SlideShare ist ein Scribd-Unternehmen logo
1 von 51
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
TIPE PERKERASAN DI BANDARA
PERKERASAN LENTUR PERKERASAN KAKU
• CAMPURAN ASPAL DGN AGREGAT
• CAMPURAN INI DILETAKKAN DI
ATAS PERMUKAAN MATERIAL
GRANULAR MUTU TINGGI
(GRANULAR BASE AGGREGATE)
• DIBUAT DARI SLAB SLAB
BETON
• SLAB TSB DILETAKKAN DI ATAS
SUB BASE
SURFACES; CAMPURAN ASPAL
BASE COURSE; AGREGAT; STAB.
SEMEN, ASPAL ATAU UNTREATED
SUBBASE COURSE; AGREGAT; STAB.
SEMEN, ASPAL ATAU UNTREATED
TANAH DASAR
SURFACES; SLAB BETON
SUBBASE COURSE; AGRGAT
STABILISASI ASPAL, SEMEN DAN
UNTREATED
TANAH DASAR
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
LAPIS PERMUKAAN (SURFACES COURSE)
• BERFUNGSI LAPIS PERATA DAN KESELAMATAN
PENERBANGAN
• BERFUNGSI MENUMPU BEBAN RODA PESAWAT DAN MENAHAN
BEBAN BERULANG SERTA MENYEBARKAN KE LAPISAN DI
BAWAHNYA
LAPIS PONDASI ATAS (BASE COURSE)
• BERFUNGSI MENAHAN BEBAN RODA DAN MENERUSKAN KE
LAPISAN DI BAWAHNYA
• DIBUAT DARI MATERIAL AGREGAT, BISA MATERIAL
STABILSASI DENGAN SEMEN ATAU ASPAL
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
LAPIS PONDASI BAWAH (SUBBASE COURSE)
• BERFUNGSI MENAHAN BEBAN RODA DAN MENERUSKAN KE
TANAH DASAR
• DIBUAT DARI MATERIAL AGREGAT, BISA MATERIAL
STABILSASI DENGAN SEMEN ATAU ASPAL, KAPUR
METODE DESAIN PERKERASAN LAPANGAN TERBANG
• METODE CBR OLEH US CORPORATION OF ENGINEERS
• METODE FAA
• METODE LCN DARI INGGRIS
• METODE ASPHALT INSTITUTE
• METODE CANADIAN DEPARTEMEN OF TRANSPORTATION
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
METODE CBR
• DIKEMBANGKAN OLEH CALIFORNIA HIGHWAY DEPARTEMENT
SEJAK TAHUN 1942
• DIADOPSI DARI PERKERASAN JALAN RAYA
• OLEH CORPS OF ENGINEER DIMODIFIKASI UNTUK DISESUAIKAN
DENGAN KARAKTERISTIK BEBAN DAN TEKANAN RODA RODA
PESAWAT (25.000 lbs s/d 70.000 lbs DAN 60 psi) UNTUK BEBAN
RODA TUNGGAL (SWL)
• RODA RODA PESAWAT MULTIPLE WHEEL LOAD DIKONVERSI KE
ESWL
• KATEGORI RENCANA PEMBEBANAN RUNWAY (RINGAN, MEDIUM,
BERAT)
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
METODE CBR
( ) 





−+=
SCBR
PRT
.450
1
.1,8
1
.43,5log.71,8
OLEH CORPS OF ENGINEER,
METODE CBR MENJADI:
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
VARIABEL VARIABEL DESAIN METODE CBR
• CBR TANAH DASAR
• TIPE BEBAN PESAWAT DAN TIPE LALU LINTAS
• PERSYARATAN SUBBASE (LAPIS PONDASI BAWAH)
CBR RENCANA
MAKSIMUM UKURAN
% (INCHI) No. 10 No. 200
SUB BASE 50 3 50 15 25 5
SUBBASE 40 3 80 15 25 5
SUBSASE 30 3 100 15 25 5
MATEIAL
PILIHAN
20 3 - 25 35 12
LAPISAN
NILAI MAKSIMUM IJIN
PERSEN LOLOS SARINGAN
LL PI
• CBR RENCANA LAPIS PONDASI
TYPE CBR RENCANA (%)
AGREGAT BATU PECAH 100
MACADAM BASAH 100
MACADAM KERING 100
CAMPURAN ASPAL PANAS 100
BATU KAPUR 80
AGREGAT STABILISASI 80
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
VARIABEL VARIABEL DESAIN METODE CBR
• CBR RENCANA LAPIS PONDASI
RENCANA PEMBEBANAN BERAT
PERKERASAN BASE TOTAL PERKERASAN BASE TOTAL
A 5 10 15 6 9 15
B 4 9 13 5 8 13
C 4 9 13 5 8 13
D 3 6 9 3 6 9
JLN AKSES APRON 3 6 9 3 6 9
BAHU 2 6 8 2 6 8
TRAFFIC AREA
KETEBALAN MINIMUM (INCHI)
BASE: CBR 100% BASE: CBR 80%
RENCANA PEMBEBANAN MEDIUM
PERKERASAN BASE TOTAL PERKERASAN BASE TOTAL
A 4 6 10 5 6 11
B 3 6 9 4 6 10
C 3 6 9 4 6 10
JLN AKSES APRON 3 6 9 3 6 9
TRAFFIC AREA
KETEBALAN MINIMUM (INCHI)
BASE: CBR 100% BASE: CBR 80%
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
VARIABEL VARIABEL DESAIN METODE CBR
• CBR RENCANA LAPIS PONDASI
RENCANA PEMBEBANAN RINGAN
PERKERASAN BASE TOTAL PERKERASAN BASE TOTAL
B 3 6 9 4 6 10
C 3 6 9 3 6 8
JLN AKSES APRON 3 6 9 4 6 10
TRAFFIC AREA
KETEBALAN MINIMUM (INCHI)
BASE: CBR 100% BASE: CBR 80%
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
CONTOH:
RENCANAKAN PERKERASAN LENTUR UNTUK PEMBEBANAN
MEDIUM DENGAN TIPE TRAFFIC AREA TIPE A DARI DATA
MATERIAL SEBAGAI BERIKUT:
TEST CBR
% No. 10 No. 200
SUBGRADE
(TANAH ASLI)
6 ;- - 35 15
SUBBASE
(TANAH
DIPADATKAN)
10 - - 35 15
SUBSASE (1) 24 85 13 19 6
SUBBASE (2) 59 44 8 15 4
BASE BATU
PECAH
100 - ;- - -
PERSEN LOLOS SARINGAN
MATERIAL LL PI
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
JAWABAN:
TEST CBR
KETEBALAN DI ATAS
LAPISAN
% INCHI
SUBGRADE
(TANAH ASLI)
6 47 GBR 6.7, HERU B. HL. 283
SUBBASE
(TANAH
DIPADATKAN)
10 35 GBR 6.7, HERU B. HL. 283
SUBSASE (1) 24 (OK) 18 GBR 6.7, HERU B. HL. 283
SUBBASE (2) 59 (MAX.) 8 GBR 6.7, HERU B. HL. 283
BASE BATU
PECAH
100 6 (MIN) TABEL 6.3, HERU B. HL. 285
SURFACE - 4 (MIN) TABEL 6.3, HERU B. HL. 285
MATERIAL DIBACA DARI
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
METODE CBR
( ) 





−+=
SCBR
PRT
.450
1
.1,8
1
.43,5log.71,8
T = TEBAL PERKERASAN TOTAL (mm) DI ATAS TANAH DASAR
R = JUMLAH ESWL YANG BEKERJA (BEBAN BERULANG)
S = TEKANAN RODA (BAN) DALAM MPa
P = ESWL (kg)
UNTUK RODA PENDARATAN PESAWAT DENGAN MULTIPLE WHEEL
LOAD HARUS DIKONVERSI KE ESWL (EQUIVALENT SINGLE WHEEL
LOAD)
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
FAKTOR EKIVALEN MATERIAL
0,0091
0,0079
0,0059
CEMENT TREATED BASE,CTB):
KUBUS 7 HARI , 4,5 MPa
KUBUS 7 HARI , 3 MPa
KUBUS 7 HARI , < 2,7 MPa
0,0028SUBBASE, SIRTU
0,0055BATU PECAH (KERIKIL), CSB
0,017BETON ASPAL (AC)
KOEFISIEN FAKTOR
EKIVALEN
JENIS MATERIAL PERKERASAN
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
CONTOH:
RENCANAKAN TEBAL PERKERASAN LAPANGAN TERBANG UNTUK
MELAYANI BEBAN BERULANG 100.000 DARI ESWL, TEKANAN RODA 2 MPa,
ESWL = 27.000 kg, CBR TANAH DASAR = 5%. JENIS MATERIAL ADALAH
BETON ASPAL, CEMENT TREATED BASE (CTB) MUTU 4,5 MPa USIA 7 HARI,
SUBBASE BATU PECAH
PENYELESAIAN:
• HITUNG (T):
( ) mmT 12501236
2.450
1
5.1,8
1
000.2743,5000.100log71,8 ≈=





−+=
• HITUNG FAKTOR EQUIVALENT ANTAR SETIAP LAPISAN:
65,1
0055,0
0091,0
3
0055,0
017,0
====
CSB
CTB
CSB
AC
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
MISALNYA DIPILIH TEBAL AC = 150 mm EKIVALEN DENGAN:
3 x 150 = 450 mm CSB
MISAL CTB DIPILIH TEBAL = 200 mm EKIVALEN DENGAN:
1,65 x 200 = 330 mm CSB
SEHINGGA TEBAL CSB YANG DIBUTUHKAN ADALAH +
TCSB = 1250 – 450 – 330 = 470 mm
B E TON ASPAL, AC
CEMENT TREATED BASE, CTB
BATU PECAH, CSB
TANAH DASAR, CBR: 5%
150 mm
200 mm
470 mm
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
PERENCANAAN PERKERASAN LENTUR METODE FAA
• PERHITUNGAN TEBAL TIAP LAPISAN PERKERASAN
MENGGUNAKAN GRAFIK YANG TELAH DISIAPKAN OLEH FAA
• KATEGORI AREA PERKERASAN MELIPUTI AREA KRITIS DAN NON
KRITIS
• AREA KRITIS MELIPUTI: TAXIWAY, RW 300 m DARI UJUNG
THRESHOLD, APRON
• TEBAL AREA NON KRITIS BIASANYA 0,9 KALI KETEBALAN
KRITIS
• HARUS DITENTUKAN PESAWAT RENCANA UNTUK
PERHITUNGAN TEBAL PERKERASAN
• KARENA TIPE RODA PENDARATAN PESAWAT BERBEDA BEDA MAKA
HARUS DIKONVERSI KE DALAM PESAWAT RENCANA MELALUI
EQUIVELENT ANNUAL DEPARTURE PESAWAT CAMPURAN
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
RUMUS KONVERSI ADALAH:
( )
2/1
1
2
.21 





=
W
W
RLogRLog
R1 = EQUIVALENT ANNUAL DEPARTURE PESAWAT RENCANA
R2 = ANNUAL DEPARTURE PESAWAT PESAWAT CAMPURAN
DINYATAKAN DALAM RODA PENDARATAN PESAWAT
RENC.
W1 = BEBAN RODA DARI PESAWAT RENCANA
W2 = BEBAN RODA DARI PESAWAT YANG DITANYAKAN
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
RUMUS KONVERSI TIPE RODA PENDARATAN
KONVERSI DARI KE FAKTOR PENGALI
SINGLE WHEEL DUAL WHEEL 0,8
SINGLE WHEEL DUAL TANDEM 0,5
DUAL WHEEL DUAL TANDEM 0,6
DOUBLE DUAL TANDEM DUAL TANDEM 1,0
DUAL TANDEM SINGLE WHEEL 2,0
DUAL TANDEM DUAL WHEEL 1,7
DUAL WHEEL SINGLE WHEEL 1,3
DOUBLE DUAL TANDEM DUAL WHEEL 1,7
PARAMETER DALAM MENENTUKAN TEBAL PERKERASAN METODE FAA
• NILAI CBR TANAH DASAR
• NILAI CBR SUB BASE (PONDASI BAWAH)
• BERAT TOTAL/BERAT LEPAS LANDAS PESAWAT RENCANA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
CONTOH PERENCANAAN METODE FAA
RENCANAKAN TEBAL LAPIS PERKERASAN FLEXIBLE YANG MELAYANI
PESAWAT RENCANA DENGAN TIPE RODA PENDARATAN DUAL GEAR, BERAT
LEPAS LANDAS 75.000 lbs (34.000 kg), EQUIVALENT ANNUAL DEPARTURE 6000
DARI PESAWAT RENCANA, CBR SUBBASE 20% DAN CBR TANAH DASAR 6%
• HITUNG TEBAL PERKERASAN TOTAL
DENGAN MENGGUNAKAN GRAFIK DI
SAMPING, DIDAPAT:
T= 21,3 INC = 51,2 cm
• TEBAL SUB BASE DIDAPAT DARI GRAFIK
DISAMPING, DIDAPAT TEBAL SURFACE
DAN BASE:
TS_B = 9,4 INC = 23,876 cm= 24,0 cm
• MAKA TEBAL SUBBASE (TSB) =
TSB= 21,3 – 9,4 = 11,9 INC = 30,3 cm
21,39,4
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
• TEBAL LAPISAN ASPAL= 4 Inc= 10,2 cm
• TEBAL LAPIS PONDASI (TBC)=
TBC= 24 – 10,2= 13,8 cm
• SELANJUTNYA TEBAL TBC DIKONTROL
TERHADAP TBC MINIMUM DARI GRAFIK DI
SAMPING. DENGAN CBR 6% DI DAPAT :
TBC MIN = 6 Inc = 15,2 Cm > 13,8 CM
MAKA DIGUNAKAN TBC = 15,2 cm
SURFACE COURSE, T= 4 Inc = 10,2 cm
BASE COURSE, TBC= 15,2 cm
SUB BASE COURSE, TSB= 30,3 cm
TANAH DASAR, CBR = 6%
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
CONTOH:
DIBERIKAN DAFTAR PESAWAT YANG DIPERKIRAKAN HARUS DILAYANI
OLEH BANDARA YANG DIRENCANAKAN. HITUNGLAH EQUIVALENT ANNUAL
DEPARTURENYA DAN TEBAL PERKERASAN YANG DIBUTUHKAN JIKA
DIKETAHUI CBR TANAH DASAR = 6%
TIPE PESAWAT
FORECAST
ANNUAL
DEPARTURE
TIPE RODA
PENDARATAN MTOW (lbs)
727-100 3760 DUAL 160.000
727-200 9080 DUAL 190.000
707-320 B 3050 DUAL TANDEM 327.000
DC 9-30 5800 DUAL 108.000
CV-880 400 DUAL TANDEM 184.500
737-200 2650 DUAL 115.500
L-1011-100 1710 DUAL TANDEM 450.000
747-100 85 DOUBLE DUAL
TANDEM
700.000
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
PENYELESAIAN:
• TENTUKAN PESAWAT RENCANA, MISALNYA DIAMBIL 727-200
• HITUNG R2 ==== R2= FORECAST ANNUAL DEPARTURE x F. KONVERSI
PSWT 727-200 : R2 = 3760 x FAKTOR KONVERSI KE DUAL WHEEL
= 3760 x 1 = 3760
PSWT 707-320 B: R2= 3050 x 1,7= 5185
PERHITUNGAN R2 SELANJUTNYA LIHAT TABEL !!!
• HITUNG W2 ==== W2= MTOW x 0,95 x 0,25
PSWT 727-200 : W2 = MTOW x 0,95 x 0,25 = 160.000 x 0,95 x 0,25= 38.000
PERHITUNGAN W2 SELANJUTNYA LIHAT TABEL !!!
• HITUNG W1 ==== W1= 0,25 x 0,95 x MTOW PSWT RENC.
W1 = 0,25 x 0,95 x 190.000 = 45.125 lbs
• HITUNG EQUIVALENT ANNUAL DEPARTURE TERHADAP PSWT RENC (R1)
PSWT 727-100 : log R1= log 3760 . (38.000/45.125)0,5
= 1909
PERHITUNGAN SELANJUTNYA LIHAT TABEL !!!!!
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
DUAL GEAR
DEPARTURE,
R2
WHEEL LOAD
(lbs), W2
WHEEL LOAD
PSWT RENC,
W1
EQUIVALENT
ANNUAL
DEPARTURE
PSWT RENC,
R1
3760 38.000 45.125 1.909
9080 45.125 45.125 9.080
5185 38.831 45.125 2.792
5800 25.650 45.125 688
680 21.909 45.125 94
2650 27.431 45.125 467
2907 35.625 45.125 1.195
145 35.625 45.125 83
JUMLAH R1= 16.308
• DARI GRAFIK RENCANA PERKERASAN TIPE DUAL WHEEL GEAR
DENGAN CBR 6% DIDAPAT TEBAL TOTAL = 39 Inc = 99,1 cm
• DARI GRAFIK YANG SAMA, CBR= 20% TERBACA TEBAL = 18 Inc= 45,7 cm
TEBAL SUBBASE (TSB) = 39 – 18 = 21 Inc = 53,5 cm = 54 cm
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
21,39,4
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
• TEBAL LAPISAN ASPAL = 4 Inc = 10,2 cm
• TEBAL BASE COARSE (TBC) = 18 – 4= 14 Inc = 35,6 cm
• TEBAL MINIMUM TBC DIDAPAT DARI GRAFIK, CBR 6% = 13,2 Inc= 33,5 cm
KARENA TBC = 14 Inc > 13,2 Inc ==== DIPAKAI TBC= 14 Inc= 35,6 = 36 cm
SURFACE COURSE, T= 4 Inc = 10 cm
BASE COURSE, TBC= 36 cm
SUB BASE COURSE, TSB= 54 cm
TANAH DASAR, CBR = 6%
LAPISAN AREA KRITIS AREA NON KRITIS PINGGIR
SURFACE COARSE 4 inc 10 cm 3 inc 8 cm 2 inc 5 cm
BASE COARSE 14 inc 36 cm 13 inc 33 cm 10 inc 25 cm
SUBBASE COARSE 21 inc 54 cm 19 inc 48 cm 15 inc 38 cm
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
METODE LOAD CLASSIFICATION NUMBER (LCN)
• MERUPAKAN METODE PERENCANAAN PERKERASAN DAN
EVALUASI DINAS BINAMARGANYA INGGRIS YANG DIAKUI ICAO
• KAPASITAS DAYA DUKUNG/KUAT DUKUNG PERKERASAN
DINYATAKAN DALAM ANGKA LCN
• SETIAP PESAWAT BISA DINYATAKAN DALAM LCN
• ANGKA LCN TERGANTUNG PADA GEOMETRI RODA
PENDARATAN, TEKANAN RODA PESAWAT, KOMPOSISI TEBAL
PERKERASAN
• BILA ANGKA LCN PERKERASAN LAPANGAN TERBANG > LCN
PESAWAT MAKA PESAWAT DAPAT MENDARAT DENGAN SELAMAT
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
LANGKAH LANGKAH DALAM MERENCANAKAN PERKERASAN
LENTUR LAPANGAN TERBANG METODE LCN
• TENTUKAN HARGA EQUIVALENT SINGLE WHEEL LOAD
PESAWAT
• DARI TEKANAN RODA DAN KONTAK AREA YANG DIKETAHUI
BACALAH HARGA LCN DARI GRAFIK
KONTAK AREA= BEBAN RODA / TEKANAN RODA
• DARI HARGA LCN YANG DIDAPAT, BACALAH KETEBALAN
PERKERASAN BERKAITAN DENGAN NILAI CBR TIAP LAPISAN
DARI GRAFIK
NILAI LCN= 40 BERARTI PERKERASAN MAMPU
MELAYANI BEBAN 40.000 lbs TANPA MENGALAMI
KERUNTUHAN DENGAN KONTAK AREA 444 M2
DENGAN TEKANAN BAN 90 psi
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
CONTOH :
DIKETAHUI
ESWL = 42.000 lbs TEKANAN RODA PESAWAT= 150 psi
CBRTANAH DASAR= 5% CBRSUBBASE= 20% CBRBASE= 50%
HITUNGLAH TEBAL PERKERASANNYA
PENYELESAIAN:
• DARI GAMBAR TERBACA LCN 50
• DARI GAMBAR TEBAL PERKERASAN TOTAL= 28 inc
• TEBAL SUBBASE: LCN 50; CBR 20% TERBACA TEBAL = 12 inc
SEHINGGA TEBAL SUBBASE (TSB)= 28 – 12= 16 inc
• TEBAL BASE COURSE (TBS) : LCN 50 ; CBR 50% TERBACA TEBAL= 6 inc
SEHINGGA TEBAL BASE COURSE (TBC)= 12 – 6= 6 inC
• KESIMPULAN: TEBAL SURFACE = 6 inc = 15,5 cm
TEBAL BASECOURSE = 6 inc = 15,5 cm
TEBAL SUBBASE COURSE= 16 inc = 40,6 cm
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
GAMBAR GRAFIK UNTUK METODE LCN
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
LANGKAH LANGKAH DALAM MERENCANAKAN PERKERASAN
KAKU LAPANGAN TERBANG METODE FAA
1. HITUNG RAMALAN ANNUAL DEPARTURE TIAP-TIAP JENIS
PESAWAT YANG AKAN DILAYANI
2. HITUNG TOTAL EKIVALENT ANNUAL DEPARTURE PESAWAT (R1)
3. HITUNG MTOW TIAP JENIS PESAWAT YANG AKAN DILAYANI
4. ESTIMASI BAHAN PENYUSUN PERKERASAN :
a. HARGA MODULUS REAKSI TANAH DASAR DAN SUBBASE (k)
b. HARGA KUAT BENGKOK BETON (MR) UMUR 90 HARI
MR= (P. L) / bd2
ATAU MR= k . √fc’ k= 8 - 10
5. GUNAKAN GRAFIK/KURVA DARI FAA UNTUK PERKERASAN RIGID
BERDASARKAN PESAWAT RENCANA YG DIGUNAKAN
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
PERUBAHAN NILAI MODULUS REAKSI TANAH DASAR
EKIVALENT AKIBAT ADANYA LAPISAN SUBBASE DENGAN
TEBAL TERTENTU
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
CONTOH 2: MENENTUKAN TEBAL
PERKERASAN KAKU
Perkerasan didesain untuk pesawat dual tandem
dengan berat 350.000 lbs (160.000 kg) dan ekivalen
keberangkatan tahunan 6000 termasuk didalamnya
1200 kali keberangkatan untuk pesawat B-747 dengan
berat 780.000 lbs (350.000 kg). Modulus tanah dasar =
100 pci (25 MN/m3) dengan kondisi drainase buruk.
Jenis tanah dasar adalah CL. Beton memiliki flexural
strength 650 psi (4,5 MN/m2). Tentukan tebal
perkerasan yang diperlukan!
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
Langkah 1: Tentukan modulus pondasi bawah
dengan stabilisasi
210 pci
(57 MN/m3)
Catatan:
Karena beban pesawat yang
besar maka lapis pondasi bawah
harus distabilisasi.
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
Langkah 2: Tentukan tebal lapis beton
Tebal lapis
beton = 16,6 in
~ 17 in.
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
PENULANGAN PADA PERKERASAN KAKU
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA
POKOK BAHASAN:
DESAIN PERKERASAN PADA BANDAR UDARA

Weitere ähnliche Inhalte

Was ist angesagt?

Pengujian berat jenis dan penyerapan
Pengujian berat jenis dan penyerapanPengujian berat jenis dan penyerapan
Pengujian berat jenis dan penyerapanM Hayale
 
RANGKUMAN BATANG TEKAN DAN BATANG TARIK KONSTRUKSI BAJA 1
RANGKUMAN BATANG TEKAN DAN BATANG TARIK KONSTRUKSI BAJA 1RANGKUMAN BATANG TEKAN DAN BATANG TARIK KONSTRUKSI BAJA 1
RANGKUMAN BATANG TEKAN DAN BATANG TARIK KONSTRUKSI BAJA 1MOSES HADUN
 
87280501 perencanaan-sistem-drainase
87280501 perencanaan-sistem-drainase87280501 perencanaan-sistem-drainase
87280501 perencanaan-sistem-drainaseMiftakhul Yaqin
 
contoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokcontoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokShaleh Afif Hasibuan
 
Prinsip mekanika tanah
Prinsip mekanika tanahPrinsip mekanika tanah
Prinsip mekanika tanahYusrizal Mahendra
 
Pengaruh kadar air terhadap beton
Pengaruh kadar air terhadap betonPengaruh kadar air terhadap beton
Pengaruh kadar air terhadap betonHASANUDDIN UNIVERSITY
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan strukturKomang Satriawan
 
Cara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontalCara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontalJulia Maidar
 
Daya dukung pondasi dengan analisis terzaghi
Daya dukung pondasi dengan analisis terzaghiDaya dukung pondasi dengan analisis terzaghi
Daya dukung pondasi dengan analisis terzaghiAyu Fatimah Zahra
 
Laporan tugas struktur baja
Laporan tugas struktur bajaLaporan tugas struktur baja
Laporan tugas struktur bajatanchul
 
perhitungan jembatan
perhitungan jembatanperhitungan jembatan
perhitungan jembatanFarid Thahura
 
Eksentrisitas pada-pondasi
Eksentrisitas pada-pondasiEksentrisitas pada-pondasi
Eksentrisitas pada-pondasidwidam
 
9 contoh desain turap
9 contoh desain turap9 contoh desain turap
9 contoh desain turapbimapurwantoro
 
Geometrik Jalan Raya (Perencanaan)
Geometrik Jalan Raya (Perencanaan)Geometrik Jalan Raya (Perencanaan)
Geometrik Jalan Raya (Perencanaan)andribacotid
 
239735282 52373940-buku-ajar-analisa-struktur-ii
239735282 52373940-buku-ajar-analisa-struktur-ii239735282 52373940-buku-ajar-analisa-struktur-ii
239735282 52373940-buku-ajar-analisa-struktur-iiHaqie Sipil
 
243176098 3-superelevasi
243176098 3-superelevasi243176098 3-superelevasi
243176098 3-superelevasiWSKT
 
Modul 4 sesi 1 batang tekan
Modul 4  sesi 1 batang tekanModul 4  sesi 1 batang tekan
Modul 4 sesi 1 batang tekanIndah Rosa
 
Tugas Perencanaan Pelabuhan Kelompok 2
Tugas Perencanaan Pelabuhan Kelompok 2Tugas Perencanaan Pelabuhan Kelompok 2
Tugas Perencanaan Pelabuhan Kelompok 2Debora Elluisa Manurung
 
Tugas Besar Geometrik Jalan
Tugas Besar Geometrik JalanTugas Besar Geometrik Jalan
Tugas Besar Geometrik JalanAyu Fatimah Zahra
 

Was ist angesagt? (20)

Pengujian berat jenis dan penyerapan
Pengujian berat jenis dan penyerapanPengujian berat jenis dan penyerapan
Pengujian berat jenis dan penyerapan
 
RANGKUMAN BATANG TEKAN DAN BATANG TARIK KONSTRUKSI BAJA 1
RANGKUMAN BATANG TEKAN DAN BATANG TARIK KONSTRUKSI BAJA 1RANGKUMAN BATANG TEKAN DAN BATANG TARIK KONSTRUKSI BAJA 1
RANGKUMAN BATANG TEKAN DAN BATANG TARIK KONSTRUKSI BAJA 1
 
87280501 perencanaan-sistem-drainase
87280501 perencanaan-sistem-drainase87280501 perencanaan-sistem-drainase
87280501 perencanaan-sistem-drainase
 
contoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balokcontoh soal menghitung momen ultimate pada balok
contoh soal menghitung momen ultimate pada balok
 
Prinsip mekanika tanah
Prinsip mekanika tanahPrinsip mekanika tanah
Prinsip mekanika tanah
 
Pengaruh kadar air terhadap beton
Pengaruh kadar air terhadap betonPengaruh kadar air terhadap beton
Pengaruh kadar air terhadap beton
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan struktur
 
Tiang Pancang I
Tiang Pancang ITiang Pancang I
Tiang Pancang I
 
Cara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontalCara menghitung alinyemen horizontal
Cara menghitung alinyemen horizontal
 
Daya dukung pondasi dengan analisis terzaghi
Daya dukung pondasi dengan analisis terzaghiDaya dukung pondasi dengan analisis terzaghi
Daya dukung pondasi dengan analisis terzaghi
 
Laporan tugas struktur baja
Laporan tugas struktur bajaLaporan tugas struktur baja
Laporan tugas struktur baja
 
perhitungan jembatan
perhitungan jembatanperhitungan jembatan
perhitungan jembatan
 
Eksentrisitas pada-pondasi
Eksentrisitas pada-pondasiEksentrisitas pada-pondasi
Eksentrisitas pada-pondasi
 
9 contoh desain turap
9 contoh desain turap9 contoh desain turap
9 contoh desain turap
 
Geometrik Jalan Raya (Perencanaan)
Geometrik Jalan Raya (Perencanaan)Geometrik Jalan Raya (Perencanaan)
Geometrik Jalan Raya (Perencanaan)
 
239735282 52373940-buku-ajar-analisa-struktur-ii
239735282 52373940-buku-ajar-analisa-struktur-ii239735282 52373940-buku-ajar-analisa-struktur-ii
239735282 52373940-buku-ajar-analisa-struktur-ii
 
243176098 3-superelevasi
243176098 3-superelevasi243176098 3-superelevasi
243176098 3-superelevasi
 
Modul 4 sesi 1 batang tekan
Modul 4  sesi 1 batang tekanModul 4  sesi 1 batang tekan
Modul 4 sesi 1 batang tekan
 
Tugas Perencanaan Pelabuhan Kelompok 2
Tugas Perencanaan Pelabuhan Kelompok 2Tugas Perencanaan Pelabuhan Kelompok 2
Tugas Perencanaan Pelabuhan Kelompok 2
 
Tugas Besar Geometrik Jalan
Tugas Besar Geometrik JalanTugas Besar Geometrik Jalan
Tugas Besar Geometrik Jalan
 

Andere mochten auch

Manajemen & transportasi udara
Manajemen & transportasi udaraManajemen & transportasi udara
Manajemen & transportasi udaraDisani Disani
 
Manajemen Bandar Udara part 1
Manajemen Bandar Udara part 1Manajemen Bandar Udara part 1
Manajemen Bandar Udara part 1Nurcahyani Dewi
 
Persyaratan Teknis Pengoperasian Fasilitas Teknik Bandar Udara SKEP/77/VI/2005
Persyaratan Teknis Pengoperasian Fasilitas Teknik Bandar Udara SKEP/77/VI/2005Persyaratan Teknis Pengoperasian Fasilitas Teknik Bandar Udara SKEP/77/VI/2005
Persyaratan Teknis Pengoperasian Fasilitas Teknik Bandar Udara SKEP/77/VI/2005Yusrizal Mahendra
 
Isi lapangan terbang
Isi lapangan terbangIsi lapangan terbang
Isi lapangan terbangTommy Iskandar
 
Makalah lapter
Makalah lapterMakalah lapter
Makalah lapterJulius Yahya
 
Dokumen.tips tugas lapangan-terbang-sen2
Dokumen.tips tugas lapangan-terbang-sen2Dokumen.tips tugas lapangan-terbang-sen2
Dokumen.tips tugas lapangan-terbang-sen2Haridan Bin Taridi
 
Manajemen & Transportasi udara
Manajemen & Transportasi udaraManajemen & Transportasi udara
Manajemen & Transportasi udaraDisani Disani
 
1834 chapter iiAnalisa dan Perencanaan Landside Bandar Udara Wirasaba Purbali...
1834 chapter iiAnalisa dan Perencanaan Landside Bandar Udara Wirasaba Purbali...1834 chapter iiAnalisa dan Perencanaan Landside Bandar Udara Wirasaba Purbali...
1834 chapter iiAnalisa dan Perencanaan Landside Bandar Udara Wirasaba Purbali...chysar
 
Buku plc
Buku plcBuku plc
Buku plcZai Muhd
 
Bab v fix...
Bab v fix...Bab v fix...
Bab v fix...Fajar Tsani
 
Penyempurnaan pola pikir
Penyempurnaan pola pikirPenyempurnaan pola pikir
Penyempurnaan pola pikiryahyanursidik
 
Papua engineering testing
Papua engineering testingPapua engineering testing
Papua engineering testingsupriyantoedi
 
Manajemen bandara bab 3
Manajemen bandara bab 3Manajemen bandara bab 3
Manajemen bandara bab 3sylhadisaputri
 
rasarana traPnsportasi-lapangan-terbang
rasarana traPnsportasi-lapangan-terbangrasarana traPnsportasi-lapangan-terbang
rasarana traPnsportasi-lapangan-terbangYanuar Eka Putra
 
METODE GARIS PENGARUH STRUKTUR RANGKA BATANG(1)
METODE GARIS PENGARUH STRUKTUR RANGKA BATANG(1)METODE GARIS PENGARUH STRUKTUR RANGKA BATANG(1)
METODE GARIS PENGARUH STRUKTUR RANGKA BATANG(1)MOSES HADUN
 
KL5110 Final Project - Coastal Morphology Change
KL5110 Final Project - Coastal Morphology ChangeKL5110 Final Project - Coastal Morphology Change
KL5110 Final Project - Coastal Morphology ChangeFaisal Purnawarman
 
Pemanasan global
Pemanasan globalPemanasan global
Pemanasan globalAfiqah Yusoff
 
ALTERNATIVE PENGGUNAAN PERKERASAN JALAN PEMUKIMAN DI KOTA SURABAYA MENGGUNAK...
ALTERNATIVE PENGGUNAAN PERKERASAN JALAN PEMUKIMAN DI  KOTA SURABAYA MENGGUNAK...ALTERNATIVE PENGGUNAAN PERKERASAN JALAN PEMUKIMAN DI  KOTA SURABAYA MENGGUNAK...
ALTERNATIVE PENGGUNAAN PERKERASAN JALAN PEMUKIMAN DI KOTA SURABAYA MENGGUNAK...ikhsan setiawan
 
Proposal pembangunan jembatan
Proposal pembangunan jembatanProposal pembangunan jembatan
Proposal pembangunan jembatanbisri_makmur
 

Andere mochten auch (20)

Manajemen & transportasi udara
Manajemen & transportasi udaraManajemen & transportasi udara
Manajemen & transportasi udara
 
Manajemen Bandar Udara part 1
Manajemen Bandar Udara part 1Manajemen Bandar Udara part 1
Manajemen Bandar Udara part 1
 
Persyaratan Teknis Pengoperasian Fasilitas Teknik Bandar Udara SKEP/77/VI/2005
Persyaratan Teknis Pengoperasian Fasilitas Teknik Bandar Udara SKEP/77/VI/2005Persyaratan Teknis Pengoperasian Fasilitas Teknik Bandar Udara SKEP/77/VI/2005
Persyaratan Teknis Pengoperasian Fasilitas Teknik Bandar Udara SKEP/77/VI/2005
 
Isi lapangan terbang
Isi lapangan terbangIsi lapangan terbang
Isi lapangan terbang
 
Makalah lapter
Makalah lapterMakalah lapter
Makalah lapter
 
Dokumen.tips tugas lapangan-terbang-sen2
Dokumen.tips tugas lapangan-terbang-sen2Dokumen.tips tugas lapangan-terbang-sen2
Dokumen.tips tugas lapangan-terbang-sen2
 
Manajemen & Transportasi udara
Manajemen & Transportasi udaraManajemen & Transportasi udara
Manajemen & Transportasi udara
 
1834 chapter iiAnalisa dan Perencanaan Landside Bandar Udara Wirasaba Purbali...
1834 chapter iiAnalisa dan Perencanaan Landside Bandar Udara Wirasaba Purbali...1834 chapter iiAnalisa dan Perencanaan Landside Bandar Udara Wirasaba Purbali...
1834 chapter iiAnalisa dan Perencanaan Landside Bandar Udara Wirasaba Purbali...
 
Buku plc
Buku plcBuku plc
Buku plc
 
Bab v fix...
Bab v fix...Bab v fix...
Bab v fix...
 
Penyempurnaan pola pikir
Penyempurnaan pola pikirPenyempurnaan pola pikir
Penyempurnaan pola pikir
 
Papua engineering testing
Papua engineering testingPapua engineering testing
Papua engineering testing
 
Manajemen bandara bab 3
Manajemen bandara bab 3Manajemen bandara bab 3
Manajemen bandara bab 3
 
peta penerbangan indonesia
peta penerbangan indonesiapeta penerbangan indonesia
peta penerbangan indonesia
 
rasarana traPnsportasi-lapangan-terbang
rasarana traPnsportasi-lapangan-terbangrasarana traPnsportasi-lapangan-terbang
rasarana traPnsportasi-lapangan-terbang
 
METODE GARIS PENGARUH STRUKTUR RANGKA BATANG(1)
METODE GARIS PENGARUH STRUKTUR RANGKA BATANG(1)METODE GARIS PENGARUH STRUKTUR RANGKA BATANG(1)
METODE GARIS PENGARUH STRUKTUR RANGKA BATANG(1)
 
KL5110 Final Project - Coastal Morphology Change
KL5110 Final Project - Coastal Morphology ChangeKL5110 Final Project - Coastal Morphology Change
KL5110 Final Project - Coastal Morphology Change
 
Pemanasan global
Pemanasan globalPemanasan global
Pemanasan global
 
ALTERNATIVE PENGGUNAAN PERKERASAN JALAN PEMUKIMAN DI KOTA SURABAYA MENGGUNAK...
ALTERNATIVE PENGGUNAAN PERKERASAN JALAN PEMUKIMAN DI  KOTA SURABAYA MENGGUNAK...ALTERNATIVE PENGGUNAAN PERKERASAN JALAN PEMUKIMAN DI  KOTA SURABAYA MENGGUNAK...
ALTERNATIVE PENGGUNAAN PERKERASAN JALAN PEMUKIMAN DI KOTA SURABAYA MENGGUNAK...
 
Proposal pembangunan jembatan
Proposal pembangunan jembatanProposal pembangunan jembatan
Proposal pembangunan jembatan
 

Ähnlich wie desain perkerasan di bandara

Design of Flexible Pavement Using AASHTO.pptx
Design of Flexible Pavement Using AASHTO.pptxDesign of Flexible Pavement Using AASHTO.pptx
Design of Flexible Pavement Using AASHTO.pptxmohammeed3
 
DiseĂąo de pavimentos flexibles metodo aashto 93 final de los finales
DiseĂąo de pavimentos flexibles metodo aashto 93 final de los finalesDiseĂąo de pavimentos flexibles metodo aashto 93 final de los finales
DiseĂąo de pavimentos flexibles metodo aashto 93 final de los finalesRonal Pinzon Guerrero
 
COMPARISON BETWEEN CODES
COMPARISON BETWEEN CODESCOMPARISON BETWEEN CODES
COMPARISON BETWEEN CODESBahzad5
 
Twin Hills Mine Referbishment Project (1)
Twin Hills Mine Referbishment Project (1)Twin Hills Mine Referbishment Project (1)
Twin Hills Mine Referbishment Project (1)Gary Hayes
 
Haiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-FHaiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-FFrancis Mitchell
 
Pavement design in civil engineering
Pavement design in civil engineeringPavement design in civil engineering
Pavement design in civil engineeringRajinderBashal
 
Civil engineering Pavement Design
Civil engineering Pavement DesignCivil engineering Pavement Design
Civil engineering Pavement DesignRajinderBashal
 
Kelompok 1 eds.pptx
Kelompok 1 eds.pptxKelompok 1 eds.pptx
Kelompok 1 eds.pptxFalkhanBarizi1
 
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITESGIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITESFrancis Mitchell
 
7. Pavement Design using CBR (Remaining Part).pdf
7. Pavement Design using CBR (Remaining Part).pdf7. Pavement Design using CBR (Remaining Part).pdf
7. Pavement Design using CBR (Remaining Part).pdf632k18BilalAhmad
 
PrĂŠsentation du Professeur Thomas O'Rourke (Cornell University) - SCG Ouest Q...
PrĂŠsentation du Professeur Thomas O'Rourke (Cornell University) - SCG Ouest Q...PrĂŠsentation du Professeur Thomas O'Rourke (Cornell University) - SCG Ouest Q...
PrĂŠsentation du Professeur Thomas O'Rourke (Cornell University) - SCG Ouest Q...Alain Plaisant
 
wells turbine analysis using ansys for wave energy converter.pptx
wells turbine analysis using ansys for wave energy converter.pptxwells turbine analysis using ansys for wave energy converter.pptx
wells turbine analysis using ansys for wave energy converter.pptxARIJIT BISWAS
 
Uniaxial Column Design
Uniaxial Column DesignUniaxial Column Design
Uniaxial Column DesignIkhtiar Khan
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Audubon Engineering Company
 
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).khaledalshami93
 
6._Bearing_Capacity_from_other_methods.pdf
6._Bearing_Capacity_from_other_methods.pdf6._Bearing_Capacity_from_other_methods.pdf
6._Bearing_Capacity_from_other_methods.pdfAristotleMedina
 
Correlation survey and depth measurement in underground metal mines
Correlation survey and depth measurement in underground metal minesCorrelation survey and depth measurement in underground metal mines
Correlation survey and depth measurement in underground metal minesSafdar Ali
 

Ähnlich wie desain perkerasan di bandara (20)

Design of Flexible Pavement Using AASHTO.pptx
Design of Flexible Pavement Using AASHTO.pptxDesign of Flexible Pavement Using AASHTO.pptx
Design of Flexible Pavement Using AASHTO.pptx
 
DiseĂąo de pavimentos flexibles metodo aashto 93 final de los finales
DiseĂąo de pavimentos flexibles metodo aashto 93 final de los finalesDiseĂąo de pavimentos flexibles metodo aashto 93 final de los finales
DiseĂąo de pavimentos flexibles metodo aashto 93 final de los finales
 
COMPARISON BETWEEN CODES
COMPARISON BETWEEN CODESCOMPARISON BETWEEN CODES
COMPARISON BETWEEN CODES
 
Twin Hills Mine Referbishment Project (1)
Twin Hills Mine Referbishment Project (1)Twin Hills Mine Referbishment Project (1)
Twin Hills Mine Referbishment Project (1)
 
Haiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-FHaiti hydropower potential-Appendix-F
Haiti hydropower potential-Appendix-F
 
Pavement design in civil engineering
Pavement design in civil engineeringPavement design in civil engineering
Pavement design in civil engineering
 
Civil engineering Pavement Design
Civil engineering Pavement DesignCivil engineering Pavement Design
Civil engineering Pavement Design
 
Pavement Design.ppt
Pavement Design.pptPavement Design.ppt
Pavement Design.ppt
 
Kelompok 1 eds.pptx
Kelompok 1 eds.pptxKelompok 1 eds.pptx
Kelompok 1 eds.pptx
 
B.praveen kumar
B.praveen kumarB.praveen kumar
B.praveen kumar
 
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITESGIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
GIS PROCEDURE FOR PRELIMINARY EVALUATION OF POTENTIAL HYDROPOWER SITES
 
7. Pavement Design using CBR (Remaining Part).pdf
7. Pavement Design using CBR (Remaining Part).pdf7. Pavement Design using CBR (Remaining Part).pdf
7. Pavement Design using CBR (Remaining Part).pdf
 
8th Semester (June; July-2014) Civil Engineering Question Paper
8th Semester (June; July-2014) Civil Engineering Question Paper8th Semester (June; July-2014) Civil Engineering Question Paper
8th Semester (June; July-2014) Civil Engineering Question Paper
 
PrĂŠsentation du Professeur Thomas O'Rourke (Cornell University) - SCG Ouest Q...
PrĂŠsentation du Professeur Thomas O'Rourke (Cornell University) - SCG Ouest Q...PrĂŠsentation du Professeur Thomas O'Rourke (Cornell University) - SCG Ouest Q...
PrĂŠsentation du Professeur Thomas O'Rourke (Cornell University) - SCG Ouest Q...
 
wells turbine analysis using ansys for wave energy converter.pptx
wells turbine analysis using ansys for wave energy converter.pptxwells turbine analysis using ansys for wave energy converter.pptx
wells turbine analysis using ansys for wave energy converter.pptx
 
Uniaxial Column Design
Uniaxial Column DesignUniaxial Column Design
Uniaxial Column Design
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
 
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
 
6._Bearing_Capacity_from_other_methods.pdf
6._Bearing_Capacity_from_other_methods.pdf6._Bearing_Capacity_from_other_methods.pdf
6._Bearing_Capacity_from_other_methods.pdf
 
Correlation survey and depth measurement in underground metal mines
Correlation survey and depth measurement in underground metal minesCorrelation survey and depth measurement in underground metal mines
Correlation survey and depth measurement in underground metal mines
 

KĂźrzlich hochgeladen

The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneLukeKholes
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdshivubhavv
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...home
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funneljen_giacalone
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...amitlee9823
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxsuhanimunjal27
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

KĂźrzlich hochgeladen (20)

The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcd
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funnel
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptx
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

desain perkerasan di bandara

  • 1. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA TIPE PERKERASAN DI BANDARA PERKERASAN LENTUR PERKERASAN KAKU • CAMPURAN ASPAL DGN AGREGAT • CAMPURAN INI DILETAKKAN DI ATAS PERMUKAAN MATERIAL GRANULAR MUTU TINGGI (GRANULAR BASE AGGREGATE) • DIBUAT DARI SLAB SLAB BETON • SLAB TSB DILETAKKAN DI ATAS SUB BASE SURFACES; CAMPURAN ASPAL BASE COURSE; AGREGAT; STAB. SEMEN, ASPAL ATAU UNTREATED SUBBASE COURSE; AGREGAT; STAB. SEMEN, ASPAL ATAU UNTREATED TANAH DASAR SURFACES; SLAB BETON SUBBASE COURSE; AGRGAT STABILISASI ASPAL, SEMEN DAN UNTREATED TANAH DASAR
  • 2. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA LAPIS PERMUKAAN (SURFACES COURSE) • BERFUNGSI LAPIS PERATA DAN KESELAMATAN PENERBANGAN • BERFUNGSI MENUMPU BEBAN RODA PESAWAT DAN MENAHAN BEBAN BERULANG SERTA MENYEBARKAN KE LAPISAN DI BAWAHNYA LAPIS PONDASI ATAS (BASE COURSE) • BERFUNGSI MENAHAN BEBAN RODA DAN MENERUSKAN KE LAPISAN DI BAWAHNYA • DIBUAT DARI MATERIAL AGREGAT, BISA MATERIAL STABILSASI DENGAN SEMEN ATAU ASPAL
  • 3. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA LAPIS PONDASI BAWAH (SUBBASE COURSE) • BERFUNGSI MENAHAN BEBAN RODA DAN MENERUSKAN KE TANAH DASAR • DIBUAT DARI MATERIAL AGREGAT, BISA MATERIAL STABILSASI DENGAN SEMEN ATAU ASPAL, KAPUR METODE DESAIN PERKERASAN LAPANGAN TERBANG • METODE CBR OLEH US CORPORATION OF ENGINEERS • METODE FAA • METODE LCN DARI INGGRIS • METODE ASPHALT INSTITUTE • METODE CANADIAN DEPARTEMEN OF TRANSPORTATION
  • 4. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA METODE CBR • DIKEMBANGKAN OLEH CALIFORNIA HIGHWAY DEPARTEMENT SEJAK TAHUN 1942 • DIADOPSI DARI PERKERASAN JALAN RAYA • OLEH CORPS OF ENGINEER DIMODIFIKASI UNTUK DISESUAIKAN DENGAN KARAKTERISTIK BEBAN DAN TEKANAN RODA RODA PESAWAT (25.000 lbs s/d 70.000 lbs DAN 60 psi) UNTUK BEBAN RODA TUNGGAL (SWL) • RODA RODA PESAWAT MULTIPLE WHEEL LOAD DIKONVERSI KE ESWL • KATEGORI RENCANA PEMBEBANAN RUNWAY (RINGAN, MEDIUM, BERAT)
  • 5. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA METODE CBR ( )       −+= SCBR PRT .450 1 .1,8 1 .43,5log.71,8 OLEH CORPS OF ENGINEER, METODE CBR MENJADI:
  • 6. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA VARIABEL VARIABEL DESAIN METODE CBR • CBR TANAH DASAR • TIPE BEBAN PESAWAT DAN TIPE LALU LINTAS • PERSYARATAN SUBBASE (LAPIS PONDASI BAWAH) CBR RENCANA MAKSIMUM UKURAN % (INCHI) No. 10 No. 200 SUB BASE 50 3 50 15 25 5 SUBBASE 40 3 80 15 25 5 SUBSASE 30 3 100 15 25 5 MATEIAL PILIHAN 20 3 - 25 35 12 LAPISAN NILAI MAKSIMUM IJIN PERSEN LOLOS SARINGAN LL PI • CBR RENCANA LAPIS PONDASI TYPE CBR RENCANA (%) AGREGAT BATU PECAH 100 MACADAM BASAH 100 MACADAM KERING 100 CAMPURAN ASPAL PANAS 100 BATU KAPUR 80 AGREGAT STABILISASI 80
  • 7. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA VARIABEL VARIABEL DESAIN METODE CBR • CBR RENCANA LAPIS PONDASI RENCANA PEMBEBANAN BERAT PERKERASAN BASE TOTAL PERKERASAN BASE TOTAL A 5 10 15 6 9 15 B 4 9 13 5 8 13 C 4 9 13 5 8 13 D 3 6 9 3 6 9 JLN AKSES APRON 3 6 9 3 6 9 BAHU 2 6 8 2 6 8 TRAFFIC AREA KETEBALAN MINIMUM (INCHI) BASE: CBR 100% BASE: CBR 80% RENCANA PEMBEBANAN MEDIUM PERKERASAN BASE TOTAL PERKERASAN BASE TOTAL A 4 6 10 5 6 11 B 3 6 9 4 6 10 C 3 6 9 4 6 10 JLN AKSES APRON 3 6 9 3 6 9 TRAFFIC AREA KETEBALAN MINIMUM (INCHI) BASE: CBR 100% BASE: CBR 80%
  • 8. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA VARIABEL VARIABEL DESAIN METODE CBR • CBR RENCANA LAPIS PONDASI RENCANA PEMBEBANAN RINGAN PERKERASAN BASE TOTAL PERKERASAN BASE TOTAL B 3 6 9 4 6 10 C 3 6 9 3 6 8 JLN AKSES APRON 3 6 9 4 6 10 TRAFFIC AREA KETEBALAN MINIMUM (INCHI) BASE: CBR 100% BASE: CBR 80%
  • 9. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA CONTOH: RENCANAKAN PERKERASAN LENTUR UNTUK PEMBEBANAN MEDIUM DENGAN TIPE TRAFFIC AREA TIPE A DARI DATA MATERIAL SEBAGAI BERIKUT: TEST CBR % No. 10 No. 200 SUBGRADE (TANAH ASLI) 6 ;- - 35 15 SUBBASE (TANAH DIPADATKAN) 10 - - 35 15 SUBSASE (1) 24 85 13 19 6 SUBBASE (2) 59 44 8 15 4 BASE BATU PECAH 100 - ;- - - PERSEN LOLOS SARINGAN MATERIAL LL PI
  • 10. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA JAWABAN: TEST CBR KETEBALAN DI ATAS LAPISAN % INCHI SUBGRADE (TANAH ASLI) 6 47 GBR 6.7, HERU B. HL. 283 SUBBASE (TANAH DIPADATKAN) 10 35 GBR 6.7, HERU B. HL. 283 SUBSASE (1) 24 (OK) 18 GBR 6.7, HERU B. HL. 283 SUBBASE (2) 59 (MAX.) 8 GBR 6.7, HERU B. HL. 283 BASE BATU PECAH 100 6 (MIN) TABEL 6.3, HERU B. HL. 285 SURFACE - 4 (MIN) TABEL 6.3, HERU B. HL. 285 MATERIAL DIBACA DARI
  • 11. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA METODE CBR ( )       −+= SCBR PRT .450 1 .1,8 1 .43,5log.71,8 T = TEBAL PERKERASAN TOTAL (mm) DI ATAS TANAH DASAR R = JUMLAH ESWL YANG BEKERJA (BEBAN BERULANG) S = TEKANAN RODA (BAN) DALAM MPa P = ESWL (kg) UNTUK RODA PENDARATAN PESAWAT DENGAN MULTIPLE WHEEL LOAD HARUS DIKONVERSI KE ESWL (EQUIVALENT SINGLE WHEEL LOAD)
  • 12. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA FAKTOR EKIVALEN MATERIAL 0,0091 0,0079 0,0059 CEMENT TREATED BASE,CTB): KUBUS 7 HARI , 4,5 MPa KUBUS 7 HARI , 3 MPa KUBUS 7 HARI , < 2,7 MPa 0,0028SUBBASE, SIRTU 0,0055BATU PECAH (KERIKIL), CSB 0,017BETON ASPAL (AC) KOEFISIEN FAKTOR EKIVALEN JENIS MATERIAL PERKERASAN
  • 13. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA CONTOH: RENCANAKAN TEBAL PERKERASAN LAPANGAN TERBANG UNTUK MELAYANI BEBAN BERULANG 100.000 DARI ESWL, TEKANAN RODA 2 MPa, ESWL = 27.000 kg, CBR TANAH DASAR = 5%. JENIS MATERIAL ADALAH BETON ASPAL, CEMENT TREATED BASE (CTB) MUTU 4,5 MPa USIA 7 HARI, SUBBASE BATU PECAH PENYELESAIAN: • HITUNG (T): ( ) mmT 12501236 2.450 1 5.1,8 1 000.2743,5000.100log71,8 ≈=      −+= • HITUNG FAKTOR EQUIVALENT ANTAR SETIAP LAPISAN: 65,1 0055,0 0091,0 3 0055,0 017,0 ==== CSB CTB CSB AC
  • 14. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA MISALNYA DIPILIH TEBAL AC = 150 mm EKIVALEN DENGAN: 3 x 150 = 450 mm CSB MISAL CTB DIPILIH TEBAL = 200 mm EKIVALEN DENGAN: 1,65 x 200 = 330 mm CSB SEHINGGA TEBAL CSB YANG DIBUTUHKAN ADALAH + TCSB = 1250 – 450 – 330 = 470 mm B E TON ASPAL, AC CEMENT TREATED BASE, CTB BATU PECAH, CSB TANAH DASAR, CBR: 5% 150 mm 200 mm 470 mm
  • 15. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA PERENCANAAN PERKERASAN LENTUR METODE FAA • PERHITUNGAN TEBAL TIAP LAPISAN PERKERASAN MENGGUNAKAN GRAFIK YANG TELAH DISIAPKAN OLEH FAA • KATEGORI AREA PERKERASAN MELIPUTI AREA KRITIS DAN NON KRITIS • AREA KRITIS MELIPUTI: TAXIWAY, RW 300 m DARI UJUNG THRESHOLD, APRON • TEBAL AREA NON KRITIS BIASANYA 0,9 KALI KETEBALAN KRITIS • HARUS DITENTUKAN PESAWAT RENCANA UNTUK PERHITUNGAN TEBAL PERKERASAN • KARENA TIPE RODA PENDARATAN PESAWAT BERBEDA BEDA MAKA HARUS DIKONVERSI KE DALAM PESAWAT RENCANA MELALUI EQUIVELENT ANNUAL DEPARTURE PESAWAT CAMPURAN
  • 16. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA RUMUS KONVERSI ADALAH: ( ) 2/1 1 2 .21       = W W RLogRLog R1 = EQUIVALENT ANNUAL DEPARTURE PESAWAT RENCANA R2 = ANNUAL DEPARTURE PESAWAT PESAWAT CAMPURAN DINYATAKAN DALAM RODA PENDARATAN PESAWAT RENC. W1 = BEBAN RODA DARI PESAWAT RENCANA W2 = BEBAN RODA DARI PESAWAT YANG DITANYAKAN
  • 17. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA RUMUS KONVERSI TIPE RODA PENDARATAN KONVERSI DARI KE FAKTOR PENGALI SINGLE WHEEL DUAL WHEEL 0,8 SINGLE WHEEL DUAL TANDEM 0,5 DUAL WHEEL DUAL TANDEM 0,6 DOUBLE DUAL TANDEM DUAL TANDEM 1,0 DUAL TANDEM SINGLE WHEEL 2,0 DUAL TANDEM DUAL WHEEL 1,7 DUAL WHEEL SINGLE WHEEL 1,3 DOUBLE DUAL TANDEM DUAL WHEEL 1,7 PARAMETER DALAM MENENTUKAN TEBAL PERKERASAN METODE FAA • NILAI CBR TANAH DASAR • NILAI CBR SUB BASE (PONDASI BAWAH) • BERAT TOTAL/BERAT LEPAS LANDAS PESAWAT RENCANA
  • 18. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA CONTOH PERENCANAAN METODE FAA RENCANAKAN TEBAL LAPIS PERKERASAN FLEXIBLE YANG MELAYANI PESAWAT RENCANA DENGAN TIPE RODA PENDARATAN DUAL GEAR, BERAT LEPAS LANDAS 75.000 lbs (34.000 kg), EQUIVALENT ANNUAL DEPARTURE 6000 DARI PESAWAT RENCANA, CBR SUBBASE 20% DAN CBR TANAH DASAR 6% • HITUNG TEBAL PERKERASAN TOTAL DENGAN MENGGUNAKAN GRAFIK DI SAMPING, DIDAPAT: T= 21,3 INC = 51,2 cm • TEBAL SUB BASE DIDAPAT DARI GRAFIK DISAMPING, DIDAPAT TEBAL SURFACE DAN BASE: TS_B = 9,4 INC = 23,876 cm= 24,0 cm • MAKA TEBAL SUBBASE (TSB) = TSB= 21,3 – 9,4 = 11,9 INC = 30,3 cm 21,39,4
  • 19. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA • TEBAL LAPISAN ASPAL= 4 Inc= 10,2 cm • TEBAL LAPIS PONDASI (TBC)= TBC= 24 – 10,2= 13,8 cm • SELANJUTNYA TEBAL TBC DIKONTROL TERHADAP TBC MINIMUM DARI GRAFIK DI SAMPING. DENGAN CBR 6% DI DAPAT : TBC MIN = 6 Inc = 15,2 Cm > 13,8 CM MAKA DIGUNAKAN TBC = 15,2 cm SURFACE COURSE, T= 4 Inc = 10,2 cm BASE COURSE, TBC= 15,2 cm SUB BASE COURSE, TSB= 30,3 cm TANAH DASAR, CBR = 6%
  • 20. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA CONTOH: DIBERIKAN DAFTAR PESAWAT YANG DIPERKIRAKAN HARUS DILAYANI OLEH BANDARA YANG DIRENCANAKAN. HITUNGLAH EQUIVALENT ANNUAL DEPARTURENYA DAN TEBAL PERKERASAN YANG DIBUTUHKAN JIKA DIKETAHUI CBR TANAH DASAR = 6% TIPE PESAWAT FORECAST ANNUAL DEPARTURE TIPE RODA PENDARATAN MTOW (lbs) 727-100 3760 DUAL 160.000 727-200 9080 DUAL 190.000 707-320 B 3050 DUAL TANDEM 327.000 DC 9-30 5800 DUAL 108.000 CV-880 400 DUAL TANDEM 184.500 737-200 2650 DUAL 115.500 L-1011-100 1710 DUAL TANDEM 450.000 747-100 85 DOUBLE DUAL TANDEM 700.000
  • 21. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 22. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA PENYELESAIAN: • TENTUKAN PESAWAT RENCANA, MISALNYA DIAMBIL 727-200 • HITUNG R2 ==== R2= FORECAST ANNUAL DEPARTURE x F. KONVERSI PSWT 727-200 : R2 = 3760 x FAKTOR KONVERSI KE DUAL WHEEL = 3760 x 1 = 3760 PSWT 707-320 B: R2= 3050 x 1,7= 5185 PERHITUNGAN R2 SELANJUTNYA LIHAT TABEL !!! • HITUNG W2 ==== W2= MTOW x 0,95 x 0,25 PSWT 727-200 : W2 = MTOW x 0,95 x 0,25 = 160.000 x 0,95 x 0,25= 38.000 PERHITUNGAN W2 SELANJUTNYA LIHAT TABEL !!! • HITUNG W1 ==== W1= 0,25 x 0,95 x MTOW PSWT RENC. W1 = 0,25 x 0,95 x 190.000 = 45.125 lbs • HITUNG EQUIVALENT ANNUAL DEPARTURE TERHADAP PSWT RENC (R1) PSWT 727-100 : log R1= log 3760 . (38.000/45.125)0,5 = 1909 PERHITUNGAN SELANJUTNYA LIHAT TABEL !!!!!
  • 23. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA DUAL GEAR DEPARTURE, R2 WHEEL LOAD (lbs), W2 WHEEL LOAD PSWT RENC, W1 EQUIVALENT ANNUAL DEPARTURE PSWT RENC, R1 3760 38.000 45.125 1.909 9080 45.125 45.125 9.080 5185 38.831 45.125 2.792 5800 25.650 45.125 688 680 21.909 45.125 94 2650 27.431 45.125 467 2907 35.625 45.125 1.195 145 35.625 45.125 83 JUMLAH R1= 16.308 • DARI GRAFIK RENCANA PERKERASAN TIPE DUAL WHEEL GEAR DENGAN CBR 6% DIDAPAT TEBAL TOTAL = 39 Inc = 99,1 cm • DARI GRAFIK YANG SAMA, CBR= 20% TERBACA TEBAL = 18 Inc= 45,7 cm TEBAL SUBBASE (TSB) = 39 – 18 = 21 Inc = 53,5 cm = 54 cm
  • 24. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 26. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA • TEBAL LAPISAN ASPAL = 4 Inc = 10,2 cm • TEBAL BASE COARSE (TBC) = 18 – 4= 14 Inc = 35,6 cm • TEBAL MINIMUM TBC DIDAPAT DARI GRAFIK, CBR 6% = 13,2 Inc= 33,5 cm KARENA TBC = 14 Inc > 13,2 Inc ==== DIPAKAI TBC= 14 Inc= 35,6 = 36 cm SURFACE COURSE, T= 4 Inc = 10 cm BASE COURSE, TBC= 36 cm SUB BASE COURSE, TSB= 54 cm TANAH DASAR, CBR = 6% LAPISAN AREA KRITIS AREA NON KRITIS PINGGIR SURFACE COARSE 4 inc 10 cm 3 inc 8 cm 2 inc 5 cm BASE COARSE 14 inc 36 cm 13 inc 33 cm 10 inc 25 cm SUBBASE COARSE 21 inc 54 cm 19 inc 48 cm 15 inc 38 cm
  • 27. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA METODE LOAD CLASSIFICATION NUMBER (LCN) • MERUPAKAN METODE PERENCANAAN PERKERASAN DAN EVALUASI DINAS BINAMARGANYA INGGRIS YANG DIAKUI ICAO • KAPASITAS DAYA DUKUNG/KUAT DUKUNG PERKERASAN DINYATAKAN DALAM ANGKA LCN • SETIAP PESAWAT BISA DINYATAKAN DALAM LCN • ANGKA LCN TERGANTUNG PADA GEOMETRI RODA PENDARATAN, TEKANAN RODA PESAWAT, KOMPOSISI TEBAL PERKERASAN • BILA ANGKA LCN PERKERASAN LAPANGAN TERBANG > LCN PESAWAT MAKA PESAWAT DAPAT MENDARAT DENGAN SELAMAT
  • 28. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA LANGKAH LANGKAH DALAM MERENCANAKAN PERKERASAN LENTUR LAPANGAN TERBANG METODE LCN • TENTUKAN HARGA EQUIVALENT SINGLE WHEEL LOAD PESAWAT • DARI TEKANAN RODA DAN KONTAK AREA YANG DIKETAHUI BACALAH HARGA LCN DARI GRAFIK KONTAK AREA= BEBAN RODA / TEKANAN RODA • DARI HARGA LCN YANG DIDAPAT, BACALAH KETEBALAN PERKERASAN BERKAITAN DENGAN NILAI CBR TIAP LAPISAN DARI GRAFIK NILAI LCN= 40 BERARTI PERKERASAN MAMPU MELAYANI BEBAN 40.000 lbs TANPA MENGALAMI KERUNTUHAN DENGAN KONTAK AREA 444 M2 DENGAN TEKANAN BAN 90 psi
  • 29. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA CONTOH : DIKETAHUI ESWL = 42.000 lbs TEKANAN RODA PESAWAT= 150 psi CBRTANAH DASAR= 5% CBRSUBBASE= 20% CBRBASE= 50% HITUNGLAH TEBAL PERKERASANNYA PENYELESAIAN: • DARI GAMBAR TERBACA LCN 50 • DARI GAMBAR TEBAL PERKERASAN TOTAL= 28 inc • TEBAL SUBBASE: LCN 50; CBR 20% TERBACA TEBAL = 12 inc SEHINGGA TEBAL SUBBASE (TSB)= 28 – 12= 16 inc • TEBAL BASE COURSE (TBS) : LCN 50 ; CBR 50% TERBACA TEBAL= 6 inc SEHINGGA TEBAL BASE COURSE (TBC)= 12 – 6= 6 inC • KESIMPULAN: TEBAL SURFACE = 6 inc = 15,5 cm TEBAL BASECOURSE = 6 inc = 15,5 cm TEBAL SUBBASE COURSE= 16 inc = 40,6 cm
  • 30. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA GAMBAR GRAFIK UNTUK METODE LCN
  • 31. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA LANGKAH LANGKAH DALAM MERENCANAKAN PERKERASAN KAKU LAPANGAN TERBANG METODE FAA 1. HITUNG RAMALAN ANNUAL DEPARTURE TIAP-TIAP JENIS PESAWAT YANG AKAN DILAYANI 2. HITUNG TOTAL EKIVALENT ANNUAL DEPARTURE PESAWAT (R1) 3. HITUNG MTOW TIAP JENIS PESAWAT YANG AKAN DILAYANI 4. ESTIMASI BAHAN PENYUSUN PERKERASAN : a. HARGA MODULUS REAKSI TANAH DASAR DAN SUBBASE (k) b. HARGA KUAT BENGKOK BETON (MR) UMUR 90 HARI MR= (P. L) / bd2 ATAU MR= k . √fc’ k= 8 - 10 5. GUNAKAN GRAFIK/KURVA DARI FAA UNTUK PERKERASAN RIGID BERDASARKAN PESAWAT RENCANA YG DIGUNAKAN
  • 32. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 33. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA PERUBAHAN NILAI MODULUS REAKSI TANAH DASAR EKIVALENT AKIBAT ADANYA LAPISAN SUBBASE DENGAN TEBAL TERTENTU
  • 34. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 35. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 36. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 37. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 38. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 39. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 40. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 41. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 42. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA CONTOH 2: MENENTUKAN TEBAL PERKERASAN KAKU Perkerasan didesain untuk pesawat dual tandem dengan berat 350.000 lbs (160.000 kg) dan ekivalen keberangkatan tahunan 6000 termasuk didalamnya 1200 kali keberangkatan untuk pesawat B-747 dengan berat 780.000 lbs (350.000 kg). Modulus tanah dasar = 100 pci (25 MN/m3) dengan kondisi drainase buruk. Jenis tanah dasar adalah CL. Beton memiliki flexural strength 650 psi (4,5 MN/m2). Tentukan tebal perkerasan yang diperlukan!
  • 43. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 44. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA Langkah 1: Tentukan modulus pondasi bawah dengan stabilisasi 210 pci (57 MN/m3) Catatan: Karena beban pesawat yang besar maka lapis pondasi bawah harus distabilisasi.
  • 45. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA Langkah 2: Tentukan tebal lapis beton Tebal lapis beton = 16,6 in ~ 17 in.
  • 46. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA PENULANGAN PADA PERKERASAN KAKU
  • 47. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 48. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 49. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 50. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA
  • 51. POKOK BAHASAN: DESAIN PERKERASAN PADA BANDAR UDARA