SlideShare ist ein Scribd-Unternehmen logo
1 von 30
Downloaden Sie, um offline zu lesen
Project Mission
• Mission
– The mission of the MATCH is to provide an affordable home for a broad
spectrum of Houston’s arts organizations, and create an accessible
destination that will bring Houstonians together to enjoy art and enliven a
neighborhood.
• The MATCH will be:
– A destination for all Houstonians
– A creative hub for small and mid-sized arts organizations
– A catalyst for retail, residential, and other economic development in
Midtown
The Arts in Houston
• Houston is home to over 500 arts and cultural
organizations
• The City of Houston annually funds over $3M in grants
to more than 200 organizations through Hotel
Occupancy Taxes
• According to the Houston Area Arts Survey done by
the Kinder Institute at Rice University, the Houston
arts industry generates almost $869 million annually.
It is estimated to support more than 19,000 full-time
equivalent jobs
Background / Need
• Project Began in 2005 by four
arts organizations
• Challenges
– Difficult to find affordable
spaces
– Existing venues: overbooked
and low quality
– Poor locations: Isolated and
not collaborative
• 3400 Main Street was purchased for $2.5 million from the City of Houston in
June 2011.
– Centrally located
– Across the street from the HCC/Ensemble Rail Stop
– Between Museum District and Theater District
– Close proximity to six university campuses
• 129,000 students in a 3 mile radius
– Accessible by freeway
Location
Location
• Midtown History
– Until recently, very underdeveloped
– Blight, lack of direction, no cohesiveness
– HGAC commissioned Livable Centers Study in
2010
• How to make area more walkable, active,
economically vital?
• Midtown Now
– Study recommended MATCH as “catalytic
project” to spur development in Midtown
– Since 2011, new multi-family development,
retail, additional non-profit and for-profit creative
enterprises
Economic Development
• Strong committee involvement
• Partnership between Lake + Flato Architects & Studio Red Architects
with Collaborative Engineering Group & Office of James Burnett
• Goals:
– Create a place, not a building
– Inviting and welcoming to all
– Flexibility for now and in the future
• The LEED rating system was considered for deployment for the Match
project.
Architect Selection/ Design
Sustainability Experience
• COTE Top 10-Lake Flato
– 2nd highest rated LEED Platinum Office Building-SRA & CEG
– With City of Houston Green Resource and Permitting Center-SRA
• 2 Goals:
– Affordable rental rates
– Minimal annual fundraising after construction
• Roughly 65% of budget from earned income
• Public/private partnership created to subsidize operations
• 380 Agreement with City of Houston to capture incremental Sales & Mixed
Beverage taxes in Midtown area
• Annual operating support from Houston First Corporation
Business Model
Level 1- Plan
Level 2- Plan
Section Diagram- View from Main Street
Budget
• “It is important to distinguish between the construction budget, which typically
includes only hard costs (building construction costs, furniture, fixtures, equipment
costs, purchase of property, etc.) and total project budget, which includes both
hard costs, and soft costs, such as professional fees, construction financing, etc.
Soft costs related to administration of the LEED certification process and
provisions of specific services required by LEED should be included in any
analysis of the LEED premium.”
• “Classifying soft costs or “added costs” due to LEED certification will vary
depending upon project type. Administration of the LEED certification process and
documentation of LEED credits is an added cost directly associated with LEED
certification. The USGBC estimates these fees from $20,000 to $60,000
depending upon project size, complexity and project team experience.
Commissioning fees, which can range from $2.50 per square foot on smaller
projects with specialty commissioning.”
Nicolow, Jim: Citing Sources: (http://www.facilitiesnet.com/green/article/Measuring-The-Cost-To-Become-LEED-Certified-Facilities-Management-
Green-Feature--10057): November 2008)
The difference of a voluntary rating system versus code requirements in the
Development of Match.
• “The cost for energy modeling services can range from $15,000 on
smaller projects to more than $50,000 for larger, more complex projects.
Theses fees are driven not just by project size but also by complexity of
the building design and the mechanical system.”
• “So, the answer to what the LEED premium really is just depends. If LEED
certification is pursued at the beginning of the project, teams can
conservatively budget 2 percent for construction costs and $150,000 in
soft costs for Certified through Gold level certification on most projects.”
• Let’s not forget TIME = MONEY
Source: Chris Mundell, Gensler
• With this the project architect, project engineer, and the owner’s representative
viewed the application of the LEED rating system for the MATCH project.
• Another item that you will learn is the difference of a voluntary rating system
versus code requirements in the development of this project.
Environmental Outcomes
Energy
• Energy Efficiency is an ROI issue, not a
points issue
• Energy Models are not reality
• Under-Promise, Over-Deliver
• Better internal analysis & action on building
performance
Challenge
• Design Team Chase LEED points & don’t
focus on ‘Integrated Project Management’
• Clients have difficulty balancing desires
with budget
• O&M staff are reluctant to accept new
building elements & systems
• Applying lessons learned to the next project
Benefit
• Transformation of the “Market”
• Growing in-house engagement with high
performance
Energy Modeling
What is it?
Computer simulation of building
components and systems
performed over 8760 hours
Why we do it?
• Guide design decisions
• Performance comparison
• Certifications
What is can’t do?
Predict the future…
Or your actual energy COST!
Energy Modeling
How do we build it?
• Define goals
• Gather Information
• Determine systems & alternatives
When do we build it?
• As early as possible!
(refine throughout the design)
Energy Modeling
How long does it take to build?
• It depends on complexity of the
building and systems
How accurate is it?
• It depends on the level of detail in
the model, skill of the modeler,
quality of input data, limitations of
software, and actual quality of
construction
Energy Modeling
Goals
• Beautiful, Healthy spaces
• Minimize maintenance costs
• Low EUI
• Lowering your utility
Owner’s Input
• Schedules: Occupancy, equipment &
utilization
• Electronic equipment
• Campus standards & utilities
• Design Criteria: Temperature &
humidity
Energy Modeling
Architect’s Input
• Building Orientation
• Building Envelope
• Lighting
• Glass & Shading Devices floor plan
Energy Modeling
Energy Modeling
Weather Data
• Typical Meteorological Year: TMY is not
necessarily a good indicator of conditions over
the next year, or even the next five years.
Rather, it represents conditions judged to be
typical over a long period of time, such as 30
years.
• Because they represent typical rather than
extreme conditions, they are not suited for
designing systems and their components to
meet the worst-case conditions occurring at a
location.
Energy Modeling
GIVE CREDIT
• LEED RAISED THE BAR
• ESTABLISHED THE BRAND
• CODE REPSONSED AS DID THE
DESIGN COMMUNITY
“The camels nose was in the tent as
LEED programmed ratcheted up”
Case of the day, Wrongful trees, (Sept. 9, 2015)
won3
GOAL
SUSTAINABLE PLACES ARE BEAUTIFUL,
LASTING, AND MEMORABLE

Weitere ähnliche Inhalte

Andere mochten auch

Social Media en Woningpresentatie bij 't Wooninvesteringsfonds
Social Media en Woningpresentatie bij 't WooninvesteringsfondsSocial Media en Woningpresentatie bij 't Wooninvesteringsfonds
Social Media en Woningpresentatie bij 't WooninvesteringsfondsJannetta Dorsman
 
Correccion del examen de jonny
Correccion del examen de jonnyCorreccion del examen de jonny
Correccion del examen de jonnyjhaenncarlos
 
A different perspective on the Singularity Point . How IT is substituting job...
A different perspective on the Singularity Point. How IT is substituting job...A different perspective on the Singularity Point. How IT is substituting job...
A different perspective on the Singularity Point . How IT is substituting job...Jacques Bulchand
 
In the Footsteps of Jesus Christ
In the Footsteps of Jesus ChristIn the Footsteps of Jesus Christ
In the Footsteps of Jesus ChristHertiki Marsaid
 
Catálogo (1)
Catálogo (1)Catálogo (1)
Catálogo (1)Teflo79
 
Cluck Kent
Cluck KentCluck Kent
Cluck Kentgpnhs
 
0514 john 167 it is for your good power point church sermon
0514 john 167 it is for your good power point church sermon0514 john 167 it is for your good power point church sermon
0514 john 167 it is for your good power point church sermonPowerPoint_Sermons
 
இது போராட்ட சமையல் 11 March 2014
இது போராட்ட சமையல் 11 March 2014இது போராட்ட சமையல் 11 March 2014
இது போராட்ட சமையல் 11 March 2014The Savera Hotel
 
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?juliekannai
 
Antonio Berni
Antonio BerniAntonio Berni
Antonio BerniEveCapu
 
Wh logica s. 2_blog_iap
Wh logica s. 2_blog_iapWh logica s. 2_blog_iap
Wh logica s. 2_blog_iapthinks
 
Wh psicometria i 3_blog_iap
Wh psicometria i 3_blog_iapWh psicometria i 3_blog_iap
Wh psicometria i 3_blog_iapthinks
 
Evaluation question 3 - What kind of media institution might distribute your ...
Evaluation question 3 - What kind of media institution might distribute your ...Evaluation question 3 - What kind of media institution might distribute your ...
Evaluation question 3 - What kind of media institution might distribute your ...Thomas Constable
 

Andere mochten auch (19)

HNSS Poster Draft v6
HNSS Poster Draft v6HNSS Poster Draft v6
HNSS Poster Draft v6
 
Social Media en Woningpresentatie bij 't Wooninvesteringsfonds
Social Media en Woningpresentatie bij 't WooninvesteringsfondsSocial Media en Woningpresentatie bij 't Wooninvesteringsfonds
Social Media en Woningpresentatie bij 't Wooninvesteringsfonds
 
19032013 Wouter Keller Burger Bediend 2005 2015
19032013 Wouter Keller Burger Bediend 2005 201519032013 Wouter Keller Burger Bediend 2005 2015
19032013 Wouter Keller Burger Bediend 2005 2015
 
Correccion del examen de jonny
Correccion del examen de jonnyCorreccion del examen de jonny
Correccion del examen de jonny
 
A different perspective on the Singularity Point . How IT is substituting job...
A different perspective on the Singularity Point. How IT is substituting job...A different perspective on the Singularity Point. How IT is substituting job...
A different perspective on the Singularity Point . How IT is substituting job...
 
In the Footsteps of Jesus Christ
In the Footsteps of Jesus ChristIn the Footsteps of Jesus Christ
In the Footsteps of Jesus Christ
 
City in Jerusalem
City in JerusalemCity in Jerusalem
City in Jerusalem
 
Catálogo (1)
Catálogo (1)Catálogo (1)
Catálogo (1)
 
Cluck Kent
Cluck KentCluck Kent
Cluck Kent
 
Gallery manager
Gallery managerGallery manager
Gallery manager
 
0514 john 167 it is for your good power point church sermon
0514 john 167 it is for your good power point church sermon0514 john 167 it is for your good power point church sermon
0514 john 167 it is for your good power point church sermon
 
இது போராட்ட சமையல் 11 March 2014
இது போராட்ட சமையல் 11 March 2014இது போராட்ட சமையல் 11 March 2014
இது போராட்ட சமையல் 11 March 2014
 
Digipak Adverts
Digipak AdvertsDigipak Adverts
Digipak Adverts
 
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
 
Antonio Berni
Antonio BerniAntonio Berni
Antonio Berni
 
Wh logica s. 2_blog_iap
Wh logica s. 2_blog_iapWh logica s. 2_blog_iap
Wh logica s. 2_blog_iap
 
Audience profile
Audience profileAudience profile
Audience profile
 
Wh psicometria i 3_blog_iap
Wh psicometria i 3_blog_iapWh psicometria i 3_blog_iap
Wh psicometria i 3_blog_iap
 
Evaluation question 3 - What kind of media institution might distribute your ...
Evaluation question 3 - What kind of media institution might distribute your ...Evaluation question 3 - What kind of media institution might distribute your ...
Evaluation question 3 - What kind of media institution might distribute your ...
 

Ähnlich wie MATCH- Midtown Arts and Theater Center Houston

High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design WorkshopJerry Yudelson
 
Impacts of Changing Demand for Office Space
Impacts of Changing Demand for Office SpaceImpacts of Changing Demand for Office Space
Impacts of Changing Demand for Office SpacePeter Carlston
 
24 Concepts LEED AP
24 Concepts LEED AP24 Concepts LEED AP
24 Concepts LEED APRob Freeman
 
LWIT BTAD: Future Design Lab Vision
LWIT BTAD: Future Design Lab VisionLWIT BTAD: Future Design Lab Vision
LWIT BTAD: Future Design Lab VisionEsteban (Steve) Sosa
 
140409 lpl financial final presentation
140409 lpl financial final presentation140409 lpl financial final presentation
140409 lpl financial final presentationBNIM
 
2018 04 03-abc conference_slides_meliora
2018 04 03-abc conference_slides_meliora2018 04 03-abc conference_slides_meliora
2018 04 03-abc conference_slides_melioraNew Jersey Future
 
Energy Technologies for Mid-Rise Buildings - Past, Present and Future
Energy Technologies for Mid-Rise Buildings - Past, Present and FutureEnergy Technologies for Mid-Rise Buildings - Past, Present and Future
Energy Technologies for Mid-Rise Buildings - Past, Present and FutureRayco Energy
 
Physical Design Co Summary
Physical Design Co SummaryPhysical Design Co Summary
Physical Design Co SummaryDaniel Smithwick
 
Process Skid Engineering - EPIC Process Systems
Process Skid Engineering - EPIC Process SystemsProcess Skid Engineering - EPIC Process Systems
Process Skid Engineering - EPIC Process SystemsEPIC Systems
 
Measuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed SessionMeasuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed SessionCarlos Costa
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate OftenScott Bowman
 
Paths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable HomesPaths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable HomesDerek Satnik
 
City Council Presentation - Development Fees and Taxes
City Council Presentation - Development Fees and TaxesCity Council Presentation - Development Fees and Taxes
City Council Presentation - Development Fees and TaxesCityofBoulder
 
Energy efficiency presentation for codes and standards
Energy efficiency   presentation for codes and standardsEnergy efficiency   presentation for codes and standards
Energy efficiency presentation for codes and standardsBrenda Taylor
 
Dispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building CertificationDispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building CertificationKEPHART
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Shanti Pless
 

Ähnlich wie MATCH- Midtown Arts and Theater Center Houston (20)

High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
 
Impacts of Changing Demand for Office Space
Impacts of Changing Demand for Office SpaceImpacts of Changing Demand for Office Space
Impacts of Changing Demand for Office Space
 
24 Concepts LEED AP
24 Concepts LEED AP24 Concepts LEED AP
24 Concepts LEED AP
 
LWIT BTAD: Future Design Lab Vision
LWIT BTAD: Future Design Lab VisionLWIT BTAD: Future Design Lab Vision
LWIT BTAD: Future Design Lab Vision
 
140409 lpl financial final presentation
140409 lpl financial final presentation140409 lpl financial final presentation
140409 lpl financial final presentation
 
Panel 2: Utility Presentation
Panel 2: Utility PresentationPanel 2: Utility Presentation
Panel 2: Utility Presentation
 
2018 04 03-abc conference_slides_meliora
2018 04 03-abc conference_slides_meliora2018 04 03-abc conference_slides_meliora
2018 04 03-abc conference_slides_meliora
 
Energy Technologies for Mid-Rise Buildings - Past, Present and Future
Energy Technologies for Mid-Rise Buildings - Past, Present and FutureEnergy Technologies for Mid-Rise Buildings - Past, Present and Future
Energy Technologies for Mid-Rise Buildings - Past, Present and Future
 
Physical Design Co Summary
Physical Design Co SummaryPhysical Design Co Summary
Physical Design Co Summary
 
Saving the Environment One Building at a Time
Saving the Environment One Building at a TimeSaving the Environment One Building at a Time
Saving the Environment One Building at a Time
 
Process Skid Engineering - EPIC Process Systems
Process Skid Engineering - EPIC Process SystemsProcess Skid Engineering - EPIC Process Systems
Process Skid Engineering - EPIC Process Systems
 
Measuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed SessionMeasuring a Student Center’s Performance ACUI Ed Session
Measuring a Student Center’s Performance ACUI Ed Session
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate Often
 
Paths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable HomesPaths to Net-Zero Energy Sustainable Homes
Paths to Net-Zero Energy Sustainable Homes
 
City Council Presentation - Development Fees and Taxes
City Council Presentation - Development Fees and TaxesCity Council Presentation - Development Fees and Taxes
City Council Presentation - Development Fees and Taxes
 
33 cc 3_b_j-ochs
33 cc 3_b_j-ochs33 cc 3_b_j-ochs
33 cc 3_b_j-ochs
 
Energy efficiency presentation for codes and standards
Energy efficiency   presentation for codes and standardsEnergy efficiency   presentation for codes and standards
Energy efficiency presentation for codes and standards
 
Dispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building CertificationDispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building Certification
 
Leed
LeedLeed
Leed
 
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
Mainstreaming Zero: Large Scale Commercial Net Zero Energy Buildings, AGC 2013
 

Mehr von juliekannai

Resilience Begins with Community
Resilience Begins with CommunityResilience Begins with Community
Resilience Begins with Communityjuliekannai
 
Making the Texas Case for Green Infrastructure
Making the Texas Case for Green InfrastructureMaking the Texas Case for Green Infrastructure
Making the Texas Case for Green Infrastructurejuliekannai
 
Bayou Greenways and Beyond
Bayou Greenways and BeyondBayou Greenways and Beyond
Bayou Greenways and Beyondjuliekannai
 
Cultivating Sustainability on Campus: Lessons from University Communities
Cultivating Sustainability on Campus: Lessons from University CommunitiesCultivating Sustainability on Campus: Lessons from University Communities
Cultivating Sustainability on Campus: Lessons from University Communitiesjuliekannai
 
Analyzing and Designing Connectivity for Green Cities
Analyzing and Designing Connectivity for Green CitiesAnalyzing and Designing Connectivity for Green Cities
Analyzing and Designing Connectivity for Green Citiesjuliekannai
 
Historic Buildings and Sustainability
Historic Buildings and SustainabilityHistoric Buildings and Sustainability
Historic Buildings and Sustainabilityjuliekannai
 
Community Resiliency and the Role of the Public Library
Community Resiliency and the Role of the Public LibraryCommunity Resiliency and the Role of the Public Library
Community Resiliency and the Role of the Public Libraryjuliekannai
 
The Design of Belonging
The Design of BelongingThe Design of Belonging
The Design of Belongingjuliekannai
 
Houston at the Crossroads: Resilience and Sustainability in the 21st Century
Houston at the Crossroads: Resilience and Sustainability in the 21st CenturyHouston at the Crossroads: Resilience and Sustainability in the 21st Century
Houston at the Crossroads: Resilience and Sustainability in the 21st Centuryjuliekannai
 
City of Houston: Beyond Recovery
City of Houston: Beyond RecoveryCity of Houston: Beyond Recovery
City of Houston: Beyond Recoveryjuliekannai
 
RELi and Climate Ready DC
RELi and Climate Ready DCRELi and Climate Ready DC
RELi and Climate Ready DCjuliekannai
 
An Urban Bayou Education
An Urban Bayou EducationAn Urban Bayou Education
An Urban Bayou Educationjuliekannai
 
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...juliekannai
 
Promoting Resilient Stormwater Design: Getting Developer Buy-in
Promoting Resilient Stormwater Design: Getting Developer Buy-inPromoting Resilient Stormwater Design: Getting Developer Buy-in
Promoting Resilient Stormwater Design: Getting Developer Buy-injuliekannai
 
Economic Resilience in the Houston Galveston Region
Economic Resilience in the Houston Galveston RegionEconomic Resilience in the Houston Galveston Region
Economic Resilience in the Houston Galveston Regionjuliekannai
 
Communicating Flood Risk Using Esri Story Maps
Communicating Flood Risk Using Esri Story MapsCommunicating Flood Risk Using Esri Story Maps
Communicating Flood Risk Using Esri Story Mapsjuliekannai
 
Promoting Resilient Communities with the SITES Rating System
Promoting Resilient Communities with the SITES Rating SystemPromoting Resilient Communities with the SITES Rating System
Promoting Resilient Communities with the SITES Rating Systemjuliekannai
 
Post Harvey Flood Data and the Future of Resilient Infrastructure
Post Harvey Flood Data and the Future of Resilient InfrastructurePost Harvey Flood Data and the Future of Resilient Infrastructure
Post Harvey Flood Data and the Future of Resilient Infrastructurejuliekannai
 

Mehr von juliekannai (20)

Resilience Begins with Community
Resilience Begins with CommunityResilience Begins with Community
Resilience Begins with Community
 
Making the Texas Case for Green Infrastructure
Making the Texas Case for Green InfrastructureMaking the Texas Case for Green Infrastructure
Making the Texas Case for Green Infrastructure
 
Bayou Greenways and Beyond
Bayou Greenways and BeyondBayou Greenways and Beyond
Bayou Greenways and Beyond
 
Cultivating Sustainability on Campus: Lessons from University Communities
Cultivating Sustainability on Campus: Lessons from University CommunitiesCultivating Sustainability on Campus: Lessons from University Communities
Cultivating Sustainability on Campus: Lessons from University Communities
 
Analyzing and Designing Connectivity for Green Cities
Analyzing and Designing Connectivity for Green CitiesAnalyzing and Designing Connectivity for Green Cities
Analyzing and Designing Connectivity for Green Cities
 
Historic Buildings and Sustainability
Historic Buildings and SustainabilityHistoric Buildings and Sustainability
Historic Buildings and Sustainability
 
Community Resiliency and the Role of the Public Library
Community Resiliency and the Role of the Public LibraryCommunity Resiliency and the Role of the Public Library
Community Resiliency and the Role of the Public Library
 
The Design of Belonging
The Design of BelongingThe Design of Belonging
The Design of Belonging
 
Houston at the Crossroads: Resilience and Sustainability in the 21st Century
Houston at the Crossroads: Resilience and Sustainability in the 21st CenturyHouston at the Crossroads: Resilience and Sustainability in the 21st Century
Houston at the Crossroads: Resilience and Sustainability in the 21st Century
 
City of Houston: Beyond Recovery
City of Houston: Beyond RecoveryCity of Houston: Beyond Recovery
City of Houston: Beyond Recovery
 
RELi and Climate Ready DC
RELi and Climate Ready DCRELi and Climate Ready DC
RELi and Climate Ready DC
 
An Urban Bayou Education
An Urban Bayou EducationAn Urban Bayou Education
An Urban Bayou Education
 
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
Preparing for a Black Swan: Planning and Programming for Risk Mitigation in E...
 
Game of Floods
Game of FloodsGame of Floods
Game of Floods
 
Nine Natives
Nine NativesNine Natives
Nine Natives
 
Promoting Resilient Stormwater Design: Getting Developer Buy-in
Promoting Resilient Stormwater Design: Getting Developer Buy-inPromoting Resilient Stormwater Design: Getting Developer Buy-in
Promoting Resilient Stormwater Design: Getting Developer Buy-in
 
Economic Resilience in the Houston Galveston Region
Economic Resilience in the Houston Galveston RegionEconomic Resilience in the Houston Galveston Region
Economic Resilience in the Houston Galveston Region
 
Communicating Flood Risk Using Esri Story Maps
Communicating Flood Risk Using Esri Story MapsCommunicating Flood Risk Using Esri Story Maps
Communicating Flood Risk Using Esri Story Maps
 
Promoting Resilient Communities with the SITES Rating System
Promoting Resilient Communities with the SITES Rating SystemPromoting Resilient Communities with the SITES Rating System
Promoting Resilient Communities with the SITES Rating System
 
Post Harvey Flood Data and the Future of Resilient Infrastructure
Post Harvey Flood Data and the Future of Resilient InfrastructurePost Harvey Flood Data and the Future of Resilient Infrastructure
Post Harvey Flood Data and the Future of Resilient Infrastructure
 

Kürzlich hochgeladen

RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...Call Girls in Nagpur High Profile
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programsitadmin50
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋nirzagarg
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Anamikakaur10
 

Kürzlich hochgeladen (20)

RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
 
Plastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability ProgramsPlastic Bank Beyond EPR - Sustainability Programs
Plastic Bank Beyond EPR - Sustainability Programs
 
Deforestation
DeforestationDeforestation
Deforestation
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 

MATCH- Midtown Arts and Theater Center Houston

  • 1.
  • 2. Project Mission • Mission – The mission of the MATCH is to provide an affordable home for a broad spectrum of Houston’s arts organizations, and create an accessible destination that will bring Houstonians together to enjoy art and enliven a neighborhood. • The MATCH will be: – A destination for all Houstonians – A creative hub for small and mid-sized arts organizations – A catalyst for retail, residential, and other economic development in Midtown
  • 3. The Arts in Houston • Houston is home to over 500 arts and cultural organizations • The City of Houston annually funds over $3M in grants to more than 200 organizations through Hotel Occupancy Taxes • According to the Houston Area Arts Survey done by the Kinder Institute at Rice University, the Houston arts industry generates almost $869 million annually. It is estimated to support more than 19,000 full-time equivalent jobs
  • 4. Background / Need • Project Began in 2005 by four arts organizations • Challenges – Difficult to find affordable spaces – Existing venues: overbooked and low quality – Poor locations: Isolated and not collaborative
  • 5. • 3400 Main Street was purchased for $2.5 million from the City of Houston in June 2011. – Centrally located – Across the street from the HCC/Ensemble Rail Stop – Between Museum District and Theater District – Close proximity to six university campuses • 129,000 students in a 3 mile radius – Accessible by freeway Location
  • 7. • Midtown History – Until recently, very underdeveloped – Blight, lack of direction, no cohesiveness – HGAC commissioned Livable Centers Study in 2010 • How to make area more walkable, active, economically vital? • Midtown Now – Study recommended MATCH as “catalytic project” to spur development in Midtown – Since 2011, new multi-family development, retail, additional non-profit and for-profit creative enterprises Economic Development
  • 8. • Strong committee involvement • Partnership between Lake + Flato Architects & Studio Red Architects with Collaborative Engineering Group & Office of James Burnett • Goals: – Create a place, not a building – Inviting and welcoming to all – Flexibility for now and in the future • The LEED rating system was considered for deployment for the Match project. Architect Selection/ Design Sustainability Experience • COTE Top 10-Lake Flato – 2nd highest rated LEED Platinum Office Building-SRA & CEG – With City of Houston Green Resource and Permitting Center-SRA
  • 9. • 2 Goals: – Affordable rental rates – Minimal annual fundraising after construction • Roughly 65% of budget from earned income • Public/private partnership created to subsidize operations • 380 Agreement with City of Houston to capture incremental Sales & Mixed Beverage taxes in Midtown area • Annual operating support from Houston First Corporation Business Model
  • 12.
  • 13.
  • 14. Section Diagram- View from Main Street
  • 16. • “It is important to distinguish between the construction budget, which typically includes only hard costs (building construction costs, furniture, fixtures, equipment costs, purchase of property, etc.) and total project budget, which includes both hard costs, and soft costs, such as professional fees, construction financing, etc. Soft costs related to administration of the LEED certification process and provisions of specific services required by LEED should be included in any analysis of the LEED premium.” • “Classifying soft costs or “added costs” due to LEED certification will vary depending upon project type. Administration of the LEED certification process and documentation of LEED credits is an added cost directly associated with LEED certification. The USGBC estimates these fees from $20,000 to $60,000 depending upon project size, complexity and project team experience. Commissioning fees, which can range from $2.50 per square foot on smaller projects with specialty commissioning.” Nicolow, Jim: Citing Sources: (http://www.facilitiesnet.com/green/article/Measuring-The-Cost-To-Become-LEED-Certified-Facilities-Management- Green-Feature--10057): November 2008) The difference of a voluntary rating system versus code requirements in the Development of Match.
  • 17. • “The cost for energy modeling services can range from $15,000 on smaller projects to more than $50,000 for larger, more complex projects. Theses fees are driven not just by project size but also by complexity of the building design and the mechanical system.” • “So, the answer to what the LEED premium really is just depends. If LEED certification is pursued at the beginning of the project, teams can conservatively budget 2 percent for construction costs and $150,000 in soft costs for Certified through Gold level certification on most projects.” • Let’s not forget TIME = MONEY
  • 18. Source: Chris Mundell, Gensler • With this the project architect, project engineer, and the owner’s representative viewed the application of the LEED rating system for the MATCH project. • Another item that you will learn is the difference of a voluntary rating system versus code requirements in the development of this project. Environmental Outcomes
  • 19. Energy • Energy Efficiency is an ROI issue, not a points issue • Energy Models are not reality • Under-Promise, Over-Deliver • Better internal analysis & action on building performance
  • 20. Challenge • Design Team Chase LEED points & don’t focus on ‘Integrated Project Management’ • Clients have difficulty balancing desires with budget • O&M staff are reluctant to accept new building elements & systems • Applying lessons learned to the next project Benefit • Transformation of the “Market” • Growing in-house engagement with high performance
  • 21. Energy Modeling What is it? Computer simulation of building components and systems performed over 8760 hours Why we do it? • Guide design decisions • Performance comparison • Certifications What is can’t do? Predict the future… Or your actual energy COST!
  • 22. Energy Modeling How do we build it? • Define goals • Gather Information • Determine systems & alternatives When do we build it? • As early as possible! (refine throughout the design)
  • 23. Energy Modeling How long does it take to build? • It depends on complexity of the building and systems How accurate is it? • It depends on the level of detail in the model, skill of the modeler, quality of input data, limitations of software, and actual quality of construction
  • 24. Energy Modeling Goals • Beautiful, Healthy spaces • Minimize maintenance costs • Low EUI • Lowering your utility Owner’s Input • Schedules: Occupancy, equipment & utilization • Electronic equipment • Campus standards & utilities • Design Criteria: Temperature & humidity
  • 25. Energy Modeling Architect’s Input • Building Orientation • Building Envelope • Lighting • Glass & Shading Devices floor plan
  • 27. Energy Modeling Weather Data • Typical Meteorological Year: TMY is not necessarily a good indicator of conditions over the next year, or even the next five years. Rather, it represents conditions judged to be typical over a long period of time, such as 30 years. • Because they represent typical rather than extreme conditions, they are not suited for designing systems and their components to meet the worst-case conditions occurring at a location.
  • 29. GIVE CREDIT • LEED RAISED THE BAR • ESTABLISHED THE BRAND • CODE REPSONSED AS DID THE DESIGN COMMUNITY “The camels nose was in the tent as LEED programmed ratcheted up” Case of the day, Wrongful trees, (Sept. 9, 2015) won3
  • 30. GOAL SUSTAINABLE PLACES ARE BEAUTIFUL, LASTING, AND MEMORABLE