Daniel Oliveira   &  Paulo Lourenço U N I V E R S I T Y  O F  M I N H O Barcelona, November 17-19  2004 REPAIR OF STONE MASONRY ARCH BRIDGES 4TH. CONFERENCE ON ARCH BRIDGES
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION INTRODUCTION Masonry Arch Bridges in Portugal:  - Roman Period ,  Medieval Age   and  Modern Period  (P riceless architectural and cultural legacy, but often showing signs of damage) Major Causes of Damage:  - Deep  change of loads  for which bridges were built - Lack of adequate  maintenance  - Ageing  processes (decay of the materials)
INTRODUCTION 4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 (Preventive maintenance) Generalized Damage:  - Absence of mortar in the stone joints - Existence of vegetation and biological colonization - Presence of humidity and efflorescences  - Accelerated decay of the materials Localized Damage:  - Longitudinal cracking of the arches - Movement of abutments - Lack of plumbness of the spandrel walls But damage can be “minimized”… - By performing periodical inspections - By reducing the traffic load - By carrying out repair and strengthening measures…
INTRODUCTION 4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4     When dealing with  architectural valuable constructions … Principles of Intervention in the Architectural Heritage (ICOMOS):  - Minimum repair to assure safety and durability - Respect of the original conception - Compatibility between existing and new materials - … Survey and Repair of 2 Portuguese Masonry Arch   Bridges  - Boutaca Bridge - Donim Bridge
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION BOUTACA BRIDGE BOUTACA BRIDGE  (stone masonry)  - Local: Batalha, center of Portugal - Dimensions: 60m length, 7m width  (5m span ) - Purpose: roadway  (belonging to the former road Lisbon-Porto) - Date of construction: 1860 Pointed Arches Flat roadway Tie rods + anchorages Buttressing System Uncertain safety conditions     Survey requested
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 - Existing anchorages much deteriorated and rather deformed  (outward movement of masonry) (Buttresses overloaded) INTRODUCTION BOUTACA BRIDGE Results of the Survey carried out:  - Vegetation & lost of plaster  (lack of maintenance) - Humidity & biological colonization  (deficient drainage system) - Cracking in the buttress walls
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION BOUTACA BRIDGE A) Structural Strengthening Additional “buttressing system” Patress plate Tie rod Recommended Remedial Measures:  - Lightening the buttresses     Tie rods +  patress plates
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION BOUTACA BRIDGE B) Other measures: - Waterproofing of the pavement and reconstruction of the drainage system - Cleaning and removal of vegetation - Replacement of plaster - Need for periodical visual inspections
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 - Dimensions: 62m length, 4m width  (larger span  ≈ 12m ) INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE DONIM BRIDGE  (stone masonry)  - Local: Guimarães, North of Portugal - Purpose: roadway  (major importance untill 2 centuries ago) - Date of construction: 15 th  – 16 th  century Semicircular Arches Flat roadway Pier + Cutwaters Flood arch Precarious safety conditions     Survey requested
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE Results of the Survey carried out:  - Extensive longitudinal cracking in the left arch - Infesting vegetation all over the bridge - Longitudinal cracking in the flood (right) arch - Cutwater of the right pier highly damaged
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE (Incremental principal strains) - 1 block foundation missing  (underwater inspection) - A numerical analysis (3D, non-linear) carried out allow to confirm the damage observed and helped understanding its causes - Spandrel walls out of plumb Major problems :  - Outward movements of spandrel walls - Longitudinal cracking in the left and right arches - Pre-collapse of a cutwater (right pier)
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE A) Left Arch  (return joint’s thickness to its original width) ]  profiles U  shape tie rod Anchor rods Recommended Remedial Measures:  - Remove of the infill - Voussoirs placed in their original positions by means of rope-strechers  - Fastening of stainless steel U profiles placed in a U shape above the arch and close to the spandrel walls - Tie rod to bind the spandrel walls - Infill put back into its place
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE B) Flood (right) Arch  (prevent further spreading of the arch) - Full width anchors across the arch - Stitching anchors linking the arch to the spandrel walls Stitching anchors Full width anchors
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE C) Other measures: - Dismantling and rebuilding of the right cutwater  (same stones + steel cramps + steel latches) - Replacement of the missing foundation stone block  - Waterproofing of the pavement and reconstruction of the drainage system - Cleaning and removal of vegetation - Repointing of the deteriorated masonry joints
4 T H.  C O N F E R E N C E  O N  A R C H  B R I D G E S  -  B A R C E L O N A ,  2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE FINAL REMARKS Common features to both examples Final Remarks  - Cleaning and removal of vegetation - Adoption of repair measures compatible with modern principles of structural intervention in the architectural heritage - Waterproofing and drainage of the pavement Thank you for your attention www.civil.uminho.pt/masonry

Weitere ähnliche Inhalte

Andere mochten auch (8)

Arc welding & safty
Arc welding & saftyArc welding & safty
Arc welding & safty
 
Resistance Welding
Resistance WeldingResistance Welding
Resistance Welding
 
Air Pollution
Air PollutionAir Pollution
Air Pollution
 
ARCHES AND ITS TYPES
ARCHES AND ITS TYPESARCHES AND ITS TYPES
ARCHES AND ITS TYPES
 
Sand Casting
Sand CastingSand Casting
Sand Casting
 
An introduction to arches
An introduction to archesAn introduction to arches
An introduction to arches
 
Geometric Modeling
Geometric Modeling Geometric Modeling
Geometric Modeling
 
Two way slab
Two way slabTwo way slab
Two way slab
 

Ähnlich wie Arches

938-Article Text-4728-1-10-20100512.pdf
938-Article Text-4728-1-10-20100512.pdf938-Article Text-4728-1-10-20100512.pdf
938-Article Text-4728-1-10-20100512.pdf
IndusConsultants
 
IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006
Manuj Ray
 
Blair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med ResBlair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med Res
BLAIRBRIXTON
 
Project Planning for Metal Truss Bridges
Project Planning for Metal Truss BridgesProject Planning for Metal Truss Bridges
Project Planning for Metal Truss Bridges
austintexasmike
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
Filipe Mello
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
SuryoNegoro3
 

Ähnlich wie Arches (20)

The evolution of pipe couplings - repair market
The evolution of pipe couplings - repair marketThe evolution of pipe couplings - repair market
The evolution of pipe couplings - repair market
 
938-Article Text-4728-1-10-20100512.pdf
938-Article Text-4728-1-10-20100512.pdf938-Article Text-4728-1-10-20100512.pdf
938-Article Text-4728-1-10-20100512.pdf
 
STEEL CONSTRUCTION
STEEL CONSTRUCTIONSTEEL CONSTRUCTION
STEEL CONSTRUCTION
 
Rehabilitation ppt.pptx
Rehabilitation ppt.pptxRehabilitation ppt.pptx
Rehabilitation ppt.pptx
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 
IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006
 
Blair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med ResBlair Brixton Portfolio 2011 Med Res
Blair Brixton Portfolio 2011 Med Res
 
Pool Circulation pdf document Aqua Middle East FZC
Pool Circulation pdf document Aqua Middle East FZCPool Circulation pdf document Aqua Middle East FZC
Pool Circulation pdf document Aqua Middle East FZC
 
Project Planning for Metal Truss Bridges
Project Planning for Metal Truss BridgesProject Planning for Metal Truss Bridges
Project Planning for Metal Truss Bridges
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdf
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
PAMLINE
PAMLINEPAMLINE
PAMLINE
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
Kakanj wastewater project
Kakanj wastewater projectKakanj wastewater project
Kakanj wastewater project
 
Kakanj City Waste Water Project
Kakanj City Waste Water ProjectKakanj City Waste Water Project
Kakanj City Waste Water Project
 
Details of anti noise walls - june 15 2016 - nouveau pont champlain
Details of anti noise walls - june 15 2016 - nouveau pont champlainDetails of anti noise walls - june 15 2016 - nouveau pont champlain
Details of anti noise walls - june 15 2016 - nouveau pont champlain
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
Streetlifepresentation
StreetlifepresentationStreetlifepresentation
Streetlifepresentation
 
17 if g popp teutschenthal v4
17 if g popp teutschenthal v417 if g popp teutschenthal v4
17 if g popp teutschenthal v4
 

Mehr von illpa

Mixing Moulding
Mixing MouldingMixing Moulding
Mixing Moulding
illpa
 
welding
weldingwelding
welding
illpa
 
CNC Machine Maintenance
CNC Machine MaintenanceCNC Machine Maintenance
CNC Machine Maintenance
illpa
 
Bridge
Bridge Bridge
Bridge
illpa
 
DC Motors
DC MotorsDC Motors
DC Motors
illpa
 
Introduction to VLSI
Introduction to VLSI Introduction to VLSI
Introduction to VLSI
illpa
 
footing
footingfooting
footing
illpa
 
Design of Beam for Shear
Design of Beam for ShearDesign of Beam for Shear
Design of Beam for Shear
illpa
 
limit state method
limit state methodlimit state method
limit state method
illpa
 
microprocessor
microprocessormicroprocessor
microprocessor
illpa
 
plc introduction
plc introduction plc introduction
plc introduction
illpa
 
Lathe Introduction
Lathe IntroductionLathe Introduction
Lathe Introduction
illpa
 
hydraulics
hydraulicshydraulics
hydraulics
illpa
 
hydraulics introduction
hydraulics introductionhydraulics introduction
hydraulics introduction
illpa
 
robot
robotrobot
robot
illpa
 

Mehr von illpa (20)

Theodolites
TheodolitesTheodolites
Theodolites
 
Bridge
BridgeBridge
Bridge
 
Computer Aided Design
Computer Aided DesignComputer Aided Design
Computer Aided Design
 
Fire Safety
Fire SafetyFire Safety
Fire Safety
 
Pumps
PumpsPumps
Pumps
 
Mixing Moulding
Mixing MouldingMixing Moulding
Mixing Moulding
 
welding
weldingwelding
welding
 
CNC Machine Maintenance
CNC Machine MaintenanceCNC Machine Maintenance
CNC Machine Maintenance
 
Bridge
Bridge Bridge
Bridge
 
DC Motors
DC MotorsDC Motors
DC Motors
 
Introduction to VLSI
Introduction to VLSI Introduction to VLSI
Introduction to VLSI
 
footing
footingfooting
footing
 
Design of Beam for Shear
Design of Beam for ShearDesign of Beam for Shear
Design of Beam for Shear
 
limit state method
limit state methodlimit state method
limit state method
 
microprocessor
microprocessormicroprocessor
microprocessor
 
plc introduction
plc introduction plc introduction
plc introduction
 
Lathe Introduction
Lathe IntroductionLathe Introduction
Lathe Introduction
 
hydraulics
hydraulicshydraulics
hydraulics
 
hydraulics introduction
hydraulics introductionhydraulics introduction
hydraulics introduction
 
robot
robotrobot
robot
 

Kürzlich hochgeladen

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Kürzlich hochgeladen (20)

UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 

Arches

  • 1. Daniel Oliveira & Paulo Lourenço U N I V E R S I T Y O F M I N H O Barcelona, November 17-19 2004 REPAIR OF STONE MASONRY ARCH BRIDGES 4TH. CONFERENCE ON ARCH BRIDGES
  • 2. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION INTRODUCTION Masonry Arch Bridges in Portugal:  - Roman Period , Medieval Age and Modern Period (P riceless architectural and cultural legacy, but often showing signs of damage) Major Causes of Damage:  - Deep change of loads for which bridges were built - Lack of adequate maintenance - Ageing processes (decay of the materials)
  • 3. INTRODUCTION 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 (Preventive maintenance) Generalized Damage:  - Absence of mortar in the stone joints - Existence of vegetation and biological colonization - Presence of humidity and efflorescences - Accelerated decay of the materials Localized Damage:  - Longitudinal cracking of the arches - Movement of abutments - Lack of plumbness of the spandrel walls But damage can be “minimized”… - By performing periodical inspections - By reducing the traffic load - By carrying out repair and strengthening measures…
  • 4. INTRODUCTION 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4   When dealing with architectural valuable constructions … Principles of Intervention in the Architectural Heritage (ICOMOS):  - Minimum repair to assure safety and durability - Respect of the original conception - Compatibility between existing and new materials - … Survey and Repair of 2 Portuguese Masonry Arch Bridges  - Boutaca Bridge - Donim Bridge
  • 5. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION BOUTACA BRIDGE BOUTACA BRIDGE (stone masonry)  - Local: Batalha, center of Portugal - Dimensions: 60m length, 7m width (5m span ) - Purpose: roadway (belonging to the former road Lisbon-Porto) - Date of construction: 1860 Pointed Arches Flat roadway Tie rods + anchorages Buttressing System Uncertain safety conditions  Survey requested
  • 6. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 - Existing anchorages much deteriorated and rather deformed (outward movement of masonry) (Buttresses overloaded) INTRODUCTION BOUTACA BRIDGE Results of the Survey carried out:  - Vegetation & lost of plaster (lack of maintenance) - Humidity & biological colonization (deficient drainage system) - Cracking in the buttress walls
  • 7. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION BOUTACA BRIDGE A) Structural Strengthening Additional “buttressing system” Patress plate Tie rod Recommended Remedial Measures:  - Lightening the buttresses  Tie rods + patress plates
  • 8. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION BOUTACA BRIDGE B) Other measures: - Waterproofing of the pavement and reconstruction of the drainage system - Cleaning and removal of vegetation - Replacement of plaster - Need for periodical visual inspections
  • 9. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 - Dimensions: 62m length, 4m width (larger span ≈ 12m ) INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE DONIM BRIDGE (stone masonry)  - Local: Guimarães, North of Portugal - Purpose: roadway (major importance untill 2 centuries ago) - Date of construction: 15 th – 16 th century Semicircular Arches Flat roadway Pier + Cutwaters Flood arch Precarious safety conditions  Survey requested
  • 10. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE Results of the Survey carried out:  - Extensive longitudinal cracking in the left arch - Infesting vegetation all over the bridge - Longitudinal cracking in the flood (right) arch - Cutwater of the right pier highly damaged
  • 11. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE (Incremental principal strains) - 1 block foundation missing (underwater inspection) - A numerical analysis (3D, non-linear) carried out allow to confirm the damage observed and helped understanding its causes - Spandrel walls out of plumb Major problems :  - Outward movements of spandrel walls - Longitudinal cracking in the left and right arches - Pre-collapse of a cutwater (right pier)
  • 12. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE A) Left Arch (return joint’s thickness to its original width) ] profiles U shape tie rod Anchor rods Recommended Remedial Measures:  - Remove of the infill - Voussoirs placed in their original positions by means of rope-strechers - Fastening of stainless steel U profiles placed in a U shape above the arch and close to the spandrel walls - Tie rod to bind the spandrel walls - Infill put back into its place
  • 13. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE B) Flood (right) Arch (prevent further spreading of the arch) - Full width anchors across the arch - Stitching anchors linking the arch to the spandrel walls Stitching anchors Full width anchors
  • 14. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE C) Other measures: - Dismantling and rebuilding of the right cutwater (same stones + steel cramps + steel latches) - Replacement of the missing foundation stone block - Waterproofing of the pavement and reconstruction of the drainage system - Cleaning and removal of vegetation - Repointing of the deteriorated masonry joints
  • 15. 4 T H. C O N F E R E N C E O N A R C H B R I D G E S - B A R C E L O N A , 2 0 0 4 INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE FINAL REMARKS Common features to both examples Final Remarks  - Cleaning and removal of vegetation - Adoption of repair measures compatible with modern principles of structural intervention in the architectural heritage - Waterproofing and drainage of the pavement Thank you for your attention www.civil.uminho.pt/masonry