Data Center Transformation Program Planning and Design Service Offering Description © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 3/22/2011 1
Agenda Why data center transformation / cloud computing projects fail The Sunnyside solution Conclusion 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 2
The bottom line… Data-center transformation is about significantly reducing cost to an organization, helping them shift their spending away from management and maintenance and into business projects and priorities, and also helping them address the rising cost of energy, the rising consumption of energy and the mandate to be green or sustainable. These are, by no means, trivial projects. They often involve a tremendous amount of planning and affect IT, facilities, and energy planners, as well as the business leadership and line of business managers. The payoffs are potentially huge, as we'll see, from doing data center design properly, but the risks are also quite high, if things don't come out as planned. 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 3
A wise old soothsayer once said: “The reasons for program failure are more numerous than grains of sand in the desert.” 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 4
Top Reasons for Failure Transformation Initiatives / Change ,[object Object]
Making change an option 
Not involving those expected to implement the change
Delegated to “outsiders” 
No change in reward system
Leadership doesn't walk the talk
No follow-through(Mark Sanborn, CSP, CPAE) 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 5
Top Reasons for Failure IT Programs ,[object Object]
Underestimating or ignoring impact of change.
Lack of Leadership
Lack of strong executive sponsorship
Poor project management
Poor Planning
Trying to do it cheap
Lack of technical knowledge
Lack of sound business case
Poor vendor management3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 6
Top Reasons for Failure Cloud Deployments ,[object Object]

Weitere ähnliche Inhalte

Was ist angesagt?

Cloud migration strategies
Cloud migration strategiesCloud migration strategies
Cloud migration strategies
SogetiLabs
 

Was ist angesagt? (20)

Power up! Mass Migrations at Speed and Scale - Accenture
Power up! Mass Migrations at Speed and Scale - AccenturePower up! Mass Migrations at Speed and Scale - Accenture
Power up! Mass Migrations at Speed and Scale - Accenture
 
Data Center Tiers Explained
Data Center Tiers ExplainedData Center Tiers Explained
Data Center Tiers Explained
 
Cloud Center of Excellence
Cloud Center of ExcellenceCloud Center of Excellence
Cloud Center of Excellence
 
EDW Webinar: Managing Change for Successful Data Governance
EDW Webinar: Managing Change for Successful Data GovernanceEDW Webinar: Managing Change for Successful Data Governance
EDW Webinar: Managing Change for Successful Data Governance
 
IT Service Delivery Model Overview
IT Service Delivery Model OverviewIT Service Delivery Model Overview
IT Service Delivery Model Overview
 
Best Practices for Planning your Datacenter
Best Practices for Planning your DatacenterBest Practices for Planning your Datacenter
Best Practices for Planning your Datacenter
 
Understanding DataOps and Its Impact on Application Quality
Understanding DataOps and Its Impact on Application QualityUnderstanding DataOps and Its Impact on Application Quality
Understanding DataOps and Its Impact on Application Quality
 
A Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence AdoptionA Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence Adoption
 
DataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure PresentationDataCenter:: Infrastructure Presentation
DataCenter:: Infrastructure Presentation
 
Creating an Operating Model to enable a high frequency organization
Creating an Operating Model to enable a high frequency organizationCreating an Operating Model to enable a high frequency organization
Creating an Operating Model to enable a high frequency organization
 
FinOps: A Culture Transformation to Bring DevOps, Finance and the Business To...
FinOps: A Culture Transformation to Bring DevOps, Finance and the Business To...FinOps: A Culture Transformation to Bring DevOps, Finance and the Business To...
FinOps: A Culture Transformation to Bring DevOps, Finance and the Business To...
 
Cloud migration strategies
Cloud migration strategiesCloud migration strategies
Cloud migration strategies
 
Data center
Data centerData center
Data center
 
Enterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHubEnterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHub
 
An Overview of Best Practices for Large Scale Migrations - AWS Transformation...
An Overview of Best Practices for Large Scale Migrations - AWS Transformation...An Overview of Best Practices for Large Scale Migrations - AWS Transformation...
An Overview of Best Practices for Large Scale Migrations - AWS Transformation...
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)
 
AWS Community Day 2022 Joe Daly FinOps
AWS Community Day 2022 Joe Daly FinOpsAWS Community Day 2022 Joe Daly FinOps
AWS Community Day 2022 Joe Daly FinOps
 
Cloud Adoption in the Enterprise
Cloud Adoption in the EnterpriseCloud Adoption in the Enterprise
Cloud Adoption in the Enterprise
 
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud MigrationCapgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
 
Practical FinOps in Practice
Practical FinOps in PracticePractical FinOps in Practice
Practical FinOps in Practice
 

Andere mochten auch

Merger and acquisition ppt
Merger and acquisition pptMerger and acquisition ppt
Merger and acquisition ppt
Swati Garg
 
Mergers & acquisitions
Mergers & acquisitionsMergers & acquisitions
Mergers & acquisitions
jaspreet singh
 

Andere mochten auch (10)

The Future Data Center
The Future Data CenterThe Future Data Center
The Future Data Center
 
Next Generation Data Center - IT Transformation
Next Generation Data Center - IT TransformationNext Generation Data Center - IT Transformation
Next Generation Data Center - IT Transformation
 
Data Center 3.0 Infrastructure Transformation
Data Center 3.0 Infrastructure TransformationData Center 3.0 Infrastructure Transformation
Data Center 3.0 Infrastructure Transformation
 
Lessons Learned on Capgemini’s COMPLETE Managed Services Platform (DMG208) | ...
Lessons Learned on Capgemini’s COMPLETE Managed Services Platform (DMG208) | ...Lessons Learned on Capgemini’s COMPLETE Managed Services Platform (DMG208) | ...
Lessons Learned on Capgemini’s COMPLETE Managed Services Platform (DMG208) | ...
 
Data Center and System Optimization
 Data Center and System Optimization Data Center and System Optimization
Data Center and System Optimization
 
Managed Services is not a product, it's a business model!
Managed Services is not a product, it's a business model!Managed Services is not a product, it's a business model!
Managed Services is not a product, it's a business model!
 
Managed Services
Managed ServicesManaged Services
Managed Services
 
Merger and acquisition ppt
Merger and acquisition pptMerger and acquisition ppt
Merger and acquisition ppt
 
Mergers & acquisitions
Mergers & acquisitionsMergers & acquisitions
Mergers & acquisitions
 
Mergers and acquisitions
Mergers and acquisitionsMergers and acquisitions
Mergers and acquisitions
 

Ähnlich wie Data Center Transformation Program Planning and Design

The Future of Oilsands Projects – Productivity Improvement & the Role o...
The Future of Oilsands  Projects – Productivity Improvement  & the Role o...The Future of Oilsands  Projects – Productivity Improvement  & the Role o...
The Future of Oilsands Projects – Productivity Improvement & the Role o...
Nick Anderson
 
Hp application portfolio management software
Hp application portfolio management softwareHp application portfolio management software
Hp application portfolio management software
HP Enterprise Italia
 
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docxWRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
odiliagilby
 
Project proposal template 21
Project proposal template 21Project proposal template 21
Project proposal template 21
faisalbutt37
 
Franklin Scott Harter 03132016
Franklin Scott Harter 03132016Franklin Scott Harter 03132016
Franklin Scott Harter 03132016
Scott Harter
 

Ähnlich wie Data Center Transformation Program Planning and Design (20)

The Future of Oilsands Projects – Productivity Improvement & the Role o...
The Future of Oilsands  Projects – Productivity Improvement  & the Role o...The Future of Oilsands  Projects – Productivity Improvement  & the Role o...
The Future of Oilsands Projects – Productivity Improvement & the Role o...
 
Everything about Performance Equity Compensation (or as much as fits into an ...
Everything about Performance Equity Compensation (or as much as fits into an ...Everything about Performance Equity Compensation (or as much as fits into an ...
Everything about Performance Equity Compensation (or as much as fits into an ...
 
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
Lessons From IT and Non-IT Projects (by Peter W. G. Morris)
 
Back to the Future
Back to the FutureBack to the Future
Back to the Future
 
Analyzing Project Failure Modes: Lessons learnt from the field
Analyzing Project Failure Modes: Lessons learnt from the fieldAnalyzing Project Failure Modes: Lessons learnt from the field
Analyzing Project Failure Modes: Lessons learnt from the field
 
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
Revolutionizing IT Project Delivery - Embrace the Future with OnePlan’s AI-Po...
 
How to Achieve Measurable Benefits Through Project and Organizational Change
How to Achieve Measurable Benefits Through Project and Organizational ChangeHow to Achieve Measurable Benefits Through Project and Organizational Change
How to Achieve Measurable Benefits Through Project and Organizational Change
 
Overcome barriers to good req mgmt
Overcome barriers to good req mgmtOvercome barriers to good req mgmt
Overcome barriers to good req mgmt
 
HP Project and Portfolio Management
HP Project and Portfolio ManagementHP Project and Portfolio Management
HP Project and Portfolio Management
 
IT Business Value
IT Business ValueIT Business Value
IT Business Value
 
Preempting ERP Project Failure
Preempting ERP Project FailurePreempting ERP Project Failure
Preempting ERP Project Failure
 
Agile Paper Cutter
Agile Paper CutterAgile Paper Cutter
Agile Paper Cutter
 
Hp application portfolio management software
Hp application portfolio management softwareHp application portfolio management software
Hp application portfolio management software
 
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docxWRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
WRITTEN INTERVIEW QUESTIONSPhD candidates should provide an aut.docx
 
Project proposal template 21
Project proposal template 21Project proposal template 21
Project proposal template 21
 
Franklin Scott Harter 03132016
Franklin Scott Harter 03132016Franklin Scott Harter 03132016
Franklin Scott Harter 03132016
 
Comprehensive Data Governance Program
Comprehensive Data Governance ProgramComprehensive Data Governance Program
Comprehensive Data Governance Program
 
the-business-case-for-enterprise-project-performance.pdf
the-business-case-for-enterprise-project-performance.pdfthe-business-case-for-enterprise-project-performance.pdf
the-business-case-for-enterprise-project-performance.pdf
 
Ba process plan- IGATE Global Solutions LTD
Ba process plan- IGATE Global Solutions LTDBa process plan- IGATE Global Solutions LTD
Ba process plan- IGATE Global Solutions LTD
 
IS.IT. Project Office set-up in complex environment. A post-merger case ( PRA...
IS.IT. Project Office set-up in complex environment. A post-merger case ( PRA...IS.IT. Project Office set-up in complex environment. A post-merger case ( PRA...
IS.IT. Project Office set-up in complex environment. A post-merger case ( PRA...
 

Data Center Transformation Program Planning and Design

  • 1. Data Center Transformation Program Planning and Design Service Offering Description © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 3/22/2011 1
  • 2. Agenda Why data center transformation / cloud computing projects fail The Sunnyside solution Conclusion 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 2
  • 3. The bottom line… Data-center transformation is about significantly reducing cost to an organization, helping them shift their spending away from management and maintenance and into business projects and priorities, and also helping them address the rising cost of energy, the rising consumption of energy and the mandate to be green or sustainable. These are, by no means, trivial projects. They often involve a tremendous amount of planning and affect IT, facilities, and energy planners, as well as the business leadership and line of business managers. The payoffs are potentially huge, as we'll see, from doing data center design properly, but the risks are also quite high, if things don't come out as planned. 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 3
  • 4. A wise old soothsayer once said: “The reasons for program failure are more numerous than grains of sand in the desert.” 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 4
  • 5.
  • 7. Not involving those expected to implement the change
  • 9. No change in reward system
  • 11. No follow-through(Mark Sanborn, CSP, CPAE) 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 5
  • 12.
  • 13. Underestimating or ignoring impact of change.
  • 15. Lack of strong executive sponsorship
  • 18. Trying to do it cheap
  • 19. Lack of technical knowledge
  • 20. Lack of sound business case
  • 21. Poor vendor management3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 6
  • 22.
  • 23. Failing to update computing concepts
  • 24.  Failing to hold yourself accountable
  • 26. Failing to understand the service supply chain
  • 27. Failure to manage and monitor applications
  • 28.  Failing to understand financial realities
  • 29. Failing to understand the legal complexities of the cloud
  • 30. Failing to get off the sidelines3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 7
  • 31. The Gory Details Project Initiation & Planning Issues Unclear or unconvincing business case Insufficientor non-existent approvalprocess Poor definition of project scope and objectives Insufficient time or money given to project Lack of business ownership and accountability Insufficient and/or over-optimistic planning Poor estimating Long or unrealistic timescales; forcing project end dates despite best estimates Lack of thoroughness and diligence in the project startup phases 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 8
  • 32. More Gory Details Technical & Requirements Issues Lack of user involvement (resulting in expectation issues) Product owner unclear or consistently not available Scope creep; lack of adequate change control Poor or no requirements definition; incomplete or changing requirements Wrong or inappropriate technology choices Unfamiliar or changing technologies; lack of required technical skills Integration problems during implementation Poor or insufficient testing before go-live Lack of QA for key deliverables Long and unpredictable bug fixing phase at end of project 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 9
  • 33. More Gory Details Stakeholder Management & Team Issues Insufficient attention to stakeholders and their needs; failure to manage expectations Lack of senior management/executive support; project sponsors not 100% committed to the objectives; lack understanding of the project and not actively involved Inadequate visibility of project status Denial adopted in preference to hard truths People not dedicated to project; trying to balance too many different priorities Project team members lack experience and do not have the required skills Team lacks authority or decision making ability Poor collaboration, communication and teamwork 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 10
  • 34. More Gory Details Project Management Issues No project management best practices Weak ongoing management; inadequately trained or inexperienced project managers Inadequate tracking and reporting; not reviewing progress regularly or diligently enough Ineffective time and cost management Lack of leadership and/or communication skills 3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 11
  • 35.
  • 36. Projects fail when expectations are not aligned with results; in a sense, that’s the definition of failure. Given the complexity of IT projects, with many moving parts distributed among a diverse group of stakeholders, it’s not surprising that expectation mismatches occur all the time.
  • 37. Differences in expectations, goals, and priorities are substantial contributers to non-technical complexity, which is the underlying cause of most IT failures.3/22/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 12
  • 38. Agenda Why data center transformation / cloud computing projects fail The Sunnyside solution Conclusion 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 13
  • 39. Our approach foundation Program Design Principles Tailored to Data Center and ITSM transformation Takes your organization’s specific needs and requirements into account Establishes clear program vision, mission and scope Is milestone and metrics driven Best Practices Develop a rock-solid business case Avoid knee jerk response to tactical business requirements Ensure that we have the “bench strength” to succeed Invest in the right tools and technologies 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 14
  • 40. Our approach method 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 15
  • 41. 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 16
  • 42. Opportunity identification Report answers these questions in terms of strategic impact Go further with consolidation? Upgrade the network architecture? Upgrade the blade farm? Go further with virtualization? Go further with standardization? Go further with service transformation? 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 17
  • 43. Performance baselining / benchmarking Report answers these questions: What key metrics / KPIs should we use to measure service and operations performance How do we measure up? Against customer expectations / SLAs Against industry benchmarks 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 18
  • 44. Due-diligence design Report answers these questions: What is the high-level program scope, target architecture and operating model? How would we phase delivery? What is the CAPEX and OPEX forecast for the life of the program? What do IRR / ROI and KPI factors look like at key delivery milestones? 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 19
  • 45. Identify Sponsorship and Governance Report answers these questions: Composition of the Program Steering Committee? Composition of the Program Leadership Team? Who is the Program Delivery Manager? Who are the Accountable Owners? Who is the Design Authority? What are the main Pillars of the Program (logical groupings of similar projects ) 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved.
  • 46. Conclusion – Program Success Criteria Critical overarching principles must be adhered to for effective enterprise and program governance: Tiers of governance—enterprise, portfolio, and program—integrated with enterprise-wide processes for strategic planning, programming, budgeting, acquisition, and execution. Distinctly defined relationships between each governance tier with clear, non-redundant roles, responsibilities, and authorities. Integrated portfolio transition strategies overseen by executives responsible for that portfolio function who are in the best position to identify existing capability gaps, set priorities for investment, and adapt quickly to evolving strategic priorities and business challenges. A single, transparent reporting relationship for a program manager to an oversight (program-level) governance board with executives from key stakeholder organizations empowered to make decisions, binding their organizations, and creating a partnership between the business, IT, procurement, finance, etc., while establishing accountability. Timely decisions for a program in execution at the program governance level, especially as enterprises leverage modular and agile methodologies to drive smaller and more frequent incremental releases. Escalation rules and paths—from program to portfolio to enterprise—for programs experiencing issues or changes that could affect a portfolio or the enterprise. 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 21
  • 47. Call to action! Next Steps Contact Sunnyside Associates to learn more about or Data Center Transformation Program Planning and Design Service Offering and how we can tailor it to your specific program or initiative. Register to receive more information at: http://www.sunnyside-associates.net/page1.php 3/25/2011 © Copyright 2010-2011 Sunnyside Associates, LLC. All Rights Reserved. 22

Hinweis der Redaktion

  1.  Misstarts A misstart occurs when a change is ill-advised, hastily implemented or attempted without sufficient commitment. This is a leadership credibility killer.Making change an option When leadership commits to a change, the message must be that the change is not an option. But the message that often comes across is "We'd like you to change, we're asking you to change, we implore you to change, please change..." Whenever people have the option not to change, they won't.Not involving those expected to implement the change A great deal of resentment is aroused when management announces a change and then mandates the specifics of implementation. Employees need to be involved in two ways. First, their input and suggestions should be solicited when planning the change. Secondly, after a change has been committed to, they should be involved in determining the means. Leadership needs to communicate, "Here's what must happen. How do you think it can best be done?"Delegated to “outsiders” Change is an inside job. Although outsiders like consultants might provide valuable ideas and input, people inside the systems must accept responsibility for the change. Scapegoating and passing the buck is not an option.No change in reward system If you keep rewarding employees for what they've always done, you'll keep getting what you've always gotten. Make sure that rewards, recognition and compensation are adjusted for the desired change.Leadership doesn't walk the talk For change to happen, everybody involved must buy-in. Leadership, however, must take the first steps. Change is aborted whenever leadership doesn't demonstrate the same commitment it expects from others.No follow-through The best planning is worthless if not implemented, monitored and carried out. Responsibility must be clearly defined for making sure that follow-through is timely and intense
  2. Here are some of the most common mistakes organizations make as they embrace the cloud.1. Failing to define “success.”Too many organizations regard cloud computing as a modern-day cure-all. Having problems with the bottom line? Turn to the cloud. Having trouble keeping remote workers productive? Trust the cloud. Are more of your employees working from home? Hey, maybe the cloud can help.“Setting unrealistic expectations is the number one reason organizations have trouble with cloud computing,” said Robert Stroud, international VP of ISACA (Information Systems Audit and Control Association), a non-profit IT governance organization, and VP of service management and governance atCA.“Too many organizations believe that they can put in a request to a cloud provider, and, magically, everything will be working perfectly overnight.”2. Failing to update computing concepts.Early this year, startup Heroku was blindsided by an Amazon EC2 outage. Heroku provides a cloud development platform for Ruby on Rails that is hosted by Amazon. When weather caused an outage, Heroku saw its entire infrastructure disappear, along with the 40,000+ applications running on its platform.The company had done everything it was supposed to in terms of failover and redundancy. What they hadn’t realized, though, was that everything resided in a single Amazon “availability zone.”Amazon worked with Heroku to get their platform back on line quickly, but this incident shows how out-of-date computing concepts can undermine cloud efforts. Failover, backups and redundancy were easier to visualize in the on-premise computing world. If you backed up off-site, you were in good shape.If everything is off-site, though, how do you know what level of failover capability you actually have? The whole concept of data being in a specific place is challenged by cloud computing.“One of the things we’ve learned is that stability in the cloud is complicated,” said Byron Sebastian, CEO of Heroku. “One of the myths about cloud computing is that cloud infrastructure is a complete solution. It’s not. You need add-ons in the cloud as with any other IT system.”As a result, Heroku has expanded its own platform to offer its customers such services as advanced failover, load balancing and redundancy, all tailored for cloud-hosted applications.3. Failing to hold service providers accountable.Heroku was lucky. Amazon immediately reached out to them and helped them solve the problem. Others haven’t been so lucky. Visit the user forums of any major cloud computing platform and you’ll see plenty of venting.“X provider lost all of my data and won’t do anything about it!” is how these complaints often go (they’re usually in all caps and with many more exclamation points.) Some of the rants are obviously from people who screwed up and are looking for someone else to blame. Some are the rants of unbalanced lunatics. Others have the ring of legitimacy.I’ve talked to plenty of people off the record who complained about service providers, but few will discuss the struggles they’ve had with customer service. (This isn’t unusual for any story, so don’t start imagining a broad cloud conspiracy.) Anecdotally, though, the scales are weighted in the service providers’ favor.Michele Hudnall, solution marketing manager for BSM at Novell, emailed me to emphasize the importance of well-defined SLA’s. According to Hudnall, things you should watch out for are a lack of SLA’s, vague SLA’s and poor overall service management.Organizations can easily lose 1-2% of revenues when mission-critical services go down even for a short amount of time. When that happens, it’s important to hold the service provider accountable. This may mean renegotiating your contract to include SLA penalties or seeking remediation.Gartner recently drafted a list of customer rights that cloud vendors should honor. These included the right to SLA’s that address liabilities, remediation and business outcomes; the right to notification and choice about changes that will affect the service of consumers’ business processes; and the right to understand the technical limitations of the system up front.4. Failing to hold yourself accountable.Even if you have a solid SLA that has provisions for remediation, that doesn’t mean you are off the hook if something goes wrong.For instance, what happens if you store sensitive customer data in the cloud and someone breaches it? Do you really think it matters what your SLA says? Who will your customers hold responsible?You, that’s who.Earlier this month a security breach at AT&T exposed the email addresses of more than 100,000 iPad users. Most customers blamed Apple, but the problem was with AT&T’s cloud service.The breach was a minor one. After all, most people’s email addresses have been farmed by spammers many times over. However, had the leaked information been credit card or personal information, Apple would have had a problem that made the iPhone 4 antenna problems seem trivial.“You can never abdicate responsibility to a service provider,” Stroud said. “The cloud provider may be a custodian of your information, but the reality is that it is your reputation that will suffer if something goes wrong.”5. Failing to scrutinize vendors.Pretty much every service provider, hosting company and ISP is rebranding itself as a “cloud provider.” However, not all cloud providers are created equal. While it’s a pretty safe bet that Google, Amazon and IBM will be around in the years to come, you can’t say the same about numerous cloud computingstartups.What happens if your cloud provider fails? The collapse of cloud startup Coghead last year shows just how dangerous skimping on due diligence can be. Coghead wooed customers with low prices. Then, when it ran out of money and failed to raise additional VC capital, it gave its customers a few short weeks to get their data off of its systems.It could have been worse. What happens if your cloud provider shuts down with no notice? What happens if disgruntled employees smuggle servers out the back door after they get their pink slips? What happens if the local sheriff chains up the building under order from a bankruptcy judge?6. Failing to understand the service supply chain.Even if your cloud provider is stable, do you know how stable their service providers are? Cloud providers are increasingly outsourcing components of their services to third-parties. It’s important to understand the entire service supply chain in order to accurately judge the viability of the service you are signing up for.If you’re dealing with a large, established cloud provider, at least you have a single neck to choke if something goes wrong, and you can bet that bad press will motivate them to solve the problem. With smaller vendors, you might be on your own.7. Failure to manage and monitor applications.Many organizations have made the mistake of believing that management and performance problems disappear when they move to the cloud. “With traditional applications, eighty percent of your time and resources are spent on management and monitoring,” Sebastian of Heroku said. “The cloud puts a big dent in that, but it doesn’t go away entirely.”If your application performs poorly, your customers won’t blame the cloud provider, they will blame you. “There will be mistakes in your application. There always are,” Sebastian said. “With the proper performance management and monitoring tools in place, you’ll have a better chance of catching those mistakes before they become a disaster.”8. Failing to understand financial realities.Many organizations embrace the cloud because it is sold as being cheaper than in-house IT. That’s often true, but even when cloud services are cheaper, organizations may perceive them as being more expensive.Why?“We have so little visibility into what we’re paying for various technologies today that it’s easy to get sticker shock,” Stroud of ISACA and CA said. “That’s not thecloud providers’ fault.”It’s not necessarily your fault either. Financial visibility into IT systems is a tricky matter. Many costs are opaque. Who consumes what? Who pays for what? Who gets to consume how much? For many IT departments, the answer to those questions is fuzzy at best. With the cloud, though, those answers become painfully clear.9. Failing to understand the legal complexities of the cloud.When you outsource computing resources, your business, no matter how small, may have opened itself up to the legal risks of a much bigger company. You may have to comply with laws from different jurisdictions, and you may face different liabilities, depending on where your data resides.According to Gartner, “Service providers have not done a good job of explaining which jurisdictions they put data in and what legal requirements the service consumer must, therefore, meet. The service consumer needs reassurance that the provider does not violate any country’s rules for which the consumer may be held accountable.”Complying with industry regulations is also more troublesome. Even if cloud services limit your risk and technically make you more compliant, you may have a more difficult time proving that.10. Failing to get off the sidelines.Finally, the biggest reason cloud deployments fail is because they don’t get started in the first place. Too many organizations fret about issues that are not all that different from the ones they have in their own data centers. Outages, security breaches and compliance are all general IT challenges, not cloud-specific ones.