Whitetopping:
The Minnesota Experience
Matthew (Matt) Zeller, PE
Concrete Paving Association of MN
Nebraska Concrete Paving Association
39th Annual Concrete Paving Workshop
Tuesday January 16th, 2018
Cornhusker Marriott Hotel, Lincoln, NE
Concrete Overlays:
The Minnesota Experience
Nebraska Concrete Paving Association
31st Annual Concrete Paving Workshop
Tuesday January 19th , 2010
Cornhusker Hotel, Lincoln, NE
Matt Zeller, PE
Concrete Paving Assoc. of MN
Concrete Overlays
 Concrete over existing asphalt or concrete
 Ultra-thin (less than 4”)
 Thin (4” to 6”)
 Conventional (greater than 6”)
 Old Teminology
 Unbonded Overlay (UBOL)
 Whitetopping
Minnesota Market
Year
TOTAL
CONCRETE
PAVING - S.Y.
Rolling 3 Year
Average
STATE AIRPORT COUNTY
2007 1,489,201 1,312,562 1,015,999 217,564 167,308
2008 1,597,218 1,275,176 980,122 129,748 309,898
2009 3,695,387 2,260,602 2,816,691 251,378 490,290
2010 3,055,392 2,782,666 2,137,367 68,775 782,697
2011 2,557,705 3,102,828 1,975,435 78,132 396,982
2012 3,170,562 2,927,886 2,241,083 58,721 729,953
2013 1,936,729 2,554,999 1,218,095 60,787 522,028
2014 3,602,432 2,903,241 2,863,843 8,038 586,750
2015 3,025,504 2,933,807 2,061,774 114,083 748,356
2016 2,084,330 2,763,911 1,181,931 91,590 702,394
2017(est.) 3,125,876 2,754,974 2,228,992 24,995 837,568
2017 Overlay Breakdown
Market SY
Air 24,995
City 34,321
County 837,568 595,523 SY OL 595,523 Thin OL
MnDOT 2,228,992 1,026,406 SY OL 680,000 Thin OL
TOTAL: 3,125,876 52% overlays 41% Thin Overlays
2016 Overlay Breakdown
County Market Trend
Price Estimating
Website Tools
 www.concreteisbetter.com
 Case Studies
 Recent Abstracts
 Sample Plans
 Workshop Presentation
Recent Abstracts
Sample Plans
Overlays
PCC vs ACC
Concrete
 Over concrete
 Over asphalt
 Short life
 Long life
Asphalt
 Over concrete
 Reflective cracks
 Over asphalt
 Reflective cracks
 Short life (typical)
 Long life ???
MnROAD
MnROAD
MnROAD Phase II Mainline Details
 Cell 5
 Unbonded Overlay
 300’ – 4”
 300’ – 5”
 1” asphalt bond breaker or
fabric bond breaker
 No steel
 15’ joint spacing
Unbonded PCC Overlay
105 205 305 405
5 5 5 5
1" PSAB 1" PSAB
1" PSAB 1" PSAB
Oct 08 Oct 08 Oct 08 Oct 08
Current Current Current Current
Clay
LTine
Clay
LTine
7.1"
cracked
'93 PCC
3"cl4sp
27"
Cl3sp
Orig
20x14
20x13
HMA
Should
1" dowel
Clay
LTine
5"4"
7.1"
cracked
'93 PCC
5"
7.1"
'93 PCC
3"cl4sp
27"
Cl3sp
Orig
20x14
20x13
HMA
Should
1" dowel
7.1"
'93 PCC
3"cl4sp
27"
Cl3sp
Orig
20x14
20x13
HMA
Should
1" dowel
4"
3"cl4sp
27"
Cl3sp
Orig
20x14
20x13
HMA
Should
1" dowel
Clay
LTine
MnROAD 2017
 Cell 5 (705 & 805)
 Old cells 305 & 405 were in
service for 9 years (9 million
ESALs)
 5” Unbonded Overlay
 250’ – Fibers/Long joints
 300’ – No Fibers/ Short Joints
 Fabric Bond Breaker
 Note cells 505 & 605 replaced
Cells 105 & 205 (4” UBOL) in
2011
3” FRC
6’x6’ panels, 6.5 lb/yd3 Propex fibers
Fabric interlayer (standard/thin)
Silty/Clay
Thickened-edge PCC
5.5-7” design (1993)
5” Class 5 Sp (1993)
Silty/Clay
Cell 40:
Faulted joints (undoweled),
cracked panels,
skewed joints
Ultrathin Unbonded Concrete Overlay
Cells 140 and 240
Constructed in 2013 over LVR Cell 40
Nonwoven geotextile
fabric interlayer
 Standard weight
(Cell 240)
 ½ of standard
weight (Cell 140)
MnROAD Results
MN TH 65 Whitetopping
MN TH 59 4.5” Whitetopping
MN TH 59 4.5”
Whitetopping
McLeod Co 3
Steele Co 45
Cottonwood Co 1
I-35 North of Twin Cities
“6 x 6 x 6”
I-35 North of Twin Cities
“6 x 6 x 6”
Anoka Co
Anoka Co
Anoka Co
Clay Co
Scott Co
Washington Co
Washington Co
Washington Co
Moorhead
Moorhead
Olmsted Co
Olmsted Co
Olmsted Co
Benefits of Concrete Overlays
 Provides cost effective solutions - $ for $ the best
long term rehabilitation option
 Construct quick and conveniently
 Typically, no need to remove existing pavement
 Little pre-overlay repairs required in most cases
 Uses standard concrete paving equipment
 Accelerated practices can be used - can be opened in a
day
Benefits of Concrete Overlays
 Can be repaired easily
 Durable - Olmsted Co 10 (1982 – 35 years old)
 One major repair after 33 years
 Looking for 20+ more years
 Inherent sustainable properties
 Cool
 Long life
 Improved mileage
Benefits of Concrete Overlays
 Increased safety
 Better skid resistance
 No rutting or shoving
 Improved visibility
 Partial bond creates composite section adding to
design life
 Short panels reduce curling and warping stresses
as well as minimizing expansion/contraction
P.S.
 In one two minutes or less…
Fiber Reinforced Concrete
MnROAD – City Street Section
MnROAD – Early Opening
The Experiment
• Paved Cells 524 to 124, so 124 was the youngest before loading
• Cells 124 to 524 Longitudinal Test
• Cell 124 – Torture test
• Cell 224 – 5-3/4 hours old
• Cell 324 – 8-1/3 hours old
• Cell 424 – 10-1/2 hours old
• Cell 524 – Control
• Cell 624 Transverse Test
The Experiment – Longitudinal
124 224 324 424 524
3
hrs.
5-3/4
hrs.
8-1/3
hrs.
10-1/2 hrs. No Load
Concrete Age:
Burnham - NCC 2017
3 hours
2
hours
MnROAD – Early Opening
Thank You
Questions?

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (9)

Pole Line Hardware
Pole Line HardwarePole Line Hardware
Pole Line Hardware
 
Types of Concrete Block Used in Building Construction
Types of Concrete Block Used in Building ConstructionTypes of Concrete Block Used in Building Construction
Types of Concrete Block Used in Building Construction
 
Fsi module 2 v2 reorganized corium
Fsi module 2 v2 reorganized coriumFsi module 2 v2 reorganized corium
Fsi module 2 v2 reorganized corium
 
Durapro polish concrete flooring
Durapro polish concrete flooringDurapro polish concrete flooring
Durapro polish concrete flooring
 
brickwork, plastering and waterproofing
brickwork, plastering and waterproofingbrickwork, plastering and waterproofing
brickwork, plastering and waterproofing
 
Woodworking tips- furniture fittings
Woodworking tips- furniture fittingsWoodworking tips- furniture fittings
Woodworking tips- furniture fittings
 
Presentation on how to do AAC Blockwork
Presentation on how to do AAC BlockworkPresentation on how to do AAC Blockwork
Presentation on how to do AAC Blockwork
 
concrete block properties & types
concrete block properties & typesconcrete block properties & types
concrete block properties & types
 
Pointing brickwork
Pointing brickworkPointing brickwork
Pointing brickwork
 

Ähnlich wie Whitetopping: The Minnesota Experience

Florida installation manual(frsa) manual de instalacion
Florida installation manual(frsa) manual de instalacion Florida installation manual(frsa) manual de instalacion
Florida installation manual(frsa) manual de instalacion Luis Gonzalez
 
Slag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterSlag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterJill Reeves
 
IRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
IRJET- An Experimental Study of Ductile Behavior of Ferrocement SlabIRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
IRJET- An Experimental Study of Ductile Behavior of Ferrocement SlabIRJET Journal
 
Concrete Road
Concrete RoadConcrete Road
Concrete RoadKp Ahm
 
Civil Activities Productivity Rates - International .pdf
Civil Activities Productivity Rates - International .pdfCivil Activities Productivity Rates - International .pdf
Civil Activities Productivity Rates - International .pdfShahzadTabassum8
 
STUDY ON STRENGTH OF CONCRETE BY PARTIAL REPLACEMENT OF CEMENT WITH ALKALI RE...
STUDY ON STRENGTH OF CONCRETE BY PARTIAL REPLACEMENT OF CEMENT WITH ALKALI RE...STUDY ON STRENGTH OF CONCRETE BY PARTIAL REPLACEMENT OF CEMENT WITH ALKALI RE...
STUDY ON STRENGTH OF CONCRETE BY PARTIAL REPLACEMENT OF CEMENT WITH ALKALI RE...IRJET Journal
 
KTU CE 204 Construction Technology - Module 2
KTU CE 204 Construction Technology - Module 2KTU CE 204 Construction Technology - Module 2
KTU CE 204 Construction Technology - Module 2Bennet Kuriakose, PhD
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017ktx500
 
Experimental Investigation To Prepared Mix Design of M25 And M20 Grade of Con...
Experimental Investigation To Prepared Mix Design of M25 And M20 Grade of Con...Experimental Investigation To Prepared Mix Design of M25 And M20 Grade of Con...
Experimental Investigation To Prepared Mix Design of M25 And M20 Grade of Con...IRJET Journal
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxRipanJena
 
Electroplating - Spencer Electroplating
Electroplating - Spencer ElectroplatingElectroplating - Spencer Electroplating
Electroplating - Spencer Electroplatingspencerelectroplating
 
Design and construction procedure of otta seal
Design and construction procedure of otta sealDesign and construction procedure of otta seal
Design and construction procedure of otta sealSujit Dhital
 
Concrete Chapter Three.pptx
Concrete Chapter Three.pptxConcrete Chapter Three.pptx
Concrete Chapter Three.pptxssuserb4074f
 
L. labour-charges-for-11k v-system-1
L. labour-charges-for-11k v-system-1L. labour-charges-for-11k v-system-1
L. labour-charges-for-11k v-system-1Ramesh Meti
 
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...R C Patil Patil
 

Ähnlich wie Whitetopping: The Minnesota Experience (20)

Florida installation manual(frsa) manual de instalacion
Florida installation manual(frsa) manual de instalacion Florida installation manual(frsa) manual de instalacion
Florida installation manual(frsa) manual de instalacion
 
Slag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform BetterSlag Cement: Helping Concrete Perform Better
Slag Cement: Helping Concrete Perform Better
 
IRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
IRJET- An Experimental Study of Ductile Behavior of Ferrocement SlabIRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
IRJET- An Experimental Study of Ductile Behavior of Ferrocement Slab
 
Concrete Road
Concrete RoadConcrete Road
Concrete Road
 
Civil Activities Productivity Rates - International .pdf
Civil Activities Productivity Rates - International .pdfCivil Activities Productivity Rates - International .pdf
Civil Activities Productivity Rates - International .pdf
 
STUDY ON STRENGTH OF CONCRETE BY PARTIAL REPLACEMENT OF CEMENT WITH ALKALI RE...
STUDY ON STRENGTH OF CONCRETE BY PARTIAL REPLACEMENT OF CEMENT WITH ALKALI RE...STUDY ON STRENGTH OF CONCRETE BY PARTIAL REPLACEMENT OF CEMENT WITH ALKALI RE...
STUDY ON STRENGTH OF CONCRETE BY PARTIAL REPLACEMENT OF CEMENT WITH ALKALI RE...
 
KTU CE 204 Construction Technology - Module 2
KTU CE 204 Construction Technology - Module 2KTU CE 204 Construction Technology - Module 2
KTU CE 204 Construction Technology - Module 2
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017
 
Casting
CastingCasting
Casting
 
Experimental Investigation To Prepared Mix Design of M25 And M20 Grade of Con...
Experimental Investigation To Prepared Mix Design of M25 And M20 Grade of Con...Experimental Investigation To Prepared Mix Design of M25 And M20 Grade of Con...
Experimental Investigation To Prepared Mix Design of M25 And M20 Grade of Con...
 
NNH
NNHNNH
NNH
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptx
 
Electroplating - Spencer Electroplating
Electroplating - Spencer ElectroplatingElectroplating - Spencer Electroplating
Electroplating - Spencer Electroplating
 
Design and construction procedure of otta seal
Design and construction procedure of otta sealDesign and construction procedure of otta seal
Design and construction procedure of otta seal
 
Spencer Electroplating Service
Spencer Electroplating ServiceSpencer Electroplating Service
Spencer Electroplating Service
 
Concrete Chapter Three.pptx
Concrete Chapter Three.pptxConcrete Chapter Three.pptx
Concrete Chapter Three.pptx
 
Shuttering PPT.pptx
Shuttering PPT.pptxShuttering PPT.pptx
Shuttering PPT.pptx
 
L. labour-charges-for-11k v-system-1
L. labour-charges-for-11k v-system-1L. labour-charges-for-11k v-system-1
L. labour-charges-for-11k v-system-1
 
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
 
Concrete
ConcreteConcrete
Concrete
 

Mehr von Jill Reeves

Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsJill Reeves
 
Drone Applications in Concrete Paving
Drone Applications in Concrete PavingDrone Applications in Concrete Paving
Drone Applications in Concrete PavingJill Reeves
 
PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionJill Reeves
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial GroupJill Reeves
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular ConcreteJill Reeves
 
40th Annual NCPA Workshop
40th Annual NCPA Workshop40th Annual NCPA Workshop
40th Annual NCPA WorkshopJill Reeves
 
Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement ConcreteJill Reeves
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyJill Reeves
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangeJill Reeves
 
Product Availability: Fly Ash
Product Availability: Fly AshProduct Availability: Fly Ash
Product Availability: Fly AshJill Reeves
 
Federal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsFederal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsJill Reeves
 
Silica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentSilica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentJill Reeves
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeJill Reeves
 
Upcoming Airport Projects
Upcoming Airport ProjectsUpcoming Airport Projects
Upcoming Airport ProjectsJill Reeves
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectJill Reeves
 
Pavement Asset Management
Pavement Asset ManagementPavement Asset Management
Pavement Asset ManagementJill Reeves
 
Iowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsIowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsJill Reeves
 
2018 Interground/Blended Cements
2018 Interground/Blended Cements2018 Interground/Blended Cements
2018 Interground/Blended CementsJill Reeves
 
Central Plains Cement Company
Central Plains Cement CompanyCentral Plains Cement Company
Central Plains Cement CompanyJill Reeves
 
Smart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of RoadsSmart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of RoadsJill Reeves
 

Mehr von Jill Reeves (20)

Proper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete PavementsProper Maintenance for the Long Life of Concrete Pavements
Proper Maintenance for the Long Life of Concrete Pavements
 
Drone Applications in Concrete Paving
Drone Applications in Concrete PavingDrone Applications in Concrete Paving
Drone Applications in Concrete Paving
 
PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. Reconstruction
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial Group
 
Low Density Cellular Concrete
Low Density Cellular ConcreteLow Density Cellular Concrete
Low Density Cellular Concrete
 
40th Annual NCPA Workshop
40th Annual NCPA Workshop40th Annual NCPA Workshop
40th Annual NCPA Workshop
 
Optimization of Pavement Concrete
Optimization of Pavement ConcreteOptimization of Pavement Concrete
Optimization of Pavement Concrete
 
Concrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing StrategyConcrete Overlays: A Proven Resurfacing Strategy
Concrete Overlays: A Proven Resurfacing Strategy
 
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a ChangePerformance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
Performance Engineered: Mixtures and AASHTO PP 84: It's Time for a Change
 
Product Availability: Fly Ash
Product Availability: Fly AshProduct Availability: Fly Ash
Product Availability: Fly Ash
 
Federal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and RegulationsFederal Motor Carrier Rules and Regulations
Federal Motor Carrier Rules and Regulations
 
Silica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation EquipmentSilica Rule Update / Silica Mitigation Equipment
Silica Rule Update / Silica Mitigation Equipment
 
ABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel BridgeABC in Nebraska: Belden to Laurel Bridge
ABC in Nebraska: Belden to Laurel Bridge
 
Upcoming Airport Projects
Upcoming Airport ProjectsUpcoming Airport Projects
Upcoming Airport Projects
 
Accelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build ProjectAccelerated Delivery - NDOT Design-Build Project
Accelerated Delivery - NDOT Design-Build Project
 
Pavement Asset Management
Pavement Asset ManagementPavement Asset Management
Pavement Asset Management
 
Iowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City AgreementsIowa DOT - Council Bluffs Border City Agreements
Iowa DOT - Council Bluffs Border City Agreements
 
2018 Interground/Blended Cements
2018 Interground/Blended Cements2018 Interground/Blended Cements
2018 Interground/Blended Cements
 
Central Plains Cement Company
Central Plains Cement CompanyCentral Plains Cement Company
Central Plains Cement Company
 
Smart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of RoadsSmart Concrete and Autonomous Cars: Building the Future of Roads
Smart Concrete and Autonomous Cars: Building the Future of Roads
 

Kürzlich hochgeladen

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

Whitetopping: The Minnesota Experience

  • 1. Whitetopping: The Minnesota Experience Matthew (Matt) Zeller, PE Concrete Paving Association of MN Nebraska Concrete Paving Association 39th Annual Concrete Paving Workshop Tuesday January 16th, 2018 Cornhusker Marriott Hotel, Lincoln, NE
  • 2. Concrete Overlays: The Minnesota Experience Nebraska Concrete Paving Association 31st Annual Concrete Paving Workshop Tuesday January 19th , 2010 Cornhusker Hotel, Lincoln, NE Matt Zeller, PE Concrete Paving Assoc. of MN
  • 3. Concrete Overlays  Concrete over existing asphalt or concrete  Ultra-thin (less than 4”)  Thin (4” to 6”)  Conventional (greater than 6”)  Old Teminology  Unbonded Overlay (UBOL)  Whitetopping
  • 4. Minnesota Market Year TOTAL CONCRETE PAVING - S.Y. Rolling 3 Year Average STATE AIRPORT COUNTY 2007 1,489,201 1,312,562 1,015,999 217,564 167,308 2008 1,597,218 1,275,176 980,122 129,748 309,898 2009 3,695,387 2,260,602 2,816,691 251,378 490,290 2010 3,055,392 2,782,666 2,137,367 68,775 782,697 2011 2,557,705 3,102,828 1,975,435 78,132 396,982 2012 3,170,562 2,927,886 2,241,083 58,721 729,953 2013 1,936,729 2,554,999 1,218,095 60,787 522,028 2014 3,602,432 2,903,241 2,863,843 8,038 586,750 2015 3,025,504 2,933,807 2,061,774 114,083 748,356 2016 2,084,330 2,763,911 1,181,931 91,590 702,394 2017(est.) 3,125,876 2,754,974 2,228,992 24,995 837,568
  • 5. 2017 Overlay Breakdown Market SY Air 24,995 City 34,321 County 837,568 595,523 SY OL 595,523 Thin OL MnDOT 2,228,992 1,026,406 SY OL 680,000 Thin OL TOTAL: 3,125,876 52% overlays 41% Thin Overlays
  • 9. Website Tools  www.concreteisbetter.com  Case Studies  Recent Abstracts  Sample Plans  Workshop Presentation
  • 12. Overlays PCC vs ACC Concrete  Over concrete  Over asphalt  Short life  Long life Asphalt  Over concrete  Reflective cracks  Over asphalt  Reflective cracks  Short life (typical)  Long life ???
  • 13.
  • 14.
  • 16. MnROAD Phase II Mainline Details  Cell 5  Unbonded Overlay  300’ – 4”  300’ – 5”  1” asphalt bond breaker or fabric bond breaker  No steel  15’ joint spacing Unbonded PCC Overlay 105 205 305 405 5 5 5 5 1" PSAB 1" PSAB 1" PSAB 1" PSAB Oct 08 Oct 08 Oct 08 Oct 08 Current Current Current Current Clay LTine Clay LTine 7.1" cracked '93 PCC 3"cl4sp 27" Cl3sp Orig 20x14 20x13 HMA Should 1" dowel Clay LTine 5"4" 7.1" cracked '93 PCC 5" 7.1" '93 PCC 3"cl4sp 27" Cl3sp Orig 20x14 20x13 HMA Should 1" dowel 7.1" '93 PCC 3"cl4sp 27" Cl3sp Orig 20x14 20x13 HMA Should 1" dowel 4" 3"cl4sp 27" Cl3sp Orig 20x14 20x13 HMA Should 1" dowel Clay LTine
  • 17. MnROAD 2017  Cell 5 (705 & 805)  Old cells 305 & 405 were in service for 9 years (9 million ESALs)  5” Unbonded Overlay  250’ – Fibers/Long joints  300’ – No Fibers/ Short Joints  Fabric Bond Breaker  Note cells 505 & 605 replaced Cells 105 & 205 (4” UBOL) in 2011
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. 3” FRC 6’x6’ panels, 6.5 lb/yd3 Propex fibers Fabric interlayer (standard/thin) Silty/Clay Thickened-edge PCC 5.5-7” design (1993) 5” Class 5 Sp (1993) Silty/Clay Cell 40: Faulted joints (undoweled), cracked panels, skewed joints Ultrathin Unbonded Concrete Overlay Cells 140 and 240 Constructed in 2013 over LVR Cell 40 Nonwoven geotextile fabric interlayer  Standard weight (Cell 240)  ½ of standard weight (Cell 140)
  • 24. MN TH 65 Whitetopping
  • 25. MN TH 59 4.5” Whitetopping
  • 26. MN TH 59 4.5” Whitetopping
  • 30. I-35 North of Twin Cities “6 x 6 x 6”
  • 31. I-35 North of Twin Cities “6 x 6 x 6”
  • 45. Benefits of Concrete Overlays  Provides cost effective solutions - $ for $ the best long term rehabilitation option  Construct quick and conveniently  Typically, no need to remove existing pavement  Little pre-overlay repairs required in most cases  Uses standard concrete paving equipment  Accelerated practices can be used - can be opened in a day
  • 46. Benefits of Concrete Overlays  Can be repaired easily  Durable - Olmsted Co 10 (1982 – 35 years old)  One major repair after 33 years  Looking for 20+ more years  Inherent sustainable properties  Cool  Long life  Improved mileage
  • 47. Benefits of Concrete Overlays  Increased safety  Better skid resistance  No rutting or shoving  Improved visibility  Partial bond creates composite section adding to design life  Short panels reduce curling and warping stresses as well as minimizing expansion/contraction
  • 48. P.S.  In one two minutes or less…
  • 50. MnROAD – City Street Section
  • 51. MnROAD – Early Opening
  • 52. The Experiment • Paved Cells 524 to 124, so 124 was the youngest before loading • Cells 124 to 524 Longitudinal Test • Cell 124 – Torture test • Cell 224 – 5-3/4 hours old • Cell 324 – 8-1/3 hours old • Cell 424 – 10-1/2 hours old • Cell 524 – Control • Cell 624 Transverse Test
  • 53.
  • 54. The Experiment – Longitudinal 124 224 324 424 524 3 hrs. 5-3/4 hrs. 8-1/3 hrs. 10-1/2 hrs. No Load Concrete Age: Burnham - NCC 2017
  • 57. MnROAD – Early Opening

Hinweis der Redaktion

  1. When I visited 8 years ago… Today I will have a bunch of words first, then a lot of photos of what we did.
  2. We (Minnesota) typically talk in UBOL and WT terms still. But as you will see in the next few slides overlays are becoming a very large part of our program.
  3. Thin overlays are 6” or less
  4. Our county market has really grown in the past several years and a big part of that growth is due to whitetopping projects.
  5. One of the tools we provide our counties is a price trend based on recent lettings
  6. Some other tools we have on our website to help designers
  7. Now, let’s talk a little more about overlays. I’m going to focus more on whitetopping type projects today since we discussed the UBOL’s a few year ago and not a lot has changed. I do have a couple UBOL related slides though to hit what we are doing there.
  8. UBOL on the interstate where we removed the shoulder full depth to add a new lane. UBOL was 3 years old.
  9. We have started using fabric as our bond breaker almost exclusively now for UBOLs
  10. Many of you have heard about MnROAD, but just a reminder where it is.
  11. Built in 2008 after I presented in the Winter.
  12. Built in 2008.
  13. MnROAD Cell 5 UBOL – original concrete broken with guillotine before UBOL
  14. 3” FRC UBOL on city street design
  15. Much of the information we have learned at MnROAD has gone into the Overlay Guide and the BCOA design methodology. The new UBOL design methodology will also incorporate much of what we have learned at MnROAD.
  16. And now some recent projects. Dueling contractors – PCi Roads one direction, Shafer the other.
  17. Note sealing the joints. We believe it is worth the time and money to seal. Efforts being made to ensure all joint deploy so we do not have only some joints taking up all the movement of the pavement.
  18. Their first concrete overlay project, 7.5 miles
  19. Built in 2009. Still very smooth.
  20. Built under traffic. One way loop. Very well signed.
  21. Quite heavy trucks
  22. Widened old slab – 20’ to 24’. Tie bar issues?
  23. Another one lane at a time. Remained open to local traffic including apple orchard and gravel pit.
  24. Inlay left C&G in.
  25. Inlay down to old gravel.
  26. Inlay. Lesson learned – isolate C&G so joints do not reflect through.
  27. Briefly cover different overlay types. Note difference in thickness and joint spacing between different overlay types.
  28. MnDOT letting 12.5 mile 5” FRC project February 2018