2. BlueTEC in remote locations
Ir. Allard van Hoeken MBA
Head of New Energy
3. Over 35 years of marine
engineering and operations of
permanently moored systems
• FPSOs: Design, Build,
Own and Operate
• SPM: Single Point
Moorings
• Tidal Energy
Bluewater Energy Services BV
4.
5.
6. Bluetec Texel Tidal platform: modular
Fully transportable by
container transport
11. BlueTEC Modular complete package
Bluewater offers the complete system as standard package:
platform, turbine, controls, power cable, mooring system,
transport to any container port worldwide