International Scientific Conference
<< Modern city: modernization of territory and territory of modernization as the part of the festival "Days of Europe in Ekaterinburg" >>
2. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
Galleria Vittorio Emanuele II
Milan
3. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
POLAR CITY
CENTRAL STRUCTURE
The growth of Milan around its center
4. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
POLAR CITY
CENTRAL STRUCTURE
Milano Forma Urbis
Municipality of Milan, 1990
5. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
PGT
THE MULTIPOLAR CITY
The new PGT - Piano di Governo del
Territorio (Governmental Territorial Plan)
- november 2012)
88 NIL - Nuclei di Identità Locale
(Nuclei of Local Identity)
6. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
NIL - Nuclei di Identità Locali
The map of local services
PGT
7. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THE SLOW CITY
- Quality of living
- Local services
- Sweet mobility
PGT
Città Lenta: qualità dell’abitare, servizi a scala locale, mobilità dolce e capillare
8. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
TOWARDS A NEW URBAN FORM
empty spaces constructed spaces
TOWARDS A
NEW ECOLOGY
Considering the empty public spaces
beyond the traditional figures of public
spaces
9. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THE FAST CITY
PGT
The infrastructure of the fast city:
the city of the flow lines linked to the
dynamics of labor, local facilitiec and
international connections
10. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THE FAST CITY
The nodes of the fast city
PGT
11. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THE GREEN RING
- Urban agriculture
- Environmental recovery
- Water systems recovery
TOWARDS A
NEW ECOLOGY
12. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THE GREEN RAYS
- 50% of green in the new transformation
areas
- Reinforce the cycling and walking routes
- Promote a slow city
- Zero consumption of ground
TOWARDS A
NEW ECOLOGY
13. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THE GREEN RAYS
8 radial paths characterized by slow, local
moving. A continuous and protected path
to walk, run, cycle.
Creation of new green areas and
improving of the existing ones.
TOWARDS A
NEW ECOLOGY
Ray 7 - Parco Sempione
Ray 2 - Giardini di Porta Venezia
14. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
TOWARDS A
NEW ECOLOGY
Transformation areas
Green ring
Green rays
15. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
RECENT
PROJECTS
1_ Porta Nuova
2_ City Life
3_ Portello
4_ Gasometri Bovisa
5_ Maciachini
6_ Grande Bicocca
7_ Santa Giulia
8_
9_ Fiera Rho
10_ EXPO site 2015
1
2
3
4
5
6
7
8
9 10
Complesso Assago-Milanofiori
16. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
RECENT
PROJECTS
1_ Porta Nuova
2_ City Life
3_ Portello
4_ Gasometri Bovisa
5_ Maciachini
6_ Grande Bicocca
7_ Santa Giulia
8_
9_ Fiera Rho
10_ EXPO site 2015
4 million m² of transformation
7
6
1
5
4
10
9
8
2
3
Complesso Assago-Milanofiori
17. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
THE CHANGING MILAN
An itinerary through the new
urban transformations
THROUGH
18. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
La Bicocca
Metro 5
METRO 5
La Bicocca
THROUGH
19. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
La Bicocca
The site before the transformation project
THROUGH
20. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
La Bicocca
The transformation project
Delivery date: end of 2005
300.000 m² of public areas
THROUGH
21. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
La Bicocca
THROUGH
22. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
La Bicocca
The cherry hill
THROUGH
23. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
La Bicocca
Arch. Vittorio Gregotti
THROUGH
24. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
La Bicocca
Arch. Vittorio Gregotti
THROUGH
25. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
Porta Nuova
Metro 5
Metro 2
THROUGH
26. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
The site before the transformation project
THROUGH
27. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
The site before the transformation project
THROUGH
28. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
The site before the transformation project
THROUGH
29. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
The transformation project
more than 160.000 m² of public areas
3.720 parking places
6 different mixed functions
Leed certification on progress
THROUGH
30. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
The transformation project
THROUGH
31. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
The fast city
THROUGH
32. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
The slow city
THROUGH
33. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
Unicredit Tower - Arch. Cesar Pelli
THROUGH
34. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
Offices and Show room - Piùarch
THROUGH
35. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
Offices and residences - Munoz + Albin
THROUGH
36. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
Residences Bosco Verticale -
Boeri Studio
THROUGH
37. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
Residences Bosco Verticale -
Boeri Studio
THROUGH
38. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
Piazza Gae Aulenti
THROUGH
39. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
Piazza Gae Aulenti
THROUGH
40. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
Porta Nuova
Piazza Aulenti entrance from
Garibaldi Station
THROUGH
41. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
City Life
City Life
Metro 5
Metro 1
THROUGH
42. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
City Life
The site before the transformation project
- Sample’s market
THROUGH
43. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
City Life
The site before the transformation project
THROUGH
44. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
City Life
The transformation project
170.000 m² of public areas
Class A buildings (the higher italian
category for not passive buildings)
5 residence blocks
THROUGH
45. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
City Life
Arch. Zaha Hadid
Arch. Daniel Libeskind
Arch. Arata Isozaki
THROUGH
46. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
METRO 5
City Life
Residences - Arch. Zaha Hadid
THROUGH
47. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THROUGH
METRO 5
Portello
Portello
Metro 5
48. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THROUGH
METRO 5
Portello
The site before the transformation project
- Alfa Romeo Industries
49. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THROUGH
METRO 5
Portello
The site before the transformation project
- Alfa Romeo Industries
50. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THROUGH
METRO 5
Portello
The transformation project
70.000 m² of public areas
50.000 m² of offices and shops
51. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THROUGH
METRO 5
Portello
Residences - Arch. Cino Zucchi
52. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THROUGH
METRO 5
Portello
Business Center - Arch. Gino Valle
53. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THROUGH
METRO 5
Portello
Residence Bosco Verticale -
Arch. Charles Jenks and Andreas Kipar
Studio Land
54. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
DEVELOPMENT
OF A NEW URBAN
SPACE
ABITARE MILANO:
PUBLIC HOUSING
Via Gallarate, Arch. Massimo Basile
55. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
DEVELOPMENT
OF A NEW URBAN
SPACE
ABITARE MILANO:
PUBLIC HOUSING
Via Civitavecchia, Arch. Lorenzo Consalez
56. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
DEVELOPMENT
OF A NEW URBAN
SPACE
ABITARE MILANO:
PUBLIC HOUSING
Via Senigallia, Arch. Remo Dorigati
57. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
DEVELOPMENT
OF A NEW URBAN
SPACE
INTERVENTIONS ON
THE GREEN RAY
Ex Osram Area - Algarotti, Besozzi
58. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
DEVELOPMENT
OF A NEW URBAN
SPACE
INTERVENTIONS ON
THE GREEN RAY
Ex Osram Area - Algarotti, Besozzi
Before the intervention
59. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
DEVELOPMENT
OF A NEW URBAN
SPACE
INTERVENTIONS ON
THE GREEN RAY
Ex Osram Area - Algarotti, Besozzi
After the intervention
60. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
DEVELOPMENT
OF A NEW URBAN
SPACE
INTERVENTIONS ON
THE GREEN RAY
Ex Loro Parisini - Bugatti, Coppi
Before the intervention
61. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
DEVELOPMENT
OF A NEW URBAN
SPACE
INTERVENTIONS ON
THE GREEN RAY
Ex Loro Parisini - Bugatti, Coppi
After the intervention
62. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
EXPO 2015 SITE
Main axis: 1,5km
More than 150.000 m² of pavillions
69 countries already confirmed
20.000.000 extimated visitors
250.000 extimated visitors per day
60% reaching the place by public means
63. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
THE LANDSCAPE
Technological and architectonic monumentality
Attention to the landscape and to the open common areas
Offer the visitor a physical experience
64. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
EXPO 2015
HERITAGE
RESEARCH CENTER
Last February The EXPO SpA signed an
agreement with the Italian Ministery of
Environment for the construction of the
INTERNATIONAL CENTER FOOD AND
ENVIRONMENT SECURITY (CF&E)
This research center is one of the projects
that aim to leave important resources after
the EXPO will end. This approuch is one
of the strongest and more important of this
event
General purposes of the agreement
- Balance of the CO2 emissions that the event is going to produce in
preparation and realization phases (carbn foot printing)
- Promote pilot projects in developing counties, with the purpose of
spreading culture of food and environmental health
- realize during the EXPO an archive of best practices for the
sustainable and integrated use of natural, energetic and food resources.
65. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
EXPO 2015
HERITAGE
DIGITAL INFRASTRUCTURE
11 services related to infomobility
6 services in the field of transport
Based on the need to create an open environment that supports and enables
cooperation amongst the participants, to initiate the creation of a Smart City
and enable an authentic Digital Society, the main objectives are:
Facilitate the connection between the participants
Facilitate and promote interoperability and integration of services and
applications developed.
Make the fruition of the event easier to enhance the visitors’ enjoyment of the
“off-site” services and increase their overall level of satisfaction.
To propose an operational approach aimed at co-operation of those involved
whilst respecting the diversity of business models and marketing strategies.
CITY
PEOPLE
66. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITIONEXPO 2015
ARCHITECTONIC FACILITIES AND RELATED
TEAM:
HEAD DESIGNER:
YEAR:
ARCò - ARCHITECTURE AND COOPERATION
E PLUS STUDIO
MADE ASSOCIATI
METAMORPHOSYS
U-BOOT
Alessio Batistella - ARCò
2012
67. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
SHOP
RESTAURANT
+
B
B
B
B
B
B
A
A
A
A
A
A
+
+
+
+
+
+
+
+
+
MODULES
AGGREGATION
DEFINITION OF
FUNCTIONS
THE AGGREGATION SYSTEM ALLOWS TO ADAPT THE
PROJECT TO THE DIFFERENT CONFIGURATIONS
REQUIRED BY THE FUNCTIONAL PROGRAM
FLEXIBILITY
MODULEA
MODULEB
GENERAL STRATEGIES
68. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
3,60
5,70
5,70 15,00
modulo
A
modulo
A
modulo
A
mod
ulo
B
5,70
MODULARITA’
construction system
baloon frame
modulo
A
modulo
A
modulo
A
mod
ulo
B
ARCHETIPO - CASA RURALE
MODULARITA’
sistema costruttivo
baloon frame
superfici
fotovoltaiche
cascina
RICERCA DEL GIUSTO ORIENTAMENTO
3,60
5,70
5,70 15,00
modulo
A
modulo
A
modulo
A
mod
ulo
B
5,70
ARCHETIPO - CASA RURALE
MODULARITA’
sistema costruttivo
baloon frame
energy
harvesting
surfaces
cascina
FIND THE RIGHT EXPOSURE
SUSTAINABILITY MODULESARCHETYPE
Prospetto
INFOPOIN
scala 1:20
5.703.605.705.703.605.703.603.603.605.705.705.705.705.705.703.605.703.605.70 8.60
7
8
8
2 2
2
9
6
2
4
10 10 10
2
2
2
11
14
11
10 10
b
b
a
a
bb
ARCHETYPE SUSTAINABILITY
GENERAL STRATEGIES
FLOORPLAN
MODULES
69. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
01 Foundation
CONSTRUCTION KIT
70. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
02 First baloon frame’s
pillars
-
CONSTRUCTION KIT
71. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
03First baloon frame’s
pillars
First baloon frame’s
crossbeams
CONSTRUCTION KIT
72. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
04 Second baloon frame
CONSTRUCTION KIT
73. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
05Second baloon frame Closing beams
for roof and floor
CONSTRUCTION KIT
74. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
06 Third baloon frame
CONSTRUCTION KIT
75. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
07Third baloon frame Closing beams
for roof and floor and
cross bracing system
CONSTRUCTION KIT
76. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
08 Floors plugging
CONSTRUCTION KIT
77. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
09 Assembly of prefab straw bales
CONSTRUCTION KIT
78. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
10 Roof plugging
CONSTRUCTION KIT
79. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
COMPETITION
FACILITIES’
BUILDINGS
01
04
06 07
08
10 11
09
05
02 03Foundation
Second baloon frame
Third baloon frame
First baloon frame’s
pillars
-
Closing beams
for roof and floor
Closing beams
for roof and floor and
cross bracing system
First baloon frame’s
crossbeams
Floors plugging
Roof plugging Greenroof plantation
Assembly of prefab straw bales
11 Greenroof plantation
CONSTRUCTION KIT
80. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
350
km
FENCE
PATHS
COMPOST FOR AGRICULTURE
BENCHES PLAYGROUND EQUIPMENT
STEPS FOR PUBLIC EVENTS
830 mq PV PANELSgreen energy
WODEN FENCE
building sites EXPO 2015
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
WODEN FENCE RAILROAD TIES
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
natural materials
potting shed
zootechnics
reception and didactic
structures
PV PANELS
PV PANELS
PLANKS STRAW BALECROSSBEAMSBEAMS
MATERIALS
ASSEMBLY
RE-USE
RAILROAD TIES
RAILROAD TIES
830 mq PV PANELSgreen energy
WODEN FENCE
building sites EXPO 2015
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
natural materials
CROSSBEAMSBEAMS
MATERIALS
ASSEMBLY
RAILROAD TIES
COMPETITION
FACILITIES’
BUILDINGS
RE-USE STRATEGIES
81. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
350
km
FENCE
PATHS
COMPOST FOR AGRICULTURE
BENCHES PLAYGROUND EQUIPMENT
STEPS FOR PUBLIC EVENTS
830 mq PV PANELSgreen energy
WODEN FENCE
building sites EXPO 2015
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
WODEN FENCE RAILROAD TIES
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
natural materials
potting shed
zootechnics
reception and didactic
structures
PV PANELS
PV PANELS
PLANKS STRAW BALECROSSBEAMSBEAMS
MATERIALS
ASSEMBLY
RE-USE
RAILROAD TIES
RAILROAD TIES
COMPETITION
FACILITIES’
BUILDINGS
RE-USE STRATEGIES
00 PLANKS
0 CROSSBEAMS
PV PANELSPLANKS STRAW BALECROSSBEAMSBEAMS
ASSEMBLY
RE-USE
RAILROAD TIES
OAD TIES
82. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
350
km
FENCE
PATHS
COMPOST FOR AGRICULTURE
BENCHES PLAYGROUND EQUIPMENT
STEPS FOR PUBLIC EVENTS
830 mq PV PANELSgreen energy
WODEN FENCE
building sites EXPO 2015
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
WODEN FENCE RAILROAD TIES
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
natural materials
potting shed
zootechnics
reception and didactic
structures
PV PANELS
PV PANELS
PLANKS STRAW BALECROSSBEAMSBEAMS
MATERIALS
ASSEMBLY
RE-USE
RAILROAD TIES
RAILROAD TIES
COMPETITION
FACILITIES’
BUILDINGS
RE-USE STRATEGIES
FENCE
PATHS
COMPOST FOR AGRICULTURE
BENCHES PLAYGROUND EQUIPMENT
STEPS FOR PUBLIC EVENTS
WODEN FENCE RAILROAD TIES
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
PANELS
PV PANELS
RE-USE
83. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
350
km
FENCE
PATHS
COMPOST FOR AGRICULTURE
BENCHES PLAYGROUND EQUIPMENT
STEPS FOR PUBLIC EVENTS
830 mq PV PANELSgreen energy
WODEN FENCE
building sites EXPO 2015
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
WODEN FENCE RAILROAD TIES
20.000 PLANKS9.000 STRAW BALE
1.500 CROSSBEAMS550 BEAMS
natural materials
potting shed
zootechnics
reception and didactic
structures
PV PANELS
PV PANELS
PLANKS STRAW BALECROSSBEAMSBEAMS
MATERIALS
ASSEMBLY
RE-USE
RAILROAD TIES
RAILROAD TIES
COMPETITION
FACILITIES’
BUILDINGS
RE-USE STRATEGIES
350
km
ULTURE
PMENT
potting shed
zootechnics
reception and didactic
structures