SlideShare ist ein Scribd-Unternehmen logo
1 von 25
Downloaden Sie, um offline zu lesen
School of Architecture, Building and Design
Bachelor of Science (Hons) in Architecture
Internship Training and Report
(ARC2615)
FINAL REPORT
Ar. Ho Chin Keng | Supervising Architect
Keith Tan Kay Hin | Lecturer
Joyce Wee Yi Qin | Student
0319602 | Student ID
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Introduction
This module aims to introduce students to the requirements, activities and operations
involved in an architectural and construction practice. The objective of the module is
to facilitate the involvement of students in professional attachments to architectural
practices to help us develop an understanding of the general nature, principles and
procedure of law and legislation as applied to architectural drawings, especially the
building by-laws. In the process of the internship, I am exposed to the submission
process and the range of contract documentation besides the usual design stages.
For this module, I was successfully accepted to attach to aLM Architects, one of the
biggest architecture firm in Penang. The training period commenced at 3rd January
to 3rd March (8 weeks). During this intensive 8 weeks, I was assigned to attend to
different tasks ranging from design stage to contract documentation with several
meetings and site visits along the way.
This report compiles my experience during this 9 weeks with aLM Architects.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Week 1 | 3rd January to 6th January
Task 1: Paramount
My task was to make minor editings on the 3D model of a housing project in Bandar
Aman Jaya, Kedah. I added fences to the building boundary and also added
economic yet functional and aesthetic details to the façade design of the surau, hall
and residential buildings before rendering using Sketch Up and Photoshop.
Task 2: Prisma
After completing my first task, I was assigned to produce the door and window
schedule of a high rise residential project in Gerbang Bukit Kecil, Penang (Prisma).
Through this task, I am aware of the different materials and requirements of doors and
windows in a building. (Appendix1)
Meeting 1: Lafarge
On Wednesday, one of my colleague invited Lafarge for a meeting to enquire on
Agilia™, a self-compacting and self-levelling concrete which he was planning to use
to construct the shear walls in his project with Prisma.
Meeting 2: aLM Green
On Friday, our office participated in a discussion with a member of aLM Green about
the update on OTTV and Roof U-values. During the discussion, we were exposed to
the local green building requirements and ways to achieve optimum passive design
such as coping, wall-to-window ratio etc.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Week 2 | 9th January to 13th January
Task 1: Prisma
On the second week, I wrapped up my previous assignment on the Door and window
schedule which required some minor adjustments after being gone through by a
senior in the office. (Appendix1)
Task 2: Prisma
I was assigned to produce tender drawings of the toilet details of the residential units,
Type A and Type B. My task was to gather the specifications to produce detailed
sections and plans of the toilets with dimensions.
Meeting 1: Prisma
On Tuesday, I attended a client meeting alongside the PIC. During the meeting, a few
issues were brought up including the confusion in levelling and connection between
the parking lots and the residential units. At the end of the meeting the former was
resolved and the latter was left to be discussed.
Task 3: Paramount (Sketching)
On Wednesday, I was assigned to design a surau on a 36.7m x 33.082m plot in Kedah
from scratch. During this initial stage, I plotted out the setback and building lines and
also researched on the basic requirement of spaces in a surau which includes praying
halls, ablutions, bilik jenazah and washrooms (Appendix 2).
Through this task, I am aware that there are strict rules on the directions and sizes of
the prayer halls and the ablutions. Also, there are local requirements on the set back
and building lines.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Week 3 | 16th January to 20th January
Task 1: Paramount (Drafting + 3D Modelling)
This week I drafted out the plans of the surau and produced an improved plan daily.
The spaces were shifted and mirrored per the needs of the users and the ease of
access. I took in advice from Muslim colleagues on their usual rituals to have a grasp
on their routine so I can design to their needs (Appendix 2).
On Thursday, I started constructing the 3D model to play around with the façade
design. The façade design was finalized at the end of the week.
Meeting 2: Fuji Elevator (M) Sdn Bhd.
On Wednesday, I participated in a meeting with an elevator supplier which is new in
the Malaysian market. During the meeting, I was introduced to different mechanical
transportation systems, the construction process and their different authority
requirements such as a full height motor room.
Week 4 | 23rd January and 24th January
Task 1: Paramount (3D Model + Presentation Drawings)
This week, I did some final touches on the roof and window designs before proceeding
to the presentation drawings and perspective renders. In the meantime, I also aided
one of my colleague on her façade design (Appendix 2).
Task 2: Prisma
On Tuesday, I was assigned to make some changes on the door and window
schedule I did previously as there were new updates from the client where day
requested to lessen the types of doors and windows in the design.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Week 5 | 6th February to 10th February
Task 1: Asia Bina KL- Seputih (MAYC)
This week, I was assigned to team up with the other two interns to work on a SOHO
and hostel apartment, which will replace the existing MAYC Hotel in Seputih, KL. Our
task was (Appendix 3):
1. To double line the proposed single-lined plans
2. To make minor adjustments to refine the plans
3. To come out with the landscape design
4. To hatch, add spatial details for presentation purposes
Task 2: Kuala Kedah Semi-D Shop Lot
My second task of the week involves the preparation of the building plan of Semi-D
shops proposed to be built along the shoreline at Kuala Kedah. I was also involved in
(Appendix 4):
1. Making minor adjustments in the façade design.
2. Study and make structural additions on the layered roofs at the front facade
Task 3: Paramount Surau (Sketches)
Late Friday, I followed up on the surau design I did earlier on. The PIC came back with
comments from the client insisting on maximizing the prayer halls instead of having
study rooms. Amendments was done accordingly to the plans. I ended the week with
new sketches of the plans and the spatial arrangements (Appendix 2).
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Week 6 | 13th February to 17th February
Task 1: Paramount Surau
Following up on the new sketches, I produced new presentation drawings for the
surau and the 3D model. For the entire exterior of the building, I took on an approach
different from the previous design. The previous design was said to be costly and
heavy in terms of visual. Thus, I reconstructed my concept to create a space that
connects man and god which is protected within by different layers. The outcome
was more minimal and raw compared to the previous design (Appendix 2).
Task 2: Kuala Kedah Semi-D Shop Lot
My second task of the week involves amendments on the building plan of the Semi-D
shops done previously. While completing this task, I was aware of the Bomba
requirements on the running distance within enclosed space with dead ends and the
loop holes in the different regulations involving fire escape requirements.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Week 7 | 20th February to 24th February
Task 1: Paramount Guard House
This week, I was assigned to make adjustments on the 3D model and Building Plans of
the guard house after having it reviewed by the engineers. Later on, I compiled
different perspectives of the building in presentation slides to be sent to the client.
Task 2: Mr Wong SPA
I was also involved in producing drawings for the Sales and Purchase Agreement for
a project involving 12-units of terrace houses.
Task 3: Firma Atasan Technique School
Jiahui and I was assigned to design a technique school to replace an existing office
complex and a warehouse. We were given complete freedom in developing our
concepts and plans. Our task was to design a building for:
a. 1 Automotive Centre
b. 1 Auditorium (400pax)
c. 1 Library
d. Laboratory
e. 10 classrooms (40pax each)
f. Cafeteria
g. Lecturer and Dean Offices
Our design intention for the school was based on the intention of wanting to create a
learning space that is sociable, less rigid and formal. As such, breakout spaces are
incorporated for students to relax and unwind themselves amidst the busy and stressful
academic life. Emphasis was placed upon the greenery-infused pocket spaces and
open areas whereby students will have the freedom to hold activities or express
themselves. (Appendix 5)
Thanks to our very encouraging and passionate supervisor, we managed to come out
with a plan that is out of ordinary.
Site Visit 1: Bionic
On Friday, we followed Ar. Ho Chin Keng to an ongoing construction site at Bukit
Mertajam for a site meeting. The project includes
1. 32-storey strata residential + commercial building with a sky bridge
2. Individual shops
3. Low cost apartment
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
The site is close to completion so it was more convenient for us to walk around. We
participated in a discussion with a representative from the client regarding the issues
on the construction.
During the walkthrough, I was aware of the details in design and also the
miscommunication that usually occur when instructions are being given. I am also
aware of the responsibilities of the architect to make decisions when problems occur
and to lead a team of people.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Week 8 | 27th February to 3rd March
Task 1: Paramount Surau (Minor Edits)
The 3D model of the surau is further edited from the comments from the clients which
prefers a more vernacular design (the first design)
Task 2: TPPT Site Meeting
This week, we attended an on-site site meeting with TPPT regarding the ongoing
construction of a medium cost high rise residential building in Teluk Bahang, Penang.
The meeting was chaired by Ar. Sam. The meeting was a progress meeting, several
issues such as change of material and costing was raised in the meeting.
Task 3: Building Department for Prisma
On Thursday, we tagged along a colleague from the authority department to
KOMTAR, where most of the council offices are housed. We went to the building
department to make some edits on the plans for Prisma after the inspection of the
Architect in charge. Through this visit, I am aware of the responsibilities of the
authorities in inspecting the drawings.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Task 4: Eco Jerai Proposal
Eco Jerai is a proposal of developing 3 small islands nearby the foot of Gunung Jerai
into tourist attractions. Together with the other interns, I was assigned to design and
produce the programme of the man-made islands surrounding the coast to prevent
muddy waters from entering the tourist spots.
My task includes:
1. Programme and zoning of the islands
2. 3D model with building massings on the islands
3. Renderings
4. Presentation slides
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Appendix 1: Prisma | Novus Tender Drawings
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Appendix 2: Paramount | Surau
Version 1:
Setback and building line is
determined. Parking lots surrounds
the perimeter of the Surau.
Spatial requirements fulfilled.
Version 2:
Due to 6.1m internal road width
requirement, Parking space at the
front
Study room extended.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Version 3:
Bilik Pengurusan Jenazah shifted to
front for functional purposes.
Version 2:
Additional details and landscape
at reading room.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Front elevation
Right elevation
Back elevation
Left elevation
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Final floor plan | Maximized prayer hall
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Front elevation
Right elevation
Back elevation
Left elevation
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Appendix 3: Asia Bina KL | SOHO + MAYC Hostel
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Appendix 4: Kuala Kedah | Semi-D Shop Building Plan
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Appendix 5: Firma Atasan | Technique School
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Appendix 6: Testimonial Letter
Internship Training and Report | Final Report
All image rights reserved to aLM Architects.
Conclusion
During this intensive 8 weeks of internship, I have been exposed to many things
professionally. I am aware of the responsibilities of an Architect as a designer and an
administrator. Besides all the usual reading and understanding drawings, UBBL
requirements, drafting etc., there is still a lot more to learn to be a great professional
architect. Through discussions with my colleagues in the office, I have learnt that as
an architect we must hold on to our values and to fight for what is right.
During the internship, I’ve experience the conflict between design and cost. There
were times where my design was not accepted by the clients due to cost.
Disappointed to how much design should compromise for profits, I tried to balance
between both.
“Architecture is tough, but when you see the community putting use into your
design, you’ll have goosebumps and you will realize that all the blood, sweat and
tears are all worth it”
- Ar. Ho Chin Keng

Weitere ähnliche Inhalte

Was ist angesagt?

internship training and report
internship training and reportinternship training and report
internship training and reportJing Fan Koh
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnJoe Onn Lim
 
bqs Site report
bqs Site reportbqs Site report
bqs Site reportFelix Vong
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALBSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALjolynnTJL
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORTTristan Yu
 
Internship report
Internship reportInternship report
Internship reportcocongkening
 
Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1 Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1 Jervain Ng
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUPKeshav Seewraz
 
Internship report
Internship reportInternship report
Internship reportAlfred Tan
 
Internship report
Internship reportInternship report
Internship reportChengWei Chia
 
Internship Report File
Internship Report File   Internship Report File
Internship Report File Tay Jit Ying
 
internship report on architecture
internship report on architectureinternship report on architecture
internship report on architecturebiruktigistu1
 
Site visit report
Site visit report Site visit report
Site visit report Liming Hiew
 
Intern report
Intern reportIntern report
Intern reporthongbinng
 
Project management
Project managementProject management
Project managementBenjamin Tan
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectNekumi Kida
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Jannah Jailani
 
Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...Tan Jaden
 

Was ist angesagt? (20)

internship training and report
internship training and reportinternship training and report
internship training and report
 
Report final
Report finalReport final
Report final
 
Architecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe OnnArchitecture Internship Report by Lim Joe Onn
Architecture Internship Report by Lim Joe Onn
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINALBSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
BSC (H) ARCHITECTURE DEGREE SEM 4.5 INTERNSHIP REPORT FINAL
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
Internship report
Internship reportInternship report
Internship report
 
Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1 Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUP
 
Internship report
Internship reportInternship report
Internship report
 
Internship report
Internship reportInternship report
Internship report
 
Internship Report File
Internship Report File   Internship Report File
Internship Report File
 
internship report on architecture
internship report on architectureinternship report on architecture
internship report on architecture
 
Site visit report
Site visit report Site visit report
Site visit report
 
Intern report
Intern reportIntern report
Intern report
 
Project management
Project managementProject management
Project management
 
Project Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A ProjectProject Management Project 1 Report: Defining & Documenting A Project
Project Management Project 1 Report: Defining & Documenting A Project
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...Project Management (Project 1 - Defining and documenting a project) Presentat...
Project Management (Project 1 - Defining and documenting a project) Presentat...
 

Andere mochten auch

Building Services in Public Buildings | Elderly Centre
Building Services in Public Buildings | Elderly CentreBuilding Services in Public Buildings | Elderly Centre
Building Services in Public Buildings | Elderly CentreJoyce Wee
 
Beam and Column Analysis | Group Component
Beam and Column Analysis | Group ComponentBeam and Column Analysis | Group Component
Beam and Column Analysis | Group ComponentJoyce Wee
 
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...Joyce Wee
 
Truss Analysis Calculation
Truss Analysis CalculationTruss Analysis Calculation
Truss Analysis CalculationJoyce Wee
 
Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentJoyce Wee
 
The ‘digital natives’ debate (nurnaningsih).
The ‘digital natives’ debate (nurnaningsih). The ‘digital natives’ debate (nurnaningsih).
The ‘digital natives’ debate (nurnaningsih). muhammad khanif
 
Cuestionario slide share
Cuestionario slide shareCuestionario slide share
Cuestionario slide sharejennifer ramirez
 
Pandi
PandiPandi
PandiPandi C
 
Ventajas y-desventajas-de-calameo-y-slideshare
Ventajas y-desventajas-de-calameo-y-slideshareVentajas y-desventajas-de-calameo-y-slideshare
Ventajas y-desventajas-de-calameo-y-slidesharejennifer ramirez
 
SBIR計畫審查重點說明-創業懶人包
SBIR計畫審查重點說明-創業懶人包SBIR計畫審查重點說明-創業懶人包
SBIR計畫審查重點說明-創業懶人包RICK Lin
 
Los Riesgos de Internet y las redes sociales para los niĂąos
Los Riesgos de Internet y las redes sociales para los niĂąosLos Riesgos de Internet y las redes sociales para los niĂąos
Los Riesgos de Internet y las redes sociales para los niĂąosOsvaldo Moreno
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORTEe Dong Chen
 
Internship Training report
Internship Training report Internship Training report
Internship Training report Canisius Bong
 
Hessen am is activity 5
Hessen am is activity 5Hessen am is activity 5
Hessen am is activity 5Hessen Am-is
 
internship report
internship reportinternship report
internship reportdarious demus
 
Chronoscapeをカタチにした必然と偶然|UX & Service Sketch #26「0からのプロダクトの立ち上げ方」
Chronoscapeをカタチにした必然と偶然|UX & Service Sketch #26「0からのプロダクトの立ち上げ方」Chronoscapeをカタチにした必然と偶然|UX & Service Sketch #26「0からのプロダクトの立ち上げ方」
Chronoscapeをカタチにした必然と偶然|UX & Service Sketch #26「0からのプロダクトの立ち上げ方」Koki Kaku
 

Andere mochten auch (20)

Building Services in Public Buildings | Elderly Centre
Building Services in Public Buildings | Elderly CentreBuilding Services in Public Buildings | Elderly Centre
Building Services in Public Buildings | Elderly Centre
 
Beam and Column Analysis | Group Component
Beam and Column Analysis | Group ComponentBeam and Column Analysis | Group Component
Beam and Column Analysis | Group Component
 
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
 
Truss Analysis Calculation
Truss Analysis CalculationTruss Analysis Calculation
Truss Analysis Calculation
 
Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual Component
 
The ‘digital natives’ debate (nurnaningsih).
The ‘digital natives’ debate (nurnaningsih). The ‘digital natives’ debate (nurnaningsih).
The ‘digital natives’ debate (nurnaningsih).
 
Cuestionario slide share
Cuestionario slide shareCuestionario slide share
Cuestionario slide share
 
Pandi
PandiPandi
Pandi
 
Scribd y-issuu
Scribd y-issuuScribd y-issuu
Scribd y-issuu
 
Institito tecnico nacional de comercio
Institito tecnico nacional de comercioInstitito tecnico nacional de comercio
Institito tecnico nacional de comercio
 
Ventajas y-desventajas-de-calameo-y-slideshare
Ventajas y-desventajas-de-calameo-y-slideshareVentajas y-desventajas-de-calameo-y-slideshare
Ventajas y-desventajas-de-calameo-y-slideshare
 
SBIR計畫審查重點說明-創業懶人包
SBIR計畫審查重點說明-創業懶人包SBIR計畫審查重點說明-創業懶人包
SBIR計畫審查重點說明-創業懶人包
 
Los Riesgos de Internet y las redes sociales para los niĂąos
Los Riesgos de Internet y las redes sociales para los niĂąosLos Riesgos de Internet y las redes sociales para los niĂąos
Los Riesgos de Internet y las redes sociales para los niĂąos
 
Log sheets
Log sheetsLog sheets
Log sheets
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
Internship Training report
Internship Training report Internship Training report
Internship Training report
 
Hessen am is activity 5
Hessen am is activity 5Hessen am is activity 5
Hessen am is activity 5
 
Slideshare y calameo
Slideshare y calameoSlideshare y calameo
Slideshare y calameo
 
internship report
internship reportinternship report
internship report
 
Chronoscapeをカタチにした必然と偶然|UX & Service Sketch #26「0からのプロダクトの立ち上げ方」
Chronoscapeをカタチにした必然と偶然|UX & Service Sketch #26「0からのプロダクトの立ち上げ方」Chronoscapeをカタチにした必然と偶然|UX & Service Sketch #26「0からのプロダクトの立ち上げ方」
Chronoscapeをカタチにした必然と偶然|UX & Service Sketch #26「0からのプロダクトの立ち上げ方」
 

Ähnlich wie Internship Training and Report

Internship Report ARC 2615 -GOH YEN NEE 0315551
Internship Report ARC 2615 -GOH YEN NEE 0315551Internship Report ARC 2615 -GOH YEN NEE 0315551
Internship Report ARC 2615 -GOH YEN NEE 0315551Crysmond Goh
 
Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Chenyi Teo
 
Internship report
Internship reportInternship report
Internship reportKelvin Fong
 
Tectonic design making
Tectonic design makingTectonic design making
Tectonic design makingharrietmaybe
 
Arc2625 reportfile lynettelaw0317761
Arc2625 reportfile lynettelaw0317761Arc2625 reportfile lynettelaw0317761
Arc2625 reportfile lynettelaw0317761Lynette Law
 
SEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1ASEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1ADarshiini Vig
 
ADP - PROJ 1A BRIEF
ADP - PROJ 1A BRIEFADP - PROJ 1A BRIEF
ADP - PROJ 1A BRIEFYen Min Khor
 
Ici individual
Ici individualIci individual
Ici individualKlaus Chiang
 
Internship Report
Internship ReportInternship Report
Internship Reportdtan97
 
Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Khor Hao Xiang
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othmannadiacbass
 
Sina Hashemi - Portfolio
Sina Hashemi - PortfolioSina Hashemi - Portfolio
Sina Hashemi - PortfolioSina Hashemi
 
Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Preston Liew
 
Report
ReportReport
ReportWC Yan
 
Arc2622 report file chok jiajun0323117
Arc2622 report file chok jiajun0323117Arc2622 report file chok jiajun0323117
Arc2622 report file chok jiajun0323117Jia Jun Chok
 
Magazine
MagazineMagazine
MagazineLam Yu
 
3806da 060ba18c363c4011a2d5a975cb6a7324
3806da 060ba18c363c4011a2d5a975cb6a73243806da 060ba18c363c4011a2d5a975cb6a7324
3806da 060ba18c363c4011a2d5a975cb6a7324Ong Ke Qi
 
Final practicum report
Final practicum reportFinal practicum report
Final practicum reportmanisha sah
 
Architectural Graduation Project - English
Architectural Graduation Project - EnglishArchitectural Graduation Project - English
Architectural Graduation Project - EnglishGalala University
 

Ähnlich wie Internship Training and Report (20)

Internship Report ARC 2615 -GOH YEN NEE 0315551
Internship Report ARC 2615 -GOH YEN NEE 0315551Internship Report ARC 2615 -GOH YEN NEE 0315551
Internship Report ARC 2615 -GOH YEN NEE 0315551
 
Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618
 
Internship report
Internship reportInternship report
Internship report
 
Tectonic design making
Tectonic design makingTectonic design making
Tectonic design making
 
Arc2625 reportfile lynettelaw0317761
Arc2625 reportfile lynettelaw0317761Arc2625 reportfile lynettelaw0317761
Arc2625 reportfile lynettelaw0317761
 
SEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1ASEM 6 : STUDIO PROJECT 1A
SEM 6 : STUDIO PROJECT 1A
 
ADP - PROJ 1A BRIEF
ADP - PROJ 1A BRIEFADP - PROJ 1A BRIEF
ADP - PROJ 1A BRIEF
 
Ici individual
Ici individualIci individual
Ici individual
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065Arc2615 report file khorhaoxiang0318065
Arc2615 report file khorhaoxiang0318065
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othman
 
Sina Hashemi - Portfolio
Sina Hashemi - PortfolioSina Hashemi - Portfolio
Sina Hashemi - Portfolio
 
Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016
 
Report
ReportReport
Report
 
Arc2622 report file chok jiajun0323117
Arc2622 report file chok jiajun0323117Arc2622 report file chok jiajun0323117
Arc2622 report file chok jiajun0323117
 
Magazine
MagazineMagazine
Magazine
 
3806da 060ba18c363c4011a2d5a975cb6a7324
3806da 060ba18c363c4011a2d5a975cb6a73243806da 060ba18c363c4011a2d5a975cb6a7324
3806da 060ba18c363c4011a2d5a975cb6a7324
 
Final practicum report
Final practicum reportFinal practicum report
Final practicum report
 
Chapter 10-TOR
Chapter 10-TORChapter 10-TOR
Chapter 10-TOR
 
Architectural Graduation Project - English
Architectural Graduation Project - EnglishArchitectural Graduation Project - English
Architectural Graduation Project - English
 

Mehr von Joyce Wee

[MGT60403] Project Management Final Report
[MGT60403] Project Management Final Report [MGT60403] Project Management Final Report
[MGT60403] Project Management Final Report Joyce Wee
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project ReportJoyce Wee
 
Taman Tasik Titiwangsa Site Analysis
Taman Tasik Titiwangsa Site AnalysisTaman Tasik Titiwangsa Site Analysis
Taman Tasik Titiwangsa Site AnalysisJoyce Wee
 
Food and Culture Research Proposal
Food and Culture Research ProposalFood and Culture Research Proposal
Food and Culture Research ProposalJoyce Wee
 
SIBKL Acoustic Design Analysis Report
SIBKL Acoustic Design Analysis ReportSIBKL Acoustic Design Analysis Report
SIBKL Acoustic Design Analysis ReportJoyce Wee
 
SIBKL Acoustic Design
SIBKL Acoustic DesignSIBKL Acoustic Design
SIBKL Acoustic DesignJoyce Wee
 
Reaction Paper 3 Critical Regionalism
Reaction Paper 3  Critical RegionalismReaction Paper 3  Critical Regionalism
Reaction Paper 3 Critical RegionalismJoyce Wee
 
Reaction Paper 2 Geometry of Feeling
Reaction Paper 2  Geometry of FeelingReaction Paper 2  Geometry of Feeling
Reaction Paper 2 Geometry of FeelingJoyce Wee
 
Reaction paper 1 Learning from Las Vegas
Reaction paper 1  Learning from Las VegasReaction paper 1  Learning from Las Vegas
Reaction paper 1 Learning from Las VegasJoyce Wee
 
Comparing Jalan TAR and Gwanghwamun
Comparing Jalan TAR and GwanghwamunComparing Jalan TAR and Gwanghwamun
Comparing Jalan TAR and GwanghwamunJoyce Wee
 
Building Construction 2: Skeletal Structure - Bus Shelter
Building Construction 2: Skeletal Structure - Bus ShelterBuilding Construction 2: Skeletal Structure - Bus Shelter
Building Construction 2: Skeletal Structure - Bus ShelterJoyce Wee
 
44 king street report
44 king street report44 king street report
44 king street reportJoyce Wee
 
Building Construction: Experiencing Construction
Building Construction: Experiencing ConstructionBuilding Construction: Experiencing Construction
Building Construction: Experiencing ConstructionJoyce Wee
 
Cape Rachado Reserve Forest Site Analysis
Cape Rachado Reserve Forest Site AnalysisCape Rachado Reserve Forest Site Analysis
Cape Rachado Reserve Forest Site AnalysisJoyce Wee
 
Stadium Negara Precedent Study Report
Stadium Negara Precedent Study ReportStadium Negara Precedent Study Report
Stadium Negara Precedent Study ReportJoyce Wee
 
Culture And Civil. Rome
Culture And Civil. RomeCulture And Civil. Rome
Culture And Civil. RomeJoyce Wee
 
Assignment 2
Assignment 2Assignment 2
Assignment 2Joyce Wee
 
Journal 2
Journal 2Journal 2
Journal 2Joyce Wee
 
Assignment 1
Assignment 1Assignment 1
Assignment 1Joyce Wee
 

Mehr von Joyce Wee (20)

[MGT60403] Project Management Final Report
[MGT60403] Project Management Final Report [MGT60403] Project Management Final Report
[MGT60403] Project Management Final Report
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project Report
 
Taman Tasik Titiwangsa Site Analysis
Taman Tasik Titiwangsa Site AnalysisTaman Tasik Titiwangsa Site Analysis
Taman Tasik Titiwangsa Site Analysis
 
Food and Culture Research Proposal
Food and Culture Research ProposalFood and Culture Research Proposal
Food and Culture Research Proposal
 
SIBKL Acoustic Design Analysis Report
SIBKL Acoustic Design Analysis ReportSIBKL Acoustic Design Analysis Report
SIBKL Acoustic Design Analysis Report
 
SIBKL Acoustic Design
SIBKL Acoustic DesignSIBKL Acoustic Design
SIBKL Acoustic Design
 
Reaction Paper 3 Critical Regionalism
Reaction Paper 3  Critical RegionalismReaction Paper 3  Critical Regionalism
Reaction Paper 3 Critical Regionalism
 
Reaction Paper 2 Geometry of Feeling
Reaction Paper 2  Geometry of FeelingReaction Paper 2  Geometry of Feeling
Reaction Paper 2 Geometry of Feeling
 
Reaction paper 1 Learning from Las Vegas
Reaction paper 1  Learning from Las VegasReaction paper 1  Learning from Las Vegas
Reaction paper 1 Learning from Las Vegas
 
Comparing Jalan TAR and Gwanghwamun
Comparing Jalan TAR and GwanghwamunComparing Jalan TAR and Gwanghwamun
Comparing Jalan TAR and Gwanghwamun
 
Building Construction 2: Skeletal Structure - Bus Shelter
Building Construction 2: Skeletal Structure - Bus ShelterBuilding Construction 2: Skeletal Structure - Bus Shelter
Building Construction 2: Skeletal Structure - Bus Shelter
 
44 king street report
44 king street report44 king street report
44 king street report
 
Building Construction: Experiencing Construction
Building Construction: Experiencing ConstructionBuilding Construction: Experiencing Construction
Building Construction: Experiencing Construction
 
Cape Rachado Reserve Forest Site Analysis
Cape Rachado Reserve Forest Site AnalysisCape Rachado Reserve Forest Site Analysis
Cape Rachado Reserve Forest Site Analysis
 
Stadium Negara Precedent Study Report
Stadium Negara Precedent Study ReportStadium Negara Precedent Study Report
Stadium Negara Precedent Study Report
 
Culture And Civil. Rome
Culture And Civil. RomeCulture And Civil. Rome
Culture And Civil. Rome
 
Final
FinalFinal
Final
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
Journal 2
Journal 2Journal 2
Journal 2
 
Assignment 1
Assignment 1Assignment 1
Assignment 1
 

KĂźrzlich hochgeladen

AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
👉 Call Girls Service Amritsar 👉📞 6367187148 👉📞 Just📲 Call Ruhi Call Girl Agen...
👉 Call Girls Service Amritsar 👉📞 6367187148 👉📞 Just📲 Call Ruhi Call Girl Agen...👉 Call Girls Service Amritsar 👉📞 6367187148 👉📞 Just📲 Call Ruhi Call Girl Agen...
👉 Call Girls Service Amritsar 👉📞 6367187148 👉📞 Just📲 Call Ruhi Call Girl Agen...karishmasinghjnh
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...amitlee9823
 
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...Delhi Call girls
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.Nitya salvi
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfamanda2495
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️Delhi Call girls
 
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLHingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLNitya salvi
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
➥🔝 7737669865 🔝▻ Bokaro Call-girls in Women Seeking Men 🔝Bokaro🔝 Escorts S...
➥🔝 7737669865 🔝▻ Bokaro Call-girls in Women Seeking Men  🔝Bokaro🔝   Escorts S...➥🔝 7737669865 🔝▻ Bokaro Call-girls in Women Seeking Men  🔝Bokaro🔝   Escorts S...
➥🔝 7737669865 🔝▻ Bokaro Call-girls in Women Seeking Men 🔝Bokaro🔝 Escorts S...amitlee9823
 
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men 🔝dehradun🔝 Escor...
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men  🔝dehradun🔝   Escor...➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men  🔝dehradun🔝   Escor...
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men 🔝dehradun🔝 Escor...amitlee9823
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...RitikaRoy32
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja Nehwal
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxbingyichin04
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...instagramfab782445
 

KĂźrzlich hochgeladen (20)

AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
👉 Call Girls Service Amritsar 👉📞 6367187148 👉📞 Just📲 Call Ruhi Call Girl Agen...
👉 Call Girls Service Amritsar 👉📞 6367187148 👉📞 Just📲 Call Ruhi Call Girl Agen...👉 Call Girls Service Amritsar 👉📞 6367187148 👉📞 Just📲 Call Ruhi Call Girl Agen...
👉 Call Girls Service Amritsar 👉📞 6367187148 👉📞 Just📲 Call Ruhi Call Girl Agen...
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
❤Personal Whatsapp Number 8617697112 Samba Call Girls 💦✅.
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRLHingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
Hingoli ❤CALL GIRL 8617370543 ❤CALL GIRLS IN Hingoli ESCORT SERVICE❤CALL GIRL
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
➥🔝 7737669865 🔝▻ Bokaro Call-girls in Women Seeking Men 🔝Bokaro🔝 Escorts S...
➥🔝 7737669865 🔝▻ Bokaro Call-girls in Women Seeking Men  🔝Bokaro🔝   Escorts S...➥🔝 7737669865 🔝▻ Bokaro Call-girls in Women Seeking Men  🔝Bokaro🔝   Escorts S...
➥🔝 7737669865 🔝▻ Bokaro Call-girls in Women Seeking Men 🔝Bokaro🔝 Escorts S...
 
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men 🔝dehradun🔝 Escor...
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men  🔝dehradun🔝   Escor...➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men  🔝dehradun🔝   Escor...
➥🔝 7737669865 🔝▻ dehradun Call-girls in Women Seeking Men 🔝dehradun🔝 Escor...
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 

Internship Training and Report

  • 1. School of Architecture, Building and Design Bachelor of Science (Hons) in Architecture Internship Training and Report (ARC2615) FINAL REPORT Ar. Ho Chin Keng | Supervising Architect Keith Tan Kay Hin | Lecturer Joyce Wee Yi Qin | Student 0319602 | Student ID
  • 2. Internship Training and Report | Final Report All image rights reserved to aLM Architects.
  • 3. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Introduction This module aims to introduce students to the requirements, activities and operations involved in an architectural and construction practice. The objective of the module is to facilitate the involvement of students in professional attachments to architectural practices to help us develop an understanding of the general nature, principles and procedure of law and legislation as applied to architectural drawings, especially the building by-laws. In the process of the internship, I am exposed to the submission process and the range of contract documentation besides the usual design stages. For this module, I was successfully accepted to attach to aLM Architects, one of the biggest architecture firm in Penang. The training period commenced at 3rd January to 3rd March (8 weeks). During this intensive 8 weeks, I was assigned to attend to different tasks ranging from design stage to contract documentation with several meetings and site visits along the way. This report compiles my experience during this 9 weeks with aLM Architects.
  • 4. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Week 1 | 3rd January to 6th January Task 1: Paramount My task was to make minor editings on the 3D model of a housing project in Bandar Aman Jaya, Kedah. I added fences to the building boundary and also added economic yet functional and aesthetic details to the façade design of the surau, hall and residential buildings before rendering using Sketch Up and Photoshop. Task 2: Prisma After completing my first task, I was assigned to produce the door and window schedule of a high rise residential project in Gerbang Bukit Kecil, Penang (Prisma). Through this task, I am aware of the different materials and requirements of doors and windows in a building. (Appendix1) Meeting 1: Lafarge On Wednesday, one of my colleague invited Lafarge for a meeting to enquire on Agilia™, a self-compacting and self-levelling concrete which he was planning to use to construct the shear walls in his project with Prisma. Meeting 2: aLM Green On Friday, our office participated in a discussion with a member of aLM Green about the update on OTTV and Roof U-values. During the discussion, we were exposed to the local green building requirements and ways to achieve optimum passive design such as coping, wall-to-window ratio etc.
  • 5. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Week 2 | 9th January to 13th January Task 1: Prisma On the second week, I wrapped up my previous assignment on the Door and window schedule which required some minor adjustments after being gone through by a senior in the office. (Appendix1) Task 2: Prisma I was assigned to produce tender drawings of the toilet details of the residential units, Type A and Type B. My task was to gather the specifications to produce detailed sections and plans of the toilets with dimensions. Meeting 1: Prisma On Tuesday, I attended a client meeting alongside the PIC. During the meeting, a few issues were brought up including the confusion in levelling and connection between the parking lots and the residential units. At the end of the meeting the former was resolved and the latter was left to be discussed. Task 3: Paramount (Sketching) On Wednesday, I was assigned to design a surau on a 36.7m x 33.082m plot in Kedah from scratch. During this initial stage, I plotted out the setback and building lines and also researched on the basic requirement of spaces in a surau which includes praying halls, ablutions, bilik jenazah and washrooms (Appendix 2). Through this task, I am aware that there are strict rules on the directions and sizes of the prayer halls and the ablutions. Also, there are local requirements on the set back and building lines.
  • 6. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Week 3 | 16th January to 20th January Task 1: Paramount (Drafting + 3D Modelling) This week I drafted out the plans of the surau and produced an improved plan daily. The spaces were shifted and mirrored per the needs of the users and the ease of access. I took in advice from Muslim colleagues on their usual rituals to have a grasp on their routine so I can design to their needs (Appendix 2). On Thursday, I started constructing the 3D model to play around with the façade design. The façade design was finalized at the end of the week. Meeting 2: Fuji Elevator (M) Sdn Bhd. On Wednesday, I participated in a meeting with an elevator supplier which is new in the Malaysian market. During the meeting, I was introduced to different mechanical transportation systems, the construction process and their different authority requirements such as a full height motor room. Week 4 | 23rd January and 24th January Task 1: Paramount (3D Model + Presentation Drawings) This week, I did some final touches on the roof and window designs before proceeding to the presentation drawings and perspective renders. In the meantime, I also aided one of my colleague on her façade design (Appendix 2). Task 2: Prisma On Tuesday, I was assigned to make some changes on the door and window schedule I did previously as there were new updates from the client where day requested to lessen the types of doors and windows in the design.
  • 7. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Week 5 | 6th February to 10th February Task 1: Asia Bina KL- Seputih (MAYC) This week, I was assigned to team up with the other two interns to work on a SOHO and hostel apartment, which will replace the existing MAYC Hotel in Seputih, KL. Our task was (Appendix 3): 1. To double line the proposed single-lined plans 2. To make minor adjustments to refine the plans 3. To come out with the landscape design 4. To hatch, add spatial details for presentation purposes Task 2: Kuala Kedah Semi-D Shop Lot My second task of the week involves the preparation of the building plan of Semi-D shops proposed to be built along the shoreline at Kuala Kedah. I was also involved in (Appendix 4): 1. Making minor adjustments in the façade design. 2. Study and make structural additions on the layered roofs at the front facade Task 3: Paramount Surau (Sketches) Late Friday, I followed up on the surau design I did earlier on. The PIC came back with comments from the client insisting on maximizing the prayer halls instead of having study rooms. Amendments was done accordingly to the plans. I ended the week with new sketches of the plans and the spatial arrangements (Appendix 2).
  • 8. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Week 6 | 13th February to 17th February Task 1: Paramount Surau Following up on the new sketches, I produced new presentation drawings for the surau and the 3D model. For the entire exterior of the building, I took on an approach different from the previous design. The previous design was said to be costly and heavy in terms of visual. Thus, I reconstructed my concept to create a space that connects man and god which is protected within by different layers. The outcome was more minimal and raw compared to the previous design (Appendix 2). Task 2: Kuala Kedah Semi-D Shop Lot My second task of the week involves amendments on the building plan of the Semi-D shops done previously. While completing this task, I was aware of the Bomba requirements on the running distance within enclosed space with dead ends and the loop holes in the different regulations involving fire escape requirements.
  • 9. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Week 7 | 20th February to 24th February Task 1: Paramount Guard House This week, I was assigned to make adjustments on the 3D model and Building Plans of the guard house after having it reviewed by the engineers. Later on, I compiled different perspectives of the building in presentation slides to be sent to the client. Task 2: Mr Wong SPA I was also involved in producing drawings for the Sales and Purchase Agreement for a project involving 12-units of terrace houses. Task 3: Firma Atasan Technique School Jiahui and I was assigned to design a technique school to replace an existing office complex and a warehouse. We were given complete freedom in developing our concepts and plans. Our task was to design a building for: a. 1 Automotive Centre b. 1 Auditorium (400pax) c. 1 Library d. Laboratory e. 10 classrooms (40pax each) f. Cafeteria g. Lecturer and Dean Offices Our design intention for the school was based on the intention of wanting to create a learning space that is sociable, less rigid and formal. As such, breakout spaces are incorporated for students to relax and unwind themselves amidst the busy and stressful academic life. Emphasis was placed upon the greenery-infused pocket spaces and open areas whereby students will have the freedom to hold activities or express themselves. (Appendix 5) Thanks to our very encouraging and passionate supervisor, we managed to come out with a plan that is out of ordinary. Site Visit 1: Bionic On Friday, we followed Ar. Ho Chin Keng to an ongoing construction site at Bukit Mertajam for a site meeting. The project includes 1. 32-storey strata residential + commercial building with a sky bridge 2. Individual shops 3. Low cost apartment
  • 10. Internship Training and Report | Final Report All image rights reserved to aLM Architects. The site is close to completion so it was more convenient for us to walk around. We participated in a discussion with a representative from the client regarding the issues on the construction. During the walkthrough, I was aware of the details in design and also the miscommunication that usually occur when instructions are being given. I am also aware of the responsibilities of the architect to make decisions when problems occur and to lead a team of people.
  • 11. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Week 8 | 27th February to 3rd March Task 1: Paramount Surau (Minor Edits) The 3D model of the surau is further edited from the comments from the clients which prefers a more vernacular design (the first design) Task 2: TPPT Site Meeting This week, we attended an on-site site meeting with TPPT regarding the ongoing construction of a medium cost high rise residential building in Teluk Bahang, Penang. The meeting was chaired by Ar. Sam. The meeting was a progress meeting, several issues such as change of material and costing was raised in the meeting. Task 3: Building Department for Prisma On Thursday, we tagged along a colleague from the authority department to KOMTAR, where most of the council offices are housed. We went to the building department to make some edits on the plans for Prisma after the inspection of the Architect in charge. Through this visit, I am aware of the responsibilities of the authorities in inspecting the drawings.
  • 12. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Task 4: Eco Jerai Proposal Eco Jerai is a proposal of developing 3 small islands nearby the foot of Gunung Jerai into tourist attractions. Together with the other interns, I was assigned to design and produce the programme of the man-made islands surrounding the coast to prevent muddy waters from entering the tourist spots. My task includes: 1. Programme and zoning of the islands 2. 3D model with building massings on the islands 3. Renderings 4. Presentation slides
  • 13. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Appendix 1: Prisma | Novus Tender Drawings
  • 14. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Appendix 2: Paramount | Surau Version 1: Setback and building line is determined. Parking lots surrounds the perimeter of the Surau. Spatial requirements fulfilled. Version 2: Due to 6.1m internal road width requirement, Parking space at the front Study room extended.
  • 15. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Version 3: Bilik Pengurusan Jenazah shifted to front for functional purposes. Version 2: Additional details and landscape at reading room.
  • 16. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Front elevation Right elevation Back elevation Left elevation
  • 17. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Final floor plan | Maximized prayer hall
  • 18. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Front elevation Right elevation Back elevation Left elevation
  • 19. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Appendix 3: Asia Bina KL | SOHO + MAYC Hostel
  • 20. Internship Training and Report | Final Report All image rights reserved to aLM Architects.
  • 21. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Appendix 4: Kuala Kedah | Semi-D Shop Building Plan
  • 22. Internship Training and Report | Final Report All image rights reserved to aLM Architects.
  • 23. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Appendix 5: Firma Atasan | Technique School
  • 24. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Appendix 6: Testimonial Letter
  • 25. Internship Training and Report | Final Report All image rights reserved to aLM Architects. Conclusion During this intensive 8 weeks of internship, I have been exposed to many things professionally. I am aware of the responsibilities of an Architect as a designer and an administrator. Besides all the usual reading and understanding drawings, UBBL requirements, drafting etc., there is still a lot more to learn to be a great professional architect. Through discussions with my colleagues in the office, I have learnt that as an architect we must hold on to our values and to fight for what is right. During the internship, I’ve experience the conflict between design and cost. There were times where my design was not accepted by the clients due to cost. Disappointed to how much design should compromise for profits, I tried to balance between both. “Architecture is tough, but when you see the community putting use into your design, you’ll have goosebumps and you will realize that all the blood, sweat and tears are all worth it” - Ar. Ho Chin Keng