Contents
Objectives of site visit ................................................... 3
Details of the project ................................................... 4
Observations .................................................... 5
Conclusion .................................................... 21
3. 3
Objective of site visit
To observe the different activities and techniques carried out on site.
To explore the various types of building materials and machinery used on site.
Aware of the items measurable for sub-structure and reinforced concrete frame works.
To have a feel of how the condition of the site really is and how safety is a priority.
To have an up-close view of the entire building structure as opposed to seeing it in the
drawings.
4. 4
Details of the project
-25 storeys
-2 basement floors of carpark, levels 1-2 will be the shopping areas, levels 3-6 will be
another carpark area, levels 7-24 will be the apartments.
-Approximate cost of RM100million for the entire project
-AIKBEE TIMBERS (employer), LT LEONG SEKUTU (architect), PERUNDING MAJUJAYA
(civil & structural engineer), KEW & ASSOCIATES (mechanical & electrical engineer), PCM
COST PERUDING (quantity surveyor), ENCORP CONSTRUCT (main contractor).
7. 7
The safety & health officer, in charge of the safety and well-being of those on site
Parts of scaffolding & cement stored on site
8. 8
Scaffolding in the centre of the building possibly used for installing the formworks and
pouring the concrete
Pipes, timber and other resources stored on site
16. 16
Back to ground floor
Scaffolding on the exterior of the building to gain easy excess to the upper floors
Wires to be installed along the inside of the orange pipe
17. 17
Formwork for sides and soffits of staircase
Production of spacers used to determine concrete cover
18. 18
Site office from the outside
Site office for the consultants to hold meetings and various other functions
19. 19
The drawings for the whole project
Tower crane at the front of the building used to carry heavy loads onto the upper floors
21. 21
Conclusion
From this site visit, I have experienced for the first time what it feels like to be in a
construction site and I can say it is pretty exciting. Apart from the experience, this site
visit also helps me to visualise the items that needs to be measured and how it is
properly placed in real time. I also see that safety is very important in the site especially
for us newbies. It also seems like a good place to talk to some of the people involved to
get more insight on this field. Teamwork is also important at a site that’s where
different professions come together to work on the project. For it to work, the team
must rely on each other and must constantly interact with one another.