When the Cookie Cutter Won’t Cut It –   Case Histories of Spillway Upgrades for Three Pennsylvania High Hazard Dams ASDSO NE Regional Conference State College, Pennsylvania June 14, 2009 ,[object Object],[object Object]
Introduction - Purpose ,[object Object],[object Object],[object Object]
Project Locations Ironworks Dam Aqua PA Bucks County Youngman Dam WMWA Lycoming County Poe Dam PA DCNR Centre County
Project Comparison * Top of 3 ft high parapet Ironworks Dam Youngman Dam Poe Dam Max Dam Ht (ft) 51 95 33 Normal Storage (ac-ft) 1900 1600 460 Constructed 1941 1951 1935-38 Drainage Area (mi 2 ) 5.7 2.1 4.9 CN 79 67 65 Lag Time 0.8 0.4 1.2 24-hr PMP (in) 34.4 32.4 33.0 PMF Inflow (cfs) 44,900 20,400 28,000 Spillway Type Masonry Ogee/ Earth Auxiliary Concrete Ogee Masonry Ogee Spillway Length (ft) 110/200 70 60 Normal Freeboard (ft) 7/10* 8 9 Spillway Capacity (% PMF) 40/65* 60 20
Ironworks Dam Bucks County ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Ironworks Dam – Site Layout Primary Spillway Embankment Aux. Spillway Central Dike Intake Tower Photo courtesy of  Aqua PA
Ironworks Dam History ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Ironworks Dam Previous Findings ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Ironworks Dam 2001 Alternatives Evaluation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Auxiliary Spillway Core Wall
Ironworks Dam – 2001 Concept ,[object Object],[object Object],[object Object],[object Object],[object Object],Photo courtesy of  Aqua PA
[object Object],[object Object],[object Object],[object Object],[object Object],Ironworks Dam 2004 Alternatives Evaluation
[object Object],[object Object],[object Object],[object Object],[object Object],Ironworks Dam 2004 Alternatives Evaluation
Ironworks Dam – 2005 Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Photo courtesy of  Aqua PA
Ironworks Dam Construction (2006-2007) ,[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
 
Poe Dam Centre County ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Poe Dam – Site Layout Outlet Tower Primary  Spillway Photo from Windows Live Local Embankment
Poe Dam History ,[object Object],[object Object],[object Object],[object Object],[object Object]
Poe Dam Previous Findings ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Poe Dam 2002 Evaluation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Poe Dam – Upgrading Approach RCC Armoring Replace  Outlet Tower Parapet Photo from Windows Live Local Slipline and Extend Conduit Grout Spillway
Poe Dam Construction (2008 – 2009) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
 
Youngman Dam Lycoming County ,[object Object],[object Object],[object Object]
Youngman Dam – Site Layout Outlet Tower Primary  Spillway Photo from Google Earth Embankment
Youngman Dam History ,[object Object],[object Object],[object Object],[object Object]
Youngman Dam Previous Findings ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Youngman Dam 2003 Spillway Integrity Evaluation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Youngman Dam 2003 Alternatives Evaluation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Youngman Dam – Upgrading Approach Parapet Replace Pedestrian Bridge Photo from Google Earth ,[object Object],[object Object],[object Object],[object Object]
Youngman Dam Construction (2007-2008) ,[object Object],[object Object],[object Object],[object Object],[object Object]
 
 
 
 
Case Study Comparison Ironworks Poe Youngman Selected Rehab Alternative Raise Dam + Expand Aux. Spillway RCC Embankment Armoring Raise Dam with Vinyl Sheet Pile Parapet Cost $1.6M $3.7M $1.1M Design Constraints & Objectives Modifications to Parapet and Aux. Spillway Req’d “ Seriously Inadequate” Spillway Capacity Large Drainage Area, Small Lake Small Drainage Area, Large Lake Cost effective, low impact solution
Questions

Weitere ähnliche Inhalte

Was ist angesagt?

Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Fairfax County
 
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...Fairfax County
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesFairfax County
 
Kinnickinnic River Flood Management and Watercourse Rehabilitation
Kinnickinnic River Flood Management and Watercourse RehabilitationKinnickinnic River Flood Management and Watercourse Rehabilitation
Kinnickinnic River Flood Management and Watercourse RehabilitationMatthew Hahm
 
Flatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFlatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFairfax County
 
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadPedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadFairfax County
 
Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyFairfax County
 
Dead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration ProjectDead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration ProjectFairfax County
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingFairfax County
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectFairfax County
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectFairfax County
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationFairfax County
 
Colter Cothren Resume 2016
Colter Cothren Resume 2016Colter Cothren Resume 2016
Colter Cothren Resume 2016Colter Cothren
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationFairfax County
 
Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Fairfax County
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park NorthFairfax County
 
Project Planning for Metal Truss Bridges
Project Planning for Metal Truss BridgesProject Planning for Metal Truss Bridges
Project Planning for Metal Truss Bridgesaustintexasmike
 

Was ist angesagt? (20)

Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
 
Difficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton EstatesDifficult Run Tributary at Oakton Estates
Difficult Run Tributary at Oakton Estates
 
Kinnickinnic River Flood Management and Watercourse Rehabilitation
Kinnickinnic River Flood Management and Watercourse RehabilitationKinnickinnic River Flood Management and Watercourse Rehabilitation
Kinnickinnic River Flood Management and Watercourse Rehabilitation
 
Flatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream RestorationFlatlick Branch - Phase 1 Stream Restoration
Flatlick Branch - Phase 1 Stream Restoration
 
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadPedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
 
Hunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road StudyHunter Mill Road and Sunset Hills Road Study
Hunter Mill Road and Sunset Hills Road Study
 
Dead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration ProjectDead Run at Dominican Retreat- Segment 1 Stream Restoration Project
Dead Run at Dominican Retreat- Segment 1 Stream Restoration Project
 
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public MeetingDraft Chesapeake Bay TMDL Action Plan Public Meeting
Draft Chesapeake Bay TMDL Action Plan Public Meeting
 
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization ProjectScotts Run Tributary at Windy Hill Road: Stream Stabilization Project
Scotts Run Tributary at Windy Hill Road: Stream Stabilization Project
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Big Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream RestorationBig Rocky Run Phase II Stream Restoration
Big Rocky Run Phase II Stream Restoration
 
James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
Colter Cothren Resume 2016
Colter Cothren Resume 2016Colter Cothren Resume 2016
Colter Cothren Resume 2016
 
James River Partnership 2013
James River Partnership 2013James River Partnership 2013
James River Partnership 2013
 
Paul Spring Branch Stream Restoration
Paul Spring Branch Stream RestorationPaul Spring Branch Stream Restoration
Paul Spring Branch Stream Restoration
 
Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014Dead Run Stream Restoration Public Meeting April 23, 2014
Dead Run Stream Restoration Public Meeting April 23, 2014
 
ANS-3.5 Overview
ANS-3.5 OverviewANS-3.5 Overview
ANS-3.5 Overview
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
 
Project Planning for Metal Truss Bridges
Project Planning for Metal Truss BridgesProject Planning for Metal Truss Bridges
Project Planning for Metal Truss Bridges
 

Ähnlich wie ASDSO NE Regional 2009 Presentation

2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKSTimothy Antos
 
River Road Meeting 7-22-04
River Road Meeting 7-22-04River Road Meeting 7-22-04
River Road Meeting 7-22-04HartTWI
 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsAreej Al-Azzawi
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipatorssaibabu48
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingFairfax County
 
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019Comit Projects Ltd
 
River Road Meeting 6-24-04
River Road Meeting 6-24-04River Road Meeting 6-24-04
River Road Meeting 6-24-04HartTWI
 
Dam Breach Analysis: Large and Small
Dam Breach Analysis: Large and SmallDam Breach Analysis: Large and Small
Dam Breach Analysis: Large and SmallCDM Smith
 
River Road Meeting 3-10-05
River Road Meeting 3-10-05River Road Meeting 3-10-05
River Road Meeting 3-10-05HartTWI
 
Colfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectColfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectFairfax County
 
Waynewood l Force Main Rehabilitation Project Jan 8, 2021
Waynewood l Force Main Rehabilitation Project Jan 8, 2021Waynewood l Force Main Rehabilitation Project Jan 8, 2021
Waynewood l Force Main Rehabilitation Project Jan 8, 2021Fairfax County
 
Town Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology ChoicesTown Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology ChoicesCity of Tempe, Arizona
 
Remediation of contaminated sediments.ppt
Remediation of contaminated sediments.pptRemediation of contaminated sediments.ppt
Remediation of contaminated sediments.pptAhmdSbhy
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Fairfax County
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectFairfax County
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13jhayman09
 

Ähnlich wie ASDSO NE Regional 2009 Presentation (20)

Sabol Sess3 100909
Sabol Sess3 100909Sabol Sess3 100909
Sabol Sess3 100909
 
Dwyer Sess3 101309
Dwyer Sess3 101309Dwyer Sess3 101309
Dwyer Sess3 101309
 
2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS
 
River Road Meeting 7-22-04
River Road Meeting 7-22-04River Road Meeting 7-22-04
River Road Meeting 7-22-04
 
Wastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutionsWastewater pump station_design_problems_and_solutions
Wastewater pump station_design_problems_and_solutions
 
Asdso
AsdsoAsdso
Asdso
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
 
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
 
River Road Meeting 6-24-04
River Road Meeting 6-24-04River Road Meeting 6-24-04
River Road Meeting 6-24-04
 
Dam Breach Analysis: Large and Small
Dam Breach Analysis: Large and SmallDam Breach Analysis: Large and Small
Dam Breach Analysis: Large and Small
 
River Road Meeting 3-10-05
River Road Meeting 3-10-05River Road Meeting 3-10-05
River Road Meeting 3-10-05
 
Colfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation ProjectColfax Ave Emergency Sewer Rehabilitation Project
Colfax Ave Emergency Sewer Rehabilitation Project
 
Waynewood l Force Main Rehabilitation Project Jan 8, 2021
Waynewood l Force Main Rehabilitation Project Jan 8, 2021Waynewood l Force Main Rehabilitation Project Jan 8, 2021
Waynewood l Force Main Rehabilitation Project Jan 8, 2021
 
Town Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology ChoicesTown Lake Dam Replacement Technology Choices
Town Lake Dam Replacement Technology Choices
 
Remediation of contaminated sediments.ppt
Remediation of contaminated sediments.pptRemediation of contaminated sediments.ppt
Remediation of contaminated sediments.ppt
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15 ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
 
Savannah cruise ship study phase i report presentaion 06-24-13
Savannah cruise ship study phase i report presentaion  06-24-13Savannah cruise ship study phase i report presentaion  06-24-13
Savannah cruise ship study phase i report presentaion 06-24-13
 

ASDSO NE Regional 2009 Presentation

  • 1.
  • 2.
  • 3. Project Locations Ironworks Dam Aqua PA Bucks County Youngman Dam WMWA Lycoming County Poe Dam PA DCNR Centre County
  • 4. Project Comparison * Top of 3 ft high parapet Ironworks Dam Youngman Dam Poe Dam Max Dam Ht (ft) 51 95 33 Normal Storage (ac-ft) 1900 1600 460 Constructed 1941 1951 1935-38 Drainage Area (mi 2 ) 5.7 2.1 4.9 CN 79 67 65 Lag Time 0.8 0.4 1.2 24-hr PMP (in) 34.4 32.4 33.0 PMF Inflow (cfs) 44,900 20,400 28,000 Spillway Type Masonry Ogee/ Earth Auxiliary Concrete Ogee Masonry Ogee Spillway Length (ft) 110/200 70 60 Normal Freeboard (ft) 7/10* 8 9 Spillway Capacity (% PMF) 40/65* 60 20
  • 5.
  • 6. Ironworks Dam – Site Layout Primary Spillway Embankment Aux. Spillway Central Dike Intake Tower Photo courtesy of Aqua PA
  • 7.
  • 8.
  • 9.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.  
  • 17.  
  • 18.  
  • 19.
  • 20. Poe Dam – Site Layout Outlet Tower Primary Spillway Photo from Windows Live Local Embankment
  • 21.
  • 22.
  • 23.
  • 24. Poe Dam – Upgrading Approach RCC Armoring Replace Outlet Tower Parapet Photo from Windows Live Local Slipline and Extend Conduit Grout Spillway
  • 25.
  • 26.  
  • 27.  
  • 28.  
  • 29.
  • 30. Youngman Dam – Site Layout Outlet Tower Primary Spillway Photo from Google Earth Embankment
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.  
  • 38.  
  • 39.  
  • 40.  
  • 41. Case Study Comparison Ironworks Poe Youngman Selected Rehab Alternative Raise Dam + Expand Aux. Spillway RCC Embankment Armoring Raise Dam with Vinyl Sheet Pile Parapet Cost $1.6M $3.7M $1.1M Design Constraints & Objectives Modifications to Parapet and Aux. Spillway Req’d “ Seriously Inadequate” Spillway Capacity Large Drainage Area, Small Lake Small Drainage Area, Large Lake Cost effective, low impact solution