SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Downloaden Sie, um offline zu lesen
• Superior Waterproof and Dustproof
• High Accuracy & Long Measuring Range
• Enhanced Absolute Encoder
• Versatile Application Functions
• Dual-Axis Tilt Sensor
High-Performance & High-Quality
GTS-250series
GTS-250seriesTOTAL STATION
H
S
V
H
S
V
GTS-250 series conform to IEC Standard IP54. No worry about sudden
bad weather.
• High accuracy: ±(2mm+2ppm x D) m.s.e.
• Long distance: 2,000m with a Single Prism.
On-board data collection, Survey, Layout, Road Calculation, and many
more functions.
To easily determine the height of a point where a prism cannot be placed.
Take a distance to a prism placed either directly above or directly below
the target point, then sight to the target point.
To measure horizontal distance, slope distance and height difference
between two prisms.
GTS-250 Series store the measured data up to 24,000 points.
GTS-250 Series adopted an absolute encoder system, which doesn’t
require 0 set and realizes stable measurement with less reading error.
Superior Waterproof and Dustproof
High Accuracy & Long Measuring Range
Versatile Application Functions
Remote Elevation Measurement (R.E.M.) Missing Line Measurement (M.L.M.)
Extra-large memory capacity for 24,000 points
Enhanced Absolute Encoder
900m
2,000m
mini prism
1p prism
GTS-250 Series Total Station
High-Performance & High-Quality
The dual-axis tilt sensor monitors inclination of both the X and Y axes,
and the correct horizontal and vertical angle readings automatically.
Dual-axis tilt sensor
Front View
Inclined
Horizontal Plane
True
Horizontal Plane
Inclined Instrument
Axis
True Perpendicular
Axis
Measuring PointSide View
Inclined
Horizontal Plane
True
Horizontal Plane
Inclined Instrument
Axis
True Perpendicular
Axis
Measuring Point
H
PRIMARY FEATURES
Layout function for coordinate measurement and control stakeout and
resection measurements.
Road function automatically calculates parameters of a complicated spiral
curve and a long distance route simply by defining the start point, end
point and curve elements.
LAYOUT Road
N
Z
E
Circular level for
easy check
Data exchange with PC
via RS-232C port
Detachable handle ergonomically designed for easy gripping
Clear and bright telescope
Magnification: 30x
Minimum focus: 1.3m
Instrument
center mark
Optical plummet
Magnification: 3x
Precise leveling by
a highly sensitive
plate level
Easy-to-use 10-key pads
with alphabet entry on
both faces
Lock and fine
adjustment tangent
screw.
Easy viewing displays with 4-line,
20-character, with backlight and
heater on both faces
Integrated tribrach with quick
lock/release feature
Rechargeable battery
BT-G1W
Rough but quick capture of
prism by sighting collimator
Telescope grip that
enables subtle
adjustment
Model GTS-252 GTS-255
Telescope
Magnification 30x
Resolving power 3.0"
Length: 150mm, Objective aperture: 45mm (50mm for EDM), Image: Erect, Field of view: 1°30' (26m/1,000m), Minimum focus: 1.3m
Angle measurement
Display resolutions (selectable) 1" / 5" (0.0002 / 0.001gon)
Accuracy (ISO 17123-3:2001) 2" 5"
Method Absolute rotary encoder scanning
Detecting system Horizontal 2 sides
Vertical 1 side
Compensator Dual-axis liquid tilt sensor, working range: ±3', Correction unit: 1”
Distance measurement
Measuring range
(under average conditions*1
)
Mini prism 900m (3,000ft)
One prism 2,000m (6,600ft.) / Under good conditions*2
: 2,300m (7,500ft.)
Three prisms 2,700m (8,900ft.) / Under good conditions*2
: 3,100m (10,200ft.)
Accuracy (D=measuring distance in mm) ±(2mm + 2ppm x D) m.s.e.
Least count in measurement Fine: 1mm (0.005ft.) / 0.2mm (0.001ft.), Coarse: 10mm (0.02ft.) / 1mm (0.005ft.), Tracking: 10mm (0.02ft.)
Measurement time*3
Fine: 1mm: 1.2s (Initial 4s) / 0.2mm: 2.8s (Initial 5s), Coarse: 0.7s (Initial 3s), Tracking: 0.4s (Initial 3s)
Interface and Data management
Display Graphics LCD, 160 × 64dots
Keyboard Alphanumeric 24keys
Control panel location On both faces
Data storage Internal memory 24,000pts.
Interface RS-232C
General
Levels Circular level 10' / 2mm
Plate level 30" / 2mm
Optical plummet telescope Magnification: 3x, Focusing range: 0.5m to infinity, Image: Erect
Dust and water protection (With BT-G1W) IP54 (IEC 60529)
Operating temperature -20 to +50°C (-4 to 122°F)
Size / Instrument height W184 x D172 x H336mm (W7.2 x D6.8 x H13.2in.) /176mm (6.93in.) from the tribrach dish
Weight Instrument with battery 4.9kg (10.8lbs)
Plastic carrying case 3.4kg (7.5lbs), Weight of the carrying case may be slightly different due to specific market.
Power supply
Battery (BT-G1W) Operating time (Fine mode) Approx. 27 hours (Single distance measurement every 30 seconds at +20°C / +68°F*4
)
Approx. 9 hours (Continuous distance measurement at +20°C / +68°F)
Battery charger Recharging time 1.8 hours (+10 to +40°C)
SPECIFICATIONS
©2013 Topcon Corporation All rights reserved. P-171-1 GE
Your local Authorized Topcon dealer is:
- Specifications subjectto change withoutnotice.
- Other trademarks and trade names are those of their respective owners.
TOPCON CORPORATION
75-1 Hasunuma-cho, Itabashi-ku, Tokyo 174-8580, Japan
Phone: (+81)3-3558-2993 Fax: (+81)3-3960-4214
www.topcon.co.jp
Standard Accessories
• Main unit x 1
• Battery (BT-G1W) x 1
• Battery Charger x 1
• Lens cap x 1
• Tool kit with case x 1
• Plastic rain cover x 1
• Silicon cloth x 1
• Carrying Case x 1
GTS-250series
*1 Average conditions: Slight haze with visibility about 20km (12.5 miles) moderate sunlight with light heat shimmer. *2 Good conditions: No haze with visibility about 40km (25 miles), overcast with no heat shimmer.
*3 The initial time will be different by a condition and setting EDM off time. *4 On the condition EDM off time is set at 0 minutes.

Weitere ähnliche Inhalte

Andere mochten auch

Crónica de un paseo ecológico comunitario
Crónica de un paseo ecológico comunitarioCrónica de un paseo ecológico comunitario
Crónica de un paseo ecológico comunitarioEnrique Posada
 
La república conservadora en Chile
La república conservadora en ChileLa república conservadora en Chile
La república conservadora en ChileGonzalo Rivas Flores
 
Aspectos a trabajar en el habla y los retrasos en su desarrollo
Aspectos a trabajar en el habla y los retrasos en su desarrolloAspectos a trabajar en el habla y los retrasos en su desarrollo
Aspectos a trabajar en el habla y los retrasos en su desarrolloZelorius
 
Peligros y valoración de los riesgos
Peligros y valoración de los riesgosPeligros y valoración de los riesgos
Peligros y valoración de los riesgosmarcelacar1103
 
RDA hacia un nuevo horizonte
RDA hacia un nuevo horizonteRDA hacia un nuevo horizonte
RDA hacia un nuevo horizonteSUAGM Info Cat
 

Andere mochten auch (7)

Crónica de un paseo ecológico comunitario
Crónica de un paseo ecológico comunitarioCrónica de un paseo ecológico comunitario
Crónica de un paseo ecológico comunitario
 
Edad media 4
Edad media 4Edad media 4
Edad media 4
 
La república conservadora en Chile
La república conservadora en ChileLa república conservadora en Chile
La república conservadora en Chile
 
Aspectos a trabajar en el habla y los retrasos en su desarrollo
Aspectos a trabajar en el habla y los retrasos en su desarrolloAspectos a trabajar en el habla y los retrasos en su desarrollo
Aspectos a trabajar en el habla y los retrasos en su desarrollo
 
Enara
EnaraEnara
Enara
 
Peligros y valoración de los riesgos
Peligros y valoración de los riesgosPeligros y valoración de los riesgos
Peligros y valoración de los riesgos
 
RDA hacia un nuevo horizonte
RDA hacia un nuevo horizonteRDA hacia un nuevo horizonte
RDA hacia un nuevo horizonte
 

Kürzlich hochgeladen

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 

Kürzlich hochgeladen (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 

jual total station topcon gts-255n : 021~94070886

  • 1. • Superior Waterproof and Dustproof • High Accuracy & Long Measuring Range • Enhanced Absolute Encoder • Versatile Application Functions • Dual-Axis Tilt Sensor High-Performance & High-Quality GTS-250series GTS-250seriesTOTAL STATION
  • 2. H S V H S V GTS-250 series conform to IEC Standard IP54. No worry about sudden bad weather. • High accuracy: ±(2mm+2ppm x D) m.s.e. • Long distance: 2,000m with a Single Prism. On-board data collection, Survey, Layout, Road Calculation, and many more functions. To easily determine the height of a point where a prism cannot be placed. Take a distance to a prism placed either directly above or directly below the target point, then sight to the target point. To measure horizontal distance, slope distance and height difference between two prisms. GTS-250 Series store the measured data up to 24,000 points. GTS-250 Series adopted an absolute encoder system, which doesn’t require 0 set and realizes stable measurement with less reading error. Superior Waterproof and Dustproof High Accuracy & Long Measuring Range Versatile Application Functions Remote Elevation Measurement (R.E.M.) Missing Line Measurement (M.L.M.) Extra-large memory capacity for 24,000 points Enhanced Absolute Encoder 900m 2,000m mini prism 1p prism GTS-250 Series Total Station High-Performance & High-Quality The dual-axis tilt sensor monitors inclination of both the X and Y axes, and the correct horizontal and vertical angle readings automatically. Dual-axis tilt sensor Front View Inclined Horizontal Plane True Horizontal Plane Inclined Instrument Axis True Perpendicular Axis Measuring PointSide View Inclined Horizontal Plane True Horizontal Plane Inclined Instrument Axis True Perpendicular Axis Measuring Point H
  • 3. PRIMARY FEATURES Layout function for coordinate measurement and control stakeout and resection measurements. Road function automatically calculates parameters of a complicated spiral curve and a long distance route simply by defining the start point, end point and curve elements. LAYOUT Road N Z E Circular level for easy check Data exchange with PC via RS-232C port Detachable handle ergonomically designed for easy gripping Clear and bright telescope Magnification: 30x Minimum focus: 1.3m Instrument center mark Optical plummet Magnification: 3x Precise leveling by a highly sensitive plate level Easy-to-use 10-key pads with alphabet entry on both faces Lock and fine adjustment tangent screw. Easy viewing displays with 4-line, 20-character, with backlight and heater on both faces Integrated tribrach with quick lock/release feature Rechargeable battery BT-G1W Rough but quick capture of prism by sighting collimator Telescope grip that enables subtle adjustment
  • 4. Model GTS-252 GTS-255 Telescope Magnification 30x Resolving power 3.0" Length: 150mm, Objective aperture: 45mm (50mm for EDM), Image: Erect, Field of view: 1°30' (26m/1,000m), Minimum focus: 1.3m Angle measurement Display resolutions (selectable) 1" / 5" (0.0002 / 0.001gon) Accuracy (ISO 17123-3:2001) 2" 5" Method Absolute rotary encoder scanning Detecting system Horizontal 2 sides Vertical 1 side Compensator Dual-axis liquid tilt sensor, working range: ±3', Correction unit: 1” Distance measurement Measuring range (under average conditions*1 ) Mini prism 900m (3,000ft) One prism 2,000m (6,600ft.) / Under good conditions*2 : 2,300m (7,500ft.) Three prisms 2,700m (8,900ft.) / Under good conditions*2 : 3,100m (10,200ft.) Accuracy (D=measuring distance in mm) ±(2mm + 2ppm x D) m.s.e. Least count in measurement Fine: 1mm (0.005ft.) / 0.2mm (0.001ft.), Coarse: 10mm (0.02ft.) / 1mm (0.005ft.), Tracking: 10mm (0.02ft.) Measurement time*3 Fine: 1mm: 1.2s (Initial 4s) / 0.2mm: 2.8s (Initial 5s), Coarse: 0.7s (Initial 3s), Tracking: 0.4s (Initial 3s) Interface and Data management Display Graphics LCD, 160 × 64dots Keyboard Alphanumeric 24keys Control panel location On both faces Data storage Internal memory 24,000pts. Interface RS-232C General Levels Circular level 10' / 2mm Plate level 30" / 2mm Optical plummet telescope Magnification: 3x, Focusing range: 0.5m to infinity, Image: Erect Dust and water protection (With BT-G1W) IP54 (IEC 60529) Operating temperature -20 to +50°C (-4 to 122°F) Size / Instrument height W184 x D172 x H336mm (W7.2 x D6.8 x H13.2in.) /176mm (6.93in.) from the tribrach dish Weight Instrument with battery 4.9kg (10.8lbs) Plastic carrying case 3.4kg (7.5lbs), Weight of the carrying case may be slightly different due to specific market. Power supply Battery (BT-G1W) Operating time (Fine mode) Approx. 27 hours (Single distance measurement every 30 seconds at +20°C / +68°F*4 ) Approx. 9 hours (Continuous distance measurement at +20°C / +68°F) Battery charger Recharging time 1.8 hours (+10 to +40°C) SPECIFICATIONS ©2013 Topcon Corporation All rights reserved. P-171-1 GE Your local Authorized Topcon dealer is: - Specifications subjectto change withoutnotice. - Other trademarks and trade names are those of their respective owners. TOPCON CORPORATION 75-1 Hasunuma-cho, Itabashi-ku, Tokyo 174-8580, Japan Phone: (+81)3-3558-2993 Fax: (+81)3-3960-4214 www.topcon.co.jp Standard Accessories • Main unit x 1 • Battery (BT-G1W) x 1 • Battery Charger x 1 • Lens cap x 1 • Tool kit with case x 1 • Plastic rain cover x 1 • Silicon cloth x 1 • Carrying Case x 1 GTS-250series *1 Average conditions: Slight haze with visibility about 20km (12.5 miles) moderate sunlight with light heat shimmer. *2 Good conditions: No haze with visibility about 40km (25 miles), overcast with no heat shimmer. *3 The initial time will be different by a condition and setting EDM off time. *4 On the condition EDM off time is set at 0 minutes.