulated time period.  Combustibility: This assesses whether a material will burn and add to a fire when subjected to an existing fire. Spread of flame this assesses whether the fire will spread over the surface of the material (especially wall linings).  Compartment(fire): A building or part of a building, comprising one or more rooms, spaces or floors constructed to prevent the spread of fire to or from another part of the same building, or an adjoining building. The basis is to provide adequate means of escape, and to provide fire separation for adjoining buildings.
  • 11.  Fire door(assembly): A door or shutter provided for the passage of persons, air or objects which together with its frame and furniture as installed in a building is intended when closed, to resist the passage of fire and/or gaseous products of combustion and is capable of meeting specified performance criteria to those ends.  Fire-resisting door set: A complete installed door assembly comprising door frame, door leaves, building hardware, seals and any glazing that, when closed, is intended to resist the passage of fire and smoke in accordance with specified performance criteria.  Fire-resisting glazed screen: Glazed structure or window incorporating fire-resisting glass and designed to resist the spread of fire and the gaseous products of combustion for a stipulated period of time.
  • 12.  Fire-resisting glass: A glass that demonstrates its ability to meet the defined heating and pressure conditions specified in Fire resistance Test (or any other National or International fire resistance test method). Typically, the glass will be clear, textured, toughened, laminated or wired and may incorporate special features such as coatings or laminations that enable the glass to achieve a particular fire performance in terms of integrity and insulation.  Fire-resisting ductwork: Ventilation or extraction ductwork designed to contain fire and the products of combustion in a manner that does not allow passage to other parts of the building from the compartment of origin for a stipulated time period.
  • 13.  Fire-resisting partition: An internal non load bearing vertical dividing structure designed to resist the spread of fire, heat, and the products of combustion for a stipulated period of time. Such a partition can include a glazed section or a fire door.  Fire-resisting suspended ceiling: A suspended ceiling designed to contribute to the overall fire resistance of a floor assembly or to prevent the collapse of steel beams supporting a floor or roof, for a stipulated period of time. It may also provide fire resistance as a membrane in the same way as a partition.
  • 14.  Fire-stopping: Sealing products that take up imperfections of fit or design tolerance between the fire resisting fixed elements of a building to restrict the passage of fire and smoke. They continue to take up the imperfections of fit at all times and have the same fire rating as the fixed elements of which they form a part. In reaction to a fire condition they swell, spread or deform to achieve their performance.  Fire-resisting luminaire: Lighting structure or fitting for suspended ceilings designed to resist the spread of fire and the products of combustion for a stipulated period of time. It is required to be tested for integrity when fitted to an individual manufacturer’s suspended ceiling.  .