1 Smoke Ring   One of our favourite things about the programme given for the
               stadium was the requirement to integrate the stadium and the city.
               Initially, it sounds like a contradiction - a stadium is introverted by
               it’s nature. For the spectators the focal point is inside the stadium
               and since the building should house as many seats as possible a tall
               solid mass is created that does not communicate with the sur-
               rounding city.

               Our proposal suggests the creation of a split stadium. Partly cov-
               ered in ground and partly floating over the pitch. A volcano and a
               smoke ring if you may. The first ring, as well as the pitch, the park-
               ing lot and several other functions would be slightly submerged
               and covered until a height of about 10 meters in artificial soil, act-
               ing as a green roof, with only the entrances peaking out of it.
               Above the top of the first seat ring, a 10 meter gap would allow a
               continuous view of the city through the stadium, from the city into
               the stadium and from the stadium towards the city.
               The top seating ring would be concealed in a light-as-possible con-
               struction, that would appear to be floating over the hill, making it
               iconic, memorable and unique. The smoke ring would be fixed on
               a set of columns that would include the horizontal moment axises
               – the stairs and the lifts.
               The top structure would also include the VIP rooms and some of
               the functions.

               the sustainable approach taken in this concept is of a more social
               nature. We look at the connection with the city and the the trans-
               parency as values of great importance in the relation to the con-
               text, and enables the community to feel greater connection to the
               place, that is open to all, not only for the paying crowd, the new
               sloped terrine created would encourage new uses instead of the
               conventional carpet of parking lots surrounding most stadiums.
               This green strip continues the master plan’s intention of creating
               an urban part, making the mountain a focal point in it.
Weight Lifting Gas Weight of Air Net Lift
            (kg/m3)        (kg/m3)     (kg/m3)
Hydrogen     0.085          1.223        1.14
Helium       0.169          1.223        1.05




Lifting the top ring
ONLY SEATS:
Aluminum sheets        7 kg/m2
                       50000 m2
                                    350.000 kg
   or a 350.000m3 ‘donut blimp’,   1150.000 m3




SEATS AND PEOPLE:
Aluminum sheet seats                350.000 kg
30.000 persons, 80 kg              2400.000 kg

                           total 2750.000 kg
   or a 2750.000m3 closed blimb, 400*300*25m




Loading airship, model CA 200T

Length*height* width               220*66*113m
Envelope volume                    600.000 m3
Static lift                        593.775 kg
Empty weight                       300.000 kg
A   B   C
• Too steep to be functional
• A barrier instead of an invitation
• Not integrated

                                       A
• Sexy!
• Generates electricity
• Removeable mobile roof
• Less radical in concept
                            B
B
• Sexier!
• Fully integrated
• True 24/7
• Extended adaptability and mobility.




                                        C
C
C
C
C
C
#
2 Chameleon   This proposal does not regard the shape of the stadium itself, but
              an idea in which the facade and roof system take a new role upon
              themselves. Not only they would protect the spectators from the
              elements, they would also play an important role in communicat-
              ing the building’s status and use to the city’s inhabitants.
              The continuous facade and roof system could be positioned in
              one of four modes, acting as either an internal roof to cover
              stadium in case of rain, an external roof to shelter venues outside
              the stadium, a fully retracted mode, in which the roof covers the
              entire facade, and a half covered state in which the roof covers
              the top ring.

              This multifunctional roof system would act like an extrovert sign,
              allowing the people of the city to understand by a quick look what
              is happening at the moment in the building. The envelope itself
              would be modular and adjustable. The system must enable great
              flexibility to adopt to changes in geometry.

              The moving skin would be a platform that could contain photo
              voltaic cells as well as built in RGB LED lights. By using small tiles
              and individually controlled LED light, the whole surface, on both of
              it’s sides could be used as a gigantic display and give unprecedent-
              ed visual e ects in matches, concerts, urban installations etc’. The
              internal part of it could emit a constant, balanced, and shadowless
              lighting when positioned as a roof, that would enable high quality
              TV broadcasting.
Watch
Watch
Accordeon
Sigma
#
3 lift!   The city of Rotterdam is best known by it’s port. Since the site is
          located at the sea front, the distinct aesthetics of the cranes and
          harbor machines makes scene as a contextual choice. The cranes
          are massive and impressive mechanisms, that were designed to
          last and are able to carry tremendous loads. We came up with an
          idea to reuse unused cranes from the port (and other ports as
          well) to support the stadium and it’s roof, instead of investing huge
          amount of resources and energy to create new construction. Old
          cranes of various sizes and shapes could be used to support the
          seating rings, staircases and the roof. There is also the possibility
          to use them to lift the pitch upwards to the level of the upper ring
          in smaller matches when not all of the stadium is in use and even
          further to the top level in case the stadium is used as a concert
          hall or just to expose the grass to the sun in an optimal way.
Crane properties
Model              `Ship to Shore STS
Capacity on        40 – 120 Tons under spreader
Outreach           30 – 70+ meters
Railspan           15 – 70 meters
Backreach          0 – 25 meters



                   Weight of conventional
                   soccer pitch: 11.000 tons,
                   => min. 92 cranes to lift
Rotterdam

StocExpo-RotterdaDate: 22-MAR-11 to 24-MAR-11
Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The
Netherlands

Industry & Environment
Date: 18-MAY-11 to 19-MAY-11
Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The
Netherlands

SOLIDS
Date: 05-OCT-11 to 06-OCT-11
Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The
Netherlands

EUROPORT
Date: 08-NOV-11 to 11-NOV-11
Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The
Netherlands

GEVEL
Date: 25-JAN-12 to 27-JAN-12
Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The
Netherlands
Integration?

    Zeppelin   LED

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Basement study
Basement studyBasement study
Basement study
 
warm and humid climate
warm and humid climatewarm and humid climate
warm and humid climate
 
Cept Case study
Cept Case studyCept Case study
Cept Case study
 
Composite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhiComposite climate and aurabindo ashramam,new delhi
Composite climate and aurabindo ashramam,new delhi
 
Sangath and passive solar hstl by bv doshi
Sangath and passive solar hstl by bv doshiSangath and passive solar hstl by bv doshi
Sangath and passive solar hstl by bv doshi
 
Passive design
Passive designPassive design
Passive design
 
B.v. doshi sangath
B.v. doshi sangathB.v. doshi sangath
B.v. doshi sangath
 
vernacular architecture in Hot and dry climate
vernacular architecture in Hot and dry climate vernacular architecture in Hot and dry climate
vernacular architecture in Hot and dry climate
 
Vernacular Architecture
Vernacular ArchitectureVernacular Architecture
Vernacular Architecture
 
Passive solar hostel jodhpur
Passive solar hostel jodhpurPassive solar hostel jodhpur
Passive solar hostel jodhpur
 
SPORTS COMPLEX,JAMIA MILLIA ISLAMAI, NEW DELHI
SPORTS COMPLEX,JAMIA MILLIA ISLAMAI, NEW DELHISPORTS COMPLEX,JAMIA MILLIA ISLAMAI, NEW DELHI
SPORTS COMPLEX,JAMIA MILLIA ISLAMAI, NEW DELHI
 
Data collection - Climate Analysis - Tropical Wet and Dry Climate - Architect...
Data collection - Climate Analysis - Tropical Wet and Dry Climate - Architect...Data collection - Climate Analysis - Tropical Wet and Dry Climate - Architect...
Data collection - Climate Analysis - Tropical Wet and Dry Climate - Architect...
 
Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)Teri, bangalore & solar passive techniques(rupesh)
Teri, bangalore & solar passive techniques(rupesh)
 
Cold and Cloudy climatic region
Cold and Cloudy climatic regionCold and Cloudy climatic region
Cold and Cloudy climatic region
 
Museum case study by Sarthak
Museum case study by SarthakMuseum case study by Sarthak
Museum case study by Sarthak
 
Residence for mohini mullick... CASE STUDY
Residence for mohini mullick... CASE STUDYResidence for mohini mullick... CASE STUDY
Residence for mohini mullick... CASE STUDY
 
TERI -BANGLORE_Case study
TERI -BANGLORE_Case study TERI -BANGLORE_Case study
TERI -BANGLORE_Case study
 
Sabarmati Ashram
Sabarmati AshramSabarmati Ashram
Sabarmati Ashram
 
The druk white lotus school presentation
The druk white lotus school presentationThe druk white lotus school presentation
The druk white lotus school presentation
 
Ar.Ananth raje
Ar.Ananth rajeAr.Ananth raje
Ar.Ananth raje
 

Andere mochten auch

A U D I E N C I A Projeto A R E N A
A U D I E N C I A Projeto A R E N AA U D I E N C I A Projeto A R E N A
A U D I E N C I A Projeto A R E N A
dellamanna
 
Sports Stadium
Sports StadiumSports Stadium
Sports Stadium
hazza48
 
Arena 92 Business Model - RBV Model
Arena 92 Business Model - RBV ModelArena 92 Business Model - RBV Model
Arena 92 Business Model - RBV Model
LaJos11
 
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIPATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
maria laura santamarina
 
Notre Ville Nea Smyrni
Notre Ville Nea SmyrniNotre Ville Nea Smyrni
Notre Ville Nea Smyrni
gueste6341a6
 
XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1
Michela Turrin
 
PIS Uyo - Stadium Complex
PIS Uyo - Stadium ComplexPIS Uyo - Stadium Complex
PIS Uyo - Stadium Complex
Sven Maedler
 

Andere mochten auch (20)

A U D I E N C I A Projeto A R E N A
A U D I E N C I A Projeto A R E N AA U D I E N C I A Projeto A R E N A
A U D I E N C I A Projeto A R E N A
 
Urban Stadium
Urban StadiumUrban Stadium
Urban Stadium
 
Brief
BriefBrief
Brief
 
Sports Stadium
Sports StadiumSports Stadium
Sports Stadium
 
Arena 92 Business Model - RBV Model
Arena 92 Business Model - RBV ModelArena 92 Business Model - RBV Model
Arena 92 Business Model - RBV Model
 
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIPATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
ATHLONE STADIUM AND KLIPFONTEIN COMMERCIAL STRIP
 
Rice Eccles stadium
Rice Eccles stadiumRice Eccles stadium
Rice Eccles stadium
 
Notre Ville Nea Smyrni
Notre Ville Nea SmyrniNotre Ville Nea Smyrni
Notre Ville Nea Smyrni
 
Connected Sport Stadium by Gregory Kuzin
Connected Sport Stadium by Gregory KuzinConnected Sport Stadium by Gregory Kuzin
Connected Sport Stadium by Gregory Kuzin
 
XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1XXL2012 - Pin up - Team 1
XXL2012 - Pin up - Team 1
 
Urban Stadium Sport England
Urban Stadium   Sport EnglandUrban Stadium   Sport England
Urban Stadium Sport England
 
Anz Stadium Case Study - SeatShare Concept Test - CheckinLine
Anz Stadium Case Study - SeatShare Concept Test - CheckinLineAnz Stadium Case Study - SeatShare Concept Test - CheckinLine
Anz Stadium Case Study - SeatShare Concept Test - CheckinLine
 
PIS Uyo - Stadium Complex
PIS Uyo - Stadium ComplexPIS Uyo - Stadium Complex
PIS Uyo - Stadium Complex
 
2313 – al arabi stadium upgrade-structural presentation
2313 – al arabi stadium upgrade-structural presentation2313 – al arabi stadium upgrade-structural presentation
2313 – al arabi stadium upgrade-structural presentation
 
FREI OTTO
FREI OTTOFREI OTTO
FREI OTTO
 
8 بحث مشروع التخرج
8 بحث مشروع التخرج 8 بحث مشروع التخرج
8 بحث مشروع التخرج
 
PRESENTATION
PRESENTATIONPRESENTATION
PRESENTATION
 
Creative Concepts Presentation
Creative Concepts PresentationCreative Concepts Presentation
Creative Concepts Presentation
 
9 بحث مشروع التخرج
9 بحث مشروع التخرج 9 بحث مشروع التخرج
9 بحث مشروع التخرج
 
Beijing Olympic Stadium 2008
Beijing Olympic Stadium 2008Beijing Olympic Stadium 2008
Beijing Olympic Stadium 2008
 

Ähnlich wie XXL2011 group 3 concept presentation

BJMcGhee Portfolio Online
BJMcGhee Portfolio OnlineBJMcGhee Portfolio Online
BJMcGhee Portfolio Online
Ben McGhee
 
ULI-THC Recommendations-edit03
ULI-THC Recommendations-edit03ULI-THC Recommendations-edit03
ULI-THC Recommendations-edit03
Chris Alexander
 
Norman foster (srishti shubh)
Norman foster (srishti shubh)Norman foster (srishti shubh)
Norman foster (srishti shubh)
Srishti Shubh
 

Ähnlich wie XXL2011 group 3 concept presentation (20)

XXL2010 - Team 3 - PinUp Presentation 11 Feb
XXL2010 - Team 3 - PinUp Presentation 11 Feb XXL2010 - Team 3 - PinUp Presentation 11 Feb
XXL2010 - Team 3 - PinUp Presentation 11 Feb
 
Presentation1
Presentation1Presentation1
Presentation1
 
Technosphere
TechnosphereTechnosphere
Technosphere
 
BEORMA comp sub
BEORMA comp subBEORMA comp sub
BEORMA comp sub
 
BJMcGhee Portfolio Online
BJMcGhee Portfolio OnlineBJMcGhee Portfolio Online
BJMcGhee Portfolio Online
 
Ar.Norman Foster by Shrikant
Ar.Norman Foster by ShrikantAr.Norman Foster by Shrikant
Ar.Norman Foster by Shrikant
 
ULI-THC Recommendations-edit03
ULI-THC Recommendations-edit03ULI-THC Recommendations-edit03
ULI-THC Recommendations-edit03
 
Superman
SupermanSuperman
Superman
 
Eco Bulevar | Ecosistema Urbano
Eco Bulevar | Ecosistema UrbanoEco Bulevar | Ecosistema Urbano
Eco Bulevar | Ecosistema Urbano
 
Norman foster (srishti shubh)
Norman foster (srishti shubh)Norman foster (srishti shubh)
Norman foster (srishti shubh)
 
presentation2-170515151741.pdf
presentation2-170515151741.pdfpresentation2-170515151741.pdf
presentation2-170515151741.pdf
 
Recent construction technologies
Recent construction technologiesRecent construction technologies
Recent construction technologies
 
norman foster
norman fosternorman foster
norman foster
 
Exploring masdar-city-site-tour-booklet
Exploring masdar-city-site-tour-bookletExploring masdar-city-site-tour-booklet
Exploring masdar-city-site-tour-booklet
 
Coliseum, Hong Kong
Coliseum, Hong KongColiseum, Hong Kong
Coliseum, Hong Kong
 
Alun Dolton Crit Wall: 07-10-2015
Alun Dolton Crit Wall: 07-10-2015Alun Dolton Crit Wall: 07-10-2015
Alun Dolton Crit Wall: 07-10-2015
 
High rise
High riseHigh rise
High rise
 
Ulx 02 09
Ulx 02 09Ulx 02 09
Ulx 02 09
 
High tech architecture
High tech architectureHigh tech architecture
High tech architecture
 
+
++
+
 

Mehr von Itai Cohen (14)

comm.bined group C first presentation
comm.bined group C first presentationcomm.bined group C first presentation
comm.bined group C first presentation
 
comm.bined group B first presentation
comm.bined group B first presentationcomm.bined group B first presentation
comm.bined group B first presentation
 
comm.bined group A first presentation
comm.bined group A first presentationcomm.bined group A first presentation
comm.bined group A first presentation
 
Site mapping
Site mappingSite mapping
Site mapping
 
Site mapping
Site mappingSite mapping
Site mapping
 
Energy in buildings
Energy in buildingsEnergy in buildings
Energy in buildings
 
Lesson 2 introduction to grasshopper3D
Lesson 2   introduction to grasshopper3DLesson 2   introduction to grasshopper3D
Lesson 2 introduction to grasshopper3D
 
01.01 introduction and sites
01.01 introduction and sites01.01 introduction and sites
01.01 introduction and sites
 
Lesson 1 parametric design 2 final
Lesson 1   parametric design 2 finalLesson 1   parametric design 2 final
Lesson 1 parametric design 2 final
 
Group3 180311
Group3 180311Group3 180311
Group3 180311
 
A Thousand Years
A Thousand YearsA Thousand Years
A Thousand Years
 
Mt. Carmel visitor center
Mt. Carmel visitor centerMt. Carmel visitor center
Mt. Carmel visitor center
 
Temporary Installation Itai Cohen
Temporary Installation Itai CohenTemporary Installation Itai Cohen
Temporary Installation Itai Cohen
 
Presentation Umm El Fahem Museum 2008, so-architecture
Presentation Umm El Fahem Museum 2008, so-architecturePresentation Umm El Fahem Museum 2008, so-architecture
Presentation Umm El Fahem Museum 2008, so-architecture
 

Kürzlich hochgeladen

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 

Kürzlich hochgeladen (20)

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 

XXL2011 group 3 concept presentation

  • 1. # 1 Smoke Ring One of our favourite things about the programme given for the stadium was the requirement to integrate the stadium and the city. Initially, it sounds like a contradiction - a stadium is introverted by it’s nature. For the spectators the focal point is inside the stadium and since the building should house as many seats as possible a tall solid mass is created that does not communicate with the sur- rounding city. Our proposal suggests the creation of a split stadium. Partly cov- ered in ground and partly floating over the pitch. A volcano and a smoke ring if you may. The first ring, as well as the pitch, the park- ing lot and several other functions would be slightly submerged and covered until a height of about 10 meters in artificial soil, act- ing as a green roof, with only the entrances peaking out of it. Above the top of the first seat ring, a 10 meter gap would allow a continuous view of the city through the stadium, from the city into the stadium and from the stadium towards the city. The top seating ring would be concealed in a light-as-possible con- struction, that would appear to be floating over the hill, making it iconic, memorable and unique. The smoke ring would be fixed on a set of columns that would include the horizontal moment axises – the stairs and the lifts. The top structure would also include the VIP rooms and some of the functions. the sustainable approach taken in this concept is of a more social nature. We look at the connection with the city and the the trans- parency as values of great importance in the relation to the con- text, and enables the community to feel greater connection to the place, that is open to all, not only for the paying crowd, the new sloped terrine created would encourage new uses instead of the conventional carpet of parking lots surrounding most stadiums. This green strip continues the master plan’s intention of creating an urban part, making the mountain a focal point in it.
  • 2.
  • 3. Weight Lifting Gas Weight of Air Net Lift (kg/m3) (kg/m3) (kg/m3) Hydrogen 0.085 1.223 1.14 Helium 0.169 1.223 1.05 Lifting the top ring ONLY SEATS: Aluminum sheets 7 kg/m2 50000 m2 350.000 kg or a 350.000m3 ‘donut blimp’, 1150.000 m3 SEATS AND PEOPLE: Aluminum sheet seats 350.000 kg 30.000 persons, 80 kg 2400.000 kg total 2750.000 kg or a 2750.000m3 closed blimb, 400*300*25m Loading airship, model CA 200T Length*height* width 220*66*113m Envelope volume 600.000 m3 Static lift 593.775 kg Empty weight 300.000 kg
  • 4. A B C
  • 5. • Too steep to be functional • A barrier instead of an invitation • Not integrated A
  • 6. • Sexy! • Generates electricity • Removeable mobile roof • Less radical in concept B
  • 7. B
  • 8. • Sexier! • Fully integrated • True 24/7 • Extended adaptability and mobility. C
  • 9. C
  • 10. C
  • 11. C
  • 12. C
  • 13. C
  • 14. # 2 Chameleon This proposal does not regard the shape of the stadium itself, but an idea in which the facade and roof system take a new role upon themselves. Not only they would protect the spectators from the elements, they would also play an important role in communicat- ing the building’s status and use to the city’s inhabitants. The continuous facade and roof system could be positioned in one of four modes, acting as either an internal roof to cover stadium in case of rain, an external roof to shelter venues outside the stadium, a fully retracted mode, in which the roof covers the entire facade, and a half covered state in which the roof covers the top ring. This multifunctional roof system would act like an extrovert sign, allowing the people of the city to understand by a quick look what is happening at the moment in the building. The envelope itself would be modular and adjustable. The system must enable great flexibility to adopt to changes in geometry. The moving skin would be a platform that could contain photo voltaic cells as well as built in RGB LED lights. By using small tiles and individually controlled LED light, the whole surface, on both of it’s sides could be used as a gigantic display and give unprecedent- ed visual e ects in matches, concerts, urban installations etc’. The internal part of it could emit a constant, balanced, and shadowless lighting when positioned as a roof, that would enable high quality TV broadcasting.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. Watch
  • 23. Watch
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Sigma
  • 31. # 3 lift! The city of Rotterdam is best known by it’s port. Since the site is located at the sea front, the distinct aesthetics of the cranes and harbor machines makes scene as a contextual choice. The cranes are massive and impressive mechanisms, that were designed to last and are able to carry tremendous loads. We came up with an idea to reuse unused cranes from the port (and other ports as well) to support the stadium and it’s roof, instead of investing huge amount of resources and energy to create new construction. Old cranes of various sizes and shapes could be used to support the seating rings, staircases and the roof. There is also the possibility to use them to lift the pitch upwards to the level of the upper ring in smaller matches when not all of the stadium is in use and even further to the top level in case the stadium is used as a concert hall or just to expose the grass to the sun in an optimal way.
  • 32. Crane properties Model `Ship to Shore STS Capacity on 40 – 120 Tons under spreader Outreach 30 – 70+ meters Railspan 15 – 70 meters Backreach 0 – 25 meters Weight of conventional soccer pitch: 11.000 tons, => min. 92 cranes to lift
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. Rotterdam StocExpo-RotterdaDate: 22-MAR-11 to 24-MAR-11 Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The Netherlands Industry & Environment Date: 18-MAY-11 to 19-MAY-11 Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The Netherlands SOLIDS Date: 05-OCT-11 to 06-OCT-11 Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The Netherlands EUROPORT Date: 08-NOV-11 to 11-NOV-11 Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The Netherlands GEVEL Date: 25-JAN-12 to 27-JAN-12 Venue: Rotterdam Ahoy, Rotterdam, Zuid-Holland, The Netherlands
  • 39.
  • 40. Integration? Zeppelin LED