Weitere ähnliche Inhalte Ähnlich wie Promoting Resilient Stormwater Design: Getting Developer Buy-in (20) Mehr von juliekannai (20) Kürzlich hochgeladen (20) Promoting Resilient Stormwater Design: Getting Developer Buy-in3. Low Impact Development
• Exceeds Local Water Quality Requirements
• Eases Burden on Support Entities
• Prevents Downstream Erosion
• Mitigates Flash Flooding
• Aesthetically Appealing
• Mimics Nature
• Absorbs Greenhouse Gasses
• Solves Tough Engineering Challenges
23. Developing a WHY Vision
WHY Should a Developer Use LID?
• simple and clear
• ac%onable
• focused on how it’ll contribute to developers success, and
• expressed in affirma%ve language that resonates with the
developer
28. Birnamwood Drive – Harris County
WHY LOW IMPACT DEVELOPMENT?
- Reduced Construc%on Costs
- Reduced Maintenance Costs
- Safety
- Prac%ce What We Preach
- Proof of Concept
30. Birnamwood Drive – Economics
1-Mile Long 4 lane Concrete Boulevard with Median
Tradi%onal (es%mated) LID (actual)
Site Prep & Earthwork $391,634.00 $449,060.00
Drainage $400,000.00 $288,432.00
SWPPP $69,600.00 $87,000.00
Landscape PlanDng $30,000.00 $66,140.00
Landscpe warranty/Maint $0.00 $34,630.00
Bridge $208,517.00 $208,517.00
Subgrade & Paving $1,139,791.00 $1,139,791.00
Traffic $9,000.00 $9,000.00
Signing & Striping $25,461.00 $25,461.00
Traffic Signal $128,010.00 $128,010.00
UDliDes $16,140.00 $16,140.00
Extra Work Items $15,650.00 $36,650.00
BiofiltraDon System $0.00 $132,931.00
SWQ System $30,000.00 $0.00
DetenDon Basin $350,000.00 $0.00
Total $2,813,803.00 $2,621,762.00
esDmated cost benefit: $192,041.00 7% Cost Reduc%on Per Mile
31. Easton Commons – New Quest Property
WHY LOW IMPACT DEVELOPMENT?
- Economics
- Economics
- Economics
- Economics
- Economics
- Economics
- Economics
32. Easton Commons – Economics
WHY LOW IMPACT DEVELOPMENT?
- Economics
- Economics
- Economics
- Economics
- Economics
- Economics
- Economics
Underground Deten%on:
Required Storage – 27,950 CF
Cost Per CF - $9.50 to $12.00 CF
Cost of System - $280,000
33. Easton Commons – Economics
Low Impact Development Solu%on:
Required Storage – 14,561 CF
Cost per CF - $7.55
Cost of System - $110,000
38. Queenston Manor Apartments - Economics
Hard Costs
• 7 Acres @ .35 ACFT/AC = 106,000 CF
Integrated Design Approach
• 43,560 SF Porous Pavers @ $12 SF = $522,720 (-$217,800) = $304,920
• 21,000CF UG Detention / Drainage @ $6 = $126,000 (-$50,000)= $76,000
• 600 SF Biofiltration System @ $100 SF = $60.000
• 50,000 CF @ $.50 CF (Bioswale Excavation & Hauloff) = $25,000
• 2,500 SY Sod @ $1.30SY = $3,250
Total Cost = $469,170
Opportunity Seized – ROI = 10 Months
40. Maple Court – Palt, Inc
WHY LOW IMPACT DEVELOPMENT?
- Economics
- Aesthe%cs
61. Time of Flow to Outlet = 3 MinutesTime of Flow to Outlet = 15 Minutes
Slow It Down, Spread It Out, Soak It In