ABOUT BRUNEI DARUSSALAM

  BRUNEI PROFILE
 GOVERNMENT : Malay Islamic
  Monarchy, Independence on 1st
  January 1984
 LOCATION : North-West of
  Borneo Island in South Eastern
  Asia, Longitudes Between 114
  deg 04’E & 115 deg 23’E And
  Latitudes Between 4 deg 00’N &
  5 deg 05’N
 CAPITAL : Bandar Seri Begawan


 AREA : 5,765 sq. km.


 POPULATION : 398,000(mid-year
  of 2008)


 CLIMATE : Tropical Equatorial




                                                   1
TYPES OF SANITATION FACILITIES

 SANITATION
  IN BRUNEI



PIT LATRINES
                                                      CENTRALISED SEWERAGE
                                                      CENTRALISED SEWERAGE
DIRECT TO                                          SYSTEM INCLUDING SEWAGE
                                                     SYSTEM INCLUDING SEWAGE
                                                        TREATMENT WORKS
                                                         TREATMENT WORKS
 GROUND OR
 WATERCOURSES
SEPTIC TANKS
 EITHER TO
 SOAKAWAY OR
 DRAIN/RIVER
SEWERAGE
 SYSTEM FOR
 TREATMENT
 AND/OR DISPOSAL
                   SEPTIC TANK WITH SOAKAWAY
                   SEPTIC TANK WITH SOAKAWAY   PIT LATRINE
                                               PIT LATRINE                     DIRECT DISCHARGE OF SEWAGE
                                                                               DIRECT DISCHARGE OF SEWAGE
                                                                                         TO RIVER
                                                                                         TO RIVER




                                                                                                            2
SANITATION COVERAGE IN BRUNEI

                     Estimated                        Estimated                       Estimated                    Estimated
                     Population                      No. of Houses               No. of Urban Houses          No. of Rural Houses

                                                                                         Septic                       Septic
           Urban       Rural      Total 1   Urban       Rural        Total 2   Sewer              Other     Sewer                   Other
                                                                                          Tank                        Tank

National   236,984    95,860      332,844   43,204     12,492        55,696    49%        46%          5%    0%        65%          35%

               Note:
               1. Extracted from Table 1.6 Summary Tables of the population Census 2001 JPKE
               2. Extracted from Table 13.1 Summary Tables of the population Census 2001 JPKE

               POPULATION                                  SEWER SYSTEM CONNECTIONS
                        90%                               Public Sewerage and Septic Tank
                                              Public Sewerage system only with total length
                        40%
                                                          of sewer pipe 740km




                                                                                                                                          3
SEWERAGE VACUUM SYSTEM


 HOUSEHOLD                                         HDPE VACUUM
                                                                    VACUUM PUMP
SANITARY PIPES                                         MAIN
                                                                      STATION


                          VACUUM COLLECTION
                             POT/CHAMBER




                                                                 SEWAGE TREATMENT
                                                                      PLANT




 SEWAGE TREATMENT PLANT
                                        BOLKIAH ‘A’ AND ‘B’ WATER VILLAGES




                                                                                    4
SEWERAGE PROJECTS
                           NDP 2007-2012

Total of 20 projects with overall cost B$139,875,000.00 (US$97millions).
The projects are categorized into 5 groups which are as follows:

1.   Upgrading of Sewage Treatment Plant (4 projects)              - B$37M
2.   Extension of Main Sewer line (2 projects)                     - B$14M
3.   Sewer pipe connection to Main Sewer line (10 projects)        - B$65.375M
4.   New Sewerage Scheme (3 projects)                              - B$19M
5.   Sewerage Asset Management                                     - B$4.5M
                                                             Total : B$139.875M
                                                                     (US$97millions)




                                                                                       5
SEWERAGE PROJECTS
NDP (2007-2012)                                          916-019


                                                    916-020                                      916-021
                                          916-023

                                                                                               916-022

                                                                                             916-025

                                916-035                916-029       916-028       916-027      916-026
            916-018
                      916-034                                    916-033       916-032


  916-017                                                                                                  916-024




    916-030           916-031




                                                                                Legends:


                                                                                         Upgrading of Sewage Treatment Plant

                                                                                         Extension of Main Sewer line

                                                                                         Sewer pipe connection to the Main Sewer line

                                                                                         New Sewerage Scheme



                                                                                                                                        6
STRATEGIC GOALS




   TARGET DATES                     STRATEGY                      REMARKS

                           Greater access to high quality
                           sewerage system in line with
5% increase every NDP      the Millennium Development       Currently at 40% sewer.
                           Goal 7 (Ensure Environmental
                                   Sustainability).




                                                                                      7
STRATEGIC FORESIGHTING




                         8
Thank You



            9

Weitere ähnliche Inhalte

Was ist angesagt?

Wastewater treatment
Wastewater treatmentWastewater treatment
Wastewater treatment
Ghassan Hadi
 
Water & Wastewater Treatment Plants in Pakistan
Water & Wastewater Treatment Plants in PakistanWater & Wastewater Treatment Plants in Pakistan
Water & Wastewater Treatment Plants in Pakistan
Hara Bhara Pakistan
 
SDGE Environmental Lab
SDGE Environmental LabSDGE Environmental Lab
SDGE Environmental Lab
Lydia Pellecer
 
Sewage treatment-system-8
Sewage treatment-system-8Sewage treatment-system-8
Sewage treatment-system-8
cheeweishan
 

Was ist angesagt? (20)

Wastewater treatment
Wastewater treatmentWastewater treatment
Wastewater treatment
 
Design of 210 Sewage Treatment Plant
Design of 210 Sewage Treatment PlantDesign of 210 Sewage Treatment Plant
Design of 210 Sewage Treatment Plant
 
Sewage treatment plant
Sewage treatment plantSewage treatment plant
Sewage treatment plant
 
Water & Wastewater Treatment Plants in Pakistan
Water & Wastewater Treatment Plants in PakistanWater & Wastewater Treatment Plants in Pakistan
Water & Wastewater Treatment Plants in Pakistan
 
Unit 3
Unit 3Unit 3
Unit 3
 
Septic tank
Septic tankSeptic tank
Septic tank
 
Water quality project ppt (Silicon Institute of Technology)
Water quality project ppt (Silicon Institute of Technology)Water quality project ppt (Silicon Institute of Technology)
Water quality project ppt (Silicon Institute of Technology)
 
Building Material - wastewater treatment
Building Material - wastewater treatmentBuilding Material - wastewater treatment
Building Material - wastewater treatment
 
SDGE Environmental Lab
SDGE Environmental LabSDGE Environmental Lab
SDGE Environmental Lab
 
Week 05 lecture 05 water supply
Week 05 lecture 05 water supplyWeek 05 lecture 05 water supply
Week 05 lecture 05 water supply
 
Ee 2
Ee 2Ee 2
Ee 2
 
Sewage treatment-system-8
Sewage treatment-system-8Sewage treatment-system-8
Sewage treatment-system-8
 
Disposal of wastewater
Disposal of wastewaterDisposal of wastewater
Disposal of wastewater
 
Module iii
Module iiiModule iii
Module iii
 
Final PPT
Final PPTFinal PPT
Final PPT
 
To develop a water purification system especially designed
To develop a water purification system especially designedTo develop a water purification system especially designed
To develop a water purification system especially designed
 
Sewage Treatment Plant
Sewage Treatment PlantSewage Treatment Plant
Sewage Treatment Plant
 
Lab5 determination of hardness of water
Lab5 determination of hardness of waterLab5 determination of hardness of water
Lab5 determination of hardness of water
 
Water supply system
Water supply systemWater supply system
Water supply system
 
Mechanism of sulphonation 1
Mechanism of sulphonation 1Mechanism of sulphonation 1
Mechanism of sulphonation 1
 

Ähnlich wie Sanitation Development in Brunei Darussalam (9)

1 decision making in rwss delivery in ghana presentation
1 decision making in rwss delivery in ghana presentation1 decision making in rwss delivery in ghana presentation
1 decision making in rwss delivery in ghana presentation
 
The Political Economy of a Seventeen-Hundred Million-Liters-per-Day Soda Mach...
The Political Economy of a Seventeen-Hundred Million-Liters-per-Day Soda Mach...The Political Economy of a Seventeen-Hundred Million-Liters-per-Day Soda Mach...
The Political Economy of a Seventeen-Hundred Million-Liters-per-Day Soda Mach...
 
MANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAMMANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAM
 
Health Benefit Options for GCDs, Julian Fontana, TML IEBP
Health Benefit Options for GCDs, Julian Fontana, TML IEBPHealth Benefit Options for GCDs, Julian Fontana, TML IEBP
Health Benefit Options for GCDs, Julian Fontana, TML IEBP
 
Singapore's Response to Sanitation and Water Challenges
Singapore's Response to Sanitation and Water ChallengesSingapore's Response to Sanitation and Water Challenges
Singapore's Response to Sanitation and Water Challenges
 
NJFuture Redevelopment Forum 13 Infrastructure Strickland
NJFuture Redevelopment Forum 13 Infrastructure StricklandNJFuture Redevelopment Forum 13 Infrastructure Strickland
NJFuture Redevelopment Forum 13 Infrastructure Strickland
 
Tomo Drepr Regional Final
Tomo Drepr Regional  FinalTomo Drepr Regional  Final
Tomo Drepr Regional Final
 
Tomo Drepr Regional Final
Tomo Drepr Regional  FinalTomo Drepr Regional  Final
Tomo Drepr Regional Final
 
Tomo Drepr Regional Final
Tomo Drepr Regional  FinalTomo Drepr Regional  Final
Tomo Drepr Regional Final
 

Mehr von infosanitasi

Permen pupr24 2014
Permen pupr24 2014Permen pupr24 2014
Permen pupr24 2014
infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
infosanitasi
 
Permen PUPR pupr26 2014
Permen PUPR pupr26 2014Permen PUPR pupr26 2014
Permen PUPR pupr26 2014
infosanitasi
 

Mehr von infosanitasi (20)

Permen pupr24 2014
Permen pupr24 2014Permen pupr24 2014
Permen pupr24 2014
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR pupr26 2014
Permen PUPR pupr26 2014Permen PUPR pupr26 2014
Permen PUPR pupr26 2014
 
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
 
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program SanitasiUsulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasi
 
Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019
 
Pengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang KesehatanPengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang Kesehatan
 
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
 
Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015
 
Kesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBMKesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBM
 
Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019
 
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan SanitasiPeraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
 
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
 
Tahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi PermukimanTahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi Permukiman
 
Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015
 
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
 

Sanitation Development in Brunei Darussalam

  • 1. ABOUT BRUNEI DARUSSALAM BRUNEI PROFILE  GOVERNMENT : Malay Islamic Monarchy, Independence on 1st January 1984  LOCATION : North-West of Borneo Island in South Eastern Asia, Longitudes Between 114 deg 04’E & 115 deg 23’E And Latitudes Between 4 deg 00’N & 5 deg 05’N  CAPITAL : Bandar Seri Begawan  AREA : 5,765 sq. km.  POPULATION : 398,000(mid-year of 2008)  CLIMATE : Tropical Equatorial 1
  • 2. TYPES OF SANITATION FACILITIES SANITATION IN BRUNEI PIT LATRINES CENTRALISED SEWERAGE CENTRALISED SEWERAGE DIRECT TO SYSTEM INCLUDING SEWAGE SYSTEM INCLUDING SEWAGE TREATMENT WORKS TREATMENT WORKS GROUND OR WATERCOURSES SEPTIC TANKS EITHER TO SOAKAWAY OR DRAIN/RIVER SEWERAGE SYSTEM FOR TREATMENT AND/OR DISPOSAL SEPTIC TANK WITH SOAKAWAY SEPTIC TANK WITH SOAKAWAY PIT LATRINE PIT LATRINE DIRECT DISCHARGE OF SEWAGE DIRECT DISCHARGE OF SEWAGE TO RIVER TO RIVER 2
  • 3. SANITATION COVERAGE IN BRUNEI Estimated Estimated Estimated Estimated Population No. of Houses No. of Urban Houses No. of Rural Houses Septic Septic Urban Rural Total 1 Urban Rural Total 2 Sewer Other Sewer Other Tank Tank National 236,984 95,860 332,844 43,204 12,492 55,696 49% 46% 5% 0% 65% 35% Note: 1. Extracted from Table 1.6 Summary Tables of the population Census 2001 JPKE 2. Extracted from Table 13.1 Summary Tables of the population Census 2001 JPKE POPULATION SEWER SYSTEM CONNECTIONS 90% Public Sewerage and Septic Tank Public Sewerage system only with total length 40% of sewer pipe 740km 3
  • 4. SEWERAGE VACUUM SYSTEM HOUSEHOLD HDPE VACUUM VACUUM PUMP SANITARY PIPES MAIN STATION VACUUM COLLECTION POT/CHAMBER SEWAGE TREATMENT PLANT SEWAGE TREATMENT PLANT BOLKIAH ‘A’ AND ‘B’ WATER VILLAGES 4
  • 5. SEWERAGE PROJECTS NDP 2007-2012 Total of 20 projects with overall cost B$139,875,000.00 (US$97millions). The projects are categorized into 5 groups which are as follows: 1. Upgrading of Sewage Treatment Plant (4 projects) - B$37M 2. Extension of Main Sewer line (2 projects) - B$14M 3. Sewer pipe connection to Main Sewer line (10 projects) - B$65.375M 4. New Sewerage Scheme (3 projects) - B$19M 5. Sewerage Asset Management - B$4.5M Total : B$139.875M (US$97millions) 5
  • 6. SEWERAGE PROJECTS NDP (2007-2012) 916-019 916-020 916-021 916-023 916-022 916-025 916-035 916-029 916-028 916-027 916-026 916-018 916-034 916-033 916-032 916-017 916-024 916-030 916-031 Legends: Upgrading of Sewage Treatment Plant Extension of Main Sewer line Sewer pipe connection to the Main Sewer line New Sewerage Scheme 6
  • 7. STRATEGIC GOALS TARGET DATES STRATEGY REMARKS Greater access to high quality sewerage system in line with 5% increase every NDP the Millennium Development Currently at 40% sewer. Goal 7 (Ensure Environmental Sustainability). 7