SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Downloaden Sie, um offline zu lesen
Size of Roof Gutter
      25 Year Storm        Area              13800 ft^2
 Intensity                                            Slope 
              Flow (cfs)   Depth (ft)    Width (in)            Depth (in)        Duration
   (in/hr)                                            (ft/ft)
        9.99        2.55          0.80                  0.0043      9.60 1 minute storm event
        6.36        1.63          0.70                  0.0043      8.40 15 minute storm event
        5.00        1.28          0.65                  0.0043      7.80 30 minute storm event
        4.02        1.03          0.61                  0.0043      7.32 45 minute storm event
        3.43        0.88          0.58                  0.0043      6.96 1 hour storm event
        2.21        0.56          0.51                  0.0043      6.12 2 hour storm event
        1.68        0.43          0.47                  0.0043      5.64 3 hour storm event
        1.33        0.34          0.44                  0.0043      5.28 4 hour storm event
        0.98        0.25          0.40                  0.0043      4.80 6 hour storm event
        0.55        0.14          0.33                  0.0043      3.96 12 hour storm event
       0.324        0.08          0.28                  0.0043      3.36 24 hour storm event
                    0.83
Required Width             13 in
Required Height            6.5 in
Flow                       .80 (cfs)

      10 Year Storm        Area              13800 ft^2
 Intensity                                            Slope 
              Flow (cfs)   Depth (ft)    Width (in)            Depth (in)        Duration
   (in/hr)                                            (ft/ft)
        8.84        2.26          0.77                  0.0043      9.24 1 minute storm event
        5.56        1.42          0.67                  0.0043      8.04 15 minute storm event
        4.26        1.09          0.62                  0.0043      7.44 30 minute storm event
        3.37        0.86          0.58                  0.0043      6.96 45 minute storm event
         2.9        0.74          0.55                  0.0043      6.60 1 hour storm event
        1.83        0.47          0.48                  0.0043      5.76 2 hour storm event
        1.41        0.36          0.44                  0.0043      5.28 3 hour storm event
        1.13        0.29          0.42                  0.0043      5.04 4 hour storm event
        0.83        0.21          0.38                  0.0043      4.56 6 hour storm event
        0.46        0.12          0.32                  0.0043      3.84 12 hour storm event
       0.273        0.07          0.27                  0.0043      3.24 24 hour storm event
                    0.72
Required Width             12 in
Required Height            6 in
Flow                       .65 (cfs)

Final Gutter Width     7 in
Final Gutter Height    7 in
*These dimensions were chosen due to there being 3 
downspouts located on the 2nd story gutter system.

Weitere ähnliche Inhalte

Mehr von J C

Leed consultant review
Leed consultant reviewLeed consultant review
Leed consultant review
J C
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
J C
 
Loan analysis
Loan analysisLoan analysis
Loan analysis
J C
 
Costs
CostsCosts
Costs
J C
 
Schedule
ScheduleSchedule
Schedule
J C
 
Final pv system
Final pv systemFinal pv system
Final pv system
J C
 
Pv system analysis
Pv system analysisPv system analysis
Pv system analysis
J C
 
Pv system sizing
Pv system sizingPv system sizing
Pv system sizing
J C
 
Structural costs
Structural costsStructural costs
Structural costs
J C
 
Foundation Analysis
Foundation AnalysisFoundation Analysis
Foundation Analysis
J C
 
Foundation data
Foundation dataFoundation data
Foundation data
J C
 
Irrigation Plan
Irrigation PlanIrrigation Plan
Irrigation Plan
J C
 
Irrigation demand
Irrigation demandIrrigation demand
Irrigation demand
J C
 
Storage capacity
Storage capacityStorage capacity
Storage capacity
J C
 
Water Collected On Roof
Water Collected On RoofWater Collected On Roof
Water Collected On Roof
J C
 
Existing Utilities
Existing UtilitiesExisting Utilities
Existing Utilities
J C
 
Leed 2009 new constru chk list
Leed 2009 new constru chk listLeed 2009 new constru chk list
Leed 2009 new constru chk list
J C
 

Mehr von J C (18)

Leed consultant review
Leed consultant reviewLeed consultant review
Leed consultant review
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Loan analysis
Loan analysisLoan analysis
Loan analysis
 
Costs
CostsCosts
Costs
 
Schedule
ScheduleSchedule
Schedule
 
Final pv system
Final pv systemFinal pv system
Final pv system
 
Pv system analysis
Pv system analysisPv system analysis
Pv system analysis
 
Pv system sizing
Pv system sizingPv system sizing
Pv system sizing
 
Structural costs
Structural costsStructural costs
Structural costs
 
Foundation Analysis
Foundation AnalysisFoundation Analysis
Foundation Analysis
 
Foundation data
Foundation dataFoundation data
Foundation data
 
Irrigation Plan
Irrigation PlanIrrigation Plan
Irrigation Plan
 
Irrigation demand
Irrigation demandIrrigation demand
Irrigation demand
 
Storage capacity
Storage capacityStorage capacity
Storage capacity
 
Water Collected On Roof
Water Collected On RoofWater Collected On Roof
Water Collected On Roof
 
Geotech and Pavement Design Information
Geotech and Pavement Design InformationGeotech and Pavement Design Information
Geotech and Pavement Design Information
 
Existing Utilities
Existing UtilitiesExisting Utilities
Existing Utilities
 
Leed 2009 new constru chk list
Leed 2009 new constru chk listLeed 2009 new constru chk list
Leed 2009 new constru chk list
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
 
UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1UiPath Test Automation using UiPath Test Suite series, part 1
UiPath Test Automation using UiPath Test Suite series, part 1
 
A Business-Centric Approach to Design System Strategy
A Business-Centric Approach to Design System StrategyA Business-Centric Approach to Design System Strategy
A Business-Centric Approach to Design System Strategy
 
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxUnpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 
The UX of Automation by AJ King, Senior UX Researcher, Ocado
The UX of Automation by AJ King, Senior UX Researcher, OcadoThe UX of Automation by AJ King, Senior UX Researcher, Ocado
The UX of Automation by AJ King, Senior UX Researcher, Ocado
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
THE BEST IPTV in GERMANY for 2024: IPTVreel
THE BEST IPTV in  GERMANY for 2024: IPTVreelTHE BEST IPTV in  GERMANY for 2024: IPTVreel
THE BEST IPTV in GERMANY for 2024: IPTVreel
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
ECS 2024 Teams Premium - Pretty Secure
ECS 2024   Teams Premium - Pretty SecureECS 2024   Teams Premium - Pretty Secure
ECS 2024 Teams Premium - Pretty Secure
 
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdfThe Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
 
Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджера
 
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
 
Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdf
 
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
Measures in SQL (a talk at SF Distributed Systems meetup, 2024-05-22)
 
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi IbrahimzadeFree and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
Free and Effective: Making Flows Publicly Accessible, Yumi Ibrahimzade
 
Buy Epson EcoTank L3210 Colour Printer Online.pdf
Buy Epson EcoTank L3210 Colour Printer Online.pdfBuy Epson EcoTank L3210 Colour Printer Online.pdf
Buy Epson EcoTank L3210 Colour Printer Online.pdf
 
AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101
 

Gutter sizing data

  • 1. Size of Roof Gutter 25 Year Storm Area 13800 ft^2 Intensity  Slope  Flow (cfs) Depth (ft) Width (in) Depth (in) Duration (in/hr) (ft/ft) 9.99 2.55 0.80 0.0043 9.60 1 minute storm event 6.36 1.63 0.70 0.0043 8.40 15 minute storm event 5.00 1.28 0.65 0.0043 7.80 30 minute storm event 4.02 1.03 0.61 0.0043 7.32 45 minute storm event 3.43 0.88 0.58 0.0043 6.96 1 hour storm event 2.21 0.56 0.51 0.0043 6.12 2 hour storm event 1.68 0.43 0.47 0.0043 5.64 3 hour storm event 1.33 0.34 0.44 0.0043 5.28 4 hour storm event 0.98 0.25 0.40 0.0043 4.80 6 hour storm event 0.55 0.14 0.33 0.0043 3.96 12 hour storm event 0.324 0.08 0.28 0.0043 3.36 24 hour storm event 0.83 Required Width 13 in Required Height 6.5 in Flow .80 (cfs) 10 Year Storm Area 13800 ft^2 Intensity  Slope  Flow (cfs) Depth (ft) Width (in) Depth (in) Duration (in/hr) (ft/ft) 8.84 2.26 0.77 0.0043 9.24 1 minute storm event 5.56 1.42 0.67 0.0043 8.04 15 minute storm event 4.26 1.09 0.62 0.0043 7.44 30 minute storm event 3.37 0.86 0.58 0.0043 6.96 45 minute storm event 2.9 0.74 0.55 0.0043 6.60 1 hour storm event 1.83 0.47 0.48 0.0043 5.76 2 hour storm event 1.41 0.36 0.44 0.0043 5.28 3 hour storm event 1.13 0.29 0.42 0.0043 5.04 4 hour storm event 0.83 0.21 0.38 0.0043 4.56 6 hour storm event 0.46 0.12 0.32 0.0043 3.84 12 hour storm event 0.273 0.07 0.27 0.0043 3.24 24 hour storm event 0.72 Required Width 12 in Required Height 6 in Flow .65 (cfs) Final Gutter Width 7 in Final Gutter Height 7 in *These dimensions were chosen due to there being 3  downspouts located on the 2nd story gutter system.