PROJECT MANAGEMENT (ARC 3612 / ARC 3614)
PROJECT 1: DEFINING & DOCUMENTING A MODULAR/RESIDENTIAL
CONSTRUCTION PROJECT
TUTOR
AR NAZARUDIN MASAT
TEAM MEMBERS
ALEX WONG KAI TZE 0303228
GERTRUDE LEE YUE SIEW 0306265
KEE TING TING 0310019
NURUL JANNAH MASTURAH 0310210
SHARIFAH DIYANA SYED HUSSAIN 1006AH78373
SOH YOU SHING 0308010
SURAYYN SELVAN 0309818
CONTENT
1.0 PROJECT INTRODUCTION
2.0 COMPANY PROFILE
2.1 ABOUT US
2.2 SERVICES
2.3 OUR TEAM
3.0 SITE
3.1 SITE INTRODUCTION
3.2 SITE ANALYSIS
3.3 SWOT ANALYSIS
4.0 CLIENT REQUIREMENT
4.1 CLIENT BACKGROUND &
REQUIREMENT
5.0 PROJECT APPROACH
5.1 DESIGN IDEAS
5.2 CASE STUDY
5.2.1 KAKKO HOUSE,YYAA
5.2.2 TOWNHOUSE , ELDING
OSCARSON
6.0 PROJECT MANAGEMENT
6.1 SUCCESS CRITERIA
6.2 RISK MANAGEMENT
6.3 WORK BREAKDOWN STRUCTURE
6.4 GANNT CHART
7.0 DESIGN
7.1 EXTERIOR PERSPECTIVE
7.2 DRAWING
7.3 PROPOSED DRAWING
7.4 TENDER DRAWING
8.0 INTERIOR DESIGN
8.1 INTERIOR PERSPECTIVE
8.2 FLOOR FINISHING
8.3 FINISHING SCHEDULE
8.4 FURNITURE LAYOUT PROPOSAL
8.5 FURNITURE SCHEDULE
9.0 LANDSCAPE DESIGN
9.1 LANDSCAPE LAYOUT
9.2 SPECIES SPECIFICATION
9.3 LANDSCAPE PERSPECTIVE
10.0 CIVIL & STRUCTURE
10.1 STRUCTURAL MEMBERS
10.1.1 EXISTING AND NEW
COLUMNS
10.1.2 EXISITNG AND NEW BEAMS
10.1.3 LOAD BEARING WALLS
10.2 STRUCTURAL LOAD
10.2.1 LOAD DISTRIBUTION
DIAGRAM
10.2.2 LOAD OF ADDITIONAL
STRUCTURE
10.3 ROOF SYSTEM
10.4 STAIRCASE
10.5 SEWAGE SYSTEM
10.6 DRAINAGE SYSTEM
11.0 MECHANICAL &
ELECTRICAL
11.1 EXISTING ELECTRICAL
SYSTEM
11.2 ELECTRICAL SYSTEM
11.2.1 GENERAL ELECTRICAL
SYSTEM
11.2.2 SOCKET PLACEMENT
11.2.3 LIGHTING PLACEMENT
11.2.4 SWITCH PLACEMENT
11.2.5 MECHANICAL
VENTILATION
PLACEMENT
11.3 EXISTING WATER SUPPLY
11.4 PROPOSED WATER SUPPLY
SYSTEM
12.0 COSTING
12.1 PROPERTY VALUE
12.2 CONSTRUCTION COSTING
12.3 CONSTRUCTION COSTING
SUMMARY
12.4 PIE CHART SUMMARY
12.5 OPTIONAL COSTING
12.6 OPTIONAL COSTING
SUMMARY
12.7 EXPENSES AND INCOME
13.0 APPENDIX
13.1 CCM MINUTES
13.2 REFERENCES
1.0 PROJECT
INTRODUCTION
1.0 PROJECT
INTRODUCTION
PROJECT BRIEF
As a team of 7, PR Architects are to design and manage a simple construction project with regards to criteria such as cost, quality, and time. Components that are focused
on includes introduction, design and conclusion. Organisational chart, work breakdown structure and risk analysis should also be taken into consideration. Through the
proposed project site by the client, we are to study the residential usage, as well as advising on the pros and cons of the project. We are needed to identify the market
segment and population demographic that could potentially be attracted by the site. To conduct cost and viability comparison between our proposal and a standard type of
building within the same market segment as a reference for the client.
CLIENT PROFILE
Ms. Fernn Ang
A qualified Financial Risk Manager with more than eight years experience in multiple large corporations. Currently a real estate negotiator with Juste Land. Her venture
into the real estate industry stems from her passion in property investments.
2.0 COMPANY PROFILE
2.0 COMPANY
PROFILE2.1 ABOUT US
Founded in 2003 by Ar. Surayyn Selvan and Ar. Kee Ting Ting, PR Architects is a design intensive
architecture firm located in Subang Jaya. The firm is committed to excellence in design with
construction management experience. Our design values are modern, expression of materials,
clean lines and forms that allow the architecture itself and inhabitants to thrive. The company has
had 22 projects thus far that range from renovation works, design development, residential and
commercial developments, as well as interior designs.
Our company vision is promoting environmental awareness and sustainability in architecture. We
explore in integration between architecture and technology. We strive for creativity, professionalism
and integrity in our work culture. PR architects realizes design solutions between space, program,
form, budget and materials.
Our aim and mission is to enhance the quality of our built environment for the comfort of our clients.
Our team provides determination consistently deliver quality product within the financial and time
restraint of the client’s brief with a strong regard for environmental issues. This way we are able to
design places, spaces and environments that offer the end users quality life choices and add value
to their lives.
2.0 COMPANY
PROFILE2.2 SERVICES
ARCHITECTURA
L
Attention to
detailed design
and presentation
of projects.
Planning,
designing and
constructing
buildings and
other structures.
INTERIOR DESIGN
Creating a look that
represents your style.
Producing themed
plans and mood
boards. Partially and
fully furnished layout.
LANDSCAPE
Specialising in
landscaping design
and ideas.
Composing, edging
and paving with
landscape supplies
on gardens and
backyard.
LOCATION : NO. 1 JALAN TAYLOR’S, 47500 SUBANG JAYA, SELANGOR DARUL
EHSAN, MALAYSIA.
EMAIL : PRARCHI@GMAIL.COM
CONTACT : +60166597383
2.0 COMPANY
PROFILE2.3 OUR TEAM
We are a dynamic team of creative individuals with expertise in our own fields. We offer more than just
creating great designs and specialize in communication practices. Focusing on Architectural, Interior and
Landscaping Design, we aim to deliver quality materials with international standards. Project management
are provided to ensure that the design we create achieve your desired goals.
Our team has experiences and understanding of the local and international market regarding design trends.
We are fully equipped to meet the standards and state-of-the-art communication technology. We aim to
provide our clients with innovative and conceptualized designed solutions.
AR. SURAYYN
SELVAN
Project Architect
M. Architecture
Manchester School of
Architecture ‘96
B. Sc. Architecture
University of Malaya
‘93
AR. KEE TING TING
Senior Architect
M. Architecture
University of Malaya
‘98
B. Sc. Architecture
University of Malaya
‘95
IR. SOH YOU SHING
M&E Engineer
M. Sc. Mechanical
Engineering
University of
Aberdeen ‘06
B. Eng. ( Electrical &
Mechanical )
University of Malaya
‘05
JANNAH JAILANI
Civil Engineer
M. Civil Engineering
University of
Nottingham ‘13
B. Civil Engineering
Infrastructure
University KL ‘11
SR. GERTRUDE LEE
Quantity Surveyor
MSc. Quantity
Surveyor
University of
Portsmouth ‘01
B. Quantity Surveyor
University of Malaya
‘99
DIYANA HUSSAIN
Interior Designer
M. Interior Design
Monash University ‘07
B. Interior Design
RMIT University ‘04
LR. ALEX WONG
Landscape Architect
M. Landscape Arch.
University of
Washington ‘10
B. Landscape Arch.
University of
Washington ‘96
3.0 PROJECT
INTRODUCTION
3.0 PROJECT INTRODUCTION
3.1 SITE INTRODUCTION
Property type : An end double-storey terraced house which has been extended
Site
Shape : Rectangular
Provisional Land Area : 71.8117 sq. meters (about 773 sq. feet)
Terrain : Flat and lies at the same level as the frontage road
Fencing & gate : Chain link fencing further secured with a pair of metal swing gate
Building
Structure : Reinforced concrete framework
Walls : Plastered and painted brickwalls
Ceiling : Fair faced concrete / asbestos free ceiling sheets
Floor Finishes : Ceramic tiles / Terrazzo / mosaic tiles / parquet woodblocks
Roof : Timber pitched roof covered with concrete roof tiles
Main Entrance : Aluminium framed casement / adjustable & fixed glass louvers
Accommodation : Ground floor
Terrace living area, dining area, bath/W.C. and kitchen
First floor
Master bedroom attached with bath/W.C. and balcony and bedroom 2
Approximate Built-up Area : Main floor area: 66.89 sq. metres (about 720 sq. feet)
Wall tiles : Glazed wall tiles ceiling height in kitchen and 5’ feet height for bath/W.C.
Remarks : The rear portion of the subject building has been extended on the ground floor to
accommodate a bigger kitchen
3.0 PROJECT INTRODUCTION
1) ENVIRONMENTAL ANALYSIS
3.2 SITE ANALYSIS
The warm season occurs from the month of April to the
month of June and the cold seasons lasts from November to
January with an average temprature of below 32 degrees
Celcius.
The air is driest in the moth of February and is most humid In
November.
Subang Jaya recieves the most amount of rainfall in October
and Decemeber whereas in June and July there is very little
rainfall. There is an average rainfall of 200mm each month.
3.0 PROJECT INTRODUCTION
2) PROPERTY 1 ANALYSIS
3.2 SITE ANALYSIS
LOT 123 JALAN SS19/6a
Location of property
ASKING PRICE RM 1,100,000 ( RM 405 psf)
BUILT-UP (sf) 2720
LISTING For Sale
FURNISHING Semi-Furnished
LAYOUT 4 bedroom, 3 bathroom
TENURE Freehold
Double-storey end lot with extended master bedroom, living area and kitchen
- Guraded community
3.0 PROJECT INTRODUCTION
2) PROPERTY 2 ANALYSIS
3.2 SITE ANALYSIS
LOT 123 JALAN SS19/6a
Location of property
ASKING PRICE RM 518,000 ( RM 720 psf)
BUILT-UP (sf) 720 sf
LISTING For Sale
FURNISHING Semi-Furnished
LAYOUT 2 bedroom, 2 bathroom
TENURE Freehold
Double storey end lot terrace house
- Fully extended kitchen with built in cabinets
- Renovated unit
3.0 PROJECT INTRODUCTION
2) PROPERTY 3 ANALYSIS
3.2 SITE ANALYSIS
LOT 123 JALAN SS19/6a
Location of property
ASKING PRICE RM 1400 / month
BUILT-UP (sf) 36 x 45
LISTING For Resnt
FURNISHING Semi-Furnished
LAYOUT 3 bedroom, 2 bathroom
TENURE -
Double storey terrace corner house
- Move in condition
- Newly painted
STRENGTHS WEAKNESSESOPPORTUNITIES THREATS
• Excellent ventilation
• Simple layout to work
with
• Structurally sound and
stable
• Poorly maintained
• Limited parking space
• Spatial constraint for
bedrooms
• Nearby park for user comfort
• Many nearby amenities
• Strategically located
• Start a new trend for
sustainable housing and
small houses
• Very low security
• Government building
requirements
• Limited entry / access points
• Real estate crisis
SWOT ANALYSIS
3.0 PROJECT INTRODUCTION
3.3 SWOT ANALYSIS
4.0 CLIENT REQUIREMENT
4. 0 CLIENT REQUIREMENT
4.1 CLIENT REQUIREMENT
Objective
To design a comfortable living space that would provide yield enhancement (rental) or capital gain (sale).
Usage Type
Residential (Long Term or Short Stay i.e. Airbnb type)
Market Value and Rental
Market Value – RM 420,000; Rental RM 1,000 per month, yield of 2.85%
Expected Return Post Redesign
- Capital Gain of at least 20% per annum or
- Rental Yield of at least 3.5% for Long Term or at least 6.5% for Short Stay
Budget
Up to RM 100,000
Project Timeline
Up to 6 months (upon receiving the relevant approvals)
Functional Specifications
- Parking
- Room min 3, max 4
- Bathrooms min 2, max 4
Other Key Requirements
- Easy maintenance
- Durable
- Good air circulation
- Natural Lighting
- Eco friendly (optional)
5.0 DESIGN APPROACH
5.0 PROJECT APPROACH
5.1 DESIGN IDEAS
MINIMALSIM
DESIGN WITH SIMPLE LINES
INCOOPERATE WITH NATURAL ELEMENTS
5.0 DESIGN
APPROACH5.2 CASE STUDY
CASE STUDY 1 : KAKKO HOUSE, YYAA
LOCATION : OSAKA, OSAKA PREFECTURE, JAPAN
Located in a densely built-up area of Osaka, Japan, the owner of this house is a
couple with their child. The size of the site is 3.4m x 13m. The house is framed in
exposed structural steel, covered with thin fire - resistant adiabatic panels . The
expanded metal stair connects each floors and spreads the sun light inside. In this
house, they are living like birds swinging from branch to branch.
It contains six floors with split levels :-
Level 1 (Basement Level) : Bedroom
Level 2 (Ground Level): Garage
Level 3 (First Level) : Bedroom (For the little girl)
Level 4 (Second Level ) : Living Space
Level 5 (Third Level) : Bathroom
Level 6 (Roof) : Roof Terrace
5.2.1 KAKKO HOUSE,YYAA
Diagram 1: Natural Lighting Diagram 2: Natural Ventilation
CASE STUDY 2 : TOWNHOUSE, ELDING OSCARSON
LOCATION : LANDSKRONA,SWEDEN
The site, 75 m2, is sandwiched between very old neighbouring buildings in
Landskrona, Sweden. The building relates to the surroundings in scale, proportion
and rhythm of low and tall buildings in the street. Our aim is to use small means to
create an array of different spatial experiences in this very small project to create a
razor sharp contrast, to express inherent clarity, but more importantly to highlight
the beauty of the surroundings. Compressed slab construction, unconventional
ceiling heights, and the ground floor flush to the street level, allows three floors into
a volume aligned with the neighbouring roof tops. The openness to all directions
generates a building both monolithic and transparent.
Interior consists of a single space, softly partitioned by three exposed steel slabs.
They are divided by programs : -
1. Kitchen
2. Dining
3. Living
4. Bed
5. Bath
6. Roof Terrace
5.0 DESIGN
APPROACH5.2 CASE STUDY
5.2.2 TOWNHOUSE,ELDING OSCARSON
Diagram 1: Natural Lighting Diagram 2: Natural Ventilation
6.0 PROJECT MANAGEMENT
6.0 PROJECT MANAGEMENT
The success of our project will be determined by the following criterias :-
QUALITY
1. The project completed must have a high level of client/end user satisfaction
2. The proejct completed must meet all the clients requirements as provided in the project brief.
3. The project completed must be finished with no accidents, high helath awareness and safety precautions should be considered on site
4. The project completed must have no defects and carefully executed by the professionals in their fields at all times.
TIME
1. The project must be completed withing the clients timeline which is 6 months, and set to a maximum of three months instead to avoid higher
exposures and risks.
2. The transportation of the materials and the monitioring of site must be strictly adhered to.
3. The construction workers must be supervised by the project manager and architect to ensure a smooth construction timeline that meets the
project work flow
4. The construction and installation of building components are to be completed as scheduled in the relevant Gantt chart.
COST
1. The project must be completed within the clients budget of RM 100,000 and should not exceed beyond RM 120,000.
2. The company’s consultants must work within the budget by attaining the lowest cost for long-term usable materials for building structures and
furnitures that include lightweight materials.
3. The materials for the project should be sourced locally to reduce cost of transportation.
6.1 SUCCESS CRITERIA
6.0 PROJECT MANAGEMENT
6.2 RISK MANAGEMENT
RISK SEVERIT
Y
LIKELIHOOD COST IMPACT STRATEGY AND MITIGATION
Building Renovation
i) Damage on existing wiring
ii) Damage on existing plumbing
iii) Disturbance to immediate
residents of the site
2
2
1
1
1
2
Low
Low
No Cost
i) Cost will occur to amend the cables and possible
electrocutions
ii) Extra cost for piping amendments
iii) A slow down in the construction timeline
- Should attain precise physical data on site from
the authority and receive all relevant legal
requirements
Consultants Liability
i) Unclear construction
specifications
ii) Incorrect cost estimation
3
2
5
4
Medium
Medium
i) Result in a delay of the project’s timeline
ii) The project’s budget will be exceeded
- Ensure all drawings are detailed with the
supervision of the architect and engineers on site
Labour
i) Injuries of workers on site
ii) Death of workers on site
iii) Insufficient workers on site
3
4
4
2
2
2
Medium
High
High
i) Lawsuits, fines and compensation
ii) Lawsuits, fines and compensation
iii) Delay of heavy construction work and contracted
fines
- Project managers has to ensure that all safety
requirements are met
- Sufficient workers must be provided to meet the
project’s timeline
Construction of Additional Floor
i) Incorrect installations
ii) Client’s change in design
iii) Overrun of time
iv) Maintenance risks
v) Unavailable utilities
2
3
3
2
1
2
1
1
1
1
Medium
High
Medium
Low
Medium
i) Extra labour, materials costs and will result in a
delay in the project’s schedule
ii) Extra labour, materials costs and will result in a
delay in the project’s schedule
iii) Fines and extra labour costs
iv) Extra amenities and services cost
v) Water and electricity from main supply are stopped
which would result in extra cost for outsourcing
- Site manager must ensure that the construction of
the additional level must meet the drawing
specifications
- The project managers has to ensure that the
client’s requirements does not violate any of the
authorities requirements while keeping within the
budget
Building Materials
i) Lack of materials
ii) Extra materials
iii) Delay in delivery time
iv) Material defects
v) Theft of materials
1
1
1
1
1
2
1
1
2
2
Medium
Unaffected
Low
Medium
Medium
i) Project’s budget will be exceeded
ii) Waste of project’s budget
iii) A delay in the project’s timeline
iv) Additional costs on materials
v) Additional costs on materials
- Ensure that all suppliers are reliable and security
of the site should be considered
- Additional costing should be considered during
the preliminary costs in the event of additional
materials
Natural Conditions
i) Heavy rainfall
ii) High humidity on site
1
1
4
1
Low
Low
i) Will result in a delay in the project schedule and will
cause defects on certain materials and structural
members
ii) Will results in the defect of certain materials and
structural members
- Ensure proper storage and protection of materials
- Roof level should be constructed as soon as
possible
Others
i) Sudden cut in client’s budget
ii) On site security
5
2
4
1
High
Low
i) Project will be suspended
ii) Project cost will be exceeded and a delay in the
project timeline will occur
- Thorough background check on the client’s
financial stability should be conducted, obtaining
legal advice
- Construction workers should be reliable
LIKELIHOOD SEVERITY
1 Remote 1 Minimal or no impact
2 Unlikely 2 Additional resources required
3 Likely 3 Minor slip in key milestone, not able to meet schedule
4 Very likely 4 Major slip in key milestone, critical path impacted
5 Near
certainty
5 Can’t achieve key term or major program milestone
6.0 PROJECT MANAGEMENT
6.3 WORK BREAKDOWN STRUCTURE
Task
No.
Task Name Description of construction method and processes Resources
Materials Labour
1.0 Analytical Studies
- Cost Management
- Labour Costs
- Surveying
- Site Surveying
- Site Analysis
Studies are to be conducted to ensure a smooth construction
schedule. All legal requirements must be identified to prevent
a delay in the project schedule.
- Project Manager
- Architect
- Interior Designer
- M&E Engineer
- C&S Engineer
- Landscape Architect
- -Quantity Surveyor
2.0 Design Development A comprehensive design development should be taken into
account and translated into clear tender drawings to be
awarded and for the clarity of the client
- Project Manager
- Architect
- Interior Designer
- M&E Engineer
- C&S Engineer
- Landscape Architect
- -Quantity Surveyor
3.0 Permit Applications Submission for authority approval should be adhered to to to
ensure smooth flow in the project schedule
- Project Manager
- Architect
4.0 External Works
- Hoarding
- External walls
- Windows
- External door
Demolition and construction of existing structures must adhere
to the construction timeline and should be carefully executed
- Autoclaved Aerated Concrete
Blocks
- Mortar
- Window and Door fixtures
- Steel beam and column
- Exterior paint
- Contractor
- Skilled workers
- Semi-skilled Workers
- Site Supervisor
- Architect
- Project Manager
5.0 Internal Works
- Internal Walls
- Floors
- Ceiling
- Internal Doors
- Staircase
Demolition and construction of existing structures must adhere
to the construction timeline and should be carefully executed
- Autoclaved Aerated Concrete
Blocks
- Autoclaved Aerated Concrete
Panels
- Mortar
- Window and Door fixtures
- Built-in furniture
- Interior paint
- New staircase structures
- Lighting and new plumbing fixtures
- Contractor
- Skilled workers
- Semi-skilled Workers
- Site Supervisor
- Interior Designer
- Architect
- Project Manager
6.0 Roof
- Roof frames
- Roof cladding
Demolition and construction of existing structures must adhere
to the construction timeline and should be carefully executed
- Steel roof structures
- Metal decking
- Skylight fixtures
- Roof insulation
- Contractor
- Skilled workers
- Semi-skilled Workers
- Site Supervisor
- Architect
- Project Manager
- C&S Engineer
6.0 PROJECT MANAGEMENT
6.3 WORK BREAKDOWN STRUCTURE
Task
No.
Task Name Description of construction method and processes Resources
Materials Labour
7.0 Landscaping Works
- Excavation
- Landscaping
Excavation of the existing site must adhere to the schedule and
should be done carefully. Planting of the chosen vegetation
should be taken care of.
- Soil
- Gardening plants
- Contractor
- Skilled workers
- Semi-skilled Workers
- Site Supervisor
- Project Manager
- Architect
- Landscape Architect
8.0 Services
- Wiring
- Plumbing
The mechanical and electrical as well as plumbing services
should be installed in accordance to the schematic design by
the M&E Engineer.
- Sanitary fittings and wares
- Hangers and brackets
- PVC pipes
- Electrical Wirings
- Wall switches and fixtures
- Contractor
- Skilled workers
- Semi-skilled Workers
- Site Supervisor
- Project Manager
- Architect
- M&E Engineer
9.0 Site Clearance Dumping and residues from the construction are to be managed
properly before handing over
- Contractor
- Skilled workers
- Semi-skilled Workers
- Site Supervisor
6.0 PROJECT MANAGEMENT
6.3 WORK BREAKDOWN STRUCTURE
DESCRIPTION START DATE DURATION (days) END DATE
Design Development
1.1 Design Proposal 31/09/2015 43 12/10/15
Permit Application
2.1 Permit Approval 12/10/15 10 26/10//2015
External Works
3.1 Walls
3.1.1 Demolition 26/10/2015 5 30/10/2015
3.1.2 Construction 2/11/15 14 16/11/2015
3.2 Windows
3.2.1 Removal 26/10/2015 7 30/10/2015
3.2.2. Installation 9/11/15 7 16/11/2015
3.3 Doors
3.3.1 Removal 26/10/2015 7 30/10/2015
3.3.2 Installation 9/11/15 7 16/11/2015
Internal Works
4.1 Walls
4.1.1 Demolition 26/10/2015 7 30/10/2015
4.1.2 Construction 9/11/15 14 16/11/2015
4.1.3 Finishes 16/11/2015 7 23/11/2015
4.2 Floors
4.2.1 Demolition 26/10/2015 7 30/10/2015
4.2.2 Construction 9/11/15 14 16/11/2015
4.2.3 Finishes 16/11/2015 7 23/11/2015
4.3 Ceiling
4.3.1 Demolition 26/10/2015 7 30/10/2015
4.3.2 Construction 9/11/15 7 16/11/2015
4.3.3 Finishes 16/11/2015 7 23/11/2015
4.4 Staircase
4.1 Installation 9/11/15 7 16/11/2015
4.2 Finsihes 16/11/2015 7 23/11/2015
Roof
5.1 Framing
5.1.2 Demolition 26/10/2015 7 30/10/2015
5.1.3 Installation 9/11/15 7 16/11/2015
5.2 Cladding
5.2.1 Removal 26/10/2015 7 30/10/2015
5.2.2 Installation 9/11/15 7 16/11/2015
Landscaping
6.1 Excavation 16/11/2015 4 19/11/2015
6.2 Planting 20/11/2015 4 23/11/2015
Services
6.1 Wiring 28/09/2015 57 23/11/2015
6.2 Plumbing 9/11/15 15 23/11/2015
6.0 PROJECT MANAGEMENT
6.4 GANTT CHART
Project Management - Redesigning Compact Living
7.0 DESIGN
7.0 DESIGN
7.1 EXTERIOR PERSPECTIVE
DAYTIME PERSPECTIVE 1
7.0 DESIGN
7.1 EXTERIOR PERSPECTIVE
DAYTIME PERSPECTIVE 2
7.0 DESIGN
7.1 EXTERIOR PERSPECTIVE
DAYTIME PERSPECTIVE 3
7.0 DESIGN
7.1 EXTERIOR PERSPECTIVE
DAYTIME PERSPECTIVE 4
7.0 DESIGN
7.1 EXTERIOR PERSPECTIVE
NIGHT TIME PERSPECTIVE
GROUND FLOOR PLAN
SCALE 1:100
FIRST FLOOR PLAN
SCALE 1:100
7.0 DESIGN
7.2 EXISTING DRAWINGS
FRONT ELEVATION
SCALE 1:100
BACK ELEVATION
SCALE 1:100
7.0 DESIGN
7.2 EXISTING DRAWINGS
SIDE ELEVATION
SCALE 1:100
SECTION A-A
SCALE 1:100
7.0 DESIGN
7.2 EXISTING DRAWINGS
GROUND FLOOR PLAN
SCALE 1:100
FIRST FLOOR PLAN
SCALE 1:100
SECOND FLOOR PLAN
SCALE 1:100
7.0 DESIGN
7.2 EXISTING DRAWINGS
ROOF PLAN
SCALE 1:100
7.0 DESIGN
7.3 PROPOSED DRAWINGS
FRONT ELEVATION
SCALE 1:100
7.0 DESIGN
7.3 PROPOSED DRAWINGS
SIDE ELEVATION
SCALE 1:100
7.0 DESIGN
7.3 PROPOSED DRAWINGS
BACK ELEVATION
SCALE 1:100
7.0 DESIGN
7.3 PROPOSED DRAWINGS
SECTION A-A
SCALE 1:100
7.0 DESIGN
7.3 PROPOSED DRAWINGS
7.0 DESIGN
7.3 PROPOSED DRAWINGS
7.0 DESIGN
7.4 TENDER DRAWING
8.0 INTERIOR DESIGN
8.0 INTERIOR DESIGN
8.1 INTERIOR PERSPECTIVE
TERRACE
8.0 INTERIOR DESIGN
8.1 INTERIOR PERSPECTIVE
LIVING
8.0 INTERIOR DESIGN
8.1 INTERIOR PERSPECTIVE
DINING + KITCHEN
8.0 INTERIOR DESIGN
8.1 INTERIOR PERSPECTIVE
BEDROOM 1
8.0 INTERIOR DESIGN
8.1 INTERIOR PERSPECTIVE
BEDROOM 2
8.0 INTERIOR DESIGN
8.1 INTERIOR PERSPECTIVE
BEDROOM 3
8.0 INTERIOR DESIGN
8.1 INTERIOR PERSPECTIVE
BATH
8.0 INTERIOR DESIGN
8.1 INTERIOR PERSPECTIVE
BALCONY
GROUND FLOOR
PLAN
NTS
8.0 INTERIOR DESIGN
8.2 FLOOR FINISHING
SECOND FLOOR
PLAN
NTS
FIRST FLOOR PLAN
NTS
Light grey ceramic
tiles
Marble aggregate tiles
Cement
Dark grey ceramic tiles
Mahogany wood
White ceramic tiles
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location: Car Porch,
Terrace, Balcony
Cement
• Raw natural finish
• 26 an y12 (40kg)
14 RM 90.00
LAFARGH
Bangunan TH Uptown
Jalan SS 21/39,
Damansara Utama,
Petaling Jaya, Malaysia
2
Location: Living
Marble Aggregate Tiles
• Polished finish
1 RM 1000.00 Maintaining existing tiles
3
Location: Dining,
Kitchen
Light Grey Ceramic Tiles
• Polished finish
1 RM 1000.00 Maintaining existing tiles
4
Location: Bedroom 1,
Bedroom 2, Bedroom 3
White Ceramic Tiles
• Matte finish
• 600 x 600 mm
84 RM 5.20
Venus Ceramic Industry
No. 260 F, 2 1/2 Miles,
Jalan Ipoh, 51200,
Kuala Lumpur, Malaysia
5
Location: Stairs
Timber Planks
• Polished finish
• 245 x 1050 x 38 mm
• 1100 x 2250 x 38 mm
• Ft/run
8.574m² RM 8.00
Mikyotech Sdn Bhd
No.21-3, Jalan PJU
8/5D, Bandar
Damansara Perdana,,
47820 Petaling Jaya,
Malaysia
6
Location: Bath 1, Bath
2, Bath 3, Bath 4
Dark Grey Ceramic Tiles
• Matte finish
• 300 x 300 mm
160 RM 3.00
Mikyotech Sdn Bhd
No.21-3, Jalan PJU
8/5D, Bandar
Damansara Perdana,,
47820 Petaling Jaya,
Malaysia
8.0 INTERIOR DESIGN
8.3 FINISHING SCHEDULE
8.0 INTERIOR DESIGN
8.4 FURNITURE LAYOUT PROPOSAL
GROUND FLOOR
PLAN
NTS
TV bench
Three-seat sofa
Balcony table with
2 folded chairs
Coffee table
40’ LED TV
Fridge
Dining table set
Water closet &
Sink
8.0 INTERIOR DESIGN
8.4 FURNITURE LAYOUT PROPOSAL
FIRST FLOOR PLAN
NTS
Study table and chair
Wardrobe
Queen bed
Single bed
Water Closet &
Sink
Wardrobe
8.0 INTERIOR DESIGN
8.4 FURNITURE LAYOUT PROPOSAL
SECOND FLOOR
PLAN
NTS
Study table and chair
Queen bed
Water Closet &
Sink
Wardrobe
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location: Living
KIVIK Two-seat Sofa
• Isunda grey
• 1900 x 950 x 850 mm
1 RM 645.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
2
Location: Living
LACK Coffee Table
• Black-brown
• 900 x 550 x 450 mm
1 RM 79.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
3
Location: Living
Besta TV Bench
• Black-brown
• 1800 x 400 x 380 mm
1 RM 795.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
4
Location: Living
Samsung 40’’ Full HD
• Flat TV H5008 Series 5
1 RM 999.00
SAMSUNG
Persiaran Kewajipan,
USJ,47600 UEP,
Subang Jaya, Selangor,
Malaysia
5
Location: Dining
Estonia White Wood Table & Cushion Seat
• Solid Wood
• 1200 x 750 x 745 mm
• Fabric Cushion
• 460 x 495 x 800 mm
1 RM 1299.00
MF DESIGN
No 26 (1st) , Jalan
Perwira 1, Taman
Perwira, 84200 Bakri,
Muar, Johor
8.0 INTERIOR DESIGN
8.5 FURNITURE SCHEDULE
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
6
Location: Kitchen
FYNDIG Kitchen Cabinet
• White / Laminate worktop
• 36 sqft
1 RM 1319.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
7
Location: Kitchen
Panasonic Econavi Fridge
• 262 litres
• 2 door top freezer
• 611 x 600 x 1499 mm
1 RM 1249.00
SENHENG SUNWAY
PYRAMID
No 3, Jalan PJS 11/15,
Bandar Sunway, 46150,
Petaling Jaya, Selangor
8
Location: Bedroom 1,
Bedroom 3
TRYSIL Bed Frame
• White-light grey
• Powder-coated steel
• 1550 x 2180 x 1499 mm
2 RM 490.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
9
Location: Bedroom 2
BRIMNES Day-bed Frame
• White / Foil finish
• 860 x 2050 x 57 mm
1 RM 799.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
10
Location: Bedroom 1,
Bedroom 3
Queen Size Mattress
• High density foam
• 1525 x 1830 x 128 mm
2 RM 598.00
MF DESIGN
No 26 (1st) , Jalan
Perwira 1, Taman
Perwira, 84200 Bakri,
Muar, Johor
8.0 INTERIOR DESIGN
8.5 FURNITURE SCHEDULE
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
11
Location: Bedroom 2
Single Size Mattress
• Foam
• 850 x 1830 x 128 mm
1 RM 199.00
MF DESIGN
No 26 (1st) , Jalan
Perwira 1, Taman
Perwira, 84200 Bakri,
Muar, Johor
12
Location: Bedroom 1,
Bedroom 3
BRIMNES Wardrobe with 3 Doors
• Foil finish / Mirror glass
• 1170 x 500 x 1900 mm
1 RM 545.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
13
Location: Bedroom 2
ASKVOLL Wardrobe
• Foil finish
• 800 x 520 x 1890 mm
2 RM 490.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
14
Location: Bedroom 1,
Bedroom 2, Bedroom 3
LISABO desk & Swivel chair
• Ash veneer / Solid birch
• 1180 x 450 x 740 mm
• White / Plywood
• 450 x 390 x 520 mm
3 RM 718.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
15
Location: Bedroom 3
KHIND Tower Fan
• High density foam
• 1525 x 1830 x 128 mm
1 RM 176.00
SENHENG SUNWAY
PYRAMID
No 3, Jalan PJS 11/15,
Bandar Sunway, 46150,
Petaling Jaya, Selangor
8.0 INTERIOR DESIGN
8.5 FURNITURE SCHEDULE
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
16
Location: Bath 1, Bath
2, Bath 3, Bath 4
GUNNERN Mirror Cabinet
• White / Mirror glass
• 310 x 124 x 620 mm
3 RM 129.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
17
Location: Bath 1, Bath
2, Bath 3, Bath 4
JOHNSON SUISSE Pavia Semi-recessed Basin
• White
• 555 x 600 x 247 mm
3 RM 423.00
MAJU HOME
FURNISHING
Lot 48 & 48, Batu 4 1/2,
Jalan Genting Klang,
53300 Setapak, Kuala
Lumpur.
18
Location: Bath 1, Bath
2, Bath 3, Bath 4
JOHNSON SUISSE Luton Close-coupled Water
Closet
• White
• Washdown / Dual Flush
• 650 x 365 x 785 mm
3 RM 466.00
MAJU HOME
FURNISHING
Lot 48 & 48, Batu 4 1/2,
Jalan Genting Klang,
53300 Setapak, Kuala
Lumpur.
19
Location: Terrace
ASKHOLMEN Balcony Table with 2 Folded Chairs
• 700 x 440 x 710 mm
• 360 x 490 x 870 mm
3 RM 225.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara
Damansara, 47820
Petaling Jaya, Selangor,
Malaysia
8.0 INTERIOR DESIGN
8.5 FURNITURE SCHEDULE
9.0 LANDSCAPE DESIGN
9.1 LANDSCAPE LAYOUT
9.0 LANDSCAPE
Emmenopterys
Henyi
Euonymus
Fortunei
Bermuda
Grass
Pebble Stone
Pebble Stone
Path
Morning
Glory
9.0 LANDSCAPE
9.2 SPECIES SPECIFICATION
ITEM NO. SPECIFICATION UNIT PRICE SUPPLIER
1
Emmenopterys Henyi
Height : 120mm
Spread : 1000mm
Sun : Sun, part sun
Watering : Medium
6 RM 80
Glorious Nursery
Jalan PJS 10/2, Bandar
Sunway, Petaling Jaya,
Selangor.
2
Euonymus Fortunei
Height : 50-60mm
Spread : 1000mm
Sun : Sun, part sun
Watering : Medium
10 RM 12
Glorious Nursery
Jalan PJS 10/2, Bandar
Sunway, Petaling Jaya,
Selangor.
3
Pebble Stone Path
Size : 400x400mm
Colour : Mixing with black and light pink
24 RM 9
Glorious Nursery
Jalan PJS 10/2, Bandar
Sunway, Petaling Jaya,
Selangor.
4
Pebble Stone
Size : Average medium size
Colour : Mixing with black and light pink
20 RM 21
Glorious Nursery
Jalan PJS 10/2, Bandar
Sunway, Petaling Jaya,
Selangor.
5
Bermuda Grass
Sun : Sun, part sun
Watering : Medium
1 RM 63
Glorious Nursery
Jalan PJS 10/2, Bandar
Sunway, Petaling Jaya,
Selangor.
6
Morning Glory Seed
Sun : Sun, part sun
Watering : Medium
1 RM 10
Glorious Nursery
Jalan PJS 10/2, Bandar
Sunway, Petaling Jaya,
Selangor.
9.0 LANDSCAPE
9.3 LANDSCAPE PERSPECTIVE
BIRD EYE VIEW
9.0 LANDSCAPE
9.3 LANDSCAPE PERSPECTIVE
PERSPECTIVE VIEW
10.0 CIVIL & STRUCTURE
10.0 CIVIL & STRUCTURE
10.1 STRUCTURAL MEMBERS
STRUCTURAL PLANS
FOUNDATION PLAN
SCALE 1:100
GROUND FLOOR PLAN
SCALE 1:100
FIRST FLOOR PLAN
SCALE 1:100
SECOND FLOOR PLAN
SCALE 1:100
BALCONY ROOF PLAN
SCALE 1:100
ROOF PLAN
SCALE 1:100
11.0 STRUCTURAL MEMBERS
STRUCTURAL PLANS
10.0 CIVIL & STRUCTURE
10.1 STRUCTURAL MEMBERS
10.1.1 EXISTING AND NEW
COLUMNS
EXISTING COLUMN
NEW COLUMN
FOUNDATION PLAN
SCALE 1:100
GROUND FLOOR PLAN
SCALE 1:100
FIRST FLOOR PLAN
SCALE 1:100
10.0 CIVIL & STRUCTURE
10.1 STRUCTURAL MEMBERS
10.1.2 EXISTING AND NEW BEAMS
EXISTING BEAM
NEW BEAM
GROUND FLOOR PLAN
SCALE 1:100
FIRST FLOOR PLAN
SCALE 1:100
SECOND FLOOR PLAN
SCALE 1:100
10.0 CIVIL & STRUCTURE
SECOND FLOOR PLAN
SCALE 1:100
GROUND FLOOR PLAN
SCALE 1:100
FIRST FLOOR PLAN
SCALE 1:100
10.1 STRUCTURAL MEMBERS
10.1.3 LOAD BEARING WALLS
NEW LOAD BEARING WALL
10.0 CIVIL & STRUCTURE
10.1 STRUCTURAL MEMBERS
NEW LOAD BEARING WALLEXISTING BEAM
NEW BEAM
EXISTING COLUMN
NEW COLUMN
COLUMNS BEAMS LOAD BEARING WALL
10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location : Column F/1
Steel Rectangular Hollow Section -
350mm x 150mm x 4.5mm x 2950mm – (28kg/m)
1 RM 385.00
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
2
Location : Ground floor
& first floor, beam 1/E-
F
Steel Rectangular Hollow Section -
350mm x 150mm x 4.5mm x 1578mm – (28kg/m) 2 RM 243.00
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
3
Location : Ground floor
& first floor, beam F/1-2
Steel Rectangular Hollow Section -
350mm x 150mm x 4.5mm x 1725mm – (28kg/m) 2 RM 265.00
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
4
Location : Second
floor, beam 1.5/C-D1
Steel Rectangular Hollow Section -
350mm x 150mm x 4.5mm x 1725mm – (28kg/m) 1 RM 346.50
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
10.1 STRUCTURAL MEMBERS
10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location : First floor,
second floor
Autoclaved Aerated Concrete (AAC) Block
600mm x 200mm x 150mm
910 RM 3.50
Starken AAC Sdn. Bhd.
No.A-1-3A, Pusat
Perdagangan Kuchai,
No.2, Jalan 1/127, Off
Jalan Kuchai Lama,
58200, Kuala Lumpur,
Wilayah Persekutuan,
Malaysia.
2
Location : First floor,
second floor
Autoclaved Aerated Concrete (AAC) Floor Panel
600mm x 150mm x 3100mm 22 RM 54.50
Starken AAC Sdn. Bhd.
No.A-1-3A, Pusat
Perdagangan Kuchai,
No.2, Jalan 1/127, Off
Jalan Kuchai Lama,
58200, Kuala Lumpur,
Wilayah Persekutuan,
Malaysia.
10.1 STRUCTURAL MEMBERS
10.0 CIVIL & STRUCTURE
10.2 STRUCTURAL LOAD
10.2.1 LOAD DISTRIBUTION DIAGRAM
GROUND FLOOR PLAN
SCALE 1:100
FIRST FLOOR PLAN
SCALE 1:100
SECOND FLOOR PLAN
SCALE 1:100
10.0 CIVIL & STRUCTURE
10.2 STRUCTURAL LOAD
10.2.2 LOAD OF ADDITIONAL STRUCTURE
ROOF PLAN
SCALE 1:100
ITEM
NO.
CALCULATION UNIT WEIGHT
(kN)
ROOF FRAME
SLOPE CORRECTION FACTOR = 1.08
1 (1.64 x 0.1)m x 0.1kN/m² x 1.08 = 0.018kN / unit 5 0.09
2 (3.09 x 0.1)m x 0.1kN/m² x 1.08 = 0.033kN / unit 3 0.10
3 (5.09 x 0.1)m x 0.1kN/m² x 1.08 = 0.055kN / unit 2 0.11
4 (4.88 x 0.1)m x 0.1kN/m² x 1.08 = 0.053kN / unit 9 0.48
5 (0.5 x 0.1)m x 0.1kN/m² x 1.08 = 5.4 x 10^-3kN / unit 2 0.01
6 (2.2 x 0.1)m x 0.1kN/m² x 1.08 = 0.24kN / unit 3 0.72
METAL ROOF SHEET
7 (4.88 x 1.64)m x 0.07kN/m² x 1.08 = 0.061kN - 0.06
8 (4.88 x 5.20)m x 0.07kN/m² x 1.08 = 2kN - 2.00
1
2
3
4
5
6
DEAD LOAD
Steel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m²
Polycarbonate Roof
Panel
0.03kN/m²
LIVE LOAD
Bedroom 1.5kN/m² Bathroom 2.0kN/m²
Balcony 1.5kN/m² Corridor 1.5kN/m²
10.0 CIVIL & STRUCTURE
10.2 STRUCTURAL LOAD
10.2.2 LOAD OF ADDITIONAL STRUCTURE
BALCONY ROOF PLAN
SCALE 1:100
ITEM
NO.
CALCULATION UNIT WEIGHT
(kN)
ROOF FRAME
SLOPE CORRECTION FACTOR = 1.08
1 (3.2 x 0.1)m x 0.1kN/m² x 1.08 = 0.035kN / unit 5 0.18
2 (4.88 x 0.1)m x 0.1kN/m² x 1.08 = 0.053kN/ unit 3 0.16
POLYCARBONATE ROOF PANEL
3 (4.88 x 3.2)m x 0.03kN/m² x 1.08 = 0.506kN - 0.51
TOTAL LOAD OF ROOF 4.42
1
2
DEAD LOAD
Steel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m²
Polycarbonate Roof
Panel
0.03kN/m²
LIVE LOAD
Bedroom 1.5kN/m² Bathroom 2.0kN/m²
Balcony 1.5kN/m² Corridor 1.5kN/m²
10.0 CIVIL & STRUCTURE
10.2 STRUCTURAL LOAD
10.2.2 LOAD OF ADDITIONAL STRUCTURE
SECOND FLOOR PLAN
SCALE 1:100
ITEM
NO.
CALCULATION UNIT WEIGHT
(kN)
AAC BLOCK WALL
1 (4.73 x 1.5 x 0.15)m³ x 7.4kN/m³ = 7.87kN / unit 1 7.87
2
(6.871 + 5.814 + 0.373)m² x 0.15m x 7.4kN/m³ =
17.12kN / unit
1 17.12
3 (12.62 + 1.076)m² x 0.15m x 7.4kN/m³ = 13.7kN / unit 1 13.70
4 (11.421 + 1.055)m² x 0.15m x 7.4kN/m³ = 13.84kN / unit 1 13.84
5
((1.57 + 2.916)/2 x 3.1)m² x 0.15m x 7.4kN/m³ = 7.72kN
/ unit
1 7.72
6 (1.25 x 1.895 x 0.15)m³ x 7.4kN/m³ = 7.63kN / unit 1 7.36
7 (1.5 x 3.63 x 0.15)m³ x 7.4kN/m³ = 6.04kN / unit 1 6.04
STEEL BEAM
8 (2.25 x 0.35 x 0.15)m³ x 78.5kN/m³ = 9.27kN / unit 1 9.27
1
2
3
8
5
6
7
4
DEAD LOAD
Steel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m²
Polycarbonate Roof
Panel
0.03kN/m²
LIVE LOAD
Bedroom 1.5kN/m² Bathroom 2.0kN/m²
Balcony 1.5kN/m² Corridor 1.5kN/m²
10.0 CIVIL & STRUCTURE
SECOND FLOOR PLAN
SCALE 1:100
ITEM
NO.
CALCULATION UNIT WEIGHT
(kN)
AAC FLOOR PANEL
1
(4.73 x 2.325 x 0.15)m³ x 8.04kN/m³ = 13.26kN / unit
Live load of balcony, (4.73 x 2.325)m² x 1.5kN/m² =
16.5kN
1 29.76
2
(2.25 x 1.275 x 0.15)m³ x 8.04kN/m³ = 3.46kN / unit
Live load of corridor, (2.25 x 1.275)m² x 1.5kN/m² =
4.3kN
1 7.76
3
(1.186 x 3.605 x 0.15)m³ x 8.04kN/m³ = 5.16kN / unit
Live load of bedroom, (1.186 x 3.605)m² x 1.5kN/m² =
6.41kN
1 11.57
4
(1.273 x 1.166 x 0.15)m³ x 8.04kN/m³ = 1.79kN / unit
Live load of bedroom, (1.273 x 1.166)m² x 1.5kN/m² =
2.23kN
1 4.02
5
(1.271 x 1.034 x 0.15)m³ x 8.04kN/m³ = 1.58kN / unit
Live load of bedroom, (1.271 x 1.034)m² x 1.5kN/m² =
1.97kN
1 3.55
6
(1.738 x 3.605 x 0.15)m³ x 8.04kN/m³ = 7.56kN / unit
Live load of bedroom, (1.738 x 3.605)m² x 1.5kN/m² =
9.4kN
1 16.96
TOTAL LOAD ON SECOND FLOOR 156.72
DEAD LOAD
Steel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m²
Polycarbonate Roof
Panel
0.03kN/m²
LIVE LOAD
Bedroom 1.5kN/m² Bathroom 2.0kN/m²
Balcony 1.5kN/m² Corridor 1.5kN/m²
1
2
3
5
6
4
10.2 STRUCTURAL LOAD
10.2.2 LOAD OF ADDITIONAL STRUCTURE
10.0 CIVIL & STRUCTURE
FIRST FLOOR PLAN
SCALE 1:100
ITEM
NO.
CALCULATION UNIT WEIGHT
(kN)
AAC BLOCK WALL
1 (0.75 + 4.176)m² x 0.15m x 7.4kN/m³ = 5.47kN / unit 1 5.47
2 (3.391 x 2.983 x 0.15)m³ x 7.4kN/m³ = 11.23kN / unit 1 11.23
3 (4.729 x 2.983 x 0.15)m³ x 7.4kN/m³ = 15.66kN / unit 1 15.66
4 (2.342 x 2.983 x 0.15)m³ x 7.4kN/m³ = 7.75kN / unit 1 7.75
5 (1.273 x 2.983 x 0.15)m³ x 7.4kN/m³ = 4.22kN / unit 1 4.22
6 (3.607 x 2.983 x 0.15)m³ x 7.4kN/m³ = 11.94kN / unit 1 11.94
7 (1.778 x 2.983 x 0.15)m³ x 7.4kN/m³ = 5.88kN / unit 1 5.88
STEEL BEAM
8 (1.778 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 7.33kN / unit 1 7.33
9 (1.579 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 6.51kN / unit 1 6.51
AAC FLOOR PANEL
10
(1.725 x 1.778 x 0.15)m³ x 8.014kN/m³ = 3.7kN
Live load of bedroom, (1.725 x 1.778)m² x 1.5kN/m² =
4.6kN
1 8.30
1
2
3
4
7
8
5
6
9
1
0
DEAD LOAD
Steel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m²
Polycarbonate Roof
Panel
0.03kN/m²
LIVE LOAD
Bedroom 1.5kN/m² Bathroom 2.0kN/m²
Balcony 1.5kN/m² Corridor 1.5kN/m²
10.2 STRUCTURAL LOAD
10.2.2 LOAD OF ADDITIONAL STRUCTURE
10.0 CIVIL & STRUCTURE
GROUND FLOOR PLAN
SCALE 1:100
ITEM
NO.
CALCULATION UNIT WEIGHT
(kN)
STEEL COLUMN
1 (2.95 x 0.35 x 0.15)m³ x 78.5kN/m³ = 12.15kN / unit 1 12.15
STEEL BEAM
2 (1.778 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 7.33kN / unit 1 7.33
3 (1.579 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 6.51kN / unit 1 6.51
TOTAL LOAD IMPOSED ON GROUND AND FIRST FLOOR 110.28
DEAD LOAD
Steel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m²
Polycarbonate Roof
Panel
0.03kN/m²
LIVE LOAD
Bedroom 1.5kN/m² Bathroom 2.0kN/m²
Balcony 1.5kN/m² Corridor 1.5kN/m²
2
1
3
TOTAL LOAD OF THE ADDITIONAL STRUCTURE 271.42 kN
The proposed structure utilizes lightweight materials like AAC blocks and panels, in order to
minimise the additional resulting load as it is unsure whether the existing structure is able to
withstand a great amount of load.
10.2 STRUCTURAL LOAD
10.2.2 LOAD OF ADDITIONAL STRUCTURE
10.0 CIVIL & STRUCTURE
10.3 ROOF SYSTEM
ROOF STRUCTURE AWNING STRUCTURE
10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location : Roof
Steel Rectangular Hollow Section -
100mm x 50mm x 4.1mm 1630mm – (6.4kg/m)
5 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
2
Location : Roof
Steel Rectangular Hollow Section –
100mm x 50mm x 4.1mm x 2647mm – (6.4kg/m) 2 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
3
Location : Roof
Steel Rectangular Hollow Section –
100mm x 50mm x 4.1mm x 1800mm – (6.4kg/m) 2 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
4
Location : Roof
Steel Rectangular Hollow Section –
100mm x 50mm x 4.1mm x 5156mm – (6.4kg/m) 3 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
10.3 ROOF SYSTEM
10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location : Roof
Steel Rectangular Hollow Section -
100mm x 50mm x 4.1mm 5000mm – (6.4kg/m)
2 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
2
Location : Roof,
balcony roof
Steel Lip Channel Section –
100mm x 50mm x 3mm x 4880mm – (6.4kg/m) 12 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
3
Location : Balcony roof
Steel Rectangular Hollow Section –
100mm x 50mm x 4.1mm x 3200mm – (6.4kg/m) 10 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
4
Location : Balcony roof
Steel Rectangular Hollow Section –
100mm x 50mm x 4.1mm x 3050mm – (6.4kg/m) 3 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
10.3 ROOF SYSTEM
10.0 CIVIL & STRUCTURE
10.4 STAIRCASE
STAIRCASE STRUCTURE &
DETAILS
NTS
10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location : New
staircase
Timber tread -
245mm x 38mm x 1050mm
18 RM 8 per ft run
Mikyotech Sdn. Bhd.
Lot 2, Jalan TUDM,
Kg. Baru Subang,
40150 Shah Alam,
Selangor.
2
Location : New
staircase
Steel Rectangular Hollow Section –
120mm x 50mm x 3.8mm – (6.4kg/m) 21m RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
3
Location : New
Staircase
Timber handrail
75mm x 30mm 7.1m RM 8 per ft run
Mikyotech Sdn. Bhd.
Lot 2, Jalan TUDM,
Kg. Baru Subang,
40150 Shah Alam,
Selangor.
4
Location : New
staircase
Steel Square Hollow Section -
20mm x 20mm x 2.5mm x 900mm – (5.3kg/m) 18 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
Pahang Darul Makmur,
Malaysia
5
Location : New
staircase
Steel flat bar connector –
50mm x 2.6mm x 142mm – (0.375kg/m)
34 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan
Perindustrian Ringan IM
6,
Bandar Indera Mahkota,
25200 Kuantan,
1
A
2 3 4
B
C
D
E
F
1
A
2 3 4
B
C
D
E
F
1
A
2 3 4
B
C
D
E
F
UP
UP
DWN
10.5 SEWAGE SYSTEM
SEWAGE LAYOUT PLAN
GROUND FLOOR PLAN
NTS
FIRST FLOOR PLAN
NTS
SECOND FLOOR PLAN
NTS
10.0 CIVIL & STRUCTURE
10.5 SEWAGE SYSTEM
SEWAGE SCHEMATIC DIAGRAM
10.0 CIVIL & STRUCTURE
10.6 DRAINAGE SYSTEM
PERIMETER DRAIN
DOWN PIPE
GUTTER
DRAIN PIPE
ROOF PLAN
NTS
DOWNPIPE PLAN
FROM SECOND FLOOR DOWN TO FIRST
FLOOR
NTS
GROUND FLOOR PLAN
NTS
10.0 CIVIL & STRUCTURE
11.0 MECHANICAL & ELECTICAL
Types of spaces No. of existing switch No. of existing
lighting
No. of existing
fan
No. of existing
socket
Living room 4 1 1 4
Dining area 2 2 - 5
Kitchen 0 1 - 3
Bathroom
(Ground Floor)
2 (including heater) 1 - -
Master Bedroom 4 2 (including balcony) 1 1
Bedroom 1 1 1 - 1
Bathroom (First Floor) 1 1 - -
Corridor 1 1 - -
11.1 EXISTING ELECTRICAL SYSTEM
11.0 MECHANICAL & ELECTRICAL
MASTER BEDROOM
BATHROOM
KITCHEN
LIVING HALL BEDROOM 1
BEDROOM 1
11.1 EXISTING ELECTRICAL SYSTEM
11.0 MECHANICAL & ELECTRICAL
11.0 MECHANICAL & ELECTRICAL
1121 ELECTRICAL SYSTEM
ELECTRICAL
LAYOUT GROUND
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT FIRST
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT SECOND
FLOOR PLAN
NTS
11.2.1 GENERAL ELECTRICAL SYSTEM
ELECTRICAL
LAYOUT GROUND
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT FIRST
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT SECOND
FLOOR PLAN
NTS
11.0 MECHANICAL & ELECTRICAL
11.2 ELECTRICAL SYSTEM
11.2.2 SOCKET PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location: Living hall,
Dining hall, Kitchen,
Bedroom 1, Bedroom
2, Bedroom 3
Schneider C-Vivace Wall socket 1-gang switched
7 RM 15.00
Schneider Electric Industries
(M) Sdn Bhd
Level 18, Tower B,
Plaza 33, No 1, Jalan
Kemajuan, Seksyen 13,
46200 Petaling Jaya,
Selangor
2
Location: Living Hallm
Dining Hall, Kitchen,
Bedroom 1, Bedroom
2, Bedroom 3, Balcony
Schneider C-Vivace Wall socket 2-gang switched
8 RM 18.00
Schneider Electric Industries
(M) Sdn Bhd
Level 18, Tower B,
Plaza 33, No 1, Jalan
Kemajuan, Seksyen 13,
46200 Petaling Jaya,
Selangor
11.0 MECHANICAL & ELECTRICAL
1121 ELECTRICAL SYSTEM
11.2.2 SOCKET PLACEMENT
11.0 MECHANICAL & ELECTRICAL
1121 ELECTRICAL SYSTEM
ELECTRICAL
LAYOUT GROUND
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT FIRST
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT SECOND
FLOOR PLAN
NTS
11.2.3 LIGHTING PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location: Terrace,
Staircase, Balcony
Philips LED Light Bulb Warm white
• Shape: Standard
• Cap/Fitting: E27
• Voltage: 220-240V
• Lifetime: 15000 (hours)
• Wattage equivalent: 40W
• Light output: 350 lumen
5 RM 16.90
Philips Electronic (M)
Sdn Bhd
Level 8&9, Menara Axis,
No. 2, Jalan 51A/223,
46100, Petaling Jaya,
Selangor, 46100,
Malaysia
2
Location: Living hall,
Dining hall, Bedroom 1,
Bedroom 2, Bedroom 3
Philips LED Light Bulb Daylight
• Shape: Standard
• Cap/Fitting: E27
• Voltage: 220-240V
• Lifetime: 15000 (hours)
• Wattage equivalent: 40W
• Light output: 350 lumen
15 RM 16.90
Philips Electronic (M)
Sdn Bhd
Level 8&9, Menara Axis,
No. 2, Jalan 51A/223,
46100, Petaling Jaya,
Selangor, 46100,
Malaysia
3
Location: Bathroom 1,
Bathroom 2, Bathroom
3
Philips LED Genie Stick Cool Daylight
• Shape: U shape
• Energy Saving: 80%
• Cap/Fitting: E14
• Voltage: 220-240V
• Lifetime: 15000 (hours)
• Wattage equivalent: 60W
4 RM 10.90
Philips Electronic (M)
Sdn Bhd
Level 8&9, Menara Axis,
No. 2, Jalan 51A/223,
46100, Petaling Jaya,
Selangor, 46100,
Malaysia
4
Location: Kitchen
Philips Linear Fluorescent Tube Soft White
• Lamp holder:T8
• Placement: Ceiling
• Length: 600mm
• Number of lamps: 1
• Luminosity: 1300lm
• Wattage: 30 W
1 RM 4.90
Philips Electronic (M)
Sdn Bhd
Level 8&9, Menara Axis,
No. 2, Jalan 51A/223,
46100, Petaling Jaya,
Selangor, 46100,
Malaysia
11.0 MECHANICAL & ELECTRICAL
11.2 ELECTRICAL SYSTEM
11.2.3 LIGHTING PLACEMENT
11.0 MECHANICAL & ELECTRICAL
11.2 ELECTRICAL SYSTEM
ELECTRICAL
LAYOUT GROUND
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT FIRST
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT SECOND
FLOOR PLAN
NTS
11.2.4 SWITCH PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location: Kitchen,
Bath room 1, Bathroom
2, Bathroom 3, Balcony
Schneider C-Vivace Wall switches 1-Gang 1 way
7 RM 7.00
Schneider Electric Industries
(M) Sdn Bhd
Level 18, Tower B,
Plaza 33, No 1, Jalan
Kemajuan, Seksyen 13,
46200 Petaling Jaya,
Selangor, Malaysia.
2
Location: Living hall
(staircase). Corridor
(2nd floor staircase)
Schneider C-Vivace Wall switches 1-Gang 2 way
2 RM 13.00
Schneider Electric Industries
(M) Sdn Bhd
Level 18, Tower B,
Plaza 33, No 1, Jalan
Kemajuan, Seksyen 13,
46200 Petaling Jaya,
Selangor, Malaysia.
3
Location: Living hall,
Bedroom 3
Schneider C-Vivace Wall switches 2-Gang 1 way
2 RM 8.00
Schneider Electric Industries
(M) Sdn Bhd
Level 18, Tower B,
Plaza 33, No 1, Jalan
Kemajuan, Seksyen 13,
46200 Petaling Jaya,
Selangor, Malaysia.
4
Location: Corridor (1st
floor staircase)
Schneider C-Vivace Wall switches 2-Gang 2 way
1 RM 16.00
Schneider Electric Industries
(M) Sdn Bhd
Level 18, Tower B,
Plaza 33, No 1, Jalan
Kemajuan, Seksyen 13,
46200 Petaling Jaya,
Selangor, Malaysia.
11.0 MECHANICAL & ELECTRICAL
11.2 ELECTRICAL SYSTEM
11.2.4 SWITCH PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
5
Location: Living hall,
Bedroom 1, Bedroom 2
Schneider C-Vivace Wall switches 3-Gang 1 way
3 RM 9.50
Schneider Electric Industries
(M) Sdn Bhd
Level 18, Tower B,
Plaza 33, No 1, Jalan
Kemajuan, Seksyen 13,
46200 Petaling Jaya,
Selangor, Malaysia.
6
Location: Bathroom 1,
Bathroom 2, Bathroom
3, Bathroom 4
Schneider C-Vivace Wall switches 1 Gang with
Neon 4 RM 8.00
Schneider Electric Industries
(M) Sdn Bhd
Level 18, Tower B,
Plaza 33, No 1, Jalan
Kemajuan, Seksyen 13,
46200 Petaling Jaya,
Selangor, Malaysia.
11.0 MECHANICAL & ELECTRICAL
11.2 ELECTRICAL SYSTEM
11.2.4 SWITCH PLACEMENT
11.0 MECHANICAL & ELECTRICAL
11.2 ELECTRICAL SYSTEM
ELECTRICAL
LAYOUT GROUND
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT FIRST
FLOOR PLAN
NTS
ELECTRICAL
LAYOUT SECOND
FLOOR PLAN
NTS
11.2.5 MECHANICAL VENTILATION PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location: Bedroom 1,
Bedroom 2, Bedroom 3
York Cooling King L-Series Air Conditioner
• Host Power: 1.0
• Power Input Cooling: 980W
• Total current: 4.38A
• Setting Temperature Range: 17℃ - 30℃
• Indoor Unit (mm): 288 x 800 x 206
• Outdoor Unit (mm): 495 x 600 x 245
• Unit weight (indoor): 9kg
• Unit weight (outdoor): 25kg
• Years of warranty: 5
3 RM 1300.00
DAIKIN Air Conditioning
(M) Sdn Bhd
Lot, 9, Jalan 13/6,
Seksyen 13, 46200
Petaling Jaya, Selangor,
Malaysia
2
Location: Living hall,
Dining hall, :Bedroom
1, Bedroom 2
KDK K12V0 Ceiling Fan
• Net Weight: 4.93 kg
• Power: 60W
• Noise Level: <58dB
• Span: 1200mm diameter
4 RM 149.00
KDK Fans (M) Sdn Bhd
15, Jalan Tandang
204a, Seksyen 51,
46050 Petaling Jaya,
Selangor, Malaysia
11.0 MECHANICAL & ELECTRICAL
11.2 ELECTRICAL SYSTEM
11.2.5 MECHANICAL VENTILATION PLACEMENT
BATHROOM (GROUND FLOOR)
with squatting WC
BATHROOM (FIRST FLOOR)
with sitting WC pan
11.3 EXISITNG WATER SUPPLY SYSTEM
11.0 MECHANICAL & ELECTRICAL
11.0 MECHANICAL & ELECTRICAL
11.4 PROPOSED WATER SUPPLY SYSTEM
WATER SUPPLY
LAYOUT GROUND
FLOOR PLAN
NTS
WATER SUPPLY
LAYOUT FIRST
FLOOR PLAN
NTS
WATER SUPPLY
LAYOUT SECOND
FLOOR PLAN
NTS
WATER SUPPLY SCHEMATIC DIAGRAM
11.0 MECHANICAL & ELECTRICAL
11.4 PROPOSED WATER SUPPLY SYSTEM
ITEM NO. SPECIFICATION UNIT PRICE
(PER UNIT)
SUPPLIER
1
Location: Bathroom 1,
Bathroom 2, Bathroom
3
alpHa Evo Series Water Heater
• Dimensions: 230mm(W) x360mm(L) x
87.80mm(H)
• Weight: 1.4kg
• Minimum Floor Rate: 3 liter/minute
• Minimum Pressure: 20 kPa (0.2 bar/2.9 psi)
• Maximum Pressure: 0.38 MPa (3.8 bar/55 psi)
4 RM300.00
Alpha Electric Co Sdn
Bhd
6, Jalan Sungai Kayu
Ara 32/37, Berjaya
Park, Section 32, 40460
Shah Alam, Selangor,
Malaysia
2
Location: Balcony
Formosa HR150 Vertical Round Bottom Stainless
Steel Water Tank
• Material: Stainless steel
• Capacity: 1500L/300 gallons
1 RM 450.00
Maxim Bath & Kitchen
Gallery Sdn Bhd
52G, Jalan OP 1/5,
One Puchong Business
Park,47610 Puchong
3
Location: Balcony
Peripheral vortex water pump 0.5HP
• Power : 375W/ 0.5 HP
• Inlet & Outlet Size: 1″x1″ (25mm)
• Water Flow : 5-36Litre/min
• Max. Head : 36m
• Max Suction : 9 meters
• Weight : 5.5kg
1 RM 135.00
Iklim Hardware &
Machinery Sdn Bhd
No. 23, Jalan 8/91
Taman Shamelin
Perkasa
56100 Kuala Lumpur
Malaysia
11.0 MECHANICAL & ELECTRICAL
11.4 PROPOSED WATER SUPPLY SYSTEM
12.0 COSTING
12.0 COSTING
12.1 PREPARE LAND PRICE
NAME SS 19 Subang Jaya
TYPE Residential
AVERAGE FOR SALE PRICE
(psf)
RM 579 September 2015
+ RM 62.70 ( 12.1%)
RM 516 August 2015
RM 531 July 2015
RM 546 June 2015
RM 494 May 2015
For this project, the total built-up area is 1643.17 square feet. By refering
to the average land sale price, RM 579 per square feet;
1643.17 sqft X RM 579/sqft = RM 951, 395.40
12.0 COSTING
12.1 PREPARE LAND PRICE
NAME SS 19 Subang Jaya
TYPE Residential
AVERAGE FOR SALE PRICE
(psf)
RM 579 September 2015
+ RM 62.70 ( 12.1%)
RM 516 August 2015
RM 531 July 2015
RM 546 June 2015
RM 494 May 2015
For this project, the total built-up area is 1643.17 square feet. By refering
to the average land sale price, RM 579 per square feet;
1643.17 sqft X RM 579/sqft = RM 951, 395.40
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.2 CONSTRUCTION COSTING
12.0 COSTING
12.3 CONSTRUCTION COSTING SUMMARY
12.0 COSTING
12.4 PIE CHART SUMMARY (WITHOUT LOOSE
FURNITURES)
7%
10%
1%
14%
2%
2%
3%
7%
1%7%
18%
11%
5%
5%
2%
5%
PRELIMINARIES
DEMOLITION WORKS
STRUCTURAL
PARTITION, WALL AND WALL
FINISHES
CEILING WORKS
FLOOR AND FLOOR FINISHES
STAIRCASE
ROOF WORK AND FINISHES
GUTTERS
DOORS AND IRONMONGERY
WINDOWS
M&E WORKS
PLUMBING WORKS
12.0 COSTING
12.5 OPTIONAL COSTING
12.0 COSTING
12.5 OPTIONAL COSTING
12.0 COSTING
12.5 OPTIONAL COSTING
12.0 COSTING
12.5 OPTIONAL COSTING
12.0 COSTING
12.6 OPTIONAL COSTING SUMMARY
12.0 COSTING
12.7 PIE CHART SUMMARY (WITH LOOSE
FURNITURES)
6%
9%
1%
12%
2%
2%
3%
6%
1%
6%15%
9%
4%
4%
1%
4%
15%
PRELIMINARIES
DEMOLITION WORKS
STRUCTURAL
PARTITION, WALL AND WALL
FINISHES
CEILING WORKS
FLOOR AND FLOOR FINISHES
STAIRCASE
ROOF WORK AND FINISHES
GUTTERS
DOORS AND IRONMONGERY
WINDOWS
M&E WORKS
PLUMBING WORKS
12.0 COSTING
12.8 EXPENSES AND INCOME
CURRENT ASKING PRICE RM 420,000 ( RM 543 psf )
CURRENT RENTAL RM 1,000 / month
CURRENT YIELD 2.85 %
CURRENT BUILT-UP (sf) 773
CURRENT FURNISHING Semi-Furnished
CURRENT LAYOUT 2 bedroom, 2 bathroom
PROPOSED ASKING PRICE RM 542,840.60 ( RM 330 psf)
PROPOSED RENTAL (without loose
furniture )
RM 1,800 / month
PROPOSED RENTAL ( with loose
furniture )
RM 2250 / month
PROPOSED YIELD 3.9%
PROPOSED BUILT-UP (sf) 1643.17
PROPOSED FURNISHING Semi-Furnished
PROPOSED LAYOUT 3 bedroom, 4 bathroom
PROPOSED BEDROOM 1 RENTAL RM 650
PROPOSED BEDROOM 2 RENTAL RM 500
PROPOSED BEDROOM 3 RENTAL RM 650
BREAK EVEN POINT
1. Without loose furniture
RM 99,306 / RM 1800 = 4.5 years
2. With loose furniture
RM 114, 225 / RM 2250 = 4.2 years
Proposed Rental Without Loose Furniture
PROPOSED BEDROOM 1 RENTAL RM 800
PROPOSED BEDROOM 2 RENTAL RM 650
PROPOSED BEDROOM 3 RENTAL RM 800
Proposed Rental With Loose Furniture
In conclusion, it would be best for the client to rent out the house at RM
2250 ( inclusive of loose furniture ) because the return would be faster
as compared to the rental without loose furniture. This however means
that the budget would have to be increased to RM 115, 000 which is
RM 15 000 more than the original budget.
13.0 APPENDIX
13.0 APPENDIX
13.1 CCM MINUTES
13.0 APPENDIX
13.2 REFERENCES
14.0 REFERENCE LIST
14.0 REFERENCE LIST
Alibaba.com. (n.d.). Hollow polycarbonate roofing sheet,clear plastic roofing panels 16mm triple wall
polycarbonate hollow sheet, View Hollow polycarbonate roofing sheet, BEIER SOLA
Product Details from Yuyao Jiasida Sun Sheet Co., Ltd. on Alibaba.com. Retrieved
from http://jiasida.en.alibaba.com/product/
Akzo Nobel Paints (Malaysia) Sdn Bhd. (n.d.). Interior and Exterior colour
(Dulux). Retrieved from https://www.dulux.com.my/en
Malaysia Property and Real Estate Investment | Propwall. (n.d.). Retrieved
September 28, 2015 from http://www.propwall.my/
Furniture Online Sale Malaysia | MF DESIGN - MALAYSIAN FAVOURITE DESIGN.
(n.d.). Retrieved September 8, 2015.
How to Create a Gantt Chart in Excel. (2013, July 8). Retrieved September 29, 2015 from https://
www.smartsheet.com/blog/gantt-chart-excel
Kinsteel.com.my,. Kinsteel Bhd. Retrieved 6 September 2015, from
http://www.kinsteel.com.my/products_services/our_products.php
Mikyotech Sdn. Bhd.,. Strength groupings of timber & its applications. Retrieved
20 September 2015, from http://www.mikyotech.com/resources.html
Malaysia Online Electrical Appliances Mall - Senheng. (n.d.). Retrieved October 2,
2015.
Malaysia Property and Real Estate for Sale and Rent. (n.d.). Retrieved September 29, 2015 from
http://www.iproperty.com.my/
Paling.com.my,. Paling - Building. Retrieved 13 September 2015, from
http://www.paling.com.my/building/
Starken.com.my,. Starken | Standard Blocks. Retrieved 27 August 2015, from
http://www.starken.com.my/standard-blocks/
The 2015 IKEA Catalogue – where the everyday begins and ends - IKEA. (n.d.).
Retrieved September 4, 2015.
Thunghing.com.my,. Thung Hing Group | PU Foam Metal | Roofing Panel.
Retrieved 29 August 2015, from http://www.thunghing.com.my/th-pu-foam- metal.php

Weitere ähnliche Inhalte

Was ist angesagt?

Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of QuantityArissa Loh
 
Bq preamble
Bq preambleBq preamble
Bq preambleaizat76
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Building services report
Building services report Building services report
Building services report Soh Shing
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityPang Khai Shuen
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1Nur Zaas
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibsUTHM
 
ECA Workshop - Presentation
ECA Workshop - PresentationECA Workshop - Presentation
ECA Workshop - PresentationKai Yun Pang
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...aarenneoone
 
Building Economics Assignment Report
Building Economics Assignment ReportBuilding Economics Assignment Report
Building Economics Assignment Reportashleyyeap
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 

Was ist angesagt? (20)

Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
Bq preamble
Bq preambleBq preamble
Bq preamble
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Building services report
Building services report Building services report
Building services report
 
Site possession
Site possessionSite possession
Site possession
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's University
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Presentation ibs
Presentation ibsPresentation ibs
Presentation ibs
 
ECA Workshop - Presentation
ECA Workshop - PresentationECA Workshop - Presentation
ECA Workshop - Presentation
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Building Economics Assignment Report
Building Economics Assignment ReportBuilding Economics Assignment Report
Building Economics Assignment Report
 
Ibs part1
Ibs part1Ibs part1
Ibs part1
 
BS Role
BS RoleBS Role
BS Role
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 

Andere mochten auch

ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...Angeline KH
 
Cimb malaysia 2014 programme directory (1) (1)
Cimb malaysia 2014 programme directory (1) (1)Cimb malaysia 2014 programme directory (1) (1)
Cimb malaysia 2014 programme directory (1) (1)Zaliha Muhammad M
 
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...Angeline KH
 
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting PlansBUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting PlansAngeline KH
 
A3-Lighting and Acoustic Research
A3-Lighting and Acoustic ResearchA3-Lighting and Acoustic Research
A3-Lighting and Acoustic ResearchAngeline KH
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingAngeline KH
 
Cimb bank assignment re=do
Cimb bank assignment re=doCimb bank assignment re=do
Cimb bank assignment re=doZack Zakius
 
Some Acoustics Material
Some Acoustics MaterialSome Acoustics Material
Some Acoustics MaterialMayur Waghulde
 
history of modern architecture - lecture 01
history of modern architecture - lecture 01history of modern architecture - lecture 01
history of modern architecture - lecture 01Shahril Khairi
 

Andere mochten auch (14)

The Right Contact
The Right ContactThe Right Contact
The Right Contact
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
Part 2
Part 2Part 2
Part 2
 
Part 1
Part 1Part 1
Part 1
 
Cimb malaysia 2014 programme directory (1) (1)
Cimb malaysia 2014 programme directory (1) (1)Cimb malaysia 2014 programme directory (1) (1)
Cimb malaysia 2014 programme directory (1) (1)
 
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
PROJECT MANAGEMENT [ARC 3164]- Project: 2 DOCUMENTATION OF A MEDIUM-SIZED PRO...
 
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting PlansBUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
BUILDING TECHNOLOGY 2 [ARC 3524]- Project 1: Building Plans/Fire-Fighting Plans
 
A3-Lighting and Acoustic Research
A3-Lighting and Acoustic ResearchA3-Lighting and Acoustic Research
A3-Lighting and Acoustic Research
 
Cimb presentation
Cimb presentationCimb presentation
Cimb presentation
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
 
Cimb bank assignment re=do
Cimb bank assignment re=doCimb bank assignment re=do
Cimb bank assignment re=do
 
Some Acoustics Material
Some Acoustics MaterialSome Acoustics Material
Some Acoustics Material
 
Acoustics
AcousticsAcoustics
Acoustics
 
history of modern architecture - lecture 01
history of modern architecture - lecture 01history of modern architecture - lecture 01
history of modern architecture - lecture 01
 

Ähnlich wie Project management project 1 report (pr architects)

2016-0116_JShim Personal
2016-0116_JShim Personal2016-0116_JShim Personal
2016-0116_JShim PersonalJai Seong Shim
 
Recro Kardo - Complete 2023 05.pdf
Recro Kardo - Complete 2023 05.pdfRecro Kardo - Complete 2023 05.pdf
Recro Kardo - Complete 2023 05.pdfRajatKumar360039
 
Project management
Project management Project management
Project management AwZhiXuan
 
Project Management (Project 1 - Defining and documenting a project)
Project Management (Project 1 - Defining and documenting a project)Project Management (Project 1 - Defining and documenting a project)
Project Management (Project 1 - Defining and documenting a project)Tan Jaden
 
Infinity studio project report
Infinity studio project reportInfinity studio project report
Infinity studio project reportamee16
 
Final report
Final reportFinal report
Final reporthongbinng
 
Project Management Group Report
Project Management Group ReportProject Management Group Report
Project Management Group ReportMuatasimahBillah
 
PM GROUP REPORT
PM GROUP REPORTPM GROUP REPORT
PM GROUP REPORTabc def
 
Residential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architectsResidential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architectsSimon Woods
 
Kunz Raubenheimer Architects - Portfolio - 2021
Kunz Raubenheimer Architects - Portfolio - 2021Kunz Raubenheimer Architects - Portfolio - 2021
Kunz Raubenheimer Architects - Portfolio - 2021WalterRaubenheimer1
 
Residential project 1st year diploma ankita jajoo,bs.c id
Residential project 1st year diploma ankita jajoo,bs.c idResidential project 1st year diploma ankita jajoo,bs.c id
Residential project 1st year diploma ankita jajoo,bs.c iddezyneecole
 
Project management
Project managementProject management
Project managementAidiel Azhar
 
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALLPROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALLCrysmond Goh
 
1 final-complete-pm
1 final-complete-pm1 final-complete-pm
1 final-complete-pmkimberlywjs
 
Pm project `1 report
Pm project `1 reportPm project `1 report
Pm project `1 reportTeo Kean Hui
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan ReportFarah Sham
 
SCA BROCHURE 2016
SCA BROCHURE 2016SCA BROCHURE 2016
SCA BROCHURE 2016Nic Raath
 

Ähnlich wie Project management project 1 report (pr architects) (20)

2016-0116_JShim Personal
2016-0116_JShim Personal2016-0116_JShim Personal
2016-0116_JShim Personal
 
Recro Kardo - Complete 2023 05.pdf
Recro Kardo - Complete 2023 05.pdfRecro Kardo - Complete 2023 05.pdf
Recro Kardo - Complete 2023 05.pdf
 
Project management
Project management Project management
Project management
 
Project Management (Project 1 - Defining and documenting a project)
Project Management (Project 1 - Defining and documenting a project)Project Management (Project 1 - Defining and documenting a project)
Project Management (Project 1 - Defining and documenting a project)
 
Ch report
Ch reportCh report
Ch report
 
Infinity studio project report
Infinity studio project reportInfinity studio project report
Infinity studio project report
 
Final report
Final reportFinal report
Final report
 
BE Compiled
BE Compiled BE Compiled
BE Compiled
 
Project Management Group Report
Project Management Group ReportProject Management Group Report
Project Management Group Report
 
PM GROUP REPORT
PM GROUP REPORTPM GROUP REPORT
PM GROUP REPORT
 
Residential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architectsResidential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architects
 
Kunz Raubenheimer Architects - Portfolio - 2021
Kunz Raubenheimer Architects - Portfolio - 2021Kunz Raubenheimer Architects - Portfolio - 2021
Kunz Raubenheimer Architects - Portfolio - 2021
 
Residential project 1st year diploma ankita jajoo,bs.c id
Residential project 1st year diploma ankita jajoo,bs.c idResidential project 1st year diploma ankita jajoo,bs.c id
Residential project 1st year diploma ankita jajoo,bs.c id
 
Project management
Project managementProject management
Project management
 
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALLPROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
PROJECT MANAGEMENT PROJECT 1-A PLACE FOR ALL
 
1 final-complete-pm
1 final-complete-pm1 final-complete-pm
1 final-complete-pm
 
1 final-complete-pm
1 final-complete-pm1 final-complete-pm
1 final-complete-pm
 
Pm project `1 report
Pm project `1 reportPm project `1 report
Pm project `1 report
 
Building Economics Cost Plan Report
Building Economics Cost Plan ReportBuilding Economics Cost Plan Report
Building Economics Cost Plan Report
 
SCA BROCHURE 2016
SCA BROCHURE 2016SCA BROCHURE 2016
SCA BROCHURE 2016
 

Mehr von Jannah Jailani

Building science 2 project 1
Building science 2 project 1Building science 2 project 1
Building science 2 project 1Jannah Jailani
 
Theories Project 1 final
Theories Project 1 finalTheories Project 1 final
Theories Project 1 finalJannah Jailani
 
Theories Project 1 Part 1
Theories Project 1 Part 1Theories Project 1 Part 1
Theories Project 1 Part 1Jannah Jailani
 
Theories Project 1 Part 2
Theories Project 1 Part 2Theories Project 1 Part 2
Theories Project 1 Part 2Jannah Jailani
 
Islamic architecture project 2
Islamic architecture   project 2Islamic architecture   project 2
Islamic architecture project 2Jannah Jailani
 
Asian architecture [arc2234] case study paper
Asian architecture [arc2234]   case study paperAsian architecture [arc2234]   case study paper
Asian architecture [arc2234] case study paperJannah Jailani
 
Building structures report [individual]
Building structures report [individual]Building structures report [individual]
Building structures report [individual]Jannah Jailani
 
Building structure [arc 2523]
Building structure [arc 2523]Building structure [arc 2523]
Building structure [arc 2523]Jannah Jailani
 
Building services report [final]
Building services report [final]Building services report [final]
Building services report [final]Jannah Jailani
 
Church of Seed booklet
Church of Seed bookletChurch of Seed booklet
Church of Seed bookletJannah Jailani
 
Building science report [singapore] final
Building science report [singapore] finalBuilding science report [singapore] final
Building science report [singapore] finalJannah Jailani
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] finalJannah Jailani
 
Building construction report
Building construction reportBuilding construction report
Building construction reportJannah Jailani
 

Mehr von Jannah Jailani (20)

Building science 2 project 1
Building science 2 project 1Building science 2 project 1
Building science 2 project 1
 
Portfolio final
Portfolio finalPortfolio final
Portfolio final
 
Design report
Design reportDesign report
Design report
 
Synopsis 4
Synopsis 4Synopsis 4
Synopsis 4
 
Synopsis 3
Synopsis 3Synopsis 3
Synopsis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
Theories Project 1 final
Theories Project 1 finalTheories Project 1 final
Theories Project 1 final
 
Theories Project 1 Part 1
Theories Project 1 Part 1Theories Project 1 Part 1
Theories Project 1 Part 1
 
Theories Project 1 Part 2
Theories Project 1 Part 2Theories Project 1 Part 2
Theories Project 1 Part 2
 
Islamic architecture project 2
Islamic architecture   project 2Islamic architecture   project 2
Islamic architecture project 2
 
Turnitin results
Turnitin resultsTurnitin results
Turnitin results
 
Asian architecture [arc2234] case study paper
Asian architecture [arc2234]   case study paperAsian architecture [arc2234]   case study paper
Asian architecture [arc2234] case study paper
 
Building structures report [individual]
Building structures report [individual]Building structures report [individual]
Building structures report [individual]
 
Building structure [arc 2523]
Building structure [arc 2523]Building structure [arc 2523]
Building structure [arc 2523]
 
Building services report [final]
Building services report [final]Building services report [final]
Building services report [final]
 
Church of Seed booklet
Church of Seed bookletChurch of Seed booklet
Church of Seed booklet
 
Building science report [singapore] final
Building science report [singapore] finalBuilding science report [singapore] final
Building science report [singapore] final
 
Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] final
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 

Kürzlich hochgeladen

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 

Kürzlich hochgeladen (20)

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

Project management project 1 report (pr architects)

  • 1. PROJECT MANAGEMENT (ARC 3612 / ARC 3614) PROJECT 1: DEFINING & DOCUMENTING A MODULAR/RESIDENTIAL CONSTRUCTION PROJECT TUTOR AR NAZARUDIN MASAT TEAM MEMBERS ALEX WONG KAI TZE 0303228 GERTRUDE LEE YUE SIEW 0306265 KEE TING TING 0310019 NURUL JANNAH MASTURAH 0310210 SHARIFAH DIYANA SYED HUSSAIN 1006AH78373 SOH YOU SHING 0308010 SURAYYN SELVAN 0309818
  • 2. CONTENT 1.0 PROJECT INTRODUCTION 2.0 COMPANY PROFILE 2.1 ABOUT US 2.2 SERVICES 2.3 OUR TEAM 3.0 SITE 3.1 SITE INTRODUCTION 3.2 SITE ANALYSIS 3.3 SWOT ANALYSIS 4.0 CLIENT REQUIREMENT 4.1 CLIENT BACKGROUND & REQUIREMENT 5.0 PROJECT APPROACH 5.1 DESIGN IDEAS 5.2 CASE STUDY 5.2.1 KAKKO HOUSE,YYAA 5.2.2 TOWNHOUSE , ELDING OSCARSON 6.0 PROJECT MANAGEMENT 6.1 SUCCESS CRITERIA 6.2 RISK MANAGEMENT 6.3 WORK BREAKDOWN STRUCTURE 6.4 GANNT CHART 7.0 DESIGN 7.1 EXTERIOR PERSPECTIVE 7.2 DRAWING 7.3 PROPOSED DRAWING 7.4 TENDER DRAWING 8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE 8.2 FLOOR FINISHING 8.3 FINISHING SCHEDULE 8.4 FURNITURE LAYOUT PROPOSAL 8.5 FURNITURE SCHEDULE 9.0 LANDSCAPE DESIGN 9.1 LANDSCAPE LAYOUT 9.2 SPECIES SPECIFICATION 9.3 LANDSCAPE PERSPECTIVE 10.0 CIVIL & STRUCTURE 10.1 STRUCTURAL MEMBERS 10.1.1 EXISTING AND NEW COLUMNS 10.1.2 EXISITNG AND NEW BEAMS 10.1.3 LOAD BEARING WALLS 10.2 STRUCTURAL LOAD 10.2.1 LOAD DISTRIBUTION DIAGRAM 10.2.2 LOAD OF ADDITIONAL STRUCTURE 10.3 ROOF SYSTEM 10.4 STAIRCASE 10.5 SEWAGE SYSTEM 10.6 DRAINAGE SYSTEM 11.0 MECHANICAL & ELECTRICAL 11.1 EXISTING ELECTRICAL SYSTEM 11.2 ELECTRICAL SYSTEM 11.2.1 GENERAL ELECTRICAL SYSTEM 11.2.2 SOCKET PLACEMENT 11.2.3 LIGHTING PLACEMENT 11.2.4 SWITCH PLACEMENT 11.2.5 MECHANICAL VENTILATION PLACEMENT 11.3 EXISTING WATER SUPPLY 11.4 PROPOSED WATER SUPPLY SYSTEM 12.0 COSTING 12.1 PROPERTY VALUE 12.2 CONSTRUCTION COSTING 12.3 CONSTRUCTION COSTING SUMMARY 12.4 PIE CHART SUMMARY 12.5 OPTIONAL COSTING 12.6 OPTIONAL COSTING SUMMARY 12.7 EXPENSES AND INCOME 13.0 APPENDIX 13.1 CCM MINUTES 13.2 REFERENCES
  • 4. 1.0 PROJECT INTRODUCTION PROJECT BRIEF As a team of 7, PR Architects are to design and manage a simple construction project with regards to criteria such as cost, quality, and time. Components that are focused on includes introduction, design and conclusion. Organisational chart, work breakdown structure and risk analysis should also be taken into consideration. Through the proposed project site by the client, we are to study the residential usage, as well as advising on the pros and cons of the project. We are needed to identify the market segment and population demographic that could potentially be attracted by the site. To conduct cost and viability comparison between our proposal and a standard type of building within the same market segment as a reference for the client. CLIENT PROFILE Ms. Fernn Ang A qualified Financial Risk Manager with more than eight years experience in multiple large corporations. Currently a real estate negotiator with Juste Land. Her venture into the real estate industry stems from her passion in property investments.
  • 6. 2.0 COMPANY PROFILE2.1 ABOUT US Founded in 2003 by Ar. Surayyn Selvan and Ar. Kee Ting Ting, PR Architects is a design intensive architecture firm located in Subang Jaya. The firm is committed to excellence in design with construction management experience. Our design values are modern, expression of materials, clean lines and forms that allow the architecture itself and inhabitants to thrive. The company has had 22 projects thus far that range from renovation works, design development, residential and commercial developments, as well as interior designs. Our company vision is promoting environmental awareness and sustainability in architecture. We explore in integration between architecture and technology. We strive for creativity, professionalism and integrity in our work culture. PR architects realizes design solutions between space, program, form, budget and materials. Our aim and mission is to enhance the quality of our built environment for the comfort of our clients. Our team provides determination consistently deliver quality product within the financial and time restraint of the client’s brief with a strong regard for environmental issues. This way we are able to design places, spaces and environments that offer the end users quality life choices and add value to their lives.
  • 7. 2.0 COMPANY PROFILE2.2 SERVICES ARCHITECTURA L Attention to detailed design and presentation of projects. Planning, designing and constructing buildings and other structures. INTERIOR DESIGN Creating a look that represents your style. Producing themed plans and mood boards. Partially and fully furnished layout. LANDSCAPE Specialising in landscaping design and ideas. Composing, edging and paving with landscape supplies on gardens and backyard. LOCATION : NO. 1 JALAN TAYLOR’S, 47500 SUBANG JAYA, SELANGOR DARUL EHSAN, MALAYSIA. EMAIL : PRARCHI@GMAIL.COM CONTACT : +60166597383
  • 8. 2.0 COMPANY PROFILE2.3 OUR TEAM We are a dynamic team of creative individuals with expertise in our own fields. We offer more than just creating great designs and specialize in communication practices. Focusing on Architectural, Interior and Landscaping Design, we aim to deliver quality materials with international standards. Project management are provided to ensure that the design we create achieve your desired goals. Our team has experiences and understanding of the local and international market regarding design trends. We are fully equipped to meet the standards and state-of-the-art communication technology. We aim to provide our clients with innovative and conceptualized designed solutions. AR. SURAYYN SELVAN Project Architect M. Architecture Manchester School of Architecture ‘96 B. Sc. Architecture University of Malaya ‘93 AR. KEE TING TING Senior Architect M. Architecture University of Malaya ‘98 B. Sc. Architecture University of Malaya ‘95 IR. SOH YOU SHING M&E Engineer M. Sc. Mechanical Engineering University of Aberdeen ‘06 B. Eng. ( Electrical & Mechanical ) University of Malaya ‘05 JANNAH JAILANI Civil Engineer M. Civil Engineering University of Nottingham ‘13 B. Civil Engineering Infrastructure University KL ‘11 SR. GERTRUDE LEE Quantity Surveyor MSc. Quantity Surveyor University of Portsmouth ‘01 B. Quantity Surveyor University of Malaya ‘99 DIYANA HUSSAIN Interior Designer M. Interior Design Monash University ‘07 B. Interior Design RMIT University ‘04 LR. ALEX WONG Landscape Architect M. Landscape Arch. University of Washington ‘10 B. Landscape Arch. University of Washington ‘96
  • 10. 3.0 PROJECT INTRODUCTION 3.1 SITE INTRODUCTION Property type : An end double-storey terraced house which has been extended Site Shape : Rectangular Provisional Land Area : 71.8117 sq. meters (about 773 sq. feet) Terrain : Flat and lies at the same level as the frontage road Fencing & gate : Chain link fencing further secured with a pair of metal swing gate Building Structure : Reinforced concrete framework Walls : Plastered and painted brickwalls Ceiling : Fair faced concrete / asbestos free ceiling sheets Floor Finishes : Ceramic tiles / Terrazzo / mosaic tiles / parquet woodblocks Roof : Timber pitched roof covered with concrete roof tiles Main Entrance : Aluminium framed casement / adjustable & fixed glass louvers Accommodation : Ground floor Terrace living area, dining area, bath/W.C. and kitchen First floor Master bedroom attached with bath/W.C. and balcony and bedroom 2 Approximate Built-up Area : Main floor area: 66.89 sq. metres (about 720 sq. feet) Wall tiles : Glazed wall tiles ceiling height in kitchen and 5’ feet height for bath/W.C. Remarks : The rear portion of the subject building has been extended on the ground floor to accommodate a bigger kitchen
  • 11. 3.0 PROJECT INTRODUCTION 1) ENVIRONMENTAL ANALYSIS 3.2 SITE ANALYSIS The warm season occurs from the month of April to the month of June and the cold seasons lasts from November to January with an average temprature of below 32 degrees Celcius. The air is driest in the moth of February and is most humid In November. Subang Jaya recieves the most amount of rainfall in October and Decemeber whereas in June and July there is very little rainfall. There is an average rainfall of 200mm each month.
  • 12. 3.0 PROJECT INTRODUCTION 2) PROPERTY 1 ANALYSIS 3.2 SITE ANALYSIS LOT 123 JALAN SS19/6a Location of property ASKING PRICE RM 1,100,000 ( RM 405 psf) BUILT-UP (sf) 2720 LISTING For Sale FURNISHING Semi-Furnished LAYOUT 4 bedroom, 3 bathroom TENURE Freehold Double-storey end lot with extended master bedroom, living area and kitchen - Guraded community
  • 13. 3.0 PROJECT INTRODUCTION 2) PROPERTY 2 ANALYSIS 3.2 SITE ANALYSIS LOT 123 JALAN SS19/6a Location of property ASKING PRICE RM 518,000 ( RM 720 psf) BUILT-UP (sf) 720 sf LISTING For Sale FURNISHING Semi-Furnished LAYOUT 2 bedroom, 2 bathroom TENURE Freehold Double storey end lot terrace house - Fully extended kitchen with built in cabinets - Renovated unit
  • 14. 3.0 PROJECT INTRODUCTION 2) PROPERTY 3 ANALYSIS 3.2 SITE ANALYSIS LOT 123 JALAN SS19/6a Location of property ASKING PRICE RM 1400 / month BUILT-UP (sf) 36 x 45 LISTING For Resnt FURNISHING Semi-Furnished LAYOUT 3 bedroom, 2 bathroom TENURE - Double storey terrace corner house - Move in condition - Newly painted
  • 15. STRENGTHS WEAKNESSESOPPORTUNITIES THREATS • Excellent ventilation • Simple layout to work with • Structurally sound and stable • Poorly maintained • Limited parking space • Spatial constraint for bedrooms • Nearby park for user comfort • Many nearby amenities • Strategically located • Start a new trend for sustainable housing and small houses • Very low security • Government building requirements • Limited entry / access points • Real estate crisis SWOT ANALYSIS 3.0 PROJECT INTRODUCTION 3.3 SWOT ANALYSIS
  • 17. 4. 0 CLIENT REQUIREMENT 4.1 CLIENT REQUIREMENT Objective To design a comfortable living space that would provide yield enhancement (rental) or capital gain (sale). Usage Type Residential (Long Term or Short Stay i.e. Airbnb type) Market Value and Rental Market Value – RM 420,000; Rental RM 1,000 per month, yield of 2.85% Expected Return Post Redesign - Capital Gain of at least 20% per annum or - Rental Yield of at least 3.5% for Long Term or at least 6.5% for Short Stay Budget Up to RM 100,000 Project Timeline Up to 6 months (upon receiving the relevant approvals) Functional Specifications - Parking - Room min 3, max 4 - Bathrooms min 2, max 4 Other Key Requirements - Easy maintenance - Durable - Good air circulation - Natural Lighting - Eco friendly (optional)
  • 19. 5.0 PROJECT APPROACH 5.1 DESIGN IDEAS MINIMALSIM DESIGN WITH SIMPLE LINES INCOOPERATE WITH NATURAL ELEMENTS
  • 20. 5.0 DESIGN APPROACH5.2 CASE STUDY CASE STUDY 1 : KAKKO HOUSE, YYAA LOCATION : OSAKA, OSAKA PREFECTURE, JAPAN Located in a densely built-up area of Osaka, Japan, the owner of this house is a couple with their child. The size of the site is 3.4m x 13m. The house is framed in exposed structural steel, covered with thin fire - resistant adiabatic panels . The expanded metal stair connects each floors and spreads the sun light inside. In this house, they are living like birds swinging from branch to branch. It contains six floors with split levels :- Level 1 (Basement Level) : Bedroom Level 2 (Ground Level): Garage Level 3 (First Level) : Bedroom (For the little girl) Level 4 (Second Level ) : Living Space Level 5 (Third Level) : Bathroom Level 6 (Roof) : Roof Terrace 5.2.1 KAKKO HOUSE,YYAA Diagram 1: Natural Lighting Diagram 2: Natural Ventilation
  • 21. CASE STUDY 2 : TOWNHOUSE, ELDING OSCARSON LOCATION : LANDSKRONA,SWEDEN The site, 75 m2, is sandwiched between very old neighbouring buildings in Landskrona, Sweden. The building relates to the surroundings in scale, proportion and rhythm of low and tall buildings in the street. Our aim is to use small means to create an array of different spatial experiences in this very small project to create a razor sharp contrast, to express inherent clarity, but more importantly to highlight the beauty of the surroundings. Compressed slab construction, unconventional ceiling heights, and the ground floor flush to the street level, allows three floors into a volume aligned with the neighbouring roof tops. The openness to all directions generates a building both monolithic and transparent. Interior consists of a single space, softly partitioned by three exposed steel slabs. They are divided by programs : - 1. Kitchen 2. Dining 3. Living 4. Bed 5. Bath 6. Roof Terrace 5.0 DESIGN APPROACH5.2 CASE STUDY 5.2.2 TOWNHOUSE,ELDING OSCARSON Diagram 1: Natural Lighting Diagram 2: Natural Ventilation
  • 23. 6.0 PROJECT MANAGEMENT The success of our project will be determined by the following criterias :- QUALITY 1. The project completed must have a high level of client/end user satisfaction 2. The proejct completed must meet all the clients requirements as provided in the project brief. 3. The project completed must be finished with no accidents, high helath awareness and safety precautions should be considered on site 4. The project completed must have no defects and carefully executed by the professionals in their fields at all times. TIME 1. The project must be completed withing the clients timeline which is 6 months, and set to a maximum of three months instead to avoid higher exposures and risks. 2. The transportation of the materials and the monitioring of site must be strictly adhered to. 3. The construction workers must be supervised by the project manager and architect to ensure a smooth construction timeline that meets the project work flow 4. The construction and installation of building components are to be completed as scheduled in the relevant Gantt chart. COST 1. The project must be completed within the clients budget of RM 100,000 and should not exceed beyond RM 120,000. 2. The company’s consultants must work within the budget by attaining the lowest cost for long-term usable materials for building structures and furnitures that include lightweight materials. 3. The materials for the project should be sourced locally to reduce cost of transportation. 6.1 SUCCESS CRITERIA
  • 24. 6.0 PROJECT MANAGEMENT 6.2 RISK MANAGEMENT RISK SEVERIT Y LIKELIHOOD COST IMPACT STRATEGY AND MITIGATION Building Renovation i) Damage on existing wiring ii) Damage on existing plumbing iii) Disturbance to immediate residents of the site 2 2 1 1 1 2 Low Low No Cost i) Cost will occur to amend the cables and possible electrocutions ii) Extra cost for piping amendments iii) A slow down in the construction timeline - Should attain precise physical data on site from the authority and receive all relevant legal requirements Consultants Liability i) Unclear construction specifications ii) Incorrect cost estimation 3 2 5 4 Medium Medium i) Result in a delay of the project’s timeline ii) The project’s budget will be exceeded - Ensure all drawings are detailed with the supervision of the architect and engineers on site Labour i) Injuries of workers on site ii) Death of workers on site iii) Insufficient workers on site 3 4 4 2 2 2 Medium High High i) Lawsuits, fines and compensation ii) Lawsuits, fines and compensation iii) Delay of heavy construction work and contracted fines - Project managers has to ensure that all safety requirements are met - Sufficient workers must be provided to meet the project’s timeline Construction of Additional Floor i) Incorrect installations ii) Client’s change in design iii) Overrun of time iv) Maintenance risks v) Unavailable utilities 2 3 3 2 1 2 1 1 1 1 Medium High Medium Low Medium i) Extra labour, materials costs and will result in a delay in the project’s schedule ii) Extra labour, materials costs and will result in a delay in the project’s schedule iii) Fines and extra labour costs iv) Extra amenities and services cost v) Water and electricity from main supply are stopped which would result in extra cost for outsourcing - Site manager must ensure that the construction of the additional level must meet the drawing specifications - The project managers has to ensure that the client’s requirements does not violate any of the authorities requirements while keeping within the budget Building Materials i) Lack of materials ii) Extra materials iii) Delay in delivery time iv) Material defects v) Theft of materials 1 1 1 1 1 2 1 1 2 2 Medium Unaffected Low Medium Medium i) Project’s budget will be exceeded ii) Waste of project’s budget iii) A delay in the project’s timeline iv) Additional costs on materials v) Additional costs on materials - Ensure that all suppliers are reliable and security of the site should be considered - Additional costing should be considered during the preliminary costs in the event of additional materials Natural Conditions i) Heavy rainfall ii) High humidity on site 1 1 4 1 Low Low i) Will result in a delay in the project schedule and will cause defects on certain materials and structural members ii) Will results in the defect of certain materials and structural members - Ensure proper storage and protection of materials - Roof level should be constructed as soon as possible Others i) Sudden cut in client’s budget ii) On site security 5 2 4 1 High Low i) Project will be suspended ii) Project cost will be exceeded and a delay in the project timeline will occur - Thorough background check on the client’s financial stability should be conducted, obtaining legal advice - Construction workers should be reliable LIKELIHOOD SEVERITY 1 Remote 1 Minimal or no impact 2 Unlikely 2 Additional resources required 3 Likely 3 Minor slip in key milestone, not able to meet schedule 4 Very likely 4 Major slip in key milestone, critical path impacted 5 Near certainty 5 Can’t achieve key term or major program milestone
  • 25. 6.0 PROJECT MANAGEMENT 6.3 WORK BREAKDOWN STRUCTURE Task No. Task Name Description of construction method and processes Resources Materials Labour 1.0 Analytical Studies - Cost Management - Labour Costs - Surveying - Site Surveying - Site Analysis Studies are to be conducted to ensure a smooth construction schedule. All legal requirements must be identified to prevent a delay in the project schedule. - Project Manager - Architect - Interior Designer - M&E Engineer - C&S Engineer - Landscape Architect - -Quantity Surveyor 2.0 Design Development A comprehensive design development should be taken into account and translated into clear tender drawings to be awarded and for the clarity of the client - Project Manager - Architect - Interior Designer - M&E Engineer - C&S Engineer - Landscape Architect - -Quantity Surveyor 3.0 Permit Applications Submission for authority approval should be adhered to to to ensure smooth flow in the project schedule - Project Manager - Architect 4.0 External Works - Hoarding - External walls - Windows - External door Demolition and construction of existing structures must adhere to the construction timeline and should be carefully executed - Autoclaved Aerated Concrete Blocks - Mortar - Window and Door fixtures - Steel beam and column - Exterior paint - Contractor - Skilled workers - Semi-skilled Workers - Site Supervisor - Architect - Project Manager 5.0 Internal Works - Internal Walls - Floors - Ceiling - Internal Doors - Staircase Demolition and construction of existing structures must adhere to the construction timeline and should be carefully executed - Autoclaved Aerated Concrete Blocks - Autoclaved Aerated Concrete Panels - Mortar - Window and Door fixtures - Built-in furniture - Interior paint - New staircase structures - Lighting and new plumbing fixtures - Contractor - Skilled workers - Semi-skilled Workers - Site Supervisor - Interior Designer - Architect - Project Manager 6.0 Roof - Roof frames - Roof cladding Demolition and construction of existing structures must adhere to the construction timeline and should be carefully executed - Steel roof structures - Metal decking - Skylight fixtures - Roof insulation - Contractor - Skilled workers - Semi-skilled Workers - Site Supervisor - Architect - Project Manager - C&S Engineer
  • 26. 6.0 PROJECT MANAGEMENT 6.3 WORK BREAKDOWN STRUCTURE Task No. Task Name Description of construction method and processes Resources Materials Labour 7.0 Landscaping Works - Excavation - Landscaping Excavation of the existing site must adhere to the schedule and should be done carefully. Planting of the chosen vegetation should be taken care of. - Soil - Gardening plants - Contractor - Skilled workers - Semi-skilled Workers - Site Supervisor - Project Manager - Architect - Landscape Architect 8.0 Services - Wiring - Plumbing The mechanical and electrical as well as plumbing services should be installed in accordance to the schematic design by the M&E Engineer. - Sanitary fittings and wares - Hangers and brackets - PVC pipes - Electrical Wirings - Wall switches and fixtures - Contractor - Skilled workers - Semi-skilled Workers - Site Supervisor - Project Manager - Architect - M&E Engineer 9.0 Site Clearance Dumping and residues from the construction are to be managed properly before handing over - Contractor - Skilled workers - Semi-skilled Workers - Site Supervisor
  • 27. 6.0 PROJECT MANAGEMENT 6.3 WORK BREAKDOWN STRUCTURE DESCRIPTION START DATE DURATION (days) END DATE Design Development 1.1 Design Proposal 31/09/2015 43 12/10/15 Permit Application 2.1 Permit Approval 12/10/15 10 26/10//2015 External Works 3.1 Walls 3.1.1 Demolition 26/10/2015 5 30/10/2015 3.1.2 Construction 2/11/15 14 16/11/2015 3.2 Windows 3.2.1 Removal 26/10/2015 7 30/10/2015 3.2.2. Installation 9/11/15 7 16/11/2015 3.3 Doors 3.3.1 Removal 26/10/2015 7 30/10/2015 3.3.2 Installation 9/11/15 7 16/11/2015 Internal Works 4.1 Walls 4.1.1 Demolition 26/10/2015 7 30/10/2015 4.1.2 Construction 9/11/15 14 16/11/2015 4.1.3 Finishes 16/11/2015 7 23/11/2015 4.2 Floors 4.2.1 Demolition 26/10/2015 7 30/10/2015 4.2.2 Construction 9/11/15 14 16/11/2015 4.2.3 Finishes 16/11/2015 7 23/11/2015 4.3 Ceiling 4.3.1 Demolition 26/10/2015 7 30/10/2015 4.3.2 Construction 9/11/15 7 16/11/2015 4.3.3 Finishes 16/11/2015 7 23/11/2015 4.4 Staircase 4.1 Installation 9/11/15 7 16/11/2015 4.2 Finsihes 16/11/2015 7 23/11/2015 Roof 5.1 Framing 5.1.2 Demolition 26/10/2015 7 30/10/2015 5.1.3 Installation 9/11/15 7 16/11/2015 5.2 Cladding 5.2.1 Removal 26/10/2015 7 30/10/2015 5.2.2 Installation 9/11/15 7 16/11/2015 Landscaping 6.1 Excavation 16/11/2015 4 19/11/2015 6.2 Planting 20/11/2015 4 23/11/2015 Services 6.1 Wiring 28/09/2015 57 23/11/2015 6.2 Plumbing 9/11/15 15 23/11/2015
  • 28. 6.0 PROJECT MANAGEMENT 6.4 GANTT CHART Project Management - Redesigning Compact Living
  • 30. 7.0 DESIGN 7.1 EXTERIOR PERSPECTIVE DAYTIME PERSPECTIVE 1
  • 31. 7.0 DESIGN 7.1 EXTERIOR PERSPECTIVE DAYTIME PERSPECTIVE 2
  • 32. 7.0 DESIGN 7.1 EXTERIOR PERSPECTIVE DAYTIME PERSPECTIVE 3
  • 33. 7.0 DESIGN 7.1 EXTERIOR PERSPECTIVE DAYTIME PERSPECTIVE 4
  • 34. 7.0 DESIGN 7.1 EXTERIOR PERSPECTIVE NIGHT TIME PERSPECTIVE
  • 35. GROUND FLOOR PLAN SCALE 1:100 FIRST FLOOR PLAN SCALE 1:100 7.0 DESIGN 7.2 EXISTING DRAWINGS
  • 36. FRONT ELEVATION SCALE 1:100 BACK ELEVATION SCALE 1:100 7.0 DESIGN 7.2 EXISTING DRAWINGS
  • 37. SIDE ELEVATION SCALE 1:100 SECTION A-A SCALE 1:100 7.0 DESIGN 7.2 EXISTING DRAWINGS
  • 38. GROUND FLOOR PLAN SCALE 1:100 FIRST FLOOR PLAN SCALE 1:100 SECOND FLOOR PLAN SCALE 1:100 7.0 DESIGN 7.2 EXISTING DRAWINGS
  • 39. ROOF PLAN SCALE 1:100 7.0 DESIGN 7.3 PROPOSED DRAWINGS
  • 40. FRONT ELEVATION SCALE 1:100 7.0 DESIGN 7.3 PROPOSED DRAWINGS
  • 41. SIDE ELEVATION SCALE 1:100 7.0 DESIGN 7.3 PROPOSED DRAWINGS
  • 42. BACK ELEVATION SCALE 1:100 7.0 DESIGN 7.3 PROPOSED DRAWINGS
  • 43. SECTION A-A SCALE 1:100 7.0 DESIGN 7.3 PROPOSED DRAWINGS
  • 47. 8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE TERRACE
  • 48. 8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE LIVING
  • 49. 8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE DINING + KITCHEN
  • 50. 8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE BEDROOM 1
  • 51. 8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE BEDROOM 2
  • 52. 8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE BEDROOM 3
  • 53. 8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE BATH
  • 54. 8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE BALCONY
  • 55. GROUND FLOOR PLAN NTS 8.0 INTERIOR DESIGN 8.2 FLOOR FINISHING SECOND FLOOR PLAN NTS FIRST FLOOR PLAN NTS Light grey ceramic tiles Marble aggregate tiles Cement Dark grey ceramic tiles Mahogany wood White ceramic tiles
  • 56. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location: Car Porch, Terrace, Balcony Cement • Raw natural finish • 26 an y12 (40kg) 14 RM 90.00 LAFARGH Bangunan TH Uptown Jalan SS 21/39, Damansara Utama, Petaling Jaya, Malaysia 2 Location: Living Marble Aggregate Tiles • Polished finish 1 RM 1000.00 Maintaining existing tiles 3 Location: Dining, Kitchen Light Grey Ceramic Tiles • Polished finish 1 RM 1000.00 Maintaining existing tiles 4 Location: Bedroom 1, Bedroom 2, Bedroom 3 White Ceramic Tiles • Matte finish • 600 x 600 mm 84 RM 5.20 Venus Ceramic Industry No. 260 F, 2 1/2 Miles, Jalan Ipoh, 51200, Kuala Lumpur, Malaysia 5 Location: Stairs Timber Planks • Polished finish • 245 x 1050 x 38 mm • 1100 x 2250 x 38 mm • Ft/run 8.574m² RM 8.00 Mikyotech Sdn Bhd No.21-3, Jalan PJU 8/5D, Bandar Damansara Perdana,, 47820 Petaling Jaya, Malaysia 6 Location: Bath 1, Bath 2, Bath 3, Bath 4 Dark Grey Ceramic Tiles • Matte finish • 300 x 300 mm 160 RM 3.00 Mikyotech Sdn Bhd No.21-3, Jalan PJU 8/5D, Bandar Damansara Perdana,, 47820 Petaling Jaya, Malaysia 8.0 INTERIOR DESIGN 8.3 FINISHING SCHEDULE
  • 57. 8.0 INTERIOR DESIGN 8.4 FURNITURE LAYOUT PROPOSAL GROUND FLOOR PLAN NTS TV bench Three-seat sofa Balcony table with 2 folded chairs Coffee table 40’ LED TV Fridge Dining table set Water closet & Sink
  • 58. 8.0 INTERIOR DESIGN 8.4 FURNITURE LAYOUT PROPOSAL FIRST FLOOR PLAN NTS Study table and chair Wardrobe Queen bed Single bed Water Closet & Sink Wardrobe
  • 59. 8.0 INTERIOR DESIGN 8.4 FURNITURE LAYOUT PROPOSAL SECOND FLOOR PLAN NTS Study table and chair Queen bed Water Closet & Sink Wardrobe
  • 60. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location: Living KIVIK Two-seat Sofa • Isunda grey • 1900 x 950 x 850 mm 1 RM 645.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 2 Location: Living LACK Coffee Table • Black-brown • 900 x 550 x 450 mm 1 RM 79.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 3 Location: Living Besta TV Bench • Black-brown • 1800 x 400 x 380 mm 1 RM 795.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 4 Location: Living Samsung 40’’ Full HD • Flat TV H5008 Series 5 1 RM 999.00 SAMSUNG Persiaran Kewajipan, USJ,47600 UEP, Subang Jaya, Selangor, Malaysia 5 Location: Dining Estonia White Wood Table & Cushion Seat • Solid Wood • 1200 x 750 x 745 mm • Fabric Cushion • 460 x 495 x 800 mm 1 RM 1299.00 MF DESIGN No 26 (1st) , Jalan Perwira 1, Taman Perwira, 84200 Bakri, Muar, Johor 8.0 INTERIOR DESIGN 8.5 FURNITURE SCHEDULE
  • 61. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 6 Location: Kitchen FYNDIG Kitchen Cabinet • White / Laminate worktop • 36 sqft 1 RM 1319.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 7 Location: Kitchen Panasonic Econavi Fridge • 262 litres • 2 door top freezer • 611 x 600 x 1499 mm 1 RM 1249.00 SENHENG SUNWAY PYRAMID No 3, Jalan PJS 11/15, Bandar Sunway, 46150, Petaling Jaya, Selangor 8 Location: Bedroom 1, Bedroom 3 TRYSIL Bed Frame • White-light grey • Powder-coated steel • 1550 x 2180 x 1499 mm 2 RM 490.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 9 Location: Bedroom 2 BRIMNES Day-bed Frame • White / Foil finish • 860 x 2050 x 57 mm 1 RM 799.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 10 Location: Bedroom 1, Bedroom 3 Queen Size Mattress • High density foam • 1525 x 1830 x 128 mm 2 RM 598.00 MF DESIGN No 26 (1st) , Jalan Perwira 1, Taman Perwira, 84200 Bakri, Muar, Johor 8.0 INTERIOR DESIGN 8.5 FURNITURE SCHEDULE
  • 62. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 11 Location: Bedroom 2 Single Size Mattress • Foam • 850 x 1830 x 128 mm 1 RM 199.00 MF DESIGN No 26 (1st) , Jalan Perwira 1, Taman Perwira, 84200 Bakri, Muar, Johor 12 Location: Bedroom 1, Bedroom 3 BRIMNES Wardrobe with 3 Doors • Foil finish / Mirror glass • 1170 x 500 x 1900 mm 1 RM 545.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 13 Location: Bedroom 2 ASKVOLL Wardrobe • Foil finish • 800 x 520 x 1890 mm 2 RM 490.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 14 Location: Bedroom 1, Bedroom 2, Bedroom 3 LISABO desk & Swivel chair • Ash veneer / Solid birch • 1180 x 450 x 740 mm • White / Plywood • 450 x 390 x 520 mm 3 RM 718.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 15 Location: Bedroom 3 KHIND Tower Fan • High density foam • 1525 x 1830 x 128 mm 1 RM 176.00 SENHENG SUNWAY PYRAMID No 3, Jalan PJS 11/15, Bandar Sunway, 46150, Petaling Jaya, Selangor 8.0 INTERIOR DESIGN 8.5 FURNITURE SCHEDULE
  • 63. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 16 Location: Bath 1, Bath 2, Bath 3, Bath 4 GUNNERN Mirror Cabinet • White / Mirror glass • 310 x 124 x 620 mm 3 RM 129.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 17 Location: Bath 1, Bath 2, Bath 3, Bath 4 JOHNSON SUISSE Pavia Semi-recessed Basin • White • 555 x 600 x 247 mm 3 RM 423.00 MAJU HOME FURNISHING Lot 48 & 48, Batu 4 1/2, Jalan Genting Klang, 53300 Setapak, Kuala Lumpur. 18 Location: Bath 1, Bath 2, Bath 3, Bath 4 JOHNSON SUISSE Luton Close-coupled Water Closet • White • Washdown / Dual Flush • 650 x 365 x 785 mm 3 RM 466.00 MAJU HOME FURNISHING Lot 48 & 48, Batu 4 1/2, Jalan Genting Klang, 53300 Setapak, Kuala Lumpur. 19 Location: Terrace ASKHOLMEN Balcony Table with 2 Folded Chairs • 700 x 440 x 710 mm • 360 x 490 x 870 mm 3 RM 225.00 IKEA DAMANSARA Jalan PJU 7/2, Mutiara Damansara, 47820 Petaling Jaya, Selangor, Malaysia 8.0 INTERIOR DESIGN 8.5 FURNITURE SCHEDULE
  • 65. 9.1 LANDSCAPE LAYOUT 9.0 LANDSCAPE Emmenopterys Henyi Euonymus Fortunei Bermuda Grass Pebble Stone Pebble Stone Path Morning Glory
  • 66. 9.0 LANDSCAPE 9.2 SPECIES SPECIFICATION ITEM NO. SPECIFICATION UNIT PRICE SUPPLIER 1 Emmenopterys Henyi Height : 120mm Spread : 1000mm Sun : Sun, part sun Watering : Medium 6 RM 80 Glorious Nursery Jalan PJS 10/2, Bandar Sunway, Petaling Jaya, Selangor. 2 Euonymus Fortunei Height : 50-60mm Spread : 1000mm Sun : Sun, part sun Watering : Medium 10 RM 12 Glorious Nursery Jalan PJS 10/2, Bandar Sunway, Petaling Jaya, Selangor. 3 Pebble Stone Path Size : 400x400mm Colour : Mixing with black and light pink 24 RM 9 Glorious Nursery Jalan PJS 10/2, Bandar Sunway, Petaling Jaya, Selangor. 4 Pebble Stone Size : Average medium size Colour : Mixing with black and light pink 20 RM 21 Glorious Nursery Jalan PJS 10/2, Bandar Sunway, Petaling Jaya, Selangor. 5 Bermuda Grass Sun : Sun, part sun Watering : Medium 1 RM 63 Glorious Nursery Jalan PJS 10/2, Bandar Sunway, Petaling Jaya, Selangor. 6 Morning Glory Seed Sun : Sun, part sun Watering : Medium 1 RM 10 Glorious Nursery Jalan PJS 10/2, Bandar Sunway, Petaling Jaya, Selangor.
  • 67. 9.0 LANDSCAPE 9.3 LANDSCAPE PERSPECTIVE BIRD EYE VIEW
  • 68. 9.0 LANDSCAPE 9.3 LANDSCAPE PERSPECTIVE PERSPECTIVE VIEW
  • 69. 10.0 CIVIL & STRUCTURE
  • 70. 10.0 CIVIL & STRUCTURE 10.1 STRUCTURAL MEMBERS STRUCTURAL PLANS FOUNDATION PLAN SCALE 1:100 GROUND FLOOR PLAN SCALE 1:100 FIRST FLOOR PLAN SCALE 1:100
  • 71. SECOND FLOOR PLAN SCALE 1:100 BALCONY ROOF PLAN SCALE 1:100 ROOF PLAN SCALE 1:100 11.0 STRUCTURAL MEMBERS STRUCTURAL PLANS 10.0 CIVIL & STRUCTURE
  • 72. 10.1 STRUCTURAL MEMBERS 10.1.1 EXISTING AND NEW COLUMNS EXISTING COLUMN NEW COLUMN FOUNDATION PLAN SCALE 1:100 GROUND FLOOR PLAN SCALE 1:100 FIRST FLOOR PLAN SCALE 1:100 10.0 CIVIL & STRUCTURE
  • 73. 10.1 STRUCTURAL MEMBERS 10.1.2 EXISTING AND NEW BEAMS EXISTING BEAM NEW BEAM GROUND FLOOR PLAN SCALE 1:100 FIRST FLOOR PLAN SCALE 1:100 SECOND FLOOR PLAN SCALE 1:100 10.0 CIVIL & STRUCTURE
  • 74. SECOND FLOOR PLAN SCALE 1:100 GROUND FLOOR PLAN SCALE 1:100 FIRST FLOOR PLAN SCALE 1:100 10.1 STRUCTURAL MEMBERS 10.1.3 LOAD BEARING WALLS NEW LOAD BEARING WALL 10.0 CIVIL & STRUCTURE
  • 75. 10.1 STRUCTURAL MEMBERS NEW LOAD BEARING WALLEXISTING BEAM NEW BEAM EXISTING COLUMN NEW COLUMN COLUMNS BEAMS LOAD BEARING WALL 10.0 CIVIL & STRUCTURE
  • 76. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location : Column F/1 Steel Rectangular Hollow Section - 350mm x 150mm x 4.5mm x 2950mm – (28kg/m) 1 RM 385.00 Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 2 Location : Ground floor & first floor, beam 1/E- F Steel Rectangular Hollow Section - 350mm x 150mm x 4.5mm x 1578mm – (28kg/m) 2 RM 243.00 Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 3 Location : Ground floor & first floor, beam F/1-2 Steel Rectangular Hollow Section - 350mm x 150mm x 4.5mm x 1725mm – (28kg/m) 2 RM 265.00 Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 4 Location : Second floor, beam 1.5/C-D1 Steel Rectangular Hollow Section - 350mm x 150mm x 4.5mm x 1725mm – (28kg/m) 1 RM 346.50 Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 10.1 STRUCTURAL MEMBERS 10.0 CIVIL & STRUCTURE
  • 77. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location : First floor, second floor Autoclaved Aerated Concrete (AAC) Block 600mm x 200mm x 150mm 910 RM 3.50 Starken AAC Sdn. Bhd. No.A-1-3A, Pusat Perdagangan Kuchai, No.2, Jalan 1/127, Off Jalan Kuchai Lama, 58200, Kuala Lumpur, Wilayah Persekutuan, Malaysia. 2 Location : First floor, second floor Autoclaved Aerated Concrete (AAC) Floor Panel 600mm x 150mm x 3100mm 22 RM 54.50 Starken AAC Sdn. Bhd. No.A-1-3A, Pusat Perdagangan Kuchai, No.2, Jalan 1/127, Off Jalan Kuchai Lama, 58200, Kuala Lumpur, Wilayah Persekutuan, Malaysia. 10.1 STRUCTURAL MEMBERS 10.0 CIVIL & STRUCTURE
  • 78. 10.2 STRUCTURAL LOAD 10.2.1 LOAD DISTRIBUTION DIAGRAM GROUND FLOOR PLAN SCALE 1:100 FIRST FLOOR PLAN SCALE 1:100 SECOND FLOOR PLAN SCALE 1:100 10.0 CIVIL & STRUCTURE
  • 79. 10.2 STRUCTURAL LOAD 10.2.2 LOAD OF ADDITIONAL STRUCTURE ROOF PLAN SCALE 1:100 ITEM NO. CALCULATION UNIT WEIGHT (kN) ROOF FRAME SLOPE CORRECTION FACTOR = 1.08 1 (1.64 x 0.1)m x 0.1kN/m² x 1.08 = 0.018kN / unit 5 0.09 2 (3.09 x 0.1)m x 0.1kN/m² x 1.08 = 0.033kN / unit 3 0.10 3 (5.09 x 0.1)m x 0.1kN/m² x 1.08 = 0.055kN / unit 2 0.11 4 (4.88 x 0.1)m x 0.1kN/m² x 1.08 = 0.053kN / unit 9 0.48 5 (0.5 x 0.1)m x 0.1kN/m² x 1.08 = 5.4 x 10^-3kN / unit 2 0.01 6 (2.2 x 0.1)m x 0.1kN/m² x 1.08 = 0.24kN / unit 3 0.72 METAL ROOF SHEET 7 (4.88 x 1.64)m x 0.07kN/m² x 1.08 = 0.061kN - 0.06 8 (4.88 x 5.20)m x 0.07kN/m² x 1.08 = 2kN - 2.00 1 2 3 4 5 6 DEAD LOAD Steel 78.5kN/m³ Steel Frame Member 0.1kN/m² AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³ Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m² LIVE LOAD Bedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m² 10.0 CIVIL & STRUCTURE
  • 80. 10.2 STRUCTURAL LOAD 10.2.2 LOAD OF ADDITIONAL STRUCTURE BALCONY ROOF PLAN SCALE 1:100 ITEM NO. CALCULATION UNIT WEIGHT (kN) ROOF FRAME SLOPE CORRECTION FACTOR = 1.08 1 (3.2 x 0.1)m x 0.1kN/m² x 1.08 = 0.035kN / unit 5 0.18 2 (4.88 x 0.1)m x 0.1kN/m² x 1.08 = 0.053kN/ unit 3 0.16 POLYCARBONATE ROOF PANEL 3 (4.88 x 3.2)m x 0.03kN/m² x 1.08 = 0.506kN - 0.51 TOTAL LOAD OF ROOF 4.42 1 2 DEAD LOAD Steel 78.5kN/m³ Steel Frame Member 0.1kN/m² AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³ Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m² LIVE LOAD Bedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m² 10.0 CIVIL & STRUCTURE
  • 81. 10.2 STRUCTURAL LOAD 10.2.2 LOAD OF ADDITIONAL STRUCTURE SECOND FLOOR PLAN SCALE 1:100 ITEM NO. CALCULATION UNIT WEIGHT (kN) AAC BLOCK WALL 1 (4.73 x 1.5 x 0.15)m³ x 7.4kN/m³ = 7.87kN / unit 1 7.87 2 (6.871 + 5.814 + 0.373)m² x 0.15m x 7.4kN/m³ = 17.12kN / unit 1 17.12 3 (12.62 + 1.076)m² x 0.15m x 7.4kN/m³ = 13.7kN / unit 1 13.70 4 (11.421 + 1.055)m² x 0.15m x 7.4kN/m³ = 13.84kN / unit 1 13.84 5 ((1.57 + 2.916)/2 x 3.1)m² x 0.15m x 7.4kN/m³ = 7.72kN / unit 1 7.72 6 (1.25 x 1.895 x 0.15)m³ x 7.4kN/m³ = 7.63kN / unit 1 7.36 7 (1.5 x 3.63 x 0.15)m³ x 7.4kN/m³ = 6.04kN / unit 1 6.04 STEEL BEAM 8 (2.25 x 0.35 x 0.15)m³ x 78.5kN/m³ = 9.27kN / unit 1 9.27 1 2 3 8 5 6 7 4 DEAD LOAD Steel 78.5kN/m³ Steel Frame Member 0.1kN/m² AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³ Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m² LIVE LOAD Bedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m² 10.0 CIVIL & STRUCTURE
  • 82. SECOND FLOOR PLAN SCALE 1:100 ITEM NO. CALCULATION UNIT WEIGHT (kN) AAC FLOOR PANEL 1 (4.73 x 2.325 x 0.15)m³ x 8.04kN/m³ = 13.26kN / unit Live load of balcony, (4.73 x 2.325)m² x 1.5kN/m² = 16.5kN 1 29.76 2 (2.25 x 1.275 x 0.15)m³ x 8.04kN/m³ = 3.46kN / unit Live load of corridor, (2.25 x 1.275)m² x 1.5kN/m² = 4.3kN 1 7.76 3 (1.186 x 3.605 x 0.15)m³ x 8.04kN/m³ = 5.16kN / unit Live load of bedroom, (1.186 x 3.605)m² x 1.5kN/m² = 6.41kN 1 11.57 4 (1.273 x 1.166 x 0.15)m³ x 8.04kN/m³ = 1.79kN / unit Live load of bedroom, (1.273 x 1.166)m² x 1.5kN/m² = 2.23kN 1 4.02 5 (1.271 x 1.034 x 0.15)m³ x 8.04kN/m³ = 1.58kN / unit Live load of bedroom, (1.271 x 1.034)m² x 1.5kN/m² = 1.97kN 1 3.55 6 (1.738 x 3.605 x 0.15)m³ x 8.04kN/m³ = 7.56kN / unit Live load of bedroom, (1.738 x 3.605)m² x 1.5kN/m² = 9.4kN 1 16.96 TOTAL LOAD ON SECOND FLOOR 156.72 DEAD LOAD Steel 78.5kN/m³ Steel Frame Member 0.1kN/m² AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³ Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m² LIVE LOAD Bedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m² 1 2 3 5 6 4 10.2 STRUCTURAL LOAD 10.2.2 LOAD OF ADDITIONAL STRUCTURE 10.0 CIVIL & STRUCTURE
  • 83. FIRST FLOOR PLAN SCALE 1:100 ITEM NO. CALCULATION UNIT WEIGHT (kN) AAC BLOCK WALL 1 (0.75 + 4.176)m² x 0.15m x 7.4kN/m³ = 5.47kN / unit 1 5.47 2 (3.391 x 2.983 x 0.15)m³ x 7.4kN/m³ = 11.23kN / unit 1 11.23 3 (4.729 x 2.983 x 0.15)m³ x 7.4kN/m³ = 15.66kN / unit 1 15.66 4 (2.342 x 2.983 x 0.15)m³ x 7.4kN/m³ = 7.75kN / unit 1 7.75 5 (1.273 x 2.983 x 0.15)m³ x 7.4kN/m³ = 4.22kN / unit 1 4.22 6 (3.607 x 2.983 x 0.15)m³ x 7.4kN/m³ = 11.94kN / unit 1 11.94 7 (1.778 x 2.983 x 0.15)m³ x 7.4kN/m³ = 5.88kN / unit 1 5.88 STEEL BEAM 8 (1.778 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 7.33kN / unit 1 7.33 9 (1.579 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 6.51kN / unit 1 6.51 AAC FLOOR PANEL 10 (1.725 x 1.778 x 0.15)m³ x 8.014kN/m³ = 3.7kN Live load of bedroom, (1.725 x 1.778)m² x 1.5kN/m² = 4.6kN 1 8.30 1 2 3 4 7 8 5 6 9 1 0 DEAD LOAD Steel 78.5kN/m³ Steel Frame Member 0.1kN/m² AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³ Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m² LIVE LOAD Bedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m² 10.2 STRUCTURAL LOAD 10.2.2 LOAD OF ADDITIONAL STRUCTURE 10.0 CIVIL & STRUCTURE
  • 84. GROUND FLOOR PLAN SCALE 1:100 ITEM NO. CALCULATION UNIT WEIGHT (kN) STEEL COLUMN 1 (2.95 x 0.35 x 0.15)m³ x 78.5kN/m³ = 12.15kN / unit 1 12.15 STEEL BEAM 2 (1.778 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 7.33kN / unit 1 7.33 3 (1.579 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 6.51kN / unit 1 6.51 TOTAL LOAD IMPOSED ON GROUND AND FIRST FLOOR 110.28 DEAD LOAD Steel 78.5kN/m³ Steel Frame Member 0.1kN/m² AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³ Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m² LIVE LOAD Bedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m² 2 1 3 TOTAL LOAD OF THE ADDITIONAL STRUCTURE 271.42 kN The proposed structure utilizes lightweight materials like AAC blocks and panels, in order to minimise the additional resulting load as it is unsure whether the existing structure is able to withstand a great amount of load. 10.2 STRUCTURAL LOAD 10.2.2 LOAD OF ADDITIONAL STRUCTURE 10.0 CIVIL & STRUCTURE
  • 85. 10.3 ROOF SYSTEM ROOF STRUCTURE AWNING STRUCTURE 10.0 CIVIL & STRUCTURE
  • 86. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location : Roof Steel Rectangular Hollow Section - 100mm x 50mm x 4.1mm 1630mm – (6.4kg/m) 5 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 2 Location : Roof Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 2647mm – (6.4kg/m) 2 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 3 Location : Roof Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 1800mm – (6.4kg/m) 2 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 4 Location : Roof Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 5156mm – (6.4kg/m) 3 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 10.3 ROOF SYSTEM 10.0 CIVIL & STRUCTURE
  • 87. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location : Roof Steel Rectangular Hollow Section - 100mm x 50mm x 4.1mm 5000mm – (6.4kg/m) 2 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 2 Location : Roof, balcony roof Steel Lip Channel Section – 100mm x 50mm x 3mm x 4880mm – (6.4kg/m) 12 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 3 Location : Balcony roof Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 3200mm – (6.4kg/m) 10 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 4 Location : Balcony roof Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 3050mm – (6.4kg/m) 3 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 10.3 ROOF SYSTEM 10.0 CIVIL & STRUCTURE
  • 88. 10.4 STAIRCASE STAIRCASE STRUCTURE & DETAILS NTS 10.0 CIVIL & STRUCTURE
  • 89. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location : New staircase Timber tread - 245mm x 38mm x 1050mm 18 RM 8 per ft run Mikyotech Sdn. Bhd. Lot 2, Jalan TUDM, Kg. Baru Subang, 40150 Shah Alam, Selangor. 2 Location : New staircase Steel Rectangular Hollow Section – 120mm x 50mm x 3.8mm – (6.4kg/m) 21m RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 3 Location : New Staircase Timber handrail 75mm x 30mm 7.1m RM 8 per ft run Mikyotech Sdn. Bhd. Lot 2, Jalan TUDM, Kg. Baru Subang, 40150 Shah Alam, Selangor. 4 Location : New staircase Steel Square Hollow Section - 20mm x 20mm x 2.5mm x 900mm – (5.3kg/m) 18 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan, Pahang Darul Makmur, Malaysia 5 Location : New staircase Steel flat bar connector – 50mm x 2.6mm x 142mm – (0.375kg/m) 34 RM 5.50 per kg Kinsteel Berhad 5, Kawasan Perindustrian Ringan IM 6, Bandar Indera Mahkota, 25200 Kuantan,
  • 90. 1 A 2 3 4 B C D E F 1 A 2 3 4 B C D E F 1 A 2 3 4 B C D E F UP UP DWN 10.5 SEWAGE SYSTEM SEWAGE LAYOUT PLAN GROUND FLOOR PLAN NTS FIRST FLOOR PLAN NTS SECOND FLOOR PLAN NTS 10.0 CIVIL & STRUCTURE
  • 91. 10.5 SEWAGE SYSTEM SEWAGE SCHEMATIC DIAGRAM 10.0 CIVIL & STRUCTURE
  • 92. 10.6 DRAINAGE SYSTEM PERIMETER DRAIN DOWN PIPE GUTTER DRAIN PIPE ROOF PLAN NTS DOWNPIPE PLAN FROM SECOND FLOOR DOWN TO FIRST FLOOR NTS GROUND FLOOR PLAN NTS 10.0 CIVIL & STRUCTURE
  • 93. 11.0 MECHANICAL & ELECTICAL
  • 94. Types of spaces No. of existing switch No. of existing lighting No. of existing fan No. of existing socket Living room 4 1 1 4 Dining area 2 2 - 5 Kitchen 0 1 - 3 Bathroom (Ground Floor) 2 (including heater) 1 - - Master Bedroom 4 2 (including balcony) 1 1 Bedroom 1 1 1 - 1 Bathroom (First Floor) 1 1 - - Corridor 1 1 - - 11.1 EXISTING ELECTRICAL SYSTEM 11.0 MECHANICAL & ELECTRICAL
  • 95. MASTER BEDROOM BATHROOM KITCHEN LIVING HALL BEDROOM 1 BEDROOM 1 11.1 EXISTING ELECTRICAL SYSTEM 11.0 MECHANICAL & ELECTRICAL
  • 96. 11.0 MECHANICAL & ELECTRICAL 1121 ELECTRICAL SYSTEM ELECTRICAL LAYOUT GROUND FLOOR PLAN NTS ELECTRICAL LAYOUT FIRST FLOOR PLAN NTS ELECTRICAL LAYOUT SECOND FLOOR PLAN NTS 11.2.1 GENERAL ELECTRICAL SYSTEM
  • 97. ELECTRICAL LAYOUT GROUND FLOOR PLAN NTS ELECTRICAL LAYOUT FIRST FLOOR PLAN NTS ELECTRICAL LAYOUT SECOND FLOOR PLAN NTS 11.0 MECHANICAL & ELECTRICAL 11.2 ELECTRICAL SYSTEM 11.2.2 SOCKET PLACEMENT
  • 98. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location: Living hall, Dining hall, Kitchen, Bedroom 1, Bedroom 2, Bedroom 3 Schneider C-Vivace Wall socket 1-gang switched 7 RM 15.00 Schneider Electric Industries (M) Sdn Bhd Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling Jaya, Selangor 2 Location: Living Hallm Dining Hall, Kitchen, Bedroom 1, Bedroom 2, Bedroom 3, Balcony Schneider C-Vivace Wall socket 2-gang switched 8 RM 18.00 Schneider Electric Industries (M) Sdn Bhd Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling Jaya, Selangor 11.0 MECHANICAL & ELECTRICAL 1121 ELECTRICAL SYSTEM 11.2.2 SOCKET PLACEMENT
  • 99. 11.0 MECHANICAL & ELECTRICAL 1121 ELECTRICAL SYSTEM ELECTRICAL LAYOUT GROUND FLOOR PLAN NTS ELECTRICAL LAYOUT FIRST FLOOR PLAN NTS ELECTRICAL LAYOUT SECOND FLOOR PLAN NTS 11.2.3 LIGHTING PLACEMENT
  • 100. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location: Terrace, Staircase, Balcony Philips LED Light Bulb Warm white • Shape: Standard • Cap/Fitting: E27 • Voltage: 220-240V • Lifetime: 15000 (hours) • Wattage equivalent: 40W • Light output: 350 lumen 5 RM 16.90 Philips Electronic (M) Sdn Bhd Level 8&9, Menara Axis, No. 2, Jalan 51A/223, 46100, Petaling Jaya, Selangor, 46100, Malaysia 2 Location: Living hall, Dining hall, Bedroom 1, Bedroom 2, Bedroom 3 Philips LED Light Bulb Daylight • Shape: Standard • Cap/Fitting: E27 • Voltage: 220-240V • Lifetime: 15000 (hours) • Wattage equivalent: 40W • Light output: 350 lumen 15 RM 16.90 Philips Electronic (M) Sdn Bhd Level 8&9, Menara Axis, No. 2, Jalan 51A/223, 46100, Petaling Jaya, Selangor, 46100, Malaysia 3 Location: Bathroom 1, Bathroom 2, Bathroom 3 Philips LED Genie Stick Cool Daylight • Shape: U shape • Energy Saving: 80% • Cap/Fitting: E14 • Voltage: 220-240V • Lifetime: 15000 (hours) • Wattage equivalent: 60W 4 RM 10.90 Philips Electronic (M) Sdn Bhd Level 8&9, Menara Axis, No. 2, Jalan 51A/223, 46100, Petaling Jaya, Selangor, 46100, Malaysia 4 Location: Kitchen Philips Linear Fluorescent Tube Soft White • Lamp holder:T8 • Placement: Ceiling • Length: 600mm • Number of lamps: 1 • Luminosity: 1300lm • Wattage: 30 W 1 RM 4.90 Philips Electronic (M) Sdn Bhd Level 8&9, Menara Axis, No. 2, Jalan 51A/223, 46100, Petaling Jaya, Selangor, 46100, Malaysia 11.0 MECHANICAL & ELECTRICAL 11.2 ELECTRICAL SYSTEM 11.2.3 LIGHTING PLACEMENT
  • 101. 11.0 MECHANICAL & ELECTRICAL 11.2 ELECTRICAL SYSTEM ELECTRICAL LAYOUT GROUND FLOOR PLAN NTS ELECTRICAL LAYOUT FIRST FLOOR PLAN NTS ELECTRICAL LAYOUT SECOND FLOOR PLAN NTS 11.2.4 SWITCH PLACEMENT
  • 102. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location: Kitchen, Bath room 1, Bathroom 2, Bathroom 3, Balcony Schneider C-Vivace Wall switches 1-Gang 1 way 7 RM 7.00 Schneider Electric Industries (M) Sdn Bhd Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling Jaya, Selangor, Malaysia. 2 Location: Living hall (staircase). Corridor (2nd floor staircase) Schneider C-Vivace Wall switches 1-Gang 2 way 2 RM 13.00 Schneider Electric Industries (M) Sdn Bhd Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling Jaya, Selangor, Malaysia. 3 Location: Living hall, Bedroom 3 Schneider C-Vivace Wall switches 2-Gang 1 way 2 RM 8.00 Schneider Electric Industries (M) Sdn Bhd Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling Jaya, Selangor, Malaysia. 4 Location: Corridor (1st floor staircase) Schneider C-Vivace Wall switches 2-Gang 2 way 1 RM 16.00 Schneider Electric Industries (M) Sdn Bhd Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling Jaya, Selangor, Malaysia. 11.0 MECHANICAL & ELECTRICAL 11.2 ELECTRICAL SYSTEM 11.2.4 SWITCH PLACEMENT
  • 103. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 5 Location: Living hall, Bedroom 1, Bedroom 2 Schneider C-Vivace Wall switches 3-Gang 1 way 3 RM 9.50 Schneider Electric Industries (M) Sdn Bhd Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling Jaya, Selangor, Malaysia. 6 Location: Bathroom 1, Bathroom 2, Bathroom 3, Bathroom 4 Schneider C-Vivace Wall switches 1 Gang with Neon 4 RM 8.00 Schneider Electric Industries (M) Sdn Bhd Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling Jaya, Selangor, Malaysia. 11.0 MECHANICAL & ELECTRICAL 11.2 ELECTRICAL SYSTEM 11.2.4 SWITCH PLACEMENT
  • 104. 11.0 MECHANICAL & ELECTRICAL 11.2 ELECTRICAL SYSTEM ELECTRICAL LAYOUT GROUND FLOOR PLAN NTS ELECTRICAL LAYOUT FIRST FLOOR PLAN NTS ELECTRICAL LAYOUT SECOND FLOOR PLAN NTS 11.2.5 MECHANICAL VENTILATION PLACEMENT
  • 105. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location: Bedroom 1, Bedroom 2, Bedroom 3 York Cooling King L-Series Air Conditioner • Host Power: 1.0 • Power Input Cooling: 980W • Total current: 4.38A • Setting Temperature Range: 17℃ - 30℃ • Indoor Unit (mm): 288 x 800 x 206 • Outdoor Unit (mm): 495 x 600 x 245 • Unit weight (indoor): 9kg • Unit weight (outdoor): 25kg • Years of warranty: 5 3 RM 1300.00 DAIKIN Air Conditioning (M) Sdn Bhd Lot, 9, Jalan 13/6, Seksyen 13, 46200 Petaling Jaya, Selangor, Malaysia 2 Location: Living hall, Dining hall, :Bedroom 1, Bedroom 2 KDK K12V0 Ceiling Fan • Net Weight: 4.93 kg • Power: 60W • Noise Level: <58dB • Span: 1200mm diameter 4 RM 149.00 KDK Fans (M) Sdn Bhd 15, Jalan Tandang 204a, Seksyen 51, 46050 Petaling Jaya, Selangor, Malaysia 11.0 MECHANICAL & ELECTRICAL 11.2 ELECTRICAL SYSTEM 11.2.5 MECHANICAL VENTILATION PLACEMENT
  • 106. BATHROOM (GROUND FLOOR) with squatting WC BATHROOM (FIRST FLOOR) with sitting WC pan 11.3 EXISITNG WATER SUPPLY SYSTEM 11.0 MECHANICAL & ELECTRICAL
  • 107. 11.0 MECHANICAL & ELECTRICAL 11.4 PROPOSED WATER SUPPLY SYSTEM WATER SUPPLY LAYOUT GROUND FLOOR PLAN NTS WATER SUPPLY LAYOUT FIRST FLOOR PLAN NTS WATER SUPPLY LAYOUT SECOND FLOOR PLAN NTS
  • 108. WATER SUPPLY SCHEMATIC DIAGRAM 11.0 MECHANICAL & ELECTRICAL 11.4 PROPOSED WATER SUPPLY SYSTEM
  • 109. ITEM NO. SPECIFICATION UNIT PRICE (PER UNIT) SUPPLIER 1 Location: Bathroom 1, Bathroom 2, Bathroom 3 alpHa Evo Series Water Heater • Dimensions: 230mm(W) x360mm(L) x 87.80mm(H) • Weight: 1.4kg • Minimum Floor Rate: 3 liter/minute • Minimum Pressure: 20 kPa (0.2 bar/2.9 psi) • Maximum Pressure: 0.38 MPa (3.8 bar/55 psi) 4 RM300.00 Alpha Electric Co Sdn Bhd 6, Jalan Sungai Kayu Ara 32/37, Berjaya Park, Section 32, 40460 Shah Alam, Selangor, Malaysia 2 Location: Balcony Formosa HR150 Vertical Round Bottom Stainless Steel Water Tank • Material: Stainless steel • Capacity: 1500L/300 gallons 1 RM 450.00 Maxim Bath & Kitchen Gallery Sdn Bhd 52G, Jalan OP 1/5, One Puchong Business Park,47610 Puchong 3 Location: Balcony Peripheral vortex water pump 0.5HP • Power : 375W/ 0.5 HP • Inlet & Outlet Size: 1″x1″ (25mm) • Water Flow : 5-36Litre/min • Max. Head : 36m • Max Suction : 9 meters • Weight : 5.5kg 1 RM 135.00 Iklim Hardware & Machinery Sdn Bhd No. 23, Jalan 8/91 Taman Shamelin Perkasa 56100 Kuala Lumpur Malaysia 11.0 MECHANICAL & ELECTRICAL 11.4 PROPOSED WATER SUPPLY SYSTEM
  • 111. 12.0 COSTING 12.1 PREPARE LAND PRICE NAME SS 19 Subang Jaya TYPE Residential AVERAGE FOR SALE PRICE (psf) RM 579 September 2015 + RM 62.70 ( 12.1%) RM 516 August 2015 RM 531 July 2015 RM 546 June 2015 RM 494 May 2015 For this project, the total built-up area is 1643.17 square feet. By refering to the average land sale price, RM 579 per square feet; 1643.17 sqft X RM 579/sqft = RM 951, 395.40
  • 112. 12.0 COSTING 12.1 PREPARE LAND PRICE NAME SS 19 Subang Jaya TYPE Residential AVERAGE FOR SALE PRICE (psf) RM 579 September 2015 + RM 62.70 ( 12.1%) RM 516 August 2015 RM 531 July 2015 RM 546 June 2015 RM 494 May 2015 For this project, the total built-up area is 1643.17 square feet. By refering to the average land sale price, RM 579 per square feet; 1643.17 sqft X RM 579/sqft = RM 951, 395.40
  • 131. 12.0 COSTING 12.3 CONSTRUCTION COSTING SUMMARY
  • 132. 12.0 COSTING 12.4 PIE CHART SUMMARY (WITHOUT LOOSE FURNITURES) 7% 10% 1% 14% 2% 2% 3% 7% 1%7% 18% 11% 5% 5% 2% 5% PRELIMINARIES DEMOLITION WORKS STRUCTURAL PARTITION, WALL AND WALL FINISHES CEILING WORKS FLOOR AND FLOOR FINISHES STAIRCASE ROOF WORK AND FINISHES GUTTERS DOORS AND IRONMONGERY WINDOWS M&E WORKS PLUMBING WORKS
  • 137. 12.0 COSTING 12.6 OPTIONAL COSTING SUMMARY
  • 138. 12.0 COSTING 12.7 PIE CHART SUMMARY (WITH LOOSE FURNITURES) 6% 9% 1% 12% 2% 2% 3% 6% 1% 6%15% 9% 4% 4% 1% 4% 15% PRELIMINARIES DEMOLITION WORKS STRUCTURAL PARTITION, WALL AND WALL FINISHES CEILING WORKS FLOOR AND FLOOR FINISHES STAIRCASE ROOF WORK AND FINISHES GUTTERS DOORS AND IRONMONGERY WINDOWS M&E WORKS PLUMBING WORKS
  • 139. 12.0 COSTING 12.8 EXPENSES AND INCOME CURRENT ASKING PRICE RM 420,000 ( RM 543 psf ) CURRENT RENTAL RM 1,000 / month CURRENT YIELD 2.85 % CURRENT BUILT-UP (sf) 773 CURRENT FURNISHING Semi-Furnished CURRENT LAYOUT 2 bedroom, 2 bathroom PROPOSED ASKING PRICE RM 542,840.60 ( RM 330 psf) PROPOSED RENTAL (without loose furniture ) RM 1,800 / month PROPOSED RENTAL ( with loose furniture ) RM 2250 / month PROPOSED YIELD 3.9% PROPOSED BUILT-UP (sf) 1643.17 PROPOSED FURNISHING Semi-Furnished PROPOSED LAYOUT 3 bedroom, 4 bathroom PROPOSED BEDROOM 1 RENTAL RM 650 PROPOSED BEDROOM 2 RENTAL RM 500 PROPOSED BEDROOM 3 RENTAL RM 650 BREAK EVEN POINT 1. Without loose furniture RM 99,306 / RM 1800 = 4.5 years 2. With loose furniture RM 114, 225 / RM 2250 = 4.2 years Proposed Rental Without Loose Furniture PROPOSED BEDROOM 1 RENTAL RM 800 PROPOSED BEDROOM 2 RENTAL RM 650 PROPOSED BEDROOM 3 RENTAL RM 800 Proposed Rental With Loose Furniture In conclusion, it would be best for the client to rent out the house at RM 2250 ( inclusive of loose furniture ) because the return would be faster as compared to the rental without loose furniture. This however means that the budget would have to be increased to RM 115, 000 which is RM 15 000 more than the original budget.
  • 144. 14.0 REFERENCE LIST Alibaba.com. (n.d.). Hollow polycarbonate roofing sheet,clear plastic roofing panels 16mm triple wall polycarbonate hollow sheet, View Hollow polycarbonate roofing sheet, BEIER SOLA Product Details from Yuyao Jiasida Sun Sheet Co., Ltd. on Alibaba.com. Retrieved from http://jiasida.en.alibaba.com/product/ Akzo Nobel Paints (Malaysia) Sdn Bhd. (n.d.). Interior and Exterior colour (Dulux). Retrieved from https://www.dulux.com.my/en Malaysia Property and Real Estate Investment | Propwall. (n.d.). Retrieved September 28, 2015 from http://www.propwall.my/ Furniture Online Sale Malaysia | MF DESIGN - MALAYSIAN FAVOURITE DESIGN. (n.d.). Retrieved September 8, 2015. How to Create a Gantt Chart in Excel. (2013, July 8). Retrieved September 29, 2015 from https:// www.smartsheet.com/blog/gantt-chart-excel Kinsteel.com.my,. Kinsteel Bhd. Retrieved 6 September 2015, from http://www.kinsteel.com.my/products_services/our_products.php Mikyotech Sdn. Bhd.,. Strength groupings of timber & its applications. Retrieved 20 September 2015, from http://www.mikyotech.com/resources.html Malaysia Online Electrical Appliances Mall - Senheng. (n.d.). Retrieved October 2, 2015. Malaysia Property and Real Estate for Sale and Rent. (n.d.). Retrieved September 29, 2015 from http://www.iproperty.com.my/ Paling.com.my,. Paling - Building. Retrieved 13 September 2015, from http://www.paling.com.my/building/ Starken.com.my,. Starken | Standard Blocks. Retrieved 27 August 2015, from http://www.starken.com.my/standard-blocks/ The 2015 IKEA Catalogue – where the everyday begins and ends - IKEA. (n.d.). Retrieved September 4, 2015. Thunghing.com.my,. Thung Hing Group | PU Foam Metal | Roofing Panel. Retrieved 29 August 2015, from http://www.thunghing.com.my/th-pu-foam- metal.php