SlideShare ist ein Scribd-Unternehmen logo
1 von 40
Downloaden Sie, um offline zu lesen
Portugal
Process tailoring
the missing evolution link

Henrique Narciso
Robert Gordon University – PHD student
Engenhus – Consultant

2013-10-18
What is tailoring?

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Transforming the standard to specific

From the factory:
- Sizes(S;M;L;XL)
- Colors
- Cut
To the customer:
- Adjusted to meet
his “characteristics”

2
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Dressed for the occasion

3
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Dressed for the occasion

Formal

4
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Dressed for the occasion

When formal limits you

5
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Dressed for the occasion

Agile

6
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Dressed for the occasion
Agile with "cold" environment

7
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Dressed for the occasion

Exploratory

8
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Dressed for the occasion

Test driven development

9
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Dressed for the occasion

Innovation

10
© 2013 CMMI Portugal Conference Series – All Rights reserved.

The Missing link

We find a new process
We try it
Doesn´t work

We find a new process
We try it
Doesn´t work

Humans adapt
Embrace change
Embrace variability

We find a new process
We try it
Doesn´t work
11
Your Process…

© 2013 CMMI Portugal Conference Series – All Rights reserved.

…must be fitted for the occasion.

Tailoring is the activity of fine-tuning a standardized, wellknown, process to resolve the needs of a specific project.

12
© 2013 CMMI Portugal Conference Series – All Rights reserved.

X

Y
Z

Y’

13
Your Process…

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Kick
off

Risk

High risk

Top 10
risks
Risk
Management

Risk
Matrix

Medium Risk

Top 5
risks

Type

Medium

Low Risk

Large

…

…
14
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Your Process…

.

15
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Your Process…

Project type

Duraction /
effort

Process

CMMI
compliance

Large

>6 months

X

Level 3

Medium

3 to 6 months

Y

Level 2

Small

< 3 months

Z

not

Inovation

3 to 6 months

Y’

not

16
Tailoring and CMMI
Level
5

© 2013 CMMI Portugal Conference Series – All Rights reserved.

4

Optimizing
Quantitatively Management

Capability
Causal Analysis and Resolution
Continuous Process Improvement
Organizational Performance Management
Organizational Process Performance
Quantitative Management
Quantitative Project Management

Result
Productivity &
Productivity
Quality
&

Quality

Decision Analysis and Resolution
Integrated Project Management
Organizational Process Definition
Organizational Process Focus
Organizational Training

3

Defined

Process Standardization

Product Integration
Requirements Development
Risk Management
Technical Solution
Validation

2

Managed

Basic Project Management

1
Initial

Heroic Efforts

Verification
Configuration Management
Measurement and Analysis
Process and Product Quality Assurance
Project Monitoring and Control
Project Planning
Requirements Management
Supplier Agreement Management
Design
Develop
Integrate
Test

Risk &
Waste
Risk & waste

17
Organization Set of Standard Processes
OSSP

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Business needs

Policies
Procedures

Corporate Policies
and Procedures

Work
Instructions
Enablers

CMMI Requirements

Tailoring

Project’s Defined
Process

18
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Software and Systems Process Engineering
Meta-model (SPEM)

19
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Software and Systems Process Engineering
Meta-model (SPEM)

20
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Software and Systems Process Engineering
Meta-model (SPEM)

21
© 2013 CMMI Portugal Conference Series – All Rights reserved.

How to Process tailor
Step by step
-

Define Organization Standard set of Processes;
Define tailoring decisions database;
Define project’s characteristics;
Generate Standard Project Defined Process(SPDP;
Fine-tune SPDP’s suggestions
Automate Project Defined Process

22
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Tailoring decisions Database
What do we as an organization agree on:
- What to do or not;
- When and when not to;
- On which project types;
- And, how if applicable it can be fine tuned or not

Thus four dimensions:
What; when; project types; and tayloring

23
Tailoring – The missing link

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Large

Medium

Small

Extra-small

Public
sector

Inovation
Internal
R&D

24
Tailoring decisions Database
Applicable Phases in Software Development
Process

Requirements

Development

Stabilization

Acceptance

Operations and
Maitenance

Deliverable

Task

Audits

PQA engineer

x

x

x

x

x

Task

Baseline Notification

Configuration Manager

x

x

x

x

x

Artifact

Bug

Tester

x

x

x

x

x

Task

Business training

Project Manager

Artifact

Change Request

Project Team Members

x

x

x

x

x

Artifact

Change Set

Product Manager

x

x

Task

CMS setup

Configuration Manager

x

Task

Code reviews

DEV Lead

Artifact

Communication of metrics
report

Project Manager

Task

Comunication Practices

Project Manager

Artifact

Conclusions and
Improvement Actions

Project Manager

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Type

Task
Artifact

Name

Responsible

Conclusions and
Improvement Actions
Project Manager
Communication
Configuration integrity Audit
Configuration Manager
checklist

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

x

Artifact

Configuration Management
Configuration Manager
Plan

x

Artifact

Control of Service result
record

Director

x

Task

Customer Meetings

Project Manager

25
Tailoring decisions Database

New Product

Innovation

Maintenance

Task

Audits

PQA engineer

1

1

1

1

Task

Baseline Notification

Configuration Manager

1

1

1

Artifact

Bug

Tester

1

1

1

1

Task

Business training

Project Manager

1

1

1

1

Artifact

Change Request

Project Team Members

1

1

1

1

Artifact

Change Set

Product Manager

1

1

1

1

Task

CMS setup

Configuration Manager

1

1

1

1

Task

Code reviews

DEV Lead

1

1

1

Artifact

Communication of metrics
report

Project Manager

1

1

1

Task

Comunication Practices

Project Manager

1

1

1

Artifact

Conclusions and
Improvement Actions

Project Manager

Type

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Project Type

Small

Deliverable

Task
Artifact

Name

Responsible

Conclusions and
Improvement Actions
Project Manager
Communication
Configuration integrity Audit
Configuration Manager
checklist

1

1
1

1

1

Artifact

Configuration Management
Configuration Manager
Plan

1

1

1

Artifact

Control of Service result
record

Director

1

1

1

Task

Customer Meetings

Project Manager

1

1

1

26
Tailoring decisions Database

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Task

Baseline Notification

Configuration Manager

1

1

1

Artifact

Bug

Tester

1

1

1

1

Task

Business training

Project Manager

1

1

1

1

y

y

Artifact

Change Request

Project Team Members

1

1

1

1

Artifact

Change Set

Product Manager

1

1

1

1

Task

CMS setup

Configuration Manager

1

1

1

1

Task

Code reviews

DEV Lead

1

1

1

y

Artifact

Communication of metrics
report

Project Manager

1

1

1

Y

Task

Comunication Practices

Project Manager

1

1

1

y

Artifact

Conclusions and
Improvement Actions

Task
Artifact

Project Manager

Conclusions and
Improvement Actions
Project Manager
Communication
Configuration integrity Audit
Configuration Manager
checklist

1
1

Tailoring Activities

Every milestone

Every milestone

as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
email notificando a
afixação of the
measurements results
and analysis results

Start, every other
milestone, end
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
email notificando a
afixação of the
measurements results
and analysis results

as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
progress meeting with
the measurements
results and analysis
results

Minimal

Medium

high

Start, middle, end

as defined in the
as defined in the
process - no tailoring process - no tailoring
applied
applied
as defined in the
as defined in the
process - no tailoring process - no tailoring
applied
applied
On-job

On-job/formal training
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
as defined in the
process - no tailoring
applied
progress meeting with
the measurements May be na email with the measurements results
results and analysis
and analysis results
results
Intense

as defined in the
as defined in the
as defined in the
as defined in the
process - no tailoring process - no tailoring process - no tailoring process - no tailoring
applied
applied
applied
applied
as defined in the
as defined in the
as defined in the
as defined in the
process - no tailoring process - no tailoring process - no tailoring process - no tailoring
applied
applied
applied
applied

1

1

Critical

1

Medium

1

Low

1

Tailoring

1

High

PQA engineer

Maintenance

Audits

Responsible

Innovation

Task

Name

Tailoring

New Product

Type

Project Type

Small

Deliverable

1

Artifact

Configuration Management
Configuration Manager
Plan

1

1

1

Artifact

Control of Service result
record

Director

1

1

1

Task

Customer Meetings

Project Manager

1

1

1

Every milestone

Every milestone

Every milestone

Every milestone

as defined in the
as defined in the
as defined in the
as defined in the
process - no tailoring process - no tailoring process - no tailoring process - no tailoring
applied
applied
applied
applied
as defined in the
as defined in the
as defined in the
as defined in the
process - no tailoring process - no tailoring process - no tailoring process - no tailoring
applied
applied
applied
applied

y

Monthly

Monthly

Monthly

only if SAM applies

Fortnightly

27
Tailoring decisions Database
Project Assessment
Manager
name
Type
Assessment result

Risk
Small Project
Low

Scope

Fixed

Schedule

No pressure

Quality Goals

Low

3

4

5

6

2

3

4

5

6

2

3

4

5

6

2

3

4

5

6

2

3

4

5

6

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

2

3

4

5

6

1

Stakeholder changes

2

1

Organizational Stakeholder consensus

6

1

Resistance to change

5

1

Personell availability

4

1

Team variance

3

1

Business Knowledge

2

1

© 2013 CMMI Portugal Conference Series – All Rights reserved.

1

Project Manager

2

3

4

5

6

1

2

3

4

5

6

Experienced
High
Cohesive team
Total availability
Low
High
Low

Project Sponsor Involvement

High

Leadership

High

Organizational Structure
Product Image
Morale

Fixed
Defined
High

Disturbing events

Few

User tests avaliability

High

Technology complexity

Easy

Technology knowledge

Known

Technology availability
Performance goals

-65

Uncertainty
-40

Available
Realistic

Unknown
9
10
Tight
7 8
9
10
High
7 8
9
10
Un-experienced
7 8
9
10
Low
7 8
9
10
Changing team
7 8
9
10
Partial availability
7 8
9
10
High
7 8
9
10
Low
7 8
9
10
High
7 8
9
10
Low
7 8
9
10
Low
7 8
9
10
Volatile
7 8
9
10
Undefined
7 8
9
10
Low
7 8
9
10
Many
7 8
9
10
Low
7 8
9
10
Complex
7 8
9
10
Unknown
7 8
9
10
Unavailable
7 8
9
10
Unrealistic
7 8
9
10
7

8

Value:

Action:
C/U
S/R
S/R
S/R
C/U
S/R
S/R
S/R
S/R

Medium

C/U
C/U
S/R

Critical

Low

High

Risk

Project
Project
Project
Project

S/R
C/U
S/R
C/U

Uncertainty

C/U
S/R
C/U
S/R
S/R

28
Tailoring decisions Database
Standard Project Defined Process
Project
Project
Project
Project

Manager
name
Type
Assessment result

Risk
Small Project
Low

-65

Uncertainty
-40

Deliverable
Type

Name

Sugestion

Responsible

Task

Audits

PQA engineer

Task

Baseline Notification

Configuration Manager

Artifact

Bug

Tester

Task

Business training

Project Manager

Artifact

Change Request

Project Team Members

Task

CMS setup

Configuration Manager

Task

Code reviews

DEV Lead

Artifact

Communication of metrics report

Project Manager

Task

Comunication Practices

Project Manager

Artifact

Conclusions and Improvement Actions

Project Manager

Task

Conclusions and Improvement Actions
Communication

Project Manager

Removed

Artifact

Configuration integrity Audit checklist

Configuration Manager

Artifact

Configuration Management Plan

Configuration Manager

Artifact

Control of Service result record

Director

Task

Customer Meetings

Project Manager

Decision

Start, middle, end
as defined in the process - no tailoring applied
as defined in the process - no tailoring applied
as defined in the process - no tailoring applied
as defined in the process - no tailoring applied
as defined in the process - no tailoring applied
as defined in the process - no tailoring applied
email notificando a afixação of the measurements results and analysis results
Minimal
Removed

Every milestone
as defined in the process - no tailoring applied
as defined in the process - no tailoring applied
Monthly

Fine
tuning

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Project Assessment

29
Tailoring decisions Database

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Generate Project’s repository
from the Project Defined Process

30
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Automating process activities

Creating workflows of process activities, from the model into
a process automation tool.
Create templates of processes and instantiate them on
project creation.

31
© 2013 CMMI Portugal Conference Series – All Rights reserved.

32
© 2013 CMMI Portugal Conference Series – All Rights reserved.

33
© 2013 CMMI Portugal Conference Series – All Rights reserved.

34
© 2013 CMMI Portugal Conference Series – All Rights reserved.

35
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Tailoring in the projects lifecycle

Idea – gather project characteristics
Go/no go – define tailoring and generate Project work
environment

During project – redefine tailoring decisions if necessary

36
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Tailoring – the cultural aspect

Gathering tailoring decisions is:
- Clarifying the organizations different working modes;
- Rethinking cultural assumptions;
- Talking, teaching, understanding what process
implementation is;

37
© 2013 CMMI Portugal Conference Series – All Rights reserved.

Tailoring – the cultural aspect

Gathering tailoring decisions is:
- Clarifying the organizations different working modes;
- Rethinking cultural assumptions;
- Talking, teaching, understanding what process
implementation is;

38
Process tailoring

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Not the silver bullet

or
The Holly grail

Just a mindset switch that may help solve process
implementation and usage - the missing link (maybe)

39
Tailor your processes

© 2013 CMMI Portugal Conference Series – All Rights reserved.

Obrigado!

Henrique Narciso
Hnarciso@gmail.com
40

Weitere ähnliche Inhalte

Was ist angesagt?

Beyond PMP: Risk Management
Beyond PMP: Risk ManagementBeyond PMP: Risk Management
Beyond PMP: Risk Managementabhinayverma
 
PMBOK® Vs PRINCE2®
PMBOK®  Vs PRINCE2®PMBOK®  Vs PRINCE2®
PMBOK® Vs PRINCE2®Rajiv Sharma
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)Study Stuff
 
RAMS 2013 Tutorial Effective Reliability Traits and Management
RAMS 2013 Tutorial Effective Reliability Traits and ManagementRAMS 2013 Tutorial Effective Reliability Traits and Management
RAMS 2013 Tutorial Effective Reliability Traits and ManagementAccendo Reliability
 
PRINCE2 key terms and free revision notes to pass the certification exam
PRINCE2 key terms and free revision notes to pass the certification examPRINCE2 key terms and free revision notes to pass the certification exam
PRINCE2 key terms and free revision notes to pass the certification examprojectingIT
 
PRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
PRINCE2-ATO-Toolkit-Presentation-Tailoring the FrameworkPRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
PRINCE2-ATO-Toolkit-Presentation-Tailoring the FrameworkDarren Radford
 
Global Competition with Global Competence
Global Competition with Global CompetenceGlobal Competition with Global Competence
Global Competition with Global CompetenceCarlos DaSilva
 
An introduction to prince2
An introduction to prince2An introduction to prince2
An introduction to prince2Business Beam
 
Three Stages Sprint Planning Layout
Three Stages Sprint Planning LayoutThree Stages Sprint Planning Layout
Three Stages Sprint Planning LayoutSlideTeam
 
A real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePMA real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePMTraining Bytesize
 
Quality by Design Course Preview
Quality by Design Course PreviewQuality by Design Course Preview
Quality by Design Course PreviewInvensis Learning
 
Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOKsundong
 
Project Management Templates
Project Management TemplatesProject Management Templates
Project Management Templatesdjwillcox
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlySteven Bonacorsi
 
CIPM certification course
CIPM certification courseCIPM certification course
CIPM certification courseblogpinion
 

Was ist angesagt? (20)

Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 
Beyond PMP: Risk Management
Beyond PMP: Risk ManagementBeyond PMP: Risk Management
Beyond PMP: Risk Management
 
PMBOK® Vs PRINCE2®
PMBOK®  Vs PRINCE2®PMBOK®  Vs PRINCE2®
PMBOK® Vs PRINCE2®
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
RAMS 2013 Tutorial Effective Reliability Traits and Management
RAMS 2013 Tutorial Effective Reliability Traits and ManagementRAMS 2013 Tutorial Effective Reliability Traits and Management
RAMS 2013 Tutorial Effective Reliability Traits and Management
 
PRINCE2 key terms and free revision notes to pass the certification exam
PRINCE2 key terms and free revision notes to pass the certification examPRINCE2 key terms and free revision notes to pass the certification exam
PRINCE2 key terms and free revision notes to pass the certification exam
 
PRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
PRINCE2-ATO-Toolkit-Presentation-Tailoring the FrameworkPRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
PRINCE2-ATO-Toolkit-Presentation-Tailoring the Framework
 
Global Competition with Global Competence
Global Competition with Global CompetenceGlobal Competition with Global Competence
Global Competition with Global Competence
 
[StepTalks2013] - How did we achieve CMMI? - Lara Osório
[StepTalks2013] - How did we achieve CMMI? - Lara Osório[StepTalks2013] - How did we achieve CMMI? - Lara Osório
[StepTalks2013] - How did we achieve CMMI? - Lara Osório
 
An introduction to prince2
An introduction to prince2An introduction to prince2
An introduction to prince2
 
Three Stages Sprint Planning Layout
Three Stages Sprint Planning LayoutThree Stages Sprint Planning Layout
Three Stages Sprint Planning Layout
 
A real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePMA real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePM
 
Types of Cost in Projects
Types of Cost in ProjectsTypes of Cost in Projects
Types of Cost in Projects
 
GAFM Certifications > gafmacademy@gmail.com
GAFM Certifications > gafmacademy@gmail.com GAFM Certifications > gafmacademy@gmail.com
GAFM Certifications > gafmacademy@gmail.com
 
Quality by Design Course Preview
Quality by Design Course PreviewQuality by Design Course Preview
Quality by Design Course Preview
 
Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOK
 
Certified Project Consultant CPC
Certified Project Consultant CPCCertified Project Consultant CPC
Certified Project Consultant CPC
 
Project Management Templates
Project Management TemplatesProject Management Templates
Project Management Templates
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
 
CIPM certification course
CIPM certification courseCIPM certification course
CIPM certification course
 

Andere mochten auch

Integrated Project Management And Solution Delivery Process
Integrated Project Management And Solution Delivery ProcessIntegrated Project Management And Solution Delivery Process
Integrated Project Management And Solution Delivery ProcessAlan McSweeney
 
Anntech new profile modified 28042012
Anntech new profile modified 28042012Anntech new profile modified 28042012
Anntech new profile modified 28042012ashokanp
 
3 soluzioni per restare in forma mantenendo il gusto
3 soluzioni per restare in forma mantenendo il gusto3 soluzioni per restare in forma mantenendo il gusto
3 soluzioni per restare in forma mantenendo il gustoValentina Mortini
 
Justification of technology2
Justification of technology2Justification of technology2
Justification of technology2msvchiang
 
Uas deleda freizia 1306468144_ot a interaktif
Uas deleda freizia 1306468144_ot a interaktifUas deleda freizia 1306468144_ot a interaktif
Uas deleda freizia 1306468144_ot a interaktifDeleda Freizia
 
Don't Climb out of the Window Tonight
Don't Climb out of the Window TonightDon't Climb out of the Window Tonight
Don't Climb out of the Window TonightRāwhiti School
 
Polarisasi ikatan kimia
Polarisasi ikatan kimiaPolarisasi ikatan kimia
Polarisasi ikatan kimiaAyu Soraya
 
Local SEO Services | Los Angeles SEO Company | OutReachLocal
Local SEO Services | Los Angeles SEO Company | OutReachLocalLocal SEO Services | Los Angeles SEO Company | OutReachLocal
Local SEO Services | Los Angeles SEO Company | OutReachLocalschmidthansen
 
Some of the_most_important_pictures_of_the_20th_century
Some of the_most_important_pictures_of_the_20th_centurySome of the_most_important_pictures_of_the_20th_century
Some of the_most_important_pictures_of_the_20th_centuryLiliana Frutos
 
Educacion inclusiva
Educacion inclusivaEducacion inclusiva
Educacion inclusivamiguel araya
 
Surveying the Education Social Media Scene, NWAIS Seattle, 6/17/2014
Surveying the Education Social Media Scene, NWAIS Seattle, 6/17/2014Surveying the Education Social Media Scene, NWAIS Seattle, 6/17/2014
Surveying the Education Social Media Scene, NWAIS Seattle, 6/17/2014burma999
 
61557874 volume-i-ericsson-umts-rf-optimization-12 dec2003
61557874 volume-i-ericsson-umts-rf-optimization-12 dec200361557874 volume-i-ericsson-umts-rf-optimization-12 dec2003
61557874 volume-i-ericsson-umts-rf-optimization-12 dec2003Mohammad Khamiseh
 

Andere mochten auch (20)

Integrated Project Management And Solution Delivery Process
Integrated Project Management And Solution Delivery ProcessIntegrated Project Management And Solution Delivery Process
Integrated Project Management And Solution Delivery Process
 
Researcher ethics thai
Researcher ethics thaiResearcher ethics thai
Researcher ethics thai
 
Anntech new profile modified 28042012
Anntech new profile modified 28042012Anntech new profile modified 28042012
Anntech new profile modified 28042012
 
3 soluzioni per restare in forma mantenendo il gusto
3 soluzioni per restare in forma mantenendo il gusto3 soluzioni per restare in forma mantenendo il gusto
3 soluzioni per restare in forma mantenendo il gusto
 
Justification of technology2
Justification of technology2Justification of technology2
Justification of technology2
 
Uas deleda freizia 1306468144_ot a interaktif
Uas deleda freizia 1306468144_ot a interaktifUas deleda freizia 1306468144_ot a interaktif
Uas deleda freizia 1306468144_ot a interaktif
 
Don't Climb out of the Window Tonight
Don't Climb out of the Window TonightDon't Climb out of the Window Tonight
Don't Climb out of the Window Tonight
 
Polarisasi ikatan kimia
Polarisasi ikatan kimiaPolarisasi ikatan kimia
Polarisasi ikatan kimia
 
ข้อสอบ
ข้อสอบข้อสอบ
ข้อสอบ
 
Local SEO Services | Los Angeles SEO Company | OutReachLocal
Local SEO Services | Los Angeles SEO Company | OutReachLocalLocal SEO Services | Los Angeles SEO Company | OutReachLocal
Local SEO Services | Los Angeles SEO Company | OutReachLocal
 
Medicine Cabinet
Medicine CabinetMedicine Cabinet
Medicine Cabinet
 
測試用簡報
測試用簡報測試用簡報
測試用簡報
 
Torneo fut
Torneo futTorneo fut
Torneo fut
 
Hizb 53
Hizb 53Hizb 53
Hizb 53
 
Lecture3
Lecture3Lecture3
Lecture3
 
Some of the_most_important_pictures_of_the_20th_century
Some of the_most_important_pictures_of_the_20th_centurySome of the_most_important_pictures_of_the_20th_century
Some of the_most_important_pictures_of_the_20th_century
 
Educacion inclusiva
Educacion inclusivaEducacion inclusiva
Educacion inclusiva
 
Getting to know you assignment
Getting to know you assignmentGetting to know you assignment
Getting to know you assignment
 
Surveying the Education Social Media Scene, NWAIS Seattle, 6/17/2014
Surveying the Education Social Media Scene, NWAIS Seattle, 6/17/2014Surveying the Education Social Media Scene, NWAIS Seattle, 6/17/2014
Surveying the Education Social Media Scene, NWAIS Seattle, 6/17/2014
 
61557874 volume-i-ericsson-umts-rf-optimization-12 dec2003
61557874 volume-i-ericsson-umts-rf-optimization-12 dec200361557874 volume-i-ericsson-umts-rf-optimization-12 dec2003
61557874 volume-i-ericsson-umts-rf-optimization-12 dec2003
 

Ähnlich wie III Conferência CMMI Portugal, Presentation 2: Process tailoring the missing evolution link, Henrique Narciso, Robert Gordon University

III Conferência CMMI Portugal, Keynote 1: Agile Methods and Capability Maturi...
III Conferência CMMI Portugal, Keynote 1: Agile Methods and Capability Maturi...III Conferência CMMI Portugal, Keynote 1: Agile Methods and Capability Maturi...
III Conferência CMMI Portugal, Keynote 1: Agile Methods and Capability Maturi...isabelmargarido
 
Six Sigma Final
Six Sigma FinalSix Sigma Final
Six Sigma Finalanubhuti10
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizenGopala P.
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizenpgopala
 
III Conferência CMMI Portugal, Workshop 2: Human Centered Process Improvement...
III Conferência CMMI Portugal, Workshop 2: Human Centered Process Improvement...III Conferência CMMI Portugal, Workshop 2: Human Centered Process Improvement...
III Conferência CMMI Portugal, Workshop 2: Human Centered Process Improvement...isabelmargarido
 
Introduction to Six Sigma
Introduction to Six Sigma Introduction to Six Sigma
Introduction to Six Sigma Vijay Rasam
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2handbook
 
Lean Six Sigma for Jewellery
Lean Six Sigma for JewelleryLean Six Sigma for Jewellery
Lean Six Sigma for JewelleryPrem Anand
 
Product Lifecycle management PowerPoint Presentation Slides
Product Lifecycle management PowerPoint Presentation Slides Product Lifecycle management PowerPoint Presentation Slides
Product Lifecycle management PowerPoint Presentation Slides SlideTeam
 
Six Sigma Yellow Belt Training
Six Sigma Yellow Belt TrainingSix Sigma Yellow Belt Training
Six Sigma Yellow Belt TrainingInvensis Learning
 
VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8Adani University
 
07 efyca- diferencias cmmi dev-svc v1.0
07 efyca- diferencias cmmi dev-svc v1.007 efyca- diferencias cmmi dev-svc v1.0
07 efyca- diferencias cmmi dev-svc v1.0CAELUM-CMMI
 
Basic overview six sigma
Basic overview six sigmaBasic overview six sigma
Basic overview six sigmaKhushmeetKhushi
 
Process Improvement in High Maturity Environments Improving the Efficiency ...
Process Improvement in High Maturity Environments   Improving the Efficiency ...Process Improvement in High Maturity Environments   Improving the Efficiency ...
Process Improvement in High Maturity Environments Improving the Efficiency ...Andre Ferreira
 
SPM Maturity Curve Session
SPM Maturity Curve SessionSPM Maturity Curve Session
SPM Maturity Curve SessionLaura Roach
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptssuser09851b1
 
Lessons learned about multiple model appraisals - How to get costs reduction
Lessons learned about multiple model appraisals - How to get costs reduction Lessons learned about multiple model appraisals - How to get costs reduction
Lessons learned about multiple model appraisals - How to get costs reduction Inigo Garro
 

Ähnlich wie III Conferência CMMI Portugal, Presentation 2: Process tailoring the missing evolution link, Henrique Narciso, Robert Gordon University (20)

III Conferência CMMI Portugal, Keynote 1: Agile Methods and Capability Maturi...
III Conferência CMMI Portugal, Keynote 1: Agile Methods and Capability Maturi...III Conferência CMMI Portugal, Keynote 1: Agile Methods and Capability Maturi...
III Conferência CMMI Portugal, Keynote 1: Agile Methods and Capability Maturi...
 
principle of six sigma
principle of six sigmaprinciple of six sigma
principle of six sigma
 
Six Sigma Final
Six Sigma FinalSix Sigma Final
Six Sigma Final
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
 
III Conferência CMMI Portugal, Workshop 2: Human Centered Process Improvement...
III Conferência CMMI Portugal, Workshop 2: Human Centered Process Improvement...III Conferência CMMI Portugal, Workshop 2: Human Centered Process Improvement...
III Conferência CMMI Portugal, Workshop 2: Human Centered Process Improvement...
 
Introduction to Six Sigma
Introduction to Six Sigma Introduction to Six Sigma
Introduction to Six Sigma
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
6 sigma
6 sigma6 sigma
6 sigma
 
Lean Six Sigma for Jewellery
Lean Six Sigma for JewelleryLean Six Sigma for Jewellery
Lean Six Sigma for Jewellery
 
Product Lifecycle management PowerPoint Presentation Slides
Product Lifecycle management PowerPoint Presentation Slides Product Lifecycle management PowerPoint Presentation Slides
Product Lifecycle management PowerPoint Presentation Slides
 
CMMI Decision Support Systems:focus on Risk & Impediment Management
CMMI Decision Support Systems:focus on Risk & Impediment ManagementCMMI Decision Support Systems:focus on Risk & Impediment Management
CMMI Decision Support Systems:focus on Risk & Impediment Management
 
Six Sigma Yellow Belt Training
Six Sigma Yellow Belt TrainingSix Sigma Yellow Belt Training
Six Sigma Yellow Belt Training
 
VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8VTU Syllabus, MBA TQM, Module 8
VTU Syllabus, MBA TQM, Module 8
 
07 efyca- diferencias cmmi dev-svc v1.0
07 efyca- diferencias cmmi dev-svc v1.007 efyca- diferencias cmmi dev-svc v1.0
07 efyca- diferencias cmmi dev-svc v1.0
 
Basic overview six sigma
Basic overview six sigmaBasic overview six sigma
Basic overview six sigma
 
Process Improvement in High Maturity Environments Improving the Efficiency ...
Process Improvement in High Maturity Environments   Improving the Efficiency ...Process Improvement in High Maturity Environments   Improving the Efficiency ...
Process Improvement in High Maturity Environments Improving the Efficiency ...
 
SPM Maturity Curve Session
SPM Maturity Curve SessionSPM Maturity Curve Session
SPM Maturity Curve Session
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.ppt
 
Lessons learned about multiple model appraisals - How to get costs reduction
Lessons learned about multiple model appraisals - How to get costs reduction Lessons learned about multiple model appraisals - How to get costs reduction
Lessons learned about multiple model appraisals - How to get costs reduction
 

Mehr von isabelmargarido

III Conferência CMMI Portugal, Presentation 5: Problems of CMMI® Implementati...
III Conferência CMMI Portugal, Presentation 5: Problems of CMMI® Implementati...III Conferência CMMI Portugal, Presentation 5: Problems of CMMI® Implementati...
III Conferência CMMI Portugal, Presentation 5: Problems of CMMI® Implementati...isabelmargarido
 
III Conferência CMMI Portugal, Presentation 4: Make the Software Process Visi...
III Conferência CMMI Portugal, Presentation 4: Make the Software Process Visi...III Conferência CMMI Portugal, Presentation 4: Make the Software Process Visi...
III Conferência CMMI Portugal, Presentation 4: Make the Software Process Visi...isabelmargarido
 
III Conferência CMMI Portugal, Keynote 2: CMMI for Services... not only for I...
III Conferência CMMI Portugal, Keynote 2: CMMI for Services... not only for I...III Conferência CMMI Portugal, Keynote 2: CMMI for Services... not only for I...
III Conferência CMMI Portugal, Keynote 2: CMMI for Services... not only for I...isabelmargarido
 
III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...
III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...
III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...isabelmargarido
 
Recommendations to Avoid Problems and Difficulties in Implementing CMMI High ...
Recommendations to Avoid Problems and Difficulties in Implementing CMMI High ...Recommendations to Avoid Problems and Difficulties in Implementing CMMI High ...
Recommendations to Avoid Problems and Difficulties in Implementing CMMI High ...isabelmargarido
 
III Conferência CMMI Portugal, Presentation 1: CMMI implementation using open...
III Conferência CMMI Portugal, Presentation 1: CMMI implementation using open...III Conferência CMMI Portugal, Presentation 1: CMMI implementation using open...
III Conferência CMMI Portugal, Presentation 1: CMMI implementation using open...isabelmargarido
 
III Conferência CMMI Portugal, Discussion Panel: CMMI challenges of V1.3 and ...
III Conferência CMMI Portugal, Discussion Panel: CMMI challenges of V1.3 and ...III Conferência CMMI Portugal, Discussion Panel: CMMI challenges of V1.3 and ...
III Conferência CMMI Portugal, Discussion Panel: CMMI challenges of V1.3 and ...isabelmargarido
 
III Conferência CMMI Portugal, Workshop 1: Introduction to change Management,...
III Conferência CMMI Portugal, Workshop 1: Introduction to change Management,...III Conferência CMMI Portugal, Workshop 1: Introduction to change Management,...
III Conferência CMMI Portugal, Workshop 1: Introduction to change Management,...isabelmargarido
 
Apresentação ordem-dos-engenheiros-v1-0
Apresentação ordem-dos-engenheiros-v1-0Apresentação ordem-dos-engenheiros-v1-0
Apresentação ordem-dos-engenheiros-v1-0isabelmargarido
 
Keynote hanssassenburg-2confcmmiportugal
Keynote hanssassenburg-2confcmmiportugalKeynote hanssassenburg-2confcmmiportugal
Keynote hanssassenburg-2confcmmiportugalisabelmargarido
 
Keynote hanssassenburg-2confcmmiportugal
Keynote hanssassenburg-2confcmmiportugalKeynote hanssassenburg-2confcmmiportugal
Keynote hanssassenburg-2confcmmiportugalisabelmargarido
 
Tutorial joaopascoalfaria-2confcmmiportugal-v1-3-split
Tutorial joaopascoalfaria-2confcmmiportugal-v1-3-splitTutorial joaopascoalfaria-2confcmmiportugal-v1-3-split
Tutorial joaopascoalfaria-2confcmmiportugal-v1-3-splitisabelmargarido
 
6 joseangelo-2confcmmiportugal-v3
6 joseangelo-2confcmmiportugal-v36 joseangelo-2confcmmiportugal-v3
6 joseangelo-2confcmmiportugal-v3isabelmargarido
 
5 pedrohenriques-2confcmmiportugal-v2-3-split
5 pedrohenriques-2confcmmiportugal-v2-3-split5 pedrohenriques-2confcmmiportugal-v2-3-split
5 pedrohenriques-2confcmmiportugal-v2-3-splitisabelmargarido
 
4 isabelmargarido-2confcmmiportugal-v1-0-split
4 isabelmargarido-2confcmmiportugal-v1-0-split4 isabelmargarido-2confcmmiportugal-v1-0-split
4 isabelmargarido-2confcmmiportugal-v1-0-splitisabelmargarido
 
3 henriquenarciso-2confcmmiportugal-v1
3 henriquenarciso-2confcmmiportugal-v13 henriquenarciso-2confcmmiportugal-v1
3 henriquenarciso-2confcmmiportugal-v1isabelmargarido
 
2 nunoseixas-2confcmmiportual
2 nunoseixas-2confcmmiportual2 nunoseixas-2confcmmiportual
2 nunoseixas-2confcmmiportualisabelmargarido
 
1 eduardoespinheira-2confcmmiportugal-v1-1
1 eduardoespinheira-2confcmmiportugal-v1-11 eduardoespinheira-2confcmmiportugal-v1-1
1 eduardoespinheira-2confcmmiportugal-v1-1isabelmargarido
 

Mehr von isabelmargarido (18)

III Conferência CMMI Portugal, Presentation 5: Problems of CMMI® Implementati...
III Conferência CMMI Portugal, Presentation 5: Problems of CMMI® Implementati...III Conferência CMMI Portugal, Presentation 5: Problems of CMMI® Implementati...
III Conferência CMMI Portugal, Presentation 5: Problems of CMMI® Implementati...
 
III Conferência CMMI Portugal, Presentation 4: Make the Software Process Visi...
III Conferência CMMI Portugal, Presentation 4: Make the Software Process Visi...III Conferência CMMI Portugal, Presentation 4: Make the Software Process Visi...
III Conferência CMMI Portugal, Presentation 4: Make the Software Process Visi...
 
III Conferência CMMI Portugal, Keynote 2: CMMI for Services... not only for I...
III Conferência CMMI Portugal, Keynote 2: CMMI for Services... not only for I...III Conferência CMMI Portugal, Keynote 2: CMMI for Services... not only for I...
III Conferência CMMI Portugal, Keynote 2: CMMI for Services... not only for I...
 
III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...
III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...
III Conferência CMMI Portugal, Presentation 3: Lessons learned about multiple...
 
Recommendations to Avoid Problems and Difficulties in Implementing CMMI High ...
Recommendations to Avoid Problems and Difficulties in Implementing CMMI High ...Recommendations to Avoid Problems and Difficulties in Implementing CMMI High ...
Recommendations to Avoid Problems and Difficulties in Implementing CMMI High ...
 
III Conferência CMMI Portugal, Presentation 1: CMMI implementation using open...
III Conferência CMMI Portugal, Presentation 1: CMMI implementation using open...III Conferência CMMI Portugal, Presentation 1: CMMI implementation using open...
III Conferência CMMI Portugal, Presentation 1: CMMI implementation using open...
 
III Conferência CMMI Portugal, Discussion Panel: CMMI challenges of V1.3 and ...
III Conferência CMMI Portugal, Discussion Panel: CMMI challenges of V1.3 and ...III Conferência CMMI Portugal, Discussion Panel: CMMI challenges of V1.3 and ...
III Conferência CMMI Portugal, Discussion Panel: CMMI challenges of V1.3 and ...
 
III Conferência CMMI Portugal, Workshop 1: Introduction to change Management,...
III Conferência CMMI Portugal, Workshop 1: Introduction to change Management,...III Conferência CMMI Portugal, Workshop 1: Introduction to change Management,...
III Conferência CMMI Portugal, Workshop 1: Introduction to change Management,...
 
Apresentação ordem-dos-engenheiros-v1-0
Apresentação ordem-dos-engenheiros-v1-0Apresentação ordem-dos-engenheiros-v1-0
Apresentação ordem-dos-engenheiros-v1-0
 
Keynote hanssassenburg-2confcmmiportugal
Keynote hanssassenburg-2confcmmiportugalKeynote hanssassenburg-2confcmmiportugal
Keynote hanssassenburg-2confcmmiportugal
 
Keynote hanssassenburg-2confcmmiportugal
Keynote hanssassenburg-2confcmmiportugalKeynote hanssassenburg-2confcmmiportugal
Keynote hanssassenburg-2confcmmiportugal
 
Tutorial joaopascoalfaria-2confcmmiportugal-v1-3-split
Tutorial joaopascoalfaria-2confcmmiportugal-v1-3-splitTutorial joaopascoalfaria-2confcmmiportugal-v1-3-split
Tutorial joaopascoalfaria-2confcmmiportugal-v1-3-split
 
6 joseangelo-2confcmmiportugal-v3
6 joseangelo-2confcmmiportugal-v36 joseangelo-2confcmmiportugal-v3
6 joseangelo-2confcmmiportugal-v3
 
5 pedrohenriques-2confcmmiportugal-v2-3-split
5 pedrohenriques-2confcmmiportugal-v2-3-split5 pedrohenriques-2confcmmiportugal-v2-3-split
5 pedrohenriques-2confcmmiportugal-v2-3-split
 
4 isabelmargarido-2confcmmiportugal-v1-0-split
4 isabelmargarido-2confcmmiportugal-v1-0-split4 isabelmargarido-2confcmmiportugal-v1-0-split
4 isabelmargarido-2confcmmiportugal-v1-0-split
 
3 henriquenarciso-2confcmmiportugal-v1
3 henriquenarciso-2confcmmiportugal-v13 henriquenarciso-2confcmmiportugal-v1
3 henriquenarciso-2confcmmiportugal-v1
 
2 nunoseixas-2confcmmiportual
2 nunoseixas-2confcmmiportual2 nunoseixas-2confcmmiportual
2 nunoseixas-2confcmmiportual
 
1 eduardoespinheira-2confcmmiportugal-v1-1
1 eduardoespinheira-2confcmmiportugal-v1-11 eduardoespinheira-2confcmmiportugal-v1-1
1 eduardoespinheira-2confcmmiportugal-v1-1
 

Kürzlich hochgeladen

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 

Kürzlich hochgeladen (20)

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 

III Conferência CMMI Portugal, Presentation 2: Process tailoring the missing evolution link, Henrique Narciso, Robert Gordon University

  • 1. Portugal Process tailoring the missing evolution link Henrique Narciso Robert Gordon University – PHD student Engenhus – Consultant 2013-10-18
  • 2. What is tailoring? © 2013 CMMI Portugal Conference Series – All Rights reserved. Transforming the standard to specific From the factory: - Sizes(S;M;L;XL) - Colors - Cut To the customer: - Adjusted to meet his “characteristics” 2
  • 3. © 2013 CMMI Portugal Conference Series – All Rights reserved. Dressed for the occasion 3
  • 4. © 2013 CMMI Portugal Conference Series – All Rights reserved. Dressed for the occasion Formal 4
  • 5. © 2013 CMMI Portugal Conference Series – All Rights reserved. Dressed for the occasion When formal limits you 5
  • 6. © 2013 CMMI Portugal Conference Series – All Rights reserved. Dressed for the occasion Agile 6
  • 7. © 2013 CMMI Portugal Conference Series – All Rights reserved. Dressed for the occasion Agile with "cold" environment 7
  • 8. © 2013 CMMI Portugal Conference Series – All Rights reserved. Dressed for the occasion Exploratory 8
  • 9. © 2013 CMMI Portugal Conference Series – All Rights reserved. Dressed for the occasion Test driven development 9
  • 10. © 2013 CMMI Portugal Conference Series – All Rights reserved. Dressed for the occasion Innovation 10
  • 11. © 2013 CMMI Portugal Conference Series – All Rights reserved. The Missing link We find a new process We try it Doesn´t work We find a new process We try it Doesn´t work Humans adapt Embrace change Embrace variability We find a new process We try it Doesn´t work 11
  • 12. Your Process… © 2013 CMMI Portugal Conference Series – All Rights reserved. …must be fitted for the occasion. Tailoring is the activity of fine-tuning a standardized, wellknown, process to resolve the needs of a specific project. 12
  • 13. © 2013 CMMI Portugal Conference Series – All Rights reserved. X Y Z Y’ 13
  • 14. Your Process… © 2013 CMMI Portugal Conference Series – All Rights reserved. Kick off Risk High risk Top 10 risks Risk Management Risk Matrix Medium Risk Top 5 risks Type Medium Low Risk Large … … 14
  • 15. © 2013 CMMI Portugal Conference Series – All Rights reserved. Your Process… . 15
  • 16. © 2013 CMMI Portugal Conference Series – All Rights reserved. Your Process… Project type Duraction / effort Process CMMI compliance Large >6 months X Level 3 Medium 3 to 6 months Y Level 2 Small < 3 months Z not Inovation 3 to 6 months Y’ not 16
  • 17. Tailoring and CMMI Level 5 © 2013 CMMI Portugal Conference Series – All Rights reserved. 4 Optimizing Quantitatively Management Capability Causal Analysis and Resolution Continuous Process Improvement Organizational Performance Management Organizational Process Performance Quantitative Management Quantitative Project Management Result Productivity & Productivity Quality & Quality Decision Analysis and Resolution Integrated Project Management Organizational Process Definition Organizational Process Focus Organizational Training 3 Defined Process Standardization Product Integration Requirements Development Risk Management Technical Solution Validation 2 Managed Basic Project Management 1 Initial Heroic Efforts Verification Configuration Management Measurement and Analysis Process and Product Quality Assurance Project Monitoring and Control Project Planning Requirements Management Supplier Agreement Management Design Develop Integrate Test Risk & Waste Risk & waste 17
  • 18. Organization Set of Standard Processes OSSP © 2013 CMMI Portugal Conference Series – All Rights reserved. Business needs Policies Procedures Corporate Policies and Procedures Work Instructions Enablers CMMI Requirements Tailoring Project’s Defined Process 18
  • 19. © 2013 CMMI Portugal Conference Series – All Rights reserved. Software and Systems Process Engineering Meta-model (SPEM) 19
  • 20. © 2013 CMMI Portugal Conference Series – All Rights reserved. Software and Systems Process Engineering Meta-model (SPEM) 20
  • 21. © 2013 CMMI Portugal Conference Series – All Rights reserved. Software and Systems Process Engineering Meta-model (SPEM) 21
  • 22. © 2013 CMMI Portugal Conference Series – All Rights reserved. How to Process tailor Step by step - Define Organization Standard set of Processes; Define tailoring decisions database; Define project’s characteristics; Generate Standard Project Defined Process(SPDP; Fine-tune SPDP’s suggestions Automate Project Defined Process 22
  • 23. © 2013 CMMI Portugal Conference Series – All Rights reserved. Tailoring decisions Database What do we as an organization agree on: - What to do or not; - When and when not to; - On which project types; - And, how if applicable it can be fine tuned or not Thus four dimensions: What; when; project types; and tayloring 23
  • 24. Tailoring – The missing link © 2013 CMMI Portugal Conference Series – All Rights reserved. Large Medium Small Extra-small Public sector Inovation Internal R&D 24
  • 25. Tailoring decisions Database Applicable Phases in Software Development Process Requirements Development Stabilization Acceptance Operations and Maitenance Deliverable Task Audits PQA engineer x x x x x Task Baseline Notification Configuration Manager x x x x x Artifact Bug Tester x x x x x Task Business training Project Manager Artifact Change Request Project Team Members x x x x x Artifact Change Set Product Manager x x Task CMS setup Configuration Manager x Task Code reviews DEV Lead Artifact Communication of metrics report Project Manager Task Comunication Practices Project Manager Artifact Conclusions and Improvement Actions Project Manager © 2013 CMMI Portugal Conference Series – All Rights reserved. Type Task Artifact Name Responsible Conclusions and Improvement Actions Project Manager Communication Configuration integrity Audit Configuration Manager checklist x x x x x x x x x x x x x x x x x x x x x x x x Artifact Configuration Management Configuration Manager Plan x Artifact Control of Service result record Director x Task Customer Meetings Project Manager 25
  • 26. Tailoring decisions Database New Product Innovation Maintenance Task Audits PQA engineer 1 1 1 1 Task Baseline Notification Configuration Manager 1 1 1 Artifact Bug Tester 1 1 1 1 Task Business training Project Manager 1 1 1 1 Artifact Change Request Project Team Members 1 1 1 1 Artifact Change Set Product Manager 1 1 1 1 Task CMS setup Configuration Manager 1 1 1 1 Task Code reviews DEV Lead 1 1 1 Artifact Communication of metrics report Project Manager 1 1 1 Task Comunication Practices Project Manager 1 1 1 Artifact Conclusions and Improvement Actions Project Manager Type © 2013 CMMI Portugal Conference Series – All Rights reserved. Project Type Small Deliverable Task Artifact Name Responsible Conclusions and Improvement Actions Project Manager Communication Configuration integrity Audit Configuration Manager checklist 1 1 1 1 1 Artifact Configuration Management Configuration Manager Plan 1 1 1 Artifact Control of Service result record Director 1 1 1 Task Customer Meetings Project Manager 1 1 1 26
  • 27. Tailoring decisions Database © 2013 CMMI Portugal Conference Series – All Rights reserved. Task Baseline Notification Configuration Manager 1 1 1 Artifact Bug Tester 1 1 1 1 Task Business training Project Manager 1 1 1 1 y y Artifact Change Request Project Team Members 1 1 1 1 Artifact Change Set Product Manager 1 1 1 1 Task CMS setup Configuration Manager 1 1 1 1 Task Code reviews DEV Lead 1 1 1 y Artifact Communication of metrics report Project Manager 1 1 1 Y Task Comunication Practices Project Manager 1 1 1 y Artifact Conclusions and Improvement Actions Task Artifact Project Manager Conclusions and Improvement Actions Project Manager Communication Configuration integrity Audit Configuration Manager checklist 1 1 Tailoring Activities Every milestone Every milestone as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied email notificando a afixação of the measurements results and analysis results Start, every other milestone, end as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied email notificando a afixação of the measurements results and analysis results as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied progress meeting with the measurements results and analysis results Minimal Medium high Start, middle, end as defined in the as defined in the process - no tailoring process - no tailoring applied applied as defined in the as defined in the process - no tailoring process - no tailoring applied applied On-job On-job/formal training as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied progress meeting with the measurements May be na email with the measurements results results and analysis and analysis results results Intense as defined in the as defined in the as defined in the as defined in the process - no tailoring process - no tailoring process - no tailoring process - no tailoring applied applied applied applied as defined in the as defined in the as defined in the as defined in the process - no tailoring process - no tailoring process - no tailoring process - no tailoring applied applied applied applied 1 1 Critical 1 Medium 1 Low 1 Tailoring 1 High PQA engineer Maintenance Audits Responsible Innovation Task Name Tailoring New Product Type Project Type Small Deliverable 1 Artifact Configuration Management Configuration Manager Plan 1 1 1 Artifact Control of Service result record Director 1 1 1 Task Customer Meetings Project Manager 1 1 1 Every milestone Every milestone Every milestone Every milestone as defined in the as defined in the as defined in the as defined in the process - no tailoring process - no tailoring process - no tailoring process - no tailoring applied applied applied applied as defined in the as defined in the as defined in the as defined in the process - no tailoring process - no tailoring process - no tailoring process - no tailoring applied applied applied applied y Monthly Monthly Monthly only if SAM applies Fortnightly 27
  • 28. Tailoring decisions Database Project Assessment Manager name Type Assessment result Risk Small Project Low Scope Fixed Schedule No pressure Quality Goals Low 3 4 5 6 2 3 4 5 6 2 3 4 5 6 2 3 4 5 6 2 3 4 5 6 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 Stakeholder changes 2 1 Organizational Stakeholder consensus 6 1 Resistance to change 5 1 Personell availability 4 1 Team variance 3 1 Business Knowledge 2 1 © 2013 CMMI Portugal Conference Series – All Rights reserved. 1 Project Manager 2 3 4 5 6 1 2 3 4 5 6 Experienced High Cohesive team Total availability Low High Low Project Sponsor Involvement High Leadership High Organizational Structure Product Image Morale Fixed Defined High Disturbing events Few User tests avaliability High Technology complexity Easy Technology knowledge Known Technology availability Performance goals -65 Uncertainty -40 Available Realistic Unknown 9 10 Tight 7 8 9 10 High 7 8 9 10 Un-experienced 7 8 9 10 Low 7 8 9 10 Changing team 7 8 9 10 Partial availability 7 8 9 10 High 7 8 9 10 Low 7 8 9 10 High 7 8 9 10 Low 7 8 9 10 Low 7 8 9 10 Volatile 7 8 9 10 Undefined 7 8 9 10 Low 7 8 9 10 Many 7 8 9 10 Low 7 8 9 10 Complex 7 8 9 10 Unknown 7 8 9 10 Unavailable 7 8 9 10 Unrealistic 7 8 9 10 7 8 Value: Action: C/U S/R S/R S/R C/U S/R S/R S/R S/R Medium C/U C/U S/R Critical Low High Risk Project Project Project Project S/R C/U S/R C/U Uncertainty C/U S/R C/U S/R S/R 28
  • 29. Tailoring decisions Database Standard Project Defined Process Project Project Project Project Manager name Type Assessment result Risk Small Project Low -65 Uncertainty -40 Deliverable Type Name Sugestion Responsible Task Audits PQA engineer Task Baseline Notification Configuration Manager Artifact Bug Tester Task Business training Project Manager Artifact Change Request Project Team Members Task CMS setup Configuration Manager Task Code reviews DEV Lead Artifact Communication of metrics report Project Manager Task Comunication Practices Project Manager Artifact Conclusions and Improvement Actions Project Manager Task Conclusions and Improvement Actions Communication Project Manager Removed Artifact Configuration integrity Audit checklist Configuration Manager Artifact Configuration Management Plan Configuration Manager Artifact Control of Service result record Director Task Customer Meetings Project Manager Decision Start, middle, end as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied as defined in the process - no tailoring applied email notificando a afixação of the measurements results and analysis results Minimal Removed Every milestone as defined in the process - no tailoring applied as defined in the process - no tailoring applied Monthly Fine tuning © 2013 CMMI Portugal Conference Series – All Rights reserved. Project Assessment 29
  • 30. Tailoring decisions Database © 2013 CMMI Portugal Conference Series – All Rights reserved. Generate Project’s repository from the Project Defined Process 30
  • 31. © 2013 CMMI Portugal Conference Series – All Rights reserved. Automating process activities Creating workflows of process activities, from the model into a process automation tool. Create templates of processes and instantiate them on project creation. 31
  • 32. © 2013 CMMI Portugal Conference Series – All Rights reserved. 32
  • 33. © 2013 CMMI Portugal Conference Series – All Rights reserved. 33
  • 34. © 2013 CMMI Portugal Conference Series – All Rights reserved. 34
  • 35. © 2013 CMMI Portugal Conference Series – All Rights reserved. 35
  • 36. © 2013 CMMI Portugal Conference Series – All Rights reserved. Tailoring in the projects lifecycle Idea – gather project characteristics Go/no go – define tailoring and generate Project work environment During project – redefine tailoring decisions if necessary 36
  • 37. © 2013 CMMI Portugal Conference Series – All Rights reserved. Tailoring – the cultural aspect Gathering tailoring decisions is: - Clarifying the organizations different working modes; - Rethinking cultural assumptions; - Talking, teaching, understanding what process implementation is; 37
  • 38. © 2013 CMMI Portugal Conference Series – All Rights reserved. Tailoring – the cultural aspect Gathering tailoring decisions is: - Clarifying the organizations different working modes; - Rethinking cultural assumptions; - Talking, teaching, understanding what process implementation is; 38
  • 39. Process tailoring © 2013 CMMI Portugal Conference Series – All Rights reserved. Not the silver bullet or The Holly grail Just a mindset switch that may help solve process implementation and usage - the missing link (maybe) 39
  • 40. Tailor your processes © 2013 CMMI Portugal Conference Series – All Rights reserved. Obrigado! Henrique Narciso Hnarciso@gmail.com 40