 Project Control System
 Project Control System Varghese DANIEL kvdaniel@wrenchsolutions.com Deliver projects on-budget and on-time. Vincent CHIA vchia@wrenchsolutions.com
  “To be honest on this regard I think that when we set out on the Wrench Installation it was envisaged to some degree to be a document control tool, which to our benefit  has now evolved to be a project control tool, being used by all. ” Clint Nisbet MSc, BSc, MCIOBMurray Roberts Construction Manager simplifies your life .
Up to 200% improved ,[object Object]
 Correspondence and transmittal collaboration
 Report generation…now these were the simpler tasks achieved by Energy City Qatar a real estate developer while planning for their $2.6 billion project in Doha, Qatar simplifies your life .
40% reduced design cycles 25% quality team efficiency   100% ISO compliance  …now these were the simpler tasks achieved by CH2MHILL VECO Engineering, providing EPC services to the Oil & Gas industry. simplifies your life .
40% faster engineering cycle times 100% data security  100% quality enforcement …now these were the simpler tasks achieved by Khatib & Alami (K&A), a multidisciplinary architectural and engineering consulting company  simplifies your life .
34% reduced design cycles 0% documentation errors   100% quality improvements  …now these were the simpler tasks achieved in project 611 by  Al-Habtoor Leighton Engineering & Construction group. simplifies your life . www.wrenchsolutions.com/epc
Burning questions Are we ahead or behind schedule? Are we over or under-spending?  How far off course are we?  Where are the bottlenecks? How to fix them? What is exact progress as of now? What is %age completion of this deliverable? Are we meeting ISO standards? How efficiently are we using resources? ■
Inadequate answers Because of: Manual updates (not real-time) Lack of integration (schedules / documents) Inadequate change management Communication deficit  Inadequate ISO enforcement (rework) Lack of accountability ■
Our solution It records transactions as they occur. You get accurate indication of progress and problems encountered during execution. ■
We will set up… Web-based system On-site configuration & training Online project monitoring Automated data capture System-managed documents Real-time communication ■ Control
Package to payoff What is the progress? (cost/schedule performance index) Work package Deliverables What percentage is completed? Were they completed on schedule? Milestones Without WRENCH, you need about 2000 manual updates per week (assuming 500 deliverables per package) to assess progress
Package to payoff Assessing progress is easy, immediate, and 100% accurate! Work package Automatic updates – planned vs. actuals (of start/finish dates) captured directly by WRENCH. Deliverables Automatic updates: Actual finish date captured by WRENCH. Milestones With WRENCH. . .
But what is WRENCH? A transparent working environment: deliverables and estimated hours can be easily measured. A planning tool: teams get clear ‘To-Do’ list and defined target dates for each activity. A monitoring platform: resources track their own work (system updates individual progress) A boon for management: lead engineers and discipline heads get instant access to planned progress vs.  actual progress and present status. An aid to problem-solving: managers can ‘drill down’ and pinpoint the exact bottleneck or problem causing delay. ■
You get: updates  WRENCH Primavera 04 Jul 10 05 Jul 10 09 Jul 10 12 Jul 10 09 Jul 10 06 Jul 10 09 Jul 10 14 Jul 10 IDC IFR IFC Draw
You get: monitoring Click to enlarge
You get: reports Click to enlarge
You get: status S-Curve Budget at Completion Actual Costs Planned Value Earned Value
You get: the big picture: Current position Time Cost Ahead of Schedule Under Budget On Schedule Under Budget Behind Schedule Under Budget Ahead of Schedule On Budget On Schedule On Budget Behind Schedule On Budget Ahead of Schedule Over Budget On Schedule Over Budget Behind Schedule Over Budget
In short: 360° value Secure central storage Collaborative platform (offices, vendor, client, site etc.) File transfers via satellite servers (much faster than FTP) Correspondence management Change management (minutes of meetings, action plans) Multi-level security for optimum control/flexibility ■
Evaluation(Where did you plan to be?) Measurement(Where are you?) Correction(How to get back on track?) Summary On-time On-budget  On-time On-budget
Benefits 100%  efficient project control 100%  quality assured  60%  reduction in project management efforts 100%  efficient document control/Management ■

Weitere ähnliche Inhalte

Was ist angesagt?

Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Schedulingsaurabmi2
 
Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope ManagementTalha Siddiqui
 
Project control. Management
Project control. ManagementProject control. Management
Project control. ManagementMarius Miron
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentationNithin Dev
 
Project Time Management
Project Time ManagementProject Time Management
Project Time ManagementSerdar Temiz
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and schedulingAditi Garg
 
06 project time management
06  project time management06  project time management
06 project time managementAla Ibrahim
 
Steps in project control process
Steps in project control processSteps in project control process
Steps in project control processUday Doyal
 
Projectcontrol
ProjectcontrolProjectcontrol
ProjectcontrolRaj Sampat
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing managementDhamo daran
 
Project Management 4 Schedule Management
Project Management 4 Schedule ManagementProject Management 4 Schedule Management
Project Management 4 Schedule Managementgrmkslideshare
 
Project management (1)
Project management (1)Project management (1)
Project management (1)Hetal Visaria
 

Was ist angesagt? (20)

Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
 
Project Tracking and Scope Management
Project Tracking and Scope ManagementProject Tracking and Scope Management
Project Tracking and Scope Management
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentation
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Project Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk ManagementProject Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk Management
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and scheduling
 
06 project time management
06  project time management06  project time management
06 project time management
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Steps in project control process
Steps in project control processSteps in project control process
Steps in project control process
 
Projectcontrol
ProjectcontrolProjectcontrol
Projectcontrol
 
Monitoring the control
Monitoring the control Monitoring the control
Monitoring the control
 
Project milestone
Project milestoneProject milestone
Project milestone
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Software Project Management Spm1176
Software Project Management Spm1176Software Project Management Spm1176
Software Project Management Spm1176
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 
Project Management 4 Schedule Management
Project Management 4 Schedule ManagementProject Management 4 Schedule Management
Project Management 4 Schedule Management
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 

Andere mochten auch

Project Management Control Systems
Project Management Control SystemsProject Management Control Systems
Project Management Control Systemsskillern
 
Project Control System Manual
Project Control System ManualProject Control System Manual
Project Control System Manualharoldtaylor1113
 
92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)Pegah Hamidkhani
 
Critical Path Forecasting with CA Workload Automation iDash
Critical Path Forecasting with CA Workload Automation iDashCritical Path Forecasting with CA Workload Automation iDash
Critical Path Forecasting with CA Workload Automation iDashCA Technologies
 
Automation in Post-Production — Boris Polyak for NATEXPO 2016
Automation in Post-Production — Boris Polyak for NATEXPO 2016Automation in Post-Production — Boris Polyak for NATEXPO 2016
Automation in Post-Production — Boris Polyak for NATEXPO 2016Boris Polyak
 
presentation on work breakdown structure and critical path
presentation on work breakdown structure and critical pathpresentation on work breakdown structure and critical path
presentation on work breakdown structure and critical pathchotenawabraza
 
Operations Research
Operations ResearchOperations Research
Operations Researchmini244
 
WBS Principles
WBS PrinciplesWBS Principles
WBS Principlesdmdk12
 
Project Control Basics
Project Control BasicsProject Control Basics
Project Control Basicsprojectcompany
 
Practical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsPractical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsJeremie Averous
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoringharoldtaylor1113
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineeringtheairliner
 

Andere mochten auch (20)

Project Control System
Project Control SystemProject Control System
Project Control System
 
Project Management Control Systems
Project Management Control SystemsProject Management Control Systems
Project Management Control Systems
 
Project Control System Manual
Project Control System ManualProject Control System Manual
Project Control System Manual
 
Project Control Process
Project Control ProcessProject Control Process
Project Control Process
 
Project control
Project controlProject control
Project control
 
95 Theses: Part3
95 Theses: Part395 Theses: Part3
95 Theses: Part3
 
92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)92131562-Time Management Method(slides only)
92131562-Time Management Method(slides only)
 
Critical Path Forecasting with CA Workload Automation iDash
Critical Path Forecasting with CA Workload Automation iDashCritical Path Forecasting with CA Workload Automation iDash
Critical Path Forecasting with CA Workload Automation iDash
 
Automation in Post-Production — Boris Polyak for NATEXPO 2016
Automation in Post-Production — Boris Polyak for NATEXPO 2016Automation in Post-Production — Boris Polyak for NATEXPO 2016
Automation in Post-Production — Boris Polyak for NATEXPO 2016
 
presentation on work breakdown structure and critical path
presentation on work breakdown structure and critical pathpresentation on work breakdown structure and critical path
presentation on work breakdown structure and critical path
 
Operations Research
Operations ResearchOperations Research
Operations Research
 
WBS Principles
WBS PrinciplesWBS Principles
WBS Principles
 
Project Control Basics
Project Control BasicsProject Control Basics
Project Control Basics
 
Practical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex ProjectsPractical Project Cost Control for Large Complex Projects
Practical Project Cost Control for Large Complex Projects
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
 
PMP_Project Time Management
PMP_Project Time ManagementPMP_Project Time Management
PMP_Project Time Management
 
PMP_Project Risk Management
PMP_Project Risk ManagementPMP_Project Risk Management
PMP_Project Risk Management
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 

Ähnlich wie Wrench Enterprise - Online Project Control System

Cms Solution 07162010
Cms Solution 07162010Cms Solution 07162010
Cms Solution 07162010larrybaker90
 
JeffDavisProjectPortfolio
JeffDavisProjectPortfolioJeffDavisProjectPortfolio
JeffDavisProjectPortfolioJeff Davis
 
EngineerOffice Brochure - 2016
EngineerOffice Brochure - 2016EngineerOffice Brochure - 2016
EngineerOffice Brochure - 2016BQE Software Inc
 
Digital Time Capture Integrates with Primavera
Digital Time Capture Integrates with PrimaveraDigital Time Capture Integrates with Primavera
Digital Time Capture Integrates with PrimaveraKlopstra
 
How Schneider Electric Transformed Front-office Operations With Real-time Dat...
How Schneider Electric Transformed Front-office Operations With Real-time Dat...How Schneider Electric Transformed Front-office Operations With Real-time Dat...
How Schneider Electric Transformed Front-office Operations With Real-time Dat...Informatica Cloud
 
DTC Primavera Integration
DTC Primavera Integration DTC Primavera Integration
DTC Primavera Integration Klopstra
 
The 3 Pillars of Remote Application Development
The 3 Pillars of Remote Application DevelopmentThe 3 Pillars of Remote Application Development
The 3 Pillars of Remote Application DevelopmentJenna Starmer
 
ShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction SoftwareShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction SoftwareShapeDo
 
8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!Unanet
 
Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)Mateen Amjad
 
[Webinar Slides] Working Faster and Smarter in a Digital Transforming World W...
[Webinar Slides] Working Faster and Smarter in a Digital Transforming World W...[Webinar Slides] Working Faster and Smarter in a Digital Transforming World W...
[Webinar Slides] Working Faster and Smarter in a Digital Transforming World W...AIIM International
 
Information Systems CapstoneCo.docx
Information Systems CapstoneCo.docxInformation Systems CapstoneCo.docx
Information Systems CapstoneCo.docxjaggernaoma
 
Using Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
Using Lean Thinking to Identify and Address Delivery Pipeline BottlenecksUsing Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
Using Lean Thinking to Identify and Address Delivery Pipeline BottlenecksIBM UrbanCode Products
 
Accelerate Application Migration - August 5, 2020
Accelerate Application Migration - August 5, 2020Accelerate Application Migration - August 5, 2020
Accelerate Application Migration - August 5, 2020VMware Tanzu
 
Ask the Experts Panel: How Customers Add Value to ServiceNow Discovery and Se...
Ask the Experts Panel: How Customers Add Value to ServiceNow Discovery and Se...Ask the Experts Panel: How Customers Add Value to ServiceNow Discovery and Se...
Ask the Experts Panel: How Customers Add Value to ServiceNow Discovery and Se...Precisely
 
The Case for Value Stream Architecture
The Case for Value Stream ArchitectureThe Case for Value Stream Architecture
The Case for Value Stream ArchitectureTasktop
 
Robin Daniels Presentation / CloudViews.Org - Cloud Computing Conference 2009
Robin Daniels Presentation / CloudViews.Org - Cloud Computing  Conference 2009Robin Daniels Presentation / CloudViews.Org - Cloud Computing  Conference 2009
Robin Daniels Presentation / CloudViews.Org - Cloud Computing Conference 2009EuroCloud
 

Ähnlich wie Wrench Enterprise - Online Project Control System (20)

Cms Solution 07162010
Cms Solution 07162010Cms Solution 07162010
Cms Solution 07162010
 
Cms solution 08072010
Cms solution 08072010Cms solution 08072010
Cms solution 08072010
 
JeffDavisProjectPortfolio
JeffDavisProjectPortfolioJeffDavisProjectPortfolio
JeffDavisProjectPortfolio
 
EngineerOffice Brochure - 2016
EngineerOffice Brochure - 2016EngineerOffice Brochure - 2016
EngineerOffice Brochure - 2016
 
Digital Time Capture Integrates with Primavera
Digital Time Capture Integrates with PrimaveraDigital Time Capture Integrates with Primavera
Digital Time Capture Integrates with Primavera
 
How Schneider Electric Transformed Front-office Operations With Real-time Dat...
How Schneider Electric Transformed Front-office Operations With Real-time Dat...How Schneider Electric Transformed Front-office Operations With Real-time Dat...
How Schneider Electric Transformed Front-office Operations With Real-time Dat...
 
DTC Primavera Integration
DTC Primavera Integration DTC Primavera Integration
DTC Primavera Integration
 
The 3 Pillars of Remote Application Development
The 3 Pillars of Remote Application DevelopmentThe 3 Pillars of Remote Application Development
The 3 Pillars of Remote Application Development
 
ShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction SoftwareShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction Software
 
8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!8 Signs You’ve Outgrown Quickbooks!
8 Signs You’ve Outgrown Quickbooks!
 
Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)
 
[Webinar Slides] Working Faster and Smarter in a Digital Transforming World W...
[Webinar Slides] Working Faster and Smarter in a Digital Transforming World W...[Webinar Slides] Working Faster and Smarter in a Digital Transforming World W...
[Webinar Slides] Working Faster and Smarter in a Digital Transforming World W...
 
Information Systems CapstoneCo.docx
Information Systems CapstoneCo.docxInformation Systems CapstoneCo.docx
Information Systems CapstoneCo.docx
 
Using Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
Using Lean Thinking to Identify and Address Delivery Pipeline BottlenecksUsing Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
Using Lean Thinking to Identify and Address Delivery Pipeline Bottlenecks
 
Accelerate Application Migration - August 5, 2020
Accelerate Application Migration - August 5, 2020Accelerate Application Migration - August 5, 2020
Accelerate Application Migration - August 5, 2020
 
0916 resume
0916  resume0916  resume
0916 resume
 
Puppet on a string
Puppet on a stringPuppet on a string
Puppet on a string
 
Ask the Experts Panel: How Customers Add Value to ServiceNow Discovery and Se...
Ask the Experts Panel: How Customers Add Value to ServiceNow Discovery and Se...Ask the Experts Panel: How Customers Add Value to ServiceNow Discovery and Se...
Ask the Experts Panel: How Customers Add Value to ServiceNow Discovery and Se...
 
The Case for Value Stream Architecture
The Case for Value Stream ArchitectureThe Case for Value Stream Architecture
The Case for Value Stream Architecture
 
Robin Daniels Presentation / CloudViews.Org - Cloud Computing Conference 2009
Robin Daniels Presentation / CloudViews.Org - Cloud Computing  Conference 2009Robin Daniels Presentation / CloudViews.Org - Cloud Computing  Conference 2009
Robin Daniels Presentation / CloudViews.Org - Cloud Computing Conference 2009
 

Wrench Enterprise - Online Project Control System

  • 2. Project Control System Varghese DANIEL kvdaniel@wrenchsolutions.com Deliver projects on-budget and on-time. Vincent CHIA vchia@wrenchsolutions.com
  • 3.   “To be honest on this regard I think that when we set out on the Wrench Installation it was envisaged to some degree to be a document control tool, which to our benefit  has now evolved to be a project control tool, being used by all. ” Clint Nisbet MSc, BSc, MCIOBMurray Roberts Construction Manager simplifies your life .
  • 4.
  • 5. Correspondence and transmittal collaboration
  • 6. Report generation…now these were the simpler tasks achieved by Energy City Qatar a real estate developer while planning for their $2.6 billion project in Doha, Qatar simplifies your life .
  • 7. 40% reduced design cycles 25% quality team efficiency   100% ISO compliance  …now these were the simpler tasks achieved by CH2MHILL VECO Engineering, providing EPC services to the Oil & Gas industry. simplifies your life .
  • 8. 40% faster engineering cycle times 100% data security  100% quality enforcement …now these were the simpler tasks achieved by Khatib & Alami (K&A), a multidisciplinary architectural and engineering consulting company simplifies your life .
  • 9. 34% reduced design cycles 0% documentation errors   100% quality improvements  …now these were the simpler tasks achieved in project 611 by Al-Habtoor Leighton Engineering & Construction group. simplifies your life . www.wrenchsolutions.com/epc
  • 10. Burning questions Are we ahead or behind schedule? Are we over or under-spending? How far off course are we? Where are the bottlenecks? How to fix them? What is exact progress as of now? What is %age completion of this deliverable? Are we meeting ISO standards? How efficiently are we using resources? ■
  • 11. Inadequate answers Because of: Manual updates (not real-time) Lack of integration (schedules / documents) Inadequate change management Communication deficit Inadequate ISO enforcement (rework) Lack of accountability ■
  • 12. Our solution It records transactions as they occur. You get accurate indication of progress and problems encountered during execution. ■
  • 13. We will set up… Web-based system On-site configuration & training Online project monitoring Automated data capture System-managed documents Real-time communication ■ Control
  • 14. Package to payoff What is the progress? (cost/schedule performance index) Work package Deliverables What percentage is completed? Were they completed on schedule? Milestones Without WRENCH, you need about 2000 manual updates per week (assuming 500 deliverables per package) to assess progress
  • 15. Package to payoff Assessing progress is easy, immediate, and 100% accurate! Work package Automatic updates – planned vs. actuals (of start/finish dates) captured directly by WRENCH. Deliverables Automatic updates: Actual finish date captured by WRENCH. Milestones With WRENCH. . .
  • 16. But what is WRENCH? A transparent working environment: deliverables and estimated hours can be easily measured. A planning tool: teams get clear ‘To-Do’ list and defined target dates for each activity. A monitoring platform: resources track their own work (system updates individual progress) A boon for management: lead engineers and discipline heads get instant access to planned progress vs. actual progress and present status. An aid to problem-solving: managers can ‘drill down’ and pinpoint the exact bottleneck or problem causing delay. ■
  • 17. You get: updates WRENCH Primavera 04 Jul 10 05 Jul 10 09 Jul 10 12 Jul 10 09 Jul 10 06 Jul 10 09 Jul 10 14 Jul 10 IDC IFR IFC Draw
  • 18. You get: monitoring Click to enlarge
  • 19. You get: reports Click to enlarge
  • 20. You get: status S-Curve Budget at Completion Actual Costs Planned Value Earned Value
  • 21. You get: the big picture: Current position Time Cost Ahead of Schedule Under Budget On Schedule Under Budget Behind Schedule Under Budget Ahead of Schedule On Budget On Schedule On Budget Behind Schedule On Budget Ahead of Schedule Over Budget On Schedule Over Budget Behind Schedule Over Budget
  • 22. In short: 360° value Secure central storage Collaborative platform (offices, vendor, client, site etc.) File transfers via satellite servers (much faster than FTP) Correspondence management Change management (minutes of meetings, action plans) Multi-level security for optimum control/flexibility ■
  • 23. Evaluation(Where did you plan to be?) Measurement(Where are you?) Correction(How to get back on track?) Summary On-time On-budget On-time On-budget
  • 24. Benefits 100% efficient project control 100% quality assured 60% reduction in project management efforts 100% efficient document control/Management ■
  • 25. Our Credibility Our Partners:
  • 26. NOT How can I afford to have it?
  • 27. List of work packages of a project Present Process
  • 28.
  • 29. Cannot be sure of actual progressActual Date Manual Entry Actual Date Manual Entry Actual Date Manual Entry Actual Date Manual Entry PRIMAVERA 02-Jul-10 04-Jul-10 02-Jul-10 02-Jul-10
  • 30.
  • 31. Assured Progress14-Jul-10 02-Jul-10 12-Jul-10 16-Jul-10 IDC IFR IFC Draw WRENCH WORKFLOW