ROUGH-CUT
CAPACITY PLANNING
Capacity
Planning (RCCP)
 Type of capacity planning using some
load profiles (sometimes called
“representative routings) defined for
the product families, focused on key
or critical work centers, lines,
departments, cells, suppliers, and
support areas (engineering,
distribution, shipping).
Importance of RCCP
MRP system assumes that needed capacity always
is available.

RCCP helps to identify the key resources and to
test the feasibility of the supply plan, production
plan and master schedule before doing any
detailed capacity/material planning.

 It also helps to initiate action for making mid- to
long-term capacity adjustments.
What is RCCP and
    how does it work?
 Rough Cut Capacity Planning (RCCP) is a rough check
to evaluate all the key resources, to test the validity of
MPS, to determine the feasibility of fulfilling the
approved Production Plan that was developed in the
Sales & Operations Planning process.

  Once the master scheduler determines that a realistic
  plan exists, the production plan is then load into MRP to
  drive the allocation for all the lower-level materials. The
  production plan now translates into discrete part
  numbers, quantities and due dates.
Overstated MPS
It is a problem commonly
encountered in operating MRP
systems .
An overstated master production
schedule is one that orders more
production to be released than
production can complete.
Causes of Overstated MPS
It causes raw materials and WIP
inventories to increase.
It also causes a build-up of job queues
on the shop floor.
 Since jobs have to wait to be processed,
actual lead time increase.
As lead times increase, forecast
accuracy over the lead-time diminishes.
Few reasons of why RCCP
techniques are not used in
some companies are:
  Data requirements are quite high - firm
 demand, forecasts, past data, lead times,
 utilization, products and process
 knowledge.
 They don't have a stable MPS.
 They don't have the right skill, it is very
 time-consuming, or they are doing it the
 wrong ways.
Standard Time
   It refers to Setup time and Run
  time (processing time) which
  impact the workload on a
  resource because it actually tie
  up that resource.
Lead-Time Offset
   It is the time between the need
  for the resource and the date that
  the product has been promised.
  Lead-Time Offset is necessary if a
  product has longer lead times.
When using process routings sheet and
   BOM to create the Resource Profile, it is
   better to use this formula


Required Resource Time = (Run Time x BOM qty)
                       + (Setup Time x number
                       of Setups required)
                       + margin % of total
                       non- standard times
Several types of capacities
being used:
 Demonstrated Capacity
     - This is the proven or historical capacity
 of a key resource or work center.
 Demonstrated capacity could potentially
 change if resources are added or if operations
 are altered. In such case, adjustments to
 planned capacity must be considered before
 making evaluation of the production plan.
Planned Capacity
    - This is demonstrated capacity plus or minus
anticipated changes or adjustments to the
product-flow process.

Maximum Capacity
    - This is the maximum load a resource can
handle under any reasonable set of
circumstances. This can be achieved through
several means: use of available overtime, adding
shifts, staff additions, offload volume to outside
vendors, pay extra for supply priorities, paying
premium freights to expedite materials delivery,
etc).
Determining Capacity
Available or Planned
      Capacity
Adjustment Factors:
Utilization. Utilization is a number between 0
and 1 which is equal to 1 minus the proportion of
time typically lost due to machine breakdown,
labor shortage, parts failure, or material
unavailability.
Efficiency. Efficiency is defined as the average of
standard hours of actual production (after minus
the unavoidable lost time - setup time, change
shift, rest time).
If a time standard is exactly right,
efficiency is 1.
 If the time actually required to
perform the work is less than the
standard, efficiency is more than 1.
 If the time actually required to
perform the work is more than the
standard time, efficiency is less
than 1.
Capacity available is determined
by multiplying time available x
utilization x efficiency

  Capacity Available = Time Available
                      x Utilization
                      x Efficiency
The Resource Profile
Technique
 This technique is designed to convert the master
 production schedule from units of end items to
 be produced into the amount of time required on
 the key resources.
 Resource Profile approach considers lead-time
 offsets.
 Resource Profile technique is the most detailed
 rough-cut approach, but is not as detailed as
 Capacity Requirements Planning.
 Resource Profile technique uses detailed data on
 the time standards for each product at the key
 resources.
Time Standard
  It is the time it should take an
  average worker working at a normal
  pace to produce one unit of an item.
  The time standard for any part has
  built into it an allowance for rest to
  overcome fatigue or unavoidable
  delays, etc.
It would seems logical to accept that if
the required capacity is :

 No more than 10% greater than the
planned capacity, the master schedule is
considered realistic.
More than 20% greater than the planned
capacity, the master schedule is considered
unrealistic.
Between 10% and 20% greater than the
planned capacity, the master schedule is
questionable.
In many of today's ERP systems, there is
also a "What-If" scenarios analysis
capability being built into the capacity
planning module, that makes it possible
for the scheduler to juggle the numbers -
shifting workers, reschedule in and -out,
alternate routings, splitting lots, add
equipments, off-loading to vendors,
overtime, hiring temporary workers and
so on.
3 Approaches to Rough-
 Cut Capacity Planning
 Capacity planning using Overall factors
(CPOF) Approach – the least detailed
approach which is quickly computed but is
insensitive to shifts in product mix.
 Bill of Labor – a second approach which
involves multiplying two matrices, the bill of
labor and the master production schedule..
 Resource Profile – approach which takes
lead-time offsets into account.
Drum-buffer Rope
  It is an emerging procedure that
 eliminates the need for iteration
 found in all RCCP approaches.
  It is presently used by a small but
 growing number of corporations.
Material Requirements
   Planning (MRP)
  It uses Master Production Schedule
 (MPS) of end items to determine the
 quantity and timing of component part
 production.
  It is capacity insensitive; it implicitly
 assumes that sufficient capacity is
 available to produce components at the
 time they’re needed.
APICS Monograph
    (Berry, Voliman, and Whybark
   1979) presents case histories of
   several companies, including
   details on the capacity
   planning process.
Production Planning &
      Control
 Capacity management techniques usually
are separated into four categories that
represent the four time horizons :
 Manufacturing Resource Planning (MRP
II)
 Aggregate Production Planning
 Rough Cut Capacity Planning (RCCP)
 Capacity Requirements Planning (CRP).
In any MRP system, the same
sequence is to create a master
schedule, use Rough Cut Capacity
Planning to verify that the MPS is
feasible, perform the MRP
explosion, and send the Planned
Order Release data to Capacity
Requirements Planning
Role of RCCP in the overall PPC system:
 To develop an achievable Master Production Schedule.
 To plan and control priorities and capacities.
 Priority Planning is the process of specifying batch
 quantities and their start and finish dates for all Supply
 Orders where procurement and manufacturing are involved.
 Priority Control is making the right things at the right time.
 It is completely dependent on maintaining a balance
 between MPS requirements and factory Output rates, in
 which suppliers delivery performance is vital.
 Capacity planning is the task of determining how much
 output is needed from factory and from suppliers.
 Capacity control is the comparison between planned levels
 and actual outputs achieved, and the identification of
 significant variances above or below plan. Corrective action
 must be done quickly (adjust capacity or changing the
 master schedule).
Typical resources that might be planned as
pat of rough-cut capacity planning:
Overall plant capacity
Labor hours in total or for people with unique skills
Assembly hours in a specific cell or bottleneck
process.
Testing cell capacity
Engineering hours needed to configure the final
product to the customer’s specification.
Space required in a warehouse or storage area
Waste or effluent release, etc.
Shipping labor
Design time or credit release time
Inspection or QC time
Supplier Capacity
Rough-Cut Capacity
Planning Functions
Shows consumption of critical resources.
Enables master schedulers to:
   Test end-item production plans
   Calculate capacity to meet the master schedule
   Compare and modify required and planned
   capacity
   Analyze load on key resources by time period
   Isolate and resolve potential problems.
Rough-cut Capacity
Planning V.S. Capacity
      Planning
 CRP uses time-phased material plan
information, while RCCP uses aggregate data.
 MRP takes into account capacity stored as
inventory.
 Shop floor systems take into account W.I.P. –
only consider what's needed to complete the
requirement.
 CRP considers service and spare parts
requirements also.
EXAMPLE problem:
Let's assume a lamps manufacturer I call
it Johor's Lamps. Johor's Lamps runs 3
shifts, 120 hours per week from Monday
to Friday; Planned Production Lost Time
per shift (change shift & rest time) is 35
minutes, and company allows a
maximum overtime of 10% of per shift
either during weekdays or through Sat.
& Sunday.


Weitere ähnliche Inhalte

Was ist angesagt?

Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production scheduleMRPeasy
 
Master Scheduling
Master SchedulingMaster Scheduling
Master Schedulingpilly_leon
 
Pull Vs. Push Production
Pull Vs. Push ProductionPull Vs. Push Production
Pull Vs. Push ProductionZara Tariq
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Snehav Sharma
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps omfatuma ahmed
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and controlDacanay Elmer
 
Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningRaju Pegada
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLAttiMurugan
 
Basic of PPIC
Basic of PPICBasic of PPIC
Basic of PPICMoh Safii
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementSuryakumar Thangarasu
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planningjetromarquez
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
Material requirement planning
Material requirement planningMaterial requirement planning
Material requirement planningRajeev Sharan
 
Material Requirement and Planning
Material Requirement and PlanningMaterial Requirement and Planning
Material Requirement and PlanningAsim Irshad
 

Was ist angesagt? (20)

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
What is master production schedule
What is master production scheduleWhat is master production schedule
What is master production schedule
 
Master Scheduling
Master SchedulingMaster Scheduling
Master Scheduling
 
Pull Vs. Push Production
Pull Vs. Push ProductionPull Vs. Push Production
Pull Vs. Push Production
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Capacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity PlanningCapacity Requirement Planning, Rough Cut Capacity Planning
Capacity Requirement Planning, Rough Cut Capacity Planning
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Basic of PPIC
Basic of PPICBasic of PPIC
Basic of PPIC
 
MRP,MRP-II,JIT
MRP,MRP-II,JITMRP,MRP-II,JIT
MRP,MRP-II,JIT
 
Material requirement planning - Production and Operation Management
Material requirement planning - Production and Operation ManagementMaterial requirement planning - Production and Operation Management
Material requirement planning - Production and Operation Management
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
 
Aggregate Planning
Aggregate  PlanningAggregate  Planning
Aggregate Planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Material requirement planning
Material requirement planningMaterial requirement planning
Material requirement planning
 
JIT
JITJIT
JIT
 
Material Requirement and Planning
Material Requirement and PlanningMaterial Requirement and Planning
Material Requirement and Planning
 

Ähnlich wie Rccp report

Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityJoanRachelCalansingi
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011naveenupmanyu01
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011naveenupmanyu01
 
Productionplanning aggregate capacity
Productionplanning aggregate capacityProductionplanning aggregate capacity
Productionplanning aggregate capacityzmagtoto
 
prakash agrawal crp presentation
prakash agrawal   crp presentationprakash agrawal   crp presentation
prakash agrawal crp presentationAkash Maurya
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningPritam RW
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & schedulingvarun0610
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2samjune
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations schedulingFatima Aliza
 
Ch13 - Aggregate Planning
Ch13 - Aggregate PlanningCh13 - Aggregate Planning
Ch13 - Aggregate PlanningPelly Sianova
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningMOHD ARISH
 
Planning the AMPPLE Way
Planning the AMPPLE WayPlanning the AMPPLE Way
Planning the AMPPLE Wayatif.hussain
 
Capacity Planning.ppt
Capacity Planning.pptCapacity Planning.ppt
Capacity Planning.pptCamranKhan2
 

Ähnlich wie Rccp report (20)

Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
 
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
Reading 03 rough cut capa ci-ty planning_supplement for mps_2011
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
Close Loop Mrp
Close Loop MrpClose Loop Mrp
Close Loop Mrp
 
Close Loop MRP
Close Loop MRPClose Loop MRP
Close Loop MRP
 
Productionplanning aggregate capacity
Productionplanning aggregate capacityProductionplanning aggregate capacity
Productionplanning aggregate capacity
 
prakash agrawal crp presentation
prakash agrawal   crp presentationprakash agrawal   crp presentation
prakash agrawal crp presentation
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
Ch13 - Aggregate Planning
Ch13 - Aggregate PlanningCh13 - Aggregate Planning
Ch13 - Aggregate Planning
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Pom unit 3
Pom unit 3Pom unit 3
Pom unit 3
 
Planning the AMPPLE Way
Planning the AMPPLE WayPlanning the AMPPLE Way
Planning the AMPPLE Way
 
Capacity Planning.ppt
Capacity Planning.pptCapacity Planning.ppt
Capacity Planning.ppt
 

Mehr von jetromarquez

Inventory management-1224844053656038-9
Inventory management-1224844053656038-9Inventory management-1224844053656038-9
Inventory management-1224844053656038-9jetromarquez
 
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...jetromarquez
 
Inventory 1213683812410770-9
Inventory 1213683812410770-9Inventory 1213683812410770-9
Inventory 1213683812410770-9jetromarquez
 
C9inventorymanagement 111031134635-phpapp01
C9inventorymanagement 111031134635-phpapp01C9inventorymanagement 111031134635-phpapp01
C9inventorymanagement 111031134635-phpapp01jetromarquez
 
Relationships in supply systems 2
Relationships in supply systems 2Relationships in supply systems 2
Relationships in supply systems 2jetromarquez
 

Mehr von jetromarquez (11)

Inventory management-1224844053656038-9
Inventory management-1224844053656038-9Inventory management-1224844053656038-9
Inventory management-1224844053656038-9
 
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
Cdocumentsandsettingscromamydocumentssemivpminventorycontrol 100213073759-php...
 
Inventory 1213683812410770-9
Inventory 1213683812410770-9Inventory 1213683812410770-9
Inventory 1213683812410770-9
 
C9inventorymanagement 111031134635-phpapp01
C9inventorymanagement 111031134635-phpapp01C9inventorymanagement 111031134635-phpapp01
C9inventorymanagement 111031134635-phpapp01
 
Logistics
LogisticsLogistics
Logistics
 
3 in-1 scissors
3 in-1 scissors3 in-1 scissors
3 in-1 scissors
 
Penlight
PenlightPenlight
Penlight
 
Ppt in ppc(s&op)
Ppt in ppc(s&op)Ppt in ppc(s&op)
Ppt in ppc(s&op)
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
Logistics
LogisticsLogistics
Logistics
 
Relationships in supply systems 2
Relationships in supply systems 2Relationships in supply systems 2
Relationships in supply systems 2
 

Kürzlich hochgeladen

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...apidays
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 

Kürzlich hochgeladen (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 

Rccp report

  • 2. Capacity Planning (RCCP) Type of capacity planning using some load profiles (sometimes called “representative routings) defined for the product families, focused on key or critical work centers, lines, departments, cells, suppliers, and support areas (engineering, distribution, shipping).
  • 3. Importance of RCCP MRP system assumes that needed capacity always is available. RCCP helps to identify the key resources and to test the feasibility of the supply plan, production plan and master schedule before doing any detailed capacity/material planning. It also helps to initiate action for making mid- to long-term capacity adjustments.
  • 4. What is RCCP and how does it work? Rough Cut Capacity Planning (RCCP) is a rough check to evaluate all the key resources, to test the validity of MPS, to determine the feasibility of fulfilling the approved Production Plan that was developed in the Sales & Operations Planning process. Once the master scheduler determines that a realistic plan exists, the production plan is then load into MRP to drive the allocation for all the lower-level materials. The production plan now translates into discrete part numbers, quantities and due dates.
  • 5. Overstated MPS It is a problem commonly encountered in operating MRP systems . An overstated master production schedule is one that orders more production to be released than production can complete.
  • 6. Causes of Overstated MPS It causes raw materials and WIP inventories to increase. It also causes a build-up of job queues on the shop floor. Since jobs have to wait to be processed, actual lead time increase. As lead times increase, forecast accuracy over the lead-time diminishes.
  • 7. Few reasons of why RCCP techniques are not used in some companies are: Data requirements are quite high - firm demand, forecasts, past data, lead times, utilization, products and process knowledge. They don't have a stable MPS. They don't have the right skill, it is very time-consuming, or they are doing it the wrong ways.
  • 8. Standard Time It refers to Setup time and Run time (processing time) which impact the workload on a resource because it actually tie up that resource.
  • 9. Lead-Time Offset It is the time between the need for the resource and the date that the product has been promised. Lead-Time Offset is necessary if a product has longer lead times.
  • 10. When using process routings sheet and BOM to create the Resource Profile, it is better to use this formula Required Resource Time = (Run Time x BOM qty) + (Setup Time x number of Setups required) + margin % of total non- standard times
  • 11. Several types of capacities being used: Demonstrated Capacity - This is the proven or historical capacity of a key resource or work center. Demonstrated capacity could potentially change if resources are added or if operations are altered. In such case, adjustments to planned capacity must be considered before making evaluation of the production plan.
  • 12. Planned Capacity - This is demonstrated capacity plus or minus anticipated changes or adjustments to the product-flow process. Maximum Capacity - This is the maximum load a resource can handle under any reasonable set of circumstances. This can be achieved through several means: use of available overtime, adding shifts, staff additions, offload volume to outside vendors, pay extra for supply priorities, paying premium freights to expedite materials delivery, etc).
  • 13. Determining Capacity Available or Planned Capacity Adjustment Factors: Utilization. Utilization is a number between 0 and 1 which is equal to 1 minus the proportion of time typically lost due to machine breakdown, labor shortage, parts failure, or material unavailability. Efficiency. Efficiency is defined as the average of standard hours of actual production (after minus the unavoidable lost time - setup time, change shift, rest time).
  • 14. If a time standard is exactly right, efficiency is 1. If the time actually required to perform the work is less than the standard, efficiency is more than 1. If the time actually required to perform the work is more than the standard time, efficiency is less than 1.
  • 15. Capacity available is determined by multiplying time available x utilization x efficiency Capacity Available = Time Available x Utilization x Efficiency
  • 16. The Resource Profile Technique This technique is designed to convert the master production schedule from units of end items to be produced into the amount of time required on the key resources. Resource Profile approach considers lead-time offsets. Resource Profile technique is the most detailed rough-cut approach, but is not as detailed as Capacity Requirements Planning. Resource Profile technique uses detailed data on the time standards for each product at the key resources.
  • 17. Time Standard It is the time it should take an average worker working at a normal pace to produce one unit of an item. The time standard for any part has built into it an allowance for rest to overcome fatigue or unavoidable delays, etc.
  • 18. It would seems logical to accept that if the required capacity is : No more than 10% greater than the planned capacity, the master schedule is considered realistic. More than 20% greater than the planned capacity, the master schedule is considered unrealistic. Between 10% and 20% greater than the planned capacity, the master schedule is questionable.
  • 19. In many of today's ERP systems, there is also a "What-If" scenarios analysis capability being built into the capacity planning module, that makes it possible for the scheduler to juggle the numbers - shifting workers, reschedule in and -out, alternate routings, splitting lots, add equipments, off-loading to vendors, overtime, hiring temporary workers and so on.
  • 20. 3 Approaches to Rough- Cut Capacity Planning Capacity planning using Overall factors (CPOF) Approach – the least detailed approach which is quickly computed but is insensitive to shifts in product mix. Bill of Labor – a second approach which involves multiplying two matrices, the bill of labor and the master production schedule.. Resource Profile – approach which takes lead-time offsets into account.
  • 21. Drum-buffer Rope It is an emerging procedure that eliminates the need for iteration found in all RCCP approaches. It is presently used by a small but growing number of corporations.
  • 22. Material Requirements Planning (MRP) It uses Master Production Schedule (MPS) of end items to determine the quantity and timing of component part production. It is capacity insensitive; it implicitly assumes that sufficient capacity is available to produce components at the time they’re needed.
  • 23. APICS Monograph (Berry, Voliman, and Whybark 1979) presents case histories of several companies, including details on the capacity planning process.
  • 24. Production Planning & Control Capacity management techniques usually are separated into four categories that represent the four time horizons : Manufacturing Resource Planning (MRP II) Aggregate Production Planning Rough Cut Capacity Planning (RCCP) Capacity Requirements Planning (CRP).
  • 25. In any MRP system, the same sequence is to create a master schedule, use Rough Cut Capacity Planning to verify that the MPS is feasible, perform the MRP explosion, and send the Planned Order Release data to Capacity Requirements Planning
  • 26. Role of RCCP in the overall PPC system: To develop an achievable Master Production Schedule. To plan and control priorities and capacities. Priority Planning is the process of specifying batch quantities and their start and finish dates for all Supply Orders where procurement and manufacturing are involved. Priority Control is making the right things at the right time. It is completely dependent on maintaining a balance between MPS requirements and factory Output rates, in which suppliers delivery performance is vital. Capacity planning is the task of determining how much output is needed from factory and from suppliers. Capacity control is the comparison between planned levels and actual outputs achieved, and the identification of significant variances above or below plan. Corrective action must be done quickly (adjust capacity or changing the master schedule).
  • 27. Typical resources that might be planned as pat of rough-cut capacity planning: Overall plant capacity Labor hours in total or for people with unique skills Assembly hours in a specific cell or bottleneck process. Testing cell capacity Engineering hours needed to configure the final product to the customer’s specification. Space required in a warehouse or storage area Waste or effluent release, etc. Shipping labor Design time or credit release time Inspection or QC time Supplier Capacity
  • 28. Rough-Cut Capacity Planning Functions Shows consumption of critical resources. Enables master schedulers to: Test end-item production plans Calculate capacity to meet the master schedule Compare and modify required and planned capacity Analyze load on key resources by time period Isolate and resolve potential problems.
  • 29.
  • 30. Rough-cut Capacity Planning V.S. Capacity Planning CRP uses time-phased material plan information, while RCCP uses aggregate data. MRP takes into account capacity stored as inventory. Shop floor systems take into account W.I.P. – only consider what's needed to complete the requirement. CRP considers service and spare parts requirements also.
  • 31. EXAMPLE problem: Let's assume a lamps manufacturer I call it Johor's Lamps. Johor's Lamps runs 3 shifts, 120 hours per week from Monday to Friday; Planned Production Lost Time per shift (change shift & rest time) is 35 minutes, and company allows a maximum overtime of 10% of per shift either during weekdays or through Sat. & Sunday.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.