Sustainable
Development
Polymer Processing ‐ Cost 
Savings Potential in the 
Process
Ciaran O'Reilly
Chartered Engineer
Process
Chartered Engineer
Technical Adviser
Sustainable DevelopmentSustainable Development
M i i iMaximising
Efficiencies
5 Programmers
Efficiencies
(1) Resource Efficiency Audit
(2) P j t M t F k(2) Project Management Framework
(3) Energy Efficiency Loan Scheme
(4) Capital Grants for SME’s of up to £40 000(4) Capital Grants for SME s of up to £40,000
(5) Industrial Symbiosis
Sustainable Development
M i i iMaximising
Efficiencies
Progress
Last 3 YearsEfficiencies Last 3 Years
850 Audits Completed
£60,000,000
of Identified Savings
Sustainable Development
CostCost
Savings Hidden Potentialdde o e a
Polymer Processing ‐ Cost Savings Potential in the Process
Areas of High Process Energy ConsumptionAreas of High Process Energy Consumption.
Actions that can be taken to reduce Consumption.
S t i bl D l t
Indicative Potential Investment Costs and Cost Savings
Sustainable Development
EnergyEnergy
Process Energy v Carbon
Manufacturing Factory Polymer Processing
80%
100%
120%
80%
100%
120%
Polymer Processing
40%
60% Heating
Electric
40%
60%
80%
Heating
Electric
S t i bl D l t
0%
20%
Carbon Energy
0%
20%
Carbon Energy
Sustainable Development
CostCost
Savings Energy used in an 
t d b iextruder business
66% Processing
Manufacturing business 16% Processing 
equipment
10%
5%
5% 2%1%
66%  Processing 
equipment
11%  Chillers
10%  Compressed Air
16%
5%
10%
5%  Chillers
10%  Compressed 
Air
66%
11%
5%  Water Pumps
5%   Lighting
2%  Factory & office 
5%
10%
5%
34%
5%  Water Pumps
20%   Lighting
S t i bl D l t
y
heating 
1%  Offices20% 34%  Factory & 
office heating 
10%  Offices
Sustainable Development
CostCost
Savings
Extrusion Blow MouldingInjection Stretch Moulding
45%
16%
8%
45%  Extruder
31%  Hydrulics
3% 3%
94%  Infra Red Lamps
31%
16%  Heat
3%  Ventilation
3%  Motion
S t i bl D l t
8%  Granulator
94%
Sustainable Development
CostCost
Savings
Process 325 KW
1 000 kg/h
Specific energy to raise the temperature of the plastic is typically
0 16 kWh/k f i t lli l ti (lik PE PP)
1,000 kg/h
• 0.16 kWh/kg for semi-crystalline plastics (like PE or PP)
• 0.10 kWh/kg for amorphous plastics (e.g., PVC, PS).
The actual specific energy consumption will be higher because of losses in the motor, gearbox,
thrust bearings cooling the feed housing and extruder barrelthrust bearings, cooling the feed housing and extruder barrel,
• 0.20 to 0.25 kWh/kg semi-crystalline plastics
• 0.15 to 0.20 kWh/kg for amorphous plastics
d i i t t li d i l ti t t k
S t i bl D l t
• a dryer, resin conveying system, water cooling and circulation system, take-up
0.20 to 0.25 kWh/kg
Sustainable Development
Energy 55 KW / HEnergy
Savings
55 KW / Hour
£7.70 / Hour
Process power
Extruder 125kw
/
Extruder 125kw
Heat per hour 160kw
Cooling 40kw
Total 325kwTotal 325kw
Heat recovery 25% 40kw
Product stored at 30C 16kw
S t i bl D l t
Product stored at 30C 16kw
Energy Savings 56kw
17%
Sustainable Development
What
No 1
Energy Efficiency
What
Works
Energy Efficiency
Plant Replacement
Insulation
Induction HeatingInduction Heating
Heat Recovery
M&TM&T
FinanceFinance
Available
No and Low
InterestInterest
Interest free Loans Invest-NI
Growth Loan Fund Invest-NI
E h d C i l AllEnhanced Capital Allowance
ROC’s & RHI for Renewables
Regulator Grants through the Utility providersRegulator Grants through the Utility providers
S t i bl D l tSustainable Development
Top 10 Investments
All SPB
Less 24 months
Sustainable Development
RenewablesRenewables
Economics Appraisal:
PV Array 50kWCAPITAL COST      £65,000
PV Array 50kW
SPB 2 years
Supply and install 50kWp system 
EXISTING ELECTRICITY COSTS
Existing electricity consumption  1,387,040kWh
Existing electricity consumption cost £194 186Existing electricity consumption cost £194,186
TOTAL COST SAVINGS
Estimated annual output of PV system  41,080kWh
INCOME
Electricty generated and used on site 90% 36,972kWh
(36,972 kWh X £0.14/p/kWh) £5,176
ROC's payment (41,080 kWh X £0.1696) £6,984
E t U it 10% (4 108 kWh X £0 0559) £246Export Units 10% (4,108 kWh X £0.0559) £246
TOTAL SAVINGS £12,406
Simple pay back 5.24 Years
Enhanced Capital Allowance £30,000
Sustainable DevelopmentIntrest Free Loan Invest‐NI (by CT) £13,063
CAPITAL OUTLAY    SPB 2 Years £21,937
SustainableSustainable
Development
What Are We Doing
Next For YouNext For You
Implementation Audits
Polymer Sector Studyy y
Special Energy Task Group
ISO 50001 W k hISO 50001 Workshops
Sustainable Development
Sustainable MaximisingSustainable
Development
Maximising
Efficiencies
Next Events
Invest-NI Sustainex 9th &10th April La Mon Hotel
Bombardier June Joint Seminar
ISO 50001 Workshops
Sustainable Development

Weitere ähnliche Inhalte

Was ist angesagt?

Goldratt TOC Mining Brief (July 2016) V1
Goldratt TOC Mining Brief (July 2016) V1Goldratt TOC Mining Brief (July 2016) V1
Goldratt TOC Mining Brief (July 2016) V1
Nicholas Renecle
 
Projects - Lead operations process engineer
Projects - Lead operations process engineerProjects - Lead operations process engineer
Projects - Lead operations process engineer
Chris Owen
 
CleanO2_Linked In_Jan 2017
CleanO2_Linked In_Jan 2017CleanO2_Linked In_Jan 2017
CleanO2_Linked In_Jan 2017
Jeff Reading
 

Was ist angesagt? (20)

The Role of Carbon Removals-Brussels
The Role of Carbon Removals-Brussels The Role of Carbon Removals-Brussels
The Role of Carbon Removals-Brussels
 
Experience from Energy Management Systems Implementation
Experience from Energy Management Systems ImplementationExperience from Energy Management Systems Implementation
Experience from Energy Management Systems Implementation
 
Environmental impacts of RTB processing and life cycle assessment
Environmental impacts of RTB processing and life cycle assessmentEnvironmental impacts of RTB processing and life cycle assessment
Environmental impacts of RTB processing and life cycle assessment
 
Presentation
PresentationPresentation
Presentation
 
KEYNOTE: "REFRIGERATION MATTERS"
KEYNOTE: "REFRIGERATION MATTERS"KEYNOTE: "REFRIGERATION MATTERS"
KEYNOTE: "REFRIGERATION MATTERS"
 
Latest NatRefs projects in SEA & overview of the global market and technology...
Latest NatRefs projects in SEA & overview of the global market and technology...Latest NatRefs projects in SEA & overview of the global market and technology...
Latest NatRefs projects in SEA & overview of the global market and technology...
 
ESOS: The Launch Pad to a Bigger Bank Balance
ESOS: The Launch Pad to a Bigger Bank BalanceESOS: The Launch Pad to a Bigger Bank Balance
ESOS: The Launch Pad to a Bigger Bank Balance
 
Goldratt TOC Mining Brief (July 2016) V1
Goldratt TOC Mining Brief (July 2016) V1Goldratt TOC Mining Brief (July 2016) V1
Goldratt TOC Mining Brief (July 2016) V1
 
C0 1 ricardo_regulation
C0 1 ricardo_regulationC0 1 ricardo_regulation
C0 1 ricardo_regulation
 
EIT Climate KIC Sustainable Production Systems
EIT Climate KIC Sustainable Production SystemsEIT Climate KIC Sustainable Production Systems
EIT Climate KIC Sustainable Production Systems
 
(XIMB) Sustainability - Castings& Forgings Industry
(XIMB) Sustainability - Castings& Forgings Industry(XIMB) Sustainability - Castings& Forgings Industry
(XIMB) Sustainability - Castings& Forgings Industry
 
21-Boris-van-Thiel
21-Boris-van-Thiel21-Boris-van-Thiel
21-Boris-van-Thiel
 
Rittal – Cementing Energy Saving Solutions to Wonder Cement
Rittal – Cementing Energy Saving Solutions to Wonder CementRittal – Cementing Energy Saving Solutions to Wonder Cement
Rittal – Cementing Energy Saving Solutions to Wonder Cement
 
Clean Burning Stoves- ProWorld Service Corps, Perú
Clean Burning Stoves- ProWorld Service Corps, PerúClean Burning Stoves- ProWorld Service Corps, Perú
Clean Burning Stoves- ProWorld Service Corps, Perú
 
Global Thermostat: A Profitable Solution to Climate Change
Global Thermostat: A Profitable Solution to Climate ChangeGlobal Thermostat: A Profitable Solution to Climate Change
Global Thermostat: A Profitable Solution to Climate Change
 
Projects - Lead operations process engineer
Projects - Lead operations process engineerProjects - Lead operations process engineer
Projects - Lead operations process engineer
 
Business Energy Efficiency Tax Review One Year On
Business Energy Efficiency Tax Review One Year OnBusiness Energy Efficiency Tax Review One Year On
Business Energy Efficiency Tax Review One Year On
 
CleanO2_Linked In_Jan 2017
CleanO2_Linked In_Jan 2017CleanO2_Linked In_Jan 2017
CleanO2_Linked In_Jan 2017
 
Case Studies: Reduce Energy Consumption of your Buildings’ HVAC
Case Studies: Reduce Energy Consumption of your Buildings’ HVACCase Studies: Reduce Energy Consumption of your Buildings’ HVAC
Case Studies: Reduce Energy Consumption of your Buildings’ HVAC
 
Day Two - UK AD & Biogas Tradeshow 2016 : R&I Hub
Day Two - UK AD & Biogas Tradeshow 2016 : R&I HubDay Two - UK AD & Biogas Tradeshow 2016 : R&I Hub
Day Two - UK AD & Biogas Tradeshow 2016 : R&I Hub
 

Ähnlich wie Polymer Processing Cost Saving Workshop - 03 Sustainable Development

Industri Minyak di Masa Depan
Industri Minyak di Masa DepanIndustri Minyak di Masa Depan
Industri Minyak di Masa Depan
Yanu Priandana
 
OPTIMIZING BATTERY END-OF-LIFE BY STATIONARY APPLICATIONS AND RECYCLING
OPTIMIZING BATTERY END-OF-LIFE BY STATIONARY APPLICATIONS AND RECYCLINGOPTIMIZING BATTERY END-OF-LIFE BY STATIONARY APPLICATIONS AND RECYCLING
OPTIMIZING BATTERY END-OF-LIFE BY STATIONARY APPLICATIONS AND RECYCLING
iQHub
 
Mike Pitts EDN mar 2010
Mike Pitts EDN mar 2010Mike Pitts EDN mar 2010
Mike Pitts EDN mar 2010
Info EDCW
 

Ähnlich wie Polymer Processing Cost Saving Workshop - 03 Sustainable Development (20)

Launch slides part 2
Launch slides part 2Launch slides part 2
Launch slides part 2
 
Climate Change - Role of Industry - Mr. Rambabu
Climate Change - Role of Industry - Mr. RambabuClimate Change - Role of Industry - Mr. Rambabu
Climate Change - Role of Industry - Mr. Rambabu
 
Biomass power plant
Biomass power plant Biomass power plant
Biomass power plant
 
SIKCO Engineering Services Pvt. Ltd, Navi Mumbai, Electric Products
SIKCO Engineering Services Pvt. Ltd, Navi Mumbai, Electric Products 	SIKCO Engineering Services Pvt. Ltd, Navi Mumbai, Electric Products
SIKCO Engineering Services Pvt. Ltd, Navi Mumbai, Electric Products
 
Industri Minyak di Masa Depan
Industri Minyak di Masa DepanIndustri Minyak di Masa Depan
Industri Minyak di Masa Depan
 
Waitrose Innovation Forum Presentation
Waitrose Innovation Forum PresentationWaitrose Innovation Forum Presentation
Waitrose Innovation Forum Presentation
 
linked in isa
linked in isalinked in isa
linked in isa
 
Enhancing Refinery Profitability
Enhancing Refinery ProfitabilityEnhancing Refinery Profitability
Enhancing Refinery Profitability
 
ITM Power: Interim Results Jan 2012
ITM Power: Interim Results Jan 2012ITM Power: Interim Results Jan 2012
ITM Power: Interim Results Jan 2012
 
OPTIMIZING BATTERY END-OF-LIFE BY STATIONARY APPLICATIONS AND RECYCLING
OPTIMIZING BATTERY END-OF-LIFE BY STATIONARY APPLICATIONS AND RECYCLINGOPTIMIZING BATTERY END-OF-LIFE BY STATIONARY APPLICATIONS AND RECYCLING
OPTIMIZING BATTERY END-OF-LIFE BY STATIONARY APPLICATIONS AND RECYCLING
 
Power Conservation Technology Integration Webinar
Power Conservation Technology Integration WebinarPower Conservation Technology Integration Webinar
Power Conservation Technology Integration Webinar
 
(Ximb) sustainability electrical equipment industry
(Ximb) sustainability electrical equipment industry(Ximb) sustainability electrical equipment industry
(Ximb) sustainability electrical equipment industry
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
ARC's Greg Gorbach Sustainable Manufacturing Presentation @ ARC Industry Foru...
ARC's Greg Gorbach Sustainable Manufacturing Presentation @ ARC Industry Foru...ARC's Greg Gorbach Sustainable Manufacturing Presentation @ ARC Industry Foru...
ARC's Greg Gorbach Sustainable Manufacturing Presentation @ ARC Industry Foru...
 
Reconciling Mass And Energy Balances In An Ethylene Complex
Reconciling Mass And Energy Balances In An Ethylene ComplexReconciling Mass And Energy Balances In An Ethylene Complex
Reconciling Mass And Energy Balances In An Ethylene Complex
 
Mike Pitts EDN mar 2010
Mike Pitts EDN mar 2010Mike Pitts EDN mar 2010
Mike Pitts EDN mar 2010
 
Understanding offsets overview 2009
Understanding offsets   overview 2009Understanding offsets   overview 2009
Understanding offsets overview 2009
 
ASFA 2007 Web
ASFA 2007 WebASFA 2007 Web
ASFA 2007 Web
 
Climate change: our chance to give rise to the next industrial revolution — F...
Climate change: our chance to give rise to the next industrial revolution — F...Climate change: our chance to give rise to the next industrial revolution — F...
Climate change: our chance to give rise to the next industrial revolution — F...
 

Mehr von Invest Northern Ireland

Mehr von Invest Northern Ireland (20)

Grant writing masterclass 16 August 2019
Grant writing masterclass 16 August 2019Grant writing masterclass 16 August 2019
Grant writing masterclass 16 August 2019
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Horizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & ManufacturingHorizon 2020 ICT and Advanced Materials & Manufacturing
Horizon 2020 ICT and Advanced Materials & Manufacturing
 
Funding for Innovation in ICT 21 May 2019
Funding for Innovation in ICT 21 May 2019Funding for Innovation in ICT 21 May 2019
Funding for Innovation in ICT 21 May 2019
 
Innovate UK funding application answer guide slides
Innovate UK funding application answer guide slidesInnovate UK funding application answer guide slides
Innovate UK funding application answer guide slides
 
Finance Options in a Dynamic Environment
Finance Options in a Dynamic EnvironmentFinance Options in a Dynamic Environment
Finance Options in a Dynamic Environment
 
Invest NI Brexit Information Workshop - February 2019
Invest NI Brexit Information Workshop - February 2019Invest NI Brexit Information Workshop - February 2019
Invest NI Brexit Information Workshop - February 2019
 
Design for Export
Design for ExportDesign for Export
Design for Export
 
Design for Export
Design for ExportDesign for Export
Design for Export
 
Design for Export
Design for ExportDesign for Export
Design for Export
 
Presentation - Funding for Innovation in Life & Health Sciences
Presentation - Funding for Innovation in Life & Health SciencesPresentation - Funding for Innovation in Life & Health Sciences
Presentation - Funding for Innovation in Life & Health Sciences
 
Stephen McComb - Masterclass - Funding for Innovation in Life & Health Sciences
Stephen McComb - Masterclass - Funding for Innovation in Life & Health SciencesStephen McComb - Masterclass - Funding for Innovation in Life & Health Sciences
Stephen McComb - Masterclass - Funding for Innovation in Life & Health Sciences
 
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
 
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
 
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
 
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020Networking Event for Personalised, Digital Health Innovations in Horizon 2020
Networking Event for Personalised, Digital Health Innovations in Horizon 2020
 

Kürzlich hochgeladen

What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
CaitlinCummins3
 

Kürzlich hochgeladen (20)

Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdfDaftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024).pdf
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
 
NFS- Operations Presentation - Recurrent
NFS- Operations Presentation - RecurrentNFS- Operations Presentation - Recurrent
NFS- Operations Presentation - Recurrent
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team Presentations
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement CriteriaSedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
 
Your Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptxYour Work Matters to God RestorationChurch.pptx
Your Work Matters to God RestorationChurch.pptx
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)tekAura | Desktop Procedure Template (2016)
tekAura | Desktop Procedure Template (2016)
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 

Polymer Processing Cost Saving Workshop - 03 Sustainable Development

  • 1. Sustainable Development Polymer Processing ‐ Cost  Savings Potential in the  Process Ciaran O'Reilly Chartered Engineer Process Chartered Engineer Technical Adviser Sustainable DevelopmentSustainable Development
  • 2. M i i iMaximising Efficiencies 5 Programmers Efficiencies (1) Resource Efficiency Audit (2) P j t M t F k(2) Project Management Framework (3) Energy Efficiency Loan Scheme (4) Capital Grants for SME’s of up to £40 000(4) Capital Grants for SME s of up to £40,000 (5) Industrial Symbiosis Sustainable Development
  • 3. M i i iMaximising Efficiencies Progress Last 3 YearsEfficiencies Last 3 Years 850 Audits Completed £60,000,000 of Identified Savings Sustainable Development
  • 4. CostCost Savings Hidden Potentialdde o e a Polymer Processing ‐ Cost Savings Potential in the Process Areas of High Process Energy ConsumptionAreas of High Process Energy Consumption. Actions that can be taken to reduce Consumption. S t i bl D l t Indicative Potential Investment Costs and Cost Savings Sustainable Development
  • 5. EnergyEnergy Process Energy v Carbon Manufacturing Factory Polymer Processing 80% 100% 120% 80% 100% 120% Polymer Processing 40% 60% Heating Electric 40% 60% 80% Heating Electric S t i bl D l t 0% 20% Carbon Energy 0% 20% Carbon Energy Sustainable Development
  • 6. CostCost Savings Energy used in an  t d b iextruder business 66% Processing Manufacturing business 16% Processing  equipment 10% 5% 5% 2%1% 66%  Processing  equipment 11%  Chillers 10%  Compressed Air 16% 5% 10% 5%  Chillers 10%  Compressed  Air 66% 11% 5%  Water Pumps 5%   Lighting 2%  Factory & office  5% 10% 5% 34% 5%  Water Pumps 20%   Lighting S t i bl D l t y heating  1%  Offices20% 34%  Factory &  office heating  10%  Offices Sustainable Development
  • 8. CostCost Savings Process 325 KW 1 000 kg/h Specific energy to raise the temperature of the plastic is typically 0 16 kWh/k f i t lli l ti (lik PE PP) 1,000 kg/h • 0.16 kWh/kg for semi-crystalline plastics (like PE or PP) • 0.10 kWh/kg for amorphous plastics (e.g., PVC, PS). The actual specific energy consumption will be higher because of losses in the motor, gearbox, thrust bearings cooling the feed housing and extruder barrelthrust bearings, cooling the feed housing and extruder barrel, • 0.20 to 0.25 kWh/kg semi-crystalline plastics • 0.15 to 0.20 kWh/kg for amorphous plastics d i i t t li d i l ti t t k S t i bl D l t • a dryer, resin conveying system, water cooling and circulation system, take-up 0.20 to 0.25 kWh/kg Sustainable Development
  • 9. Energy 55 KW / HEnergy Savings 55 KW / Hour £7.70 / Hour Process power Extruder 125kw / Extruder 125kw Heat per hour 160kw Cooling 40kw Total 325kwTotal 325kw Heat recovery 25% 40kw Product stored at 30C 16kw S t i bl D l t Product stored at 30C 16kw Energy Savings 56kw 17% Sustainable Development
  • 10. What No 1 Energy Efficiency What Works Energy Efficiency Plant Replacement Insulation Induction HeatingInduction Heating Heat Recovery M&TM&T
  • 11. FinanceFinance Available No and Low InterestInterest Interest free Loans Invest-NI Growth Loan Fund Invest-NI E h d C i l AllEnhanced Capital Allowance ROC’s & RHI for Renewables Regulator Grants through the Utility providersRegulator Grants through the Utility providers S t i bl D l tSustainable Development
  • 12. Top 10 Investments All SPB Less 24 months Sustainable Development
  • 13. RenewablesRenewables Economics Appraisal: PV Array 50kWCAPITAL COST      £65,000 PV Array 50kW SPB 2 years Supply and install 50kWp system  EXISTING ELECTRICITY COSTS Existing electricity consumption  1,387,040kWh Existing electricity consumption cost £194 186Existing electricity consumption cost £194,186 TOTAL COST SAVINGS Estimated annual output of PV system  41,080kWh INCOME Electricty generated and used on site 90% 36,972kWh (36,972 kWh X £0.14/p/kWh) £5,176 ROC's payment (41,080 kWh X £0.1696) £6,984 E t U it 10% (4 108 kWh X £0 0559) £246Export Units 10% (4,108 kWh X £0.0559) £246 TOTAL SAVINGS £12,406 Simple pay back 5.24 Years Enhanced Capital Allowance £30,000 Sustainable DevelopmentIntrest Free Loan Invest‐NI (by CT) £13,063 CAPITAL OUTLAY    SPB 2 Years £21,937
  • 14. SustainableSustainable Development What Are We Doing Next For YouNext For You Implementation Audits Polymer Sector Studyy y Special Energy Task Group ISO 50001 W k hISO 50001 Workshops Sustainable Development
  • 15. Sustainable MaximisingSustainable Development Maximising Efficiencies Next Events Invest-NI Sustainex 9th &10th April La Mon Hotel Bombardier June Joint Seminar ISO 50001 Workshops Sustainable Development