SlideShare ist ein Scribd-Unternehmen logo
1 von 14
(RUMAH BANDAR) TOWN HOUSES
KEPADATAN MAKSIMUM                 25 UNIT / EKAR
( MAXIMUM DENSITY )                ( 25 UNITS / ACRE)
SAIZ TAPAK MINIMUM                 3 EKAR (O.8 HEKTAR)
( MINIMUM SAIZ SITE )              ( 3 ACRE / 0.8 HECTARE )
LUAS RUANG LANTAI MINIMUM          83.5mp (900kp)
( MINIMUM FLOOR AREA SPACE )       ( 83.5mp / 900 kp )
BILANGAN TINGKAT MINIMUM           18.3m (60’) atau 3 tingkat.
( MINIMUM LEVEL )                  ( 18.3m / 60’ or 3 level )
PANJANG BLOK TERES                 Maksimum 97.5m (320’)
( LONG BLOCK TERRACE )             ( Maximum 97.5m / 320’ )
Jalan Perkhidmatan :
 Jalan Perkhidmatan                Minimum 15.2m (50’)
  ( Road Service )                   ( Minimum 15.2m / 50’ )
 Jalan Perkhidmatan di             Minimum 12.2m (40’)
  Kawasan Berbukit                   ( Minimum 12.2m / 40’ )
  ( Road Service at Hilly Area )
Jalan Buntu                                 Maksimum 97.5m (320’)
( cul-de-sac )                              ( Maximum 97.5m / 320’ )
Lorong Belakang                             6.1m (20’)
( Back Lane )                               ( 6,1m / 20’ )
Lorong Pemisah (fire break)/ Lorong Tepi 6.1 m (20’) – jarak antara dinding ke
( Lane separators (fire break) / side lane ) dinding bangunan.
                                             Nota: ‘Property break’ tidak dibenarkan
                                             ( 6.1m / 20’ – Distance between wall - to
                                             -wall buildings )
                                             Note: ‘Property break’ not allowed
Anjakan Bangunan :
( building setback)
 Anjakan Hadapan                           6.1m (20’)
   ( Front Setback )                          ( 6.1m / 20’ )
 Anjakan Hadapan Anjung Kereta              3.1m (10’)
   ( Car Porch’s Front Setback )              ( 3.1m / 10’ )
 Anjakan Tepi                               6.1m (20’)
   ( Side Setback )                           ( 6.1m / 20’ )

Tempat Letak Kereta (TLK)                   1 unit : 2 petak
( Parking Space )                            Tambahan 10% bagi pelawat
                                            1 units : 2 lots
                                             Additional 10% for visitors
Rajah (i)
 Rajah (i)
Anjakan Bangunan dan Lorong Belakang Bagi Rumah Bandar.
 Anjakan Bangunan dan Lorong Belakang Bagi Rumah Bandar.
((Building setback and back lane for town house ))
  Building setback and back lane for town house



          Jalan Perkhidmatan 15.2m (50’)
          Road Service 15.2m / 50’ )
                                            Anjakan Hadapan 6.1m (20’)
                                            ( Front Setback 6.1m / 20’ )



                                            Lorong Belakang 6.1m (20’)
                                            ( Back Lane 6.1m / 20’ )



                                            Anjakan Hadapan 6.1m (20’)
                                            ( Front Setback 6.1m / 20’ )
           Jalan Perkhidmatan 15.2m (50’)
           Road Service 15.2m / 50’ )
RAJAH (II)
KERATAN RENTAS JALAN DI KAWASAN BERBUKIT.
( CROSS-SECTION OF THE ROAD AT THE HILLS )

              Jalan Perkhidmatan
               Jalan Perkhidmatan
              12.1m (40’)
               12.1m (40’)
              ((Service Road
                 Service Road
              12.1m //40’ ))
               12.1m 40’




             Anjakan Bangunan 6.1m (20’)
              Anjakan Bangunan 6.1m (20’)
             ((Setback Building 6.1m //20’)
                Setback Building 6.1m 20’)
CONTOH REKABENTUK RUMAH BANDAR
( EXAMPLE OF TOWN HOUSE DESIGN )
PERUMAHAN STRATA
BERTANAH / SKIM STRATA
STRATA LANDED HOUSING / STRATA SCHEME



                  PERUMAHAN BERTANAH
                       (LANDED STRATA)
PIAWAIAN PERUMAHAN STRATA BERTANAH
( STRATA LANDED HOUSING STANDARDS )

Keluasan Tapak                        1.2 – 8.1 hektar (3 – 20ekar)
( Site Area )                         ( 1.2-8.1 hectare / 3 – 20acre )
Bilangan Unit (no. of units ) :       Bilangan Unit :      Keluasan :
 Sesebuah / Berkembar / Kluster       24-160 unit        Minimum 1.2 hek.
  ( Detached / cluster )
 Teres ( Terrace )                    48-240 unit        Maksimum 8.1
 Perumahan Bercampur                 hek.
  ( mixed housing )                    48-240 unit        ( 3 – 20 ekar )
 Rumah Bandar ( Town House )
                                       48-240 unit
Ketinggian Bangunan                   Bagi perumahan jenis banglo, berkembar,
( Building Height )                   kluster, ‘zero lot boundary’ dan rumah
                                      bandar, had ketinggian maksimum ialah
                                      4 tingkat dari basement atau 18.5m
                                      (tanpa lif).
Jalan Perkhidmatan :
 Jalan Perkhidmatan                   Minimum 15.2m (50’)
 Jalan Perkhidmatan di kawasan        Minimum 12.2m (40’)
  Berbukit.
Jalan Persendirian :
 Sehala                             9.1m (30’) termasuk rezab jalan
  ( one – way )                       9.1m (30’) including the road
 Dua Hala                            reserve.
  ( two – way )                      12.1m (40’) termasuk rezab jalan
                                      12.1m(40’) including the road
                                       reserve.
Anjakan Bangunan ( Setback
Buildings ) :
a)Perumahan Bertingkat :-            6.1m (20’)
Anjakan dari jalan perkhidmatan.     ( 6.1m / 20’ )
   ( Setback from road services )    6.1m (20’)
Anjakan sempadan bersama.            ( 6.1m / 20’ )
   ( Boundaries Setback )            dinding ke dinding (sisi) 6.1m
Anjakan sisi bangunan.               ( wall-to-wall / side 6.1m )
                                     dinding ke dinding (blkg) 4.6m
   ( Setback side buildings )
                                      ( wall-to-wall / back 4.6m )
b) Perumahan Bertanah
  ( Landed houses ) :             6.1m (20’)
 Anjakan dari jalan
  perkhidmatan.                   3.1m (10’)
  (Setback from service road )    6.1m (20’)
 Anjakan sempadan utama.
  ( Main border’s setback )
 Anjakan mengadap jalan
  utama.
  ( Setback facing the main
  road )
Akses Laluan Keluar – masuk       Rezab jalan minimum 15.2m (50’).
( Access accessibility )           ( Minimum’s road reserve is 15.2m
                                    / 50’ )
                                  Perlu disediakan dua pintu akses
                                   laluan keluar – masuk.
                                   ( Be provided two exit access doors-
                                   out )
                                  Jalan penyambungan tidak
                                   dibenarkan.
                                   ( The road connection is not
                                   justified )
Tempat Letak Kenderaan           2 TLK / 1 unit kediaman + tambahan
( parking space ) :               10% TLK untuk pelawat.
 Tempat letak kereta (TLK)       (2 TLK / 1 residential unit +
   ( Parking space / TLK )      extra 10%
 TLK orang kurang upaya          TLK for visitors. )
   ( Parking space for OKU )     2% daripada jumlah TLK, disediakan
                                  bersama ramp.
                                  ( 2 % of the total TLK, provided
                                with
                                  ramp.


Tanah Lapang dan Rekreasi        1000 penduduk : 2 hektar tanah
( Open space and recreation )      lapang.
                                    (1000 population: 2 hectares of land
                                    leisure. )
                                 Kemudahan yang di sediakan
                                  termasuk :
                                    (The facilities to be provided
                                    including )
                                • Padang permainan kanak-kanak.
                                  (Children playground )
                                • Gelanggang sepak takraw/
                                  badminton/tenis dan lain-lain.
                                  (Tennis sepak takraw /
                                  badminton / tennis and others. )
• Taman atas bumbung dibenarkan
                         tetapi tidak melebihi 30% keperluan
                         penyediaan kawasan lapang.
                          (The rooftop garden is allowed
                         but not more than 30% of the
                         total provision of open space. )

Perimeter Planting       Minimum 3m (10’) di sekeliling kawasan
( Perimeter Planting )   pembangunan ( tdk termasuk jarak dari
                         anjakan bangunan ).
                         (Minimum 3m (10 ') around the
                         development (including distance from
                         inconspicuous building setback).


Pagar / Tembok           Ketinggian maksimum 2.7m (9’).
( Fence / Wall )         ( Maximum height 2.7m /9’ )
Kemudahan Awam           Kemudahan awam bersepadu
( Public Facilities )    (masjid,sekolah dll)perlu disediakan di
                         luar kawasan perumahan.
                         (Integrated public facilities (mosques,
                         schools, etc.) should be provided
                         outside the housing.)
RAJAH (I)
ANJAKAN BANGUNAN DAN LORONG BELAKANG BAGI PERUMAHAN STRATA
BERTANAH/ SKIM STRATA
(DISPLACEMENT OF BUILDING AND HOUSING REAR LANE FOR STRATA LANDED /
STRATA SCHEMES )
                             ( Fraction of land )   (Exit access 15.2m / 50’ )




                           (Private Road 12.1m / 40’ )




                         Jalan Persendirian 12.1m (40’)




  Rumah ke rumah 24.4m
  (80’)
CONTOH ILUSTRASI STRATA BERTANAH TERDIRI DARIPADA
PEMBANGUNAN BERTINGKAT TIDAK MELEBIHI 4 TINGKAT DENGAN
PEMBERIAN HAKMILIK STRATA INDIVIDU KEPADA PECAHAN TANAH
(LAND PARCEL).




Rumah Sesebuah 2 Tingkat ( 1pecahan tanah/
                 land parcel)
   ( 2-storey detached house / land parcel )



                                               Rumah Berkembar (1pecahan tanah/
                                                          land parcel)
                                                 ( Detached House / land parcel )

Weitere ähnliche Inhalte

Was ist angesagt?

Pengenalan Tatabunyi.
Pengenalan Tatabunyi.Pengenalan Tatabunyi.
Pengenalan Tatabunyi.AizatMohiden
 
Cawangan Inspektorat
Cawangan InspektoratCawangan Inspektorat
Cawangan InspektoratMohd Asri
 
Dissertation-Minimalism in Architecture
Dissertation-Minimalism in ArchitectureDissertation-Minimalism in Architecture
Dissertation-Minimalism in ArchitectureKriti Bafna
 
Housing Policies in Malaysia
Housing Policies in Malaysia Housing Policies in Malaysia
Housing Policies in Malaysia Dhanya Pravin
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 
Compartmentation in fire protection system in Building
Compartmentation in fire protection system in BuildingCompartmentation in fire protection system in Building
Compartmentation in fire protection system in BuildingUngku OmarPolytechnic
 
Pengenalan Tatacahaya
Pengenalan TatacahayaPengenalan Tatacahaya
Pengenalan TatacahayaAizatMohiden
 
Richard meier and john hejduk
Richard meier and john hejdukRichard meier and john hejduk
Richard meier and john hejdukvikashsaini78
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement methodhiewliming
 
Penaungan seni visual di malayia
Penaungan seni visual di malayiaPenaungan seni visual di malayia
Penaungan seni visual di malayiazainiaman
 
CASE STUDY//SEMINAR ARCHITECTURE & URBAN DESIGN WITH ARRIOLA & FIOL Existi...
CASE STUDY//SEMINAR  ARCHITECTURE &  URBAN DESIGN WITH ARRIOLA & FIOL  Existi...CASE STUDY//SEMINAR  ARCHITECTURE &  URBAN DESIGN WITH ARRIOLA & FIOL  Existi...
CASE STUDY//SEMINAR ARCHITECTURE & URBAN DESIGN WITH ARRIOLA & FIOL Existi...Michael Klug
 
Brutalist Collage Introduction.pdf
Brutalist Collage Introduction.pdfBrutalist Collage Introduction.pdf
Brutalist Collage Introduction.pdfRossMatthews19
 

Was ist angesagt? (20)

Pengenalan cetakan
Pengenalan cetakanPengenalan cetakan
Pengenalan cetakan
 
Pengenalan Tatabunyi.
Pengenalan Tatabunyi.Pengenalan Tatabunyi.
Pengenalan Tatabunyi.
 
Cawangan Inspektorat
Cawangan InspektoratCawangan Inspektorat
Cawangan Inspektorat
 
Minimalism ppt
Minimalism pptMinimalism ppt
Minimalism ppt
 
Dissertation-Minimalism in Architecture
Dissertation-Minimalism in ArchitectureDissertation-Minimalism in Architecture
Dissertation-Minimalism in Architecture
 
Placemaking
PlacemakingPlacemaking
Placemaking
 
Housing Policies in Malaysia
Housing Policies in Malaysia Housing Policies in Malaysia
Housing Policies in Malaysia
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
Compartmentation in fire protection system in Building
Compartmentation in fire protection system in BuildingCompartmentation in fire protection system in Building
Compartmentation in fire protection system in Building
 
Surrealism
SurrealismSurrealism
Surrealism
 
Pengenalan Tatacahaya
Pengenalan TatacahayaPengenalan Tatacahaya
Pengenalan Tatacahaya
 
Catan
CatanCatan
Catan
 
Richard meier and john hejduk
Richard meier and john hejdukRichard meier and john hejduk
Richard meier and john hejduk
 
UBBL 2021.pdf
UBBL 2021.pdfUBBL 2021.pdf
UBBL 2021.pdf
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
Penaungan seni visual di malayia
Penaungan seni visual di malayiaPenaungan seni visual di malayia
Penaungan seni visual di malayia
 
CASE STUDY//SEMINAR ARCHITECTURE & URBAN DESIGN WITH ARRIOLA & FIOL Existi...
CASE STUDY//SEMINAR  ARCHITECTURE &  URBAN DESIGN WITH ARRIOLA & FIOL  Existi...CASE STUDY//SEMINAR  ARCHITECTURE &  URBAN DESIGN WITH ARRIOLA & FIOL  Existi...
CASE STUDY//SEMINAR ARCHITECTURE & URBAN DESIGN WITH ARRIOLA & FIOL Existi...
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 
Brutalist Collage Introduction.pdf
Brutalist Collage Introduction.pdfBrutalist Collage Introduction.pdf
Brutalist Collage Introduction.pdf
 
Simbol peralatan kebakaran
Simbol peralatan kebakaranSimbol peralatan kebakaran
Simbol peralatan kebakaran
 

Mehr von El Moro

Utility panel
Utility panelUtility panel
Utility panelEl Moro
 
Process & procedure presentation
Process & procedure presentationProcess & procedure presentation
Process & procedure presentationEl Moro
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)El Moro
 
Contoh pelan konsep
Contoh pelan konsepContoh pelan konsep
Contoh pelan konsepEl Moro
 
Commercial presentation group b
Commercial presentation group bCommercial presentation group b
Commercial presentation group bEl Moro
 
Mbas piawaian copy
Mbas piawaian   copyMbas piawaian   copy
Mbas piawaian copyEl Moro
 
Presentation1 adi
Presentation1 adiPresentation1 adi
Presentation1 adiEl Moro
 
Piawaian industri
Piawaian industriPiawaian industri
Piawaian industriEl Moro
 

Mehr von El Moro (8)

Utility panel
Utility panelUtility panel
Utility panel
 
Process & procedure presentation
Process & procedure presentationProcess & procedure presentation
Process & procedure presentation
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
Contoh pelan konsep
Contoh pelan konsepContoh pelan konsep
Contoh pelan konsep
 
Commercial presentation group b
Commercial presentation group bCommercial presentation group b
Commercial presentation group b
 
Mbas piawaian copy
Mbas piawaian   copyMbas piawaian   copy
Mbas piawaian copy
 
Presentation1 adi
Presentation1 adiPresentation1 adi
Presentation1 adi
 
Piawaian industri
Piawaian industriPiawaian industri
Piawaian industri
 

Kürzlich hochgeladen

Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 

Kürzlich hochgeladen (20)

Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Perumahan edit (2)

  • 2. KEPADATAN MAKSIMUM 25 UNIT / EKAR ( MAXIMUM DENSITY ) ( 25 UNITS / ACRE) SAIZ TAPAK MINIMUM 3 EKAR (O.8 HEKTAR) ( MINIMUM SAIZ SITE ) ( 3 ACRE / 0.8 HECTARE ) LUAS RUANG LANTAI MINIMUM 83.5mp (900kp) ( MINIMUM FLOOR AREA SPACE ) ( 83.5mp / 900 kp ) BILANGAN TINGKAT MINIMUM 18.3m (60’) atau 3 tingkat. ( MINIMUM LEVEL ) ( 18.3m / 60’ or 3 level ) PANJANG BLOK TERES Maksimum 97.5m (320’) ( LONG BLOCK TERRACE ) ( Maximum 97.5m / 320’ ) Jalan Perkhidmatan :  Jalan Perkhidmatan  Minimum 15.2m (50’) ( Road Service ) ( Minimum 15.2m / 50’ )  Jalan Perkhidmatan di  Minimum 12.2m (40’) Kawasan Berbukit ( Minimum 12.2m / 40’ ) ( Road Service at Hilly Area )
  • 3. Jalan Buntu Maksimum 97.5m (320’) ( cul-de-sac ) ( Maximum 97.5m / 320’ ) Lorong Belakang 6.1m (20’) ( Back Lane ) ( 6,1m / 20’ ) Lorong Pemisah (fire break)/ Lorong Tepi 6.1 m (20’) – jarak antara dinding ke ( Lane separators (fire break) / side lane ) dinding bangunan. Nota: ‘Property break’ tidak dibenarkan ( 6.1m / 20’ – Distance between wall - to -wall buildings ) Note: ‘Property break’ not allowed Anjakan Bangunan : ( building setback)  Anjakan Hadapan 6.1m (20’) ( Front Setback ) ( 6.1m / 20’ )  Anjakan Hadapan Anjung Kereta  3.1m (10’) ( Car Porch’s Front Setback ) ( 3.1m / 10’ )  Anjakan Tepi  6.1m (20’) ( Side Setback ) ( 6.1m / 20’ ) Tempat Letak Kereta (TLK) 1 unit : 2 petak ( Parking Space )  Tambahan 10% bagi pelawat 1 units : 2 lots  Additional 10% for visitors
  • 4. Rajah (i) Rajah (i) Anjakan Bangunan dan Lorong Belakang Bagi Rumah Bandar. Anjakan Bangunan dan Lorong Belakang Bagi Rumah Bandar. ((Building setback and back lane for town house )) Building setback and back lane for town house Jalan Perkhidmatan 15.2m (50’) Road Service 15.2m / 50’ ) Anjakan Hadapan 6.1m (20’) ( Front Setback 6.1m / 20’ ) Lorong Belakang 6.1m (20’) ( Back Lane 6.1m / 20’ ) Anjakan Hadapan 6.1m (20’) ( Front Setback 6.1m / 20’ ) Jalan Perkhidmatan 15.2m (50’) Road Service 15.2m / 50’ )
  • 5. RAJAH (II) KERATAN RENTAS JALAN DI KAWASAN BERBUKIT. ( CROSS-SECTION OF THE ROAD AT THE HILLS ) Jalan Perkhidmatan Jalan Perkhidmatan 12.1m (40’) 12.1m (40’) ((Service Road Service Road 12.1m //40’ )) 12.1m 40’ Anjakan Bangunan 6.1m (20’) Anjakan Bangunan 6.1m (20’) ((Setback Building 6.1m //20’) Setback Building 6.1m 20’)
  • 6. CONTOH REKABENTUK RUMAH BANDAR ( EXAMPLE OF TOWN HOUSE DESIGN )
  • 7. PERUMAHAN STRATA BERTANAH / SKIM STRATA STRATA LANDED HOUSING / STRATA SCHEME PERUMAHAN BERTANAH (LANDED STRATA)
  • 8. PIAWAIAN PERUMAHAN STRATA BERTANAH ( STRATA LANDED HOUSING STANDARDS ) Keluasan Tapak 1.2 – 8.1 hektar (3 – 20ekar) ( Site Area ) ( 1.2-8.1 hectare / 3 – 20acre ) Bilangan Unit (no. of units ) : Bilangan Unit : Keluasan :  Sesebuah / Berkembar / Kluster  24-160 unit Minimum 1.2 hek. ( Detached / cluster )  Teres ( Terrace )  48-240 unit Maksimum 8.1  Perumahan Bercampur hek. ( mixed housing )  48-240 unit ( 3 – 20 ekar )  Rumah Bandar ( Town House )  48-240 unit Ketinggian Bangunan Bagi perumahan jenis banglo, berkembar, ( Building Height ) kluster, ‘zero lot boundary’ dan rumah bandar, had ketinggian maksimum ialah 4 tingkat dari basement atau 18.5m (tanpa lif). Jalan Perkhidmatan :  Jalan Perkhidmatan  Minimum 15.2m (50’)  Jalan Perkhidmatan di kawasan  Minimum 12.2m (40’) Berbukit.
  • 9. Jalan Persendirian :  Sehala  9.1m (30’) termasuk rezab jalan ( one – way ) 9.1m (30’) including the road  Dua Hala reserve. ( two – way )  12.1m (40’) termasuk rezab jalan 12.1m(40’) including the road reserve. Anjakan Bangunan ( Setback Buildings ) : a)Perumahan Bertingkat :-  6.1m (20’) Anjakan dari jalan perkhidmatan. ( 6.1m / 20’ ) ( Setback from road services )  6.1m (20’) Anjakan sempadan bersama. ( 6.1m / 20’ ) ( Boundaries Setback )  dinding ke dinding (sisi) 6.1m Anjakan sisi bangunan. ( wall-to-wall / side 6.1m )  dinding ke dinding (blkg) 4.6m ( Setback side buildings ) ( wall-to-wall / back 4.6m )
  • 10. b) Perumahan Bertanah ( Landed houses ) :  6.1m (20’)  Anjakan dari jalan perkhidmatan.  3.1m (10’) (Setback from service road )  6.1m (20’)  Anjakan sempadan utama. ( Main border’s setback )  Anjakan mengadap jalan utama. ( Setback facing the main road ) Akses Laluan Keluar – masuk  Rezab jalan minimum 15.2m (50’). ( Access accessibility ) ( Minimum’s road reserve is 15.2m / 50’ )  Perlu disediakan dua pintu akses laluan keluar – masuk. ( Be provided two exit access doors- out )  Jalan penyambungan tidak dibenarkan. ( The road connection is not justified )
  • 11. Tempat Letak Kenderaan  2 TLK / 1 unit kediaman + tambahan ( parking space ) : 10% TLK untuk pelawat.  Tempat letak kereta (TLK) (2 TLK / 1 residential unit + ( Parking space / TLK ) extra 10%  TLK orang kurang upaya TLK for visitors. ) ( Parking space for OKU )  2% daripada jumlah TLK, disediakan bersama ramp. ( 2 % of the total TLK, provided with ramp. Tanah Lapang dan Rekreasi  1000 penduduk : 2 hektar tanah ( Open space and recreation ) lapang. (1000 population: 2 hectares of land     leisure. )  Kemudahan yang di sediakan termasuk : (The facilities to be provided     including ) • Padang permainan kanak-kanak. (Children playground ) • Gelanggang sepak takraw/ badminton/tenis dan lain-lain. (Tennis sepak takraw /   badminton / tennis and others. )
  • 12. • Taman atas bumbung dibenarkan tetapi tidak melebihi 30% keperluan penyediaan kawasan lapang. (The rooftop garden is allowed but not more than 30% of the total provision of open space. ) Perimeter Planting Minimum 3m (10’) di sekeliling kawasan ( Perimeter Planting ) pembangunan ( tdk termasuk jarak dari anjakan bangunan ). (Minimum 3m (10 ') around the development (including distance from inconspicuous building setback). Pagar / Tembok Ketinggian maksimum 2.7m (9’). ( Fence / Wall ) ( Maximum height 2.7m /9’ ) Kemudahan Awam Kemudahan awam bersepadu ( Public Facilities ) (masjid,sekolah dll)perlu disediakan di luar kawasan perumahan. (Integrated public facilities (mosques, schools, etc.) should be provided outside the housing.)
  • 13. RAJAH (I) ANJAKAN BANGUNAN DAN LORONG BELAKANG BAGI PERUMAHAN STRATA BERTANAH/ SKIM STRATA (DISPLACEMENT OF BUILDING AND HOUSING REAR LANE FOR STRATA LANDED / STRATA SCHEMES ) ( Fraction of land ) (Exit access 15.2m / 50’ ) (Private Road 12.1m / 40’ ) Jalan Persendirian 12.1m (40’) Rumah ke rumah 24.4m (80’)
  • 14. CONTOH ILUSTRASI STRATA BERTANAH TERDIRI DARIPADA PEMBANGUNAN BERTINGKAT TIDAK MELEBIHI 4 TINGKAT DENGAN PEMBERIAN HAKMILIK STRATA INDIVIDU KEPADA PECAHAN TANAH (LAND PARCEL). Rumah Sesebuah 2 Tingkat ( 1pecahan tanah/ land parcel) ( 2-storey detached house / land parcel ) Rumah Berkembar (1pecahan tanah/ land parcel) ( Detached House / land parcel )