DEWATS |
                           Decentralized
Decentralized Wastewater
  Treatment Solutions      Wastewater
                           Treatment Solutions




                           Demand-based technical
                           solutions to reduce water-
                           pollution by small and medium
                           enterprises and settlements
                           in densely populated areas




                                     Treatment Systems |
                                     DEWATS Service Package

                                     Developed and disseminated by
                                     BORDA & BORDA BNS Network
About DEWATS                                                                                                               The Challenge




    DEWATS stands for “Decentra-               •   DEWATS applications provide          are combined according to demand:      The demand for reliable, efficient
    lized Wastewater Treatment                     treatment for both, domestic and     •   Primary treatment: sedimentati-    and low-cost wastewater treatment         Common Wastewater Problems
    Solutions”. DEWATS is rather a                 industrial sources                       on and floatation                  systems is increasing world wide       within Small and Medium Enterprises
    technical approach than merely             •   DEWATS applications provide          •   Secondary anaerobic treatment      especially in densely populated
    a technology package.                          treatment for organic waste-             in fixed-bed reactors: baffled     urban regions where adequate
                                                   water flows from 1-1000 m3               upstream reactors or anaerobic     wastewater treatment systems do
    DEWATS applications are based on               per day                                  filters                            not exist and uncontrolled discharge
    the principle of low-maintenance           •   DEWATS applications are reliable,    •   Tertiary aerobic treatment         of wastewater endangers environ-
    since most important parts of the              long lasting and tolerant towards        in sub-surface flow filters        mental health and water resources.
    system work without technical ener-            inflow fluctuation                   •   Tertiary aerobic treatment         Many Governments have passed                             Many SME are not able to pay high
    gy inputs and cannot be switched off       •   DEWATS applications do not need          in polishing ponds                 new environmental regulations sti-                       investment and maintenance costs
    intentionally.                                 sophisticated maintenance            DEWATS applications are designed       pulating that dischargers of waste-                      required for sophisticated waste-
    DEWATS applications provide state-         Without considering facilities for ne-   and dimensioned in such a way that     water such as small and medium                           water treatment system.
    of-the-art-technology at affordable        cessary chemical pre-treatment of        treated water meets requirements       enterprises and housing estates will
    prices because all of the materials        wastewater from industries, DEWATS       stipulated in environmental laws and   be held responsible for wastewater
    used for construction are locally          applications are based on four basic     regulations.                           pollution and must therefore treat
    available.                                 technical treatment modules which                                               wastewater adequately on-site
                                                                                                                               before it is discharged into the en-
                                                                                                                               vironment.
    Appropriate Wastewater Treatment for SMEs                                                                                                                                           Maintenance of sophisticated
                                                                                                                                                                                        wastewater treatment systems
    Advantages of DEWATS technology                                                     Hence                                                                                           require high-skilled personnel.
    •   Providing treatment for domestic and industrial wastewater                      DEWATS technology is an effec-
    •   Low primary investment costs as no imports are needed                           tive, efficient and affordable
    •   Efficient treatment or daily wastewater flows up to 1000m3                      wastewater treatment solution
    •   Modular design of all components                                                for small and medium sized
    •   Tolerant towards inflow fluctuations                                            enterprises (SME).
    •   Reliable and long-lasting construction design                                                                                                                                   Due to lack of investment capital
    •   Expensive and sophisticated maintenance not required                                                                                                                            and technical knowledge SME
    •   Low maintenance costs                                                                                                                                                           often adapt non-effective low-cost
                                                                                                                                                                                        „solutions“.




                                                                                                                                                                                        Wastewater discharged by SME
1                                                  2                                                                                                                                    often does not meet environmental
                                                                                                                                                                                        standards.



                                                                                                                                 Main DEWATS-modules for phy-
                                                                                                                                 sical and biological wastewater
                                                                                                                                 treatment:
                                                                                                                                 1. Settler
                                                                                                                                 2. Anaerobic Baffled Reactor
                                                                                                                                 3. Anaerobic Filter
                                                                                                                                 4. Planted Gravel Filter

3                                                            4
Demand                                                                                                                Dissemination




For many small and medium enter-        For these potential clients, BORDA    systems, project planning, imple-       To assure sustainable dissemination     Project planning                         Quality Control
prises and housing estates, con-        and its network of partner organi-    mentation and quality control has       of appropriate wastewater treatment     Project planning includes technical      All DEWATS systems constructed
ventional wastewater treatment          sations started in 1994 to develop    resulted in a significant increase of   infrastructure in the long-term, a      feasibility studies, detailed enginee-   are designed and have a guarantee
systems are technically sophisticated   reliable and cost-efficient waste-    implementation capacity and disse-      mere focus on technical aspects has     ring designs and cost-estimates.         to fullfill specified discharge stan-
and costly, often require high energy   water treatment systems which         mination of technical know-how.         proven insufficient.                                                             dards. Effluent tests are conducted
inputs for operation and rely on        could efficiently treat non-toxic                                             The approach for implementation         Project implementation                   at regular intervals.
sophisticated maintenance services      organic wastewater according to       Today, more than 1000 stakeholders      of DEWATS projects includes not         Service provision depends on prefe-
to ensure continuous operation.         legal environmental standards.        from the private sector, govern-        simply the construction of hardware     rences of clients and network-part-      Research & Development
In most cases, such requirements        Successful efforts to standardize     ments and NGOs have been                but a whole comprehensive set of        ners and may include supervision of      Continuous efforts are made by
are unsuitable for SME.                 main components of the DEWATS         trained by the BORDA-Network to         integrated measures such as:            construction, contractor services or     members of the DEWATS partner-
                                        approach, such as multi-stakeholder   facilitate dissemination, implemen-                                             turn-key operation. To ensure high       network to improve efficiency and
                                        approach, modular design of           tation and maintenance of DEWATS        Information seminars and                quality standards, major tasks are       effectiveness of treatment systems.
                                                                                                                      workshops to introduce DEWATS           always carried out by qualified ex-
                                                                                                                      to key-stakeholders                     perts.
                                                                                                                      Early information of key-stakehol-
                                                                                                                      ders is vital to ensure continuous      Technical support and monitoring
                                                                                                                      support for programme on macro-         Staff responsible for operation and
                                                                                                                      level.                                  maintenance of DEWATS plants are
                                                                                                                                                              adequately trained by technical ex-
                                                                                                                      Co-financing of                         perts during the first year of opera-
                                                                                                                      demonstration projects                  tion.
                                                                                                                      Financial support during the start-                                                Dome shaped anaerobic baffled
                                                                                                                                                                                                         reactor for biogas recovery
                                                                                                                      up phase of a demonstration pro-
                                                                                                                      ject enhances the achievement of
                                                                                                                      desired results and impacts.


                                                                                                                      Sector specific
                                                                                                                      information-seminars
                                                                                                                      An early focus on specific priority-
                                                                                                                      sectors supports an exchange of
                                                                                                                      ideas between experts and potential
                                                                                                                      clients that have similar professio-
                                                                                                                      nal experiences.


                                                                                                                      Technical training
                                                                                                                      Long-term DEWATS experts facili-
                                          DEWATS ensures state of the art     system resulting in the sustainable     tate comprehensive training pro-
                                          treatment results at affordable
                                          cost, low maintenance and limi-     operation of more than 250              grammes for qualified staff of part-
                                          ted space requirements              DEWATS plants. The success of           ner organisations and take on
                                                                              DEWATS has fostered cooperations        a supervisory role during first tech-
                                                                              with numerous government depart-        nical implementations.
                                                                              ments, municipalities and inter-
                                                                              national donor agencies to increase
                                                                              capacities and technical implemen-
                                                                              tations.
Good Practices




DEWATS for Hospitals                                                           DEWATS for Communities
Characteristics:                        Technical Solution:                    Characteristics:
•   250 beds with outpatient            •   Treatment system for 150 m3        •   Open waste water lagoon within        •   Fully mixed digester
    department                              wastewater/day                         community                                 (fixed-dome biogas plant)
•   untreated wastewater discharge      •   Sedimentation + anaerobic filter   •   6 public toilets/6 bathrooms          •   Baffled reactor
    into nearby stream                      + horizontal sandfilter + puri-        for 500 people                        •   Landscaping
•   complaints of neighboring               fication pond                      •   Unwillingness of landlords to         •   rehabilitation of WW ditches
    communities                         •   Pumping chamber after                  upgrade sanitation infrastructure     •   MOU between NGO and
•   limited funds                           anaerobic filter                   •   Willingness to provide lagoon space       CBO regarding maintenance
•   limited technical skills of staff   •   Total construction cost:           •   Willingness of people to pay              of Sanitation/DEWATS infra-
•   sufficient space                        $ 50.0000                              for use of proper sanitation              structure
                                        •   Training of maintenance staff          infrastructure
                                            and 1 year guarantee               •   People willing to manage sani-
                                                                                   tation infrastructure


                                                                               Technical Solution:




DEWATS for Agroindustries                                                      Laboratory Test Results
Characteristics:                        Technical Solution:
•   More than 100 cattle slaughtered    Separation of wastewater
    per day                             components:
•   Extreme fluctuation of waste        •   De-watering, sedimentation                                                                   DEWATS Treatment Efficiency
    water composition                       & floatation
•   extremely high organic load         Treatment system components:                                                                     No        Para-         Unit        Anlytical-Results        Reduction
•   limited space for construction      •   Screening                                                                                              meter                     Inlet       Outlet        [%]
    near stream                         •   Sedimentation
•   unreliable responsibility and       •   Composting                                                                                    1          Temp.          °C          27           27            –
    maintenance                         •   fully-mixed digestion in biogas                                                               2              pH          –         7,6          7,3         4%
                                            reactor                                                                                       3         BOD 5        mg/l          290         53,6        83 %
                                        •   Anaerobic filter                                                                              4           COD        mg/l          590           84        86 %
                                                                                                                                          5    Phosphate         mg/l       18,33          3,67        80 %
                                                                                                                                          6            TSS       mg/l          172           84        51 %
                                                                               Effluent Quality during first
                                                                               months of DEWATS operation                                 7      Ammonia         mg/l         0,19         0,07        63 %

                                                                                                                                         Source: Graha Asih Hospital Bali,
                                                                                                                                         Anaerobic Filter + Horizontal Sandfilter + Purification Pond
Benefits of DEWATS




•   Establishing of multi-stakeholder
    networks to combat water
    pollution
•   Building up implementation
    capacity on various levels
•   Providing treatment for both,
    domestic and industrial waste-
    water at affordable price
•   Fulfillment of discharge standards
    and environmental laws
•   Wastewater pollution reduced
    by up to 90%
•   Providing treatment for waste-
    water flows up to 1000 m3 / day
•   Reliable and long lasting appli-
    cations
•   Tolerant towards inflow and load
    fluctuation
•   Materials/ inputs used for
    construction are locally available
•   Minimal maintenance and long                 •    Resource efficiency and non                     •   Resource recovery through
    de-sludging intervals                             dependence on energy                                wastewater re-use and biogas
•   Low operation and maintenance                                                                         generation
    costs




DEWATS Service Packages


o Treatment Systems                              o Emergency Sanitation                               o Health Impact Assessment
o Community Based Sanitation                     o Sanitation for Prisons                                  & Hygiene Education
o School Based Sanitation                        o Sanitation for Real Estates                        o Capacity Development
o Sanitation for Hospitals & Hotels              o Sanitation Mapping                                 o Standardisation
o Wastewater Treatment                           o Municipal Sludge Treatment                         o Research & Development
    for Agro-Industry                                 Plant


                              DEWATS – Decentralized Wastewater Treatment Solutions
Developed & disseminated by BORDA and over 20 BORDA BNS Network Partners in South and South East Asia & Southern Africa




                        Bremen Overseas Research and Development Association

                        BORDA Germany                   BORDA South East Asia         BORDA South Asia             BORDA SADC
                        Head Office                      Programme Office Indonesia     Programme Office India        Programme Office
                        fon: + 49 - 421-137 18
                        e-mail: office@borda-net.org     fon: + 62 - 274 88 82 73      fon: + 91 - 80 41 52 75 54   fon: + 255 - 681204991
                        www.borda-net.org               e-mail: yogya@borda-sea.org   e-mail: bang@borda-sa.org    e-mail: dar@borda-sadc.org

Weitere ähnliche Inhalte

Was ist angesagt?

Waterfront development
Waterfront developmentWaterfront development
Waterfront developmentmisschand
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront developmentmisschand
 
Urban design sabarmati
Urban design sabarmatiUrban design sabarmati
Urban design sabarmatiSyam M
 
Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies nado-web
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront DevelopmentBeda Choudhury
 
How DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakesHow DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakesbiomeshubha
 
Types of urban design
Types of urban designTypes of urban design
Types of urban designGoby Cracked
 
Riverfront development Case study Hoshangabad Thesis
Riverfront development  Case study Hoshangabad Thesis Riverfront development  Case study Hoshangabad Thesis
Riverfront development Case study Hoshangabad Thesis Praveen Mukati
 
Green building rating systems comparision
Green building rating systems comparisionGreen building rating systems comparision
Green building rating systems comparisionVamsi Putta
 
Amsterdam 3
Amsterdam 3Amsterdam 3
Amsterdam 3ce4710
 
BREEAM and Environmental Assessment Methods Amanda Gallagher EASLAR
BREEAM  and Environmental Assessment Methods Amanda Gallagher EASLARBREEAM  and Environmental Assessment Methods Amanda Gallagher EASLAR
BREEAM and Environmental Assessment Methods Amanda Gallagher EASLARRen Net
 
Planning for Open Spaces to make cities Healthy
Planning for Open  Spaces to make cities HealthyPlanning for Open  Spaces to make cities Healthy
Planning for Open Spaces to make cities HealthyJIT KUMAR GUPTA
 
An introduction to urban design
An introduction to urban designAn introduction to urban design
An introduction to urban designtree63
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front RevitalisationVitastaRaina
 
Infrastructural Urban Voids as an Instrument for Homogenous Urban Fabric Case...
Infrastructural Urban Voids as an Instrument for Homogenous Urban Fabric Case...Infrastructural Urban Voids as an Instrument for Homogenous Urban Fabric Case...
Infrastructural Urban Voids as an Instrument for Homogenous Urban Fabric Case...civej
 
Dewats Decentralised natural waste water treatment system
Dewats Decentralised natural waste water treatment systemDewats Decentralised natural waste water treatment system
Dewats Decentralised natural waste water treatment systemCSR WWT
 

Was ist angesagt? (20)

20 Urban Renewal Projects
20 Urban Renewal Projects20 Urban Renewal Projects
20 Urban Renewal Projects
 
Waterfront development
Waterfront developmentWaterfront development
Waterfront development
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront development
 
Urban design sabarmati
Urban design sabarmatiUrban design sabarmati
Urban design sabarmati
 
Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies Brownfields Redevelopment Case Studies
Brownfields Redevelopment Case Studies
 
MARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDYMARINA BAY SINGAPORE - URBAN CASE STUDY
MARINA BAY SINGAPORE - URBAN CASE STUDY
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront Development
 
How DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakesHow DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakes
 
Types of urban design
Types of urban designTypes of urban design
Types of urban design
 
Riverfront development Case study Hoshangabad Thesis
Riverfront development  Case study Hoshangabad Thesis Riverfront development  Case study Hoshangabad Thesis
Riverfront development Case study Hoshangabad Thesis
 
Green building rating systems comparision
Green building rating systems comparisionGreen building rating systems comparision
Green building rating systems comparision
 
Amsterdam 3
Amsterdam 3Amsterdam 3
Amsterdam 3
 
BREEAM and Environmental Assessment Methods Amanda Gallagher EASLAR
BREEAM  and Environmental Assessment Methods Amanda Gallagher EASLARBREEAM  and Environmental Assessment Methods Amanda Gallagher EASLAR
BREEAM and Environmental Assessment Methods Amanda Gallagher EASLAR
 
Planning for Open Spaces to make cities Healthy
Planning for Open  Spaces to make cities HealthyPlanning for Open  Spaces to make cities Healthy
Planning for Open Spaces to make cities Healthy
 
An introduction to urban design
An introduction to urban designAn introduction to urban design
An introduction to urban design
 
River-Front Revitalisation
River-Front RevitalisationRiver-Front Revitalisation
River-Front Revitalisation
 
Urban planning
Urban planningUrban planning
Urban planning
 
Infrastructural Urban Voids as an Instrument for Homogenous Urban Fabric Case...
Infrastructural Urban Voids as an Instrument for Homogenous Urban Fabric Case...Infrastructural Urban Voids as an Instrument for Homogenous Urban Fabric Case...
Infrastructural Urban Voids as an Instrument for Homogenous Urban Fabric Case...
 
Dewats Decentralised natural waste water treatment system
Dewats Decentralised natural waste water treatment systemDewats Decentralised natural waste water treatment system
Dewats Decentralised natural waste water treatment system
 
GRIHA
GRIHAGRIHA
GRIHA
 

Ähnlich wie Decentralized Wastewater Treatment Solutions (DEWATS)

Municipal Sludge Treatment Plant
Municipal Sludge Treatment PlantMunicipal Sludge Treatment Plant
Municipal Sludge Treatment Plantinfosanitasi
 
Ondeo IS Corporate Brochure
Ondeo IS Corporate BrochureOndeo IS Corporate Brochure
Ondeo IS Corporate Brochureavanhaaften
 
Packaged water treatment plant
Packaged water treatment plantPackaged water treatment plant
Packaged water treatment plantDeepak Paithankar
 
Sewage Treatment Plant Manufacturer In Delhi
Sewage Treatment Plant Manufacturer In DelhiSewage Treatment Plant Manufacturer In Delhi
Sewage Treatment Plant Manufacturer In DelhiNetsol Water
 
Onsite environmental solutions
Onsite environmental solutionsOnsite environmental solutions
Onsite environmental solutionsDiggricp
 
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANESMelvin Eldin
 
Municipal%20 sewage%20treatment
Municipal%20 sewage%20treatmentMunicipal%20 sewage%20treatment
Municipal%20 sewage%20treatmentDurgesh Singh
 
Why Effluent Treatment Plants Are Important for Industries.pdf
Why Effluent Treatment Plants Are Important for Industries.pdfWhy Effluent Treatment Plants Are Important for Industries.pdf
Why Effluent Treatment Plants Are Important for Industries.pdfcontactbluedrop1
 
GWT Domestic Wastewater Reuse System
GWT Domestic Wastewater Reuse SystemGWT Domestic Wastewater Reuse System
GWT Domestic Wastewater Reuse SystemNick Nicholas
 
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
14.35 Integrated Water Management Johnny Browaeys Ch2 M HillJohnny Browaeys - 庄博闻
 
Storm water design what is it all about
Storm water design  what is it all aboutStorm water design  what is it all about
Storm water design what is it all aboutrileycondon6
 
Rain Water Harvesting Leaflet H2 O Cons
Rain Water Harvesting Leaflet   H2 O ConsRain Water Harvesting Leaflet   H2 O Cons
Rain Water Harvesting Leaflet H2 O ConsTony Cain
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeRick Nabett
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternativeRick Nabett
 
Newsletter march 2013
Newsletter march 2013 Newsletter march 2013
Newsletter march 2013 John Corkery
 
Newsletter march 2013
Newsletter march 2013 Newsletter march 2013
Newsletter march 2013 John Corkery
 
Charles River Watershed Assoc: Rain Garden Fact Sheet
Charles River Watershed Assoc: Rain Garden Fact SheetCharles River Watershed Assoc: Rain Garden Fact Sheet
Charles River Watershed Assoc: Rain Garden Fact SheetSotirakou964
 

Ähnlich wie Decentralized Wastewater Treatment Solutions (DEWATS) (20)

Municipal Sludge Treatment Plant
Municipal Sludge Treatment PlantMunicipal Sludge Treatment Plant
Municipal Sludge Treatment Plant
 
Dewats system
Dewats systemDewats system
Dewats system
 
Ondeo IS Corporate Brochure
Ondeo IS Corporate BrochureOndeo IS Corporate Brochure
Ondeo IS Corporate Brochure
 
Packaged water treatment plant
Packaged water treatment plantPackaged water treatment plant
Packaged water treatment plant
 
Sewage Treatment Plant Manufacturer In Delhi
Sewage Treatment Plant Manufacturer In DelhiSewage Treatment Plant Manufacturer In Delhi
Sewage Treatment Plant Manufacturer In Delhi
 
Onsite environmental solutions
Onsite environmental solutionsOnsite environmental solutions
Onsite environmental solutions
 
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
90% RECYCLING OF LAUNDRY WASTEWATER THROUGH MEMBRANES
 
Municipal%20 sewage%20treatment
Municipal%20 sewage%20treatmentMunicipal%20 sewage%20treatment
Municipal%20 sewage%20treatment
 
Why Effluent Treatment Plants Are Important for Industries.pdf
Why Effluent Treatment Plants Are Important for Industries.pdfWhy Effluent Treatment Plants Are Important for Industries.pdf
Why Effluent Treatment Plants Are Important for Industries.pdf
 
GWT Domestic Wastewater Reuse System
GWT Domestic Wastewater Reuse SystemGWT Domestic Wastewater Reuse System
GWT Domestic Wastewater Reuse System
 
טכנולוגיות למצבי חירום ואסונות טבע
טכנולוגיות למצבי חירום ואסונות טבעטכנולוגיות למצבי חירום ואסונות טבע
טכנולוגיות למצבי חירום ואסונות טבע
 
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
14.35 Integrated Water Management Johnny Browaeys Ch2 M Hill
 
Storm water design what is it all about
Storm water design  what is it all aboutStorm water design  what is it all about
Storm water design what is it all about
 
Rain Water Harvesting Leaflet H2 O Cons
Rain Water Harvesting Leaflet   H2 O ConsRain Water Harvesting Leaflet   H2 O Cons
Rain Water Harvesting Leaflet H2 O Cons
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable Alternative
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternative
 
Newsletter march 2013
Newsletter march 2013 Newsletter march 2013
Newsletter march 2013
 
Newsletter march 2013
Newsletter march 2013 Newsletter march 2013
Newsletter march 2013
 
Dcm whitepaperfinal
Dcm whitepaperfinalDcm whitepaperfinal
Dcm whitepaperfinal
 
Charles River Watershed Assoc: Rain Garden Fact Sheet
Charles River Watershed Assoc: Rain Garden Fact SheetCharles River Watershed Assoc: Rain Garden Fact Sheet
Charles River Watershed Assoc: Rain Garden Fact Sheet
 

Mehr von infosanitasi

Permen pupr24 2014
Permen pupr24 2014Permen pupr24 2014
Permen pupr24 2014infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR pupr26 2014
Permen PUPR pupr26 2014Permen PUPR pupr26 2014
Permen PUPR pupr26 2014infosanitasi
 
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019infosanitasi
 
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program SanitasiUsulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasiinfosanitasi
 
Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019infosanitasi
 
Pengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang KesehatanPengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang Kesehataninfosanitasi
 
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015infosanitasi
 
Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015infosanitasi
 
Kesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBMKesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBMinfosanitasi
 
Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019infosanitasi
 
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan SanitasiPeraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasiinfosanitasi
 
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...infosanitasi
 
Tahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi PermukimanTahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi Permukimaninfosanitasi
 
Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015infosanitasi
 
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...infosanitasi
 

Mehr von infosanitasi (20)

Permen pupr24 2014
Permen pupr24 2014Permen pupr24 2014
Permen pupr24 2014
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR pupr26 2014
Permen PUPR pupr26 2014Permen PUPR pupr26 2014
Permen PUPR pupr26 2014
 
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
 
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program SanitasiUsulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasi
 
Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019
 
Pengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang KesehatanPengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang Kesehatan
 
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
 
Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015
 
Kesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBMKesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBM
 
Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019
 
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan SanitasiPeraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
 
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
 
Tahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi PermukimanTahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi Permukiman
 
Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015
 
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
 

Kürzlich hochgeladen

The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfSeasiaInfotech2
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 

Kürzlich hochgeladen (20)

The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdf
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 

Decentralized Wastewater Treatment Solutions (DEWATS)

  • 1. DEWATS | Decentralized Decentralized Wastewater Treatment Solutions Wastewater Treatment Solutions Demand-based technical solutions to reduce water- pollution by small and medium enterprises and settlements in densely populated areas Treatment Systems | DEWATS Service Package Developed and disseminated by BORDA & BORDA BNS Network
  • 2. About DEWATS The Challenge DEWATS stands for “Decentra- • DEWATS applications provide are combined according to demand: The demand for reliable, efficient lized Wastewater Treatment treatment for both, domestic and • Primary treatment: sedimentati- and low-cost wastewater treatment Common Wastewater Problems Solutions”. DEWATS is rather a industrial sources on and floatation systems is increasing world wide within Small and Medium Enterprises technical approach than merely • DEWATS applications provide • Secondary anaerobic treatment especially in densely populated a technology package. treatment for organic waste- in fixed-bed reactors: baffled urban regions where adequate water flows from 1-1000 m3 upstream reactors or anaerobic wastewater treatment systems do DEWATS applications are based on per day filters not exist and uncontrolled discharge the principle of low-maintenance • DEWATS applications are reliable, • Tertiary aerobic treatment of wastewater endangers environ- since most important parts of the long lasting and tolerant towards in sub-surface flow filters mental health and water resources. system work without technical ener- inflow fluctuation • Tertiary aerobic treatment Many Governments have passed Many SME are not able to pay high gy inputs and cannot be switched off • DEWATS applications do not need in polishing ponds new environmental regulations sti- investment and maintenance costs intentionally. sophisticated maintenance DEWATS applications are designed pulating that dischargers of waste- required for sophisticated waste- DEWATS applications provide state- Without considering facilities for ne- and dimensioned in such a way that water such as small and medium water treatment system. of-the-art-technology at affordable cessary chemical pre-treatment of treated water meets requirements enterprises and housing estates will prices because all of the materials wastewater from industries, DEWATS stipulated in environmental laws and be held responsible for wastewater used for construction are locally applications are based on four basic regulations. pollution and must therefore treat available. technical treatment modules which wastewater adequately on-site before it is discharged into the en- vironment. Appropriate Wastewater Treatment for SMEs Maintenance of sophisticated wastewater treatment systems Advantages of DEWATS technology Hence require high-skilled personnel. • Providing treatment for domestic and industrial wastewater DEWATS technology is an effec- • Low primary investment costs as no imports are needed tive, efficient and affordable • Efficient treatment or daily wastewater flows up to 1000m3 wastewater treatment solution • Modular design of all components for small and medium sized • Tolerant towards inflow fluctuations enterprises (SME). • Reliable and long-lasting construction design Due to lack of investment capital • Expensive and sophisticated maintenance not required and technical knowledge SME • Low maintenance costs often adapt non-effective low-cost „solutions“. Wastewater discharged by SME 1 2 often does not meet environmental standards. Main DEWATS-modules for phy- sical and biological wastewater treatment: 1. Settler 2. Anaerobic Baffled Reactor 3. Anaerobic Filter 4. Planted Gravel Filter 3 4
  • 3. Demand Dissemination For many small and medium enter- For these potential clients, BORDA systems, project planning, imple- To assure sustainable dissemination Project planning Quality Control prises and housing estates, con- and its network of partner organi- mentation and quality control has of appropriate wastewater treatment Project planning includes technical All DEWATS systems constructed ventional wastewater treatment sations started in 1994 to develop resulted in a significant increase of infrastructure in the long-term, a feasibility studies, detailed enginee- are designed and have a guarantee systems are technically sophisticated reliable and cost-efficient waste- implementation capacity and disse- mere focus on technical aspects has ring designs and cost-estimates. to fullfill specified discharge stan- and costly, often require high energy water treatment systems which mination of technical know-how. proven insufficient. dards. Effluent tests are conducted inputs for operation and rely on could efficiently treat non-toxic The approach for implementation Project implementation at regular intervals. sophisticated maintenance services organic wastewater according to Today, more than 1000 stakeholders of DEWATS projects includes not Service provision depends on prefe- to ensure continuous operation. legal environmental standards. from the private sector, govern- simply the construction of hardware rences of clients and network-part- Research & Development In most cases, such requirements Successful efforts to standardize ments and NGOs have been but a whole comprehensive set of ners and may include supervision of Continuous efforts are made by are unsuitable for SME. main components of the DEWATS trained by the BORDA-Network to integrated measures such as: construction, contractor services or members of the DEWATS partner- approach, such as multi-stakeholder facilitate dissemination, implemen- turn-key operation. To ensure high network to improve efficiency and approach, modular design of tation and maintenance of DEWATS Information seminars and quality standards, major tasks are effectiveness of treatment systems. workshops to introduce DEWATS always carried out by qualified ex- to key-stakeholders perts. Early information of key-stakehol- ders is vital to ensure continuous Technical support and monitoring support for programme on macro- Staff responsible for operation and level. maintenance of DEWATS plants are adequately trained by technical ex- Co-financing of perts during the first year of opera- demonstration projects tion. Financial support during the start- Dome shaped anaerobic baffled reactor for biogas recovery up phase of a demonstration pro- ject enhances the achievement of desired results and impacts. Sector specific information-seminars An early focus on specific priority- sectors supports an exchange of ideas between experts and potential clients that have similar professio- nal experiences. Technical training Long-term DEWATS experts facili- DEWATS ensures state of the art system resulting in the sustainable tate comprehensive training pro- treatment results at affordable cost, low maintenance and limi- operation of more than 250 grammes for qualified staff of part- ted space requirements DEWATS plants. The success of ner organisations and take on DEWATS has fostered cooperations a supervisory role during first tech- with numerous government depart- nical implementations. ments, municipalities and inter- national donor agencies to increase capacities and technical implemen- tations.
  • 4. Good Practices DEWATS for Hospitals DEWATS for Communities Characteristics: Technical Solution: Characteristics: • 250 beds with outpatient • Treatment system for 150 m3 • Open waste water lagoon within • Fully mixed digester department wastewater/day community (fixed-dome biogas plant) • untreated wastewater discharge • Sedimentation + anaerobic filter • 6 public toilets/6 bathrooms • Baffled reactor into nearby stream + horizontal sandfilter + puri- for 500 people • Landscaping • complaints of neighboring fication pond • Unwillingness of landlords to • rehabilitation of WW ditches communities • Pumping chamber after upgrade sanitation infrastructure • MOU between NGO and • limited funds anaerobic filter • Willingness to provide lagoon space CBO regarding maintenance • limited technical skills of staff • Total construction cost: • Willingness of people to pay of Sanitation/DEWATS infra- • sufficient space $ 50.0000 for use of proper sanitation structure • Training of maintenance staff infrastructure and 1 year guarantee • People willing to manage sani- tation infrastructure Technical Solution: DEWATS for Agroindustries Laboratory Test Results Characteristics: Technical Solution: • More than 100 cattle slaughtered Separation of wastewater per day components: • Extreme fluctuation of waste • De-watering, sedimentation DEWATS Treatment Efficiency water composition & floatation • extremely high organic load Treatment system components: No Para- Unit Anlytical-Results Reduction • limited space for construction • Screening meter Inlet Outlet [%] near stream • Sedimentation • unreliable responsibility and • Composting 1 Temp. °C 27 27 – maintenance • fully-mixed digestion in biogas 2 pH – 7,6 7,3 4% reactor 3 BOD 5 mg/l 290 53,6 83 % • Anaerobic filter 4 COD mg/l 590 84 86 % 5 Phosphate mg/l 18,33 3,67 80 % 6 TSS mg/l 172 84 51 % Effluent Quality during first months of DEWATS operation 7 Ammonia mg/l 0,19 0,07 63 % Source: Graha Asih Hospital Bali, Anaerobic Filter + Horizontal Sandfilter + Purification Pond
  • 5. Benefits of DEWATS • Establishing of multi-stakeholder networks to combat water pollution • Building up implementation capacity on various levels • Providing treatment for both, domestic and industrial waste- water at affordable price • Fulfillment of discharge standards and environmental laws • Wastewater pollution reduced by up to 90% • Providing treatment for waste- water flows up to 1000 m3 / day • Reliable and long lasting appli- cations • Tolerant towards inflow and load fluctuation • Materials/ inputs used for construction are locally available • Minimal maintenance and long • Resource efficiency and non • Resource recovery through de-sludging intervals dependence on energy wastewater re-use and biogas • Low operation and maintenance generation costs DEWATS Service Packages o Treatment Systems o Emergency Sanitation o Health Impact Assessment o Community Based Sanitation o Sanitation for Prisons & Hygiene Education o School Based Sanitation o Sanitation for Real Estates o Capacity Development o Sanitation for Hospitals & Hotels o Sanitation Mapping o Standardisation o Wastewater Treatment o Municipal Sludge Treatment o Research & Development for Agro-Industry Plant DEWATS – Decentralized Wastewater Treatment Solutions Developed & disseminated by BORDA and over 20 BORDA BNS Network Partners in South and South East Asia & Southern Africa Bremen Overseas Research and Development Association BORDA Germany BORDA South East Asia BORDA South Asia BORDA SADC Head Office Programme Office Indonesia Programme Office India Programme Office fon: + 49 - 421-137 18 e-mail: office@borda-net.org fon: + 62 - 274 88 82 73 fon: + 91 - 80 41 52 75 54 fon: + 255 - 681204991 www.borda-net.org e-mail: yogya@borda-sea.org e-mail: bang@borda-sa.org e-mail: dar@borda-sadc.org