Investigation on the Existing Geometry
Win Bo, Khin Maung Zaw, Kyaw Kyaw
Civil Engineering Department, Yangon
Gyogone,
ABSTRACT
Pathein Suspension Bridge constructed across Pathein
River completed in 2004 is a single-span suspension
bridge. The region has soft alluvial ground
to 2012 bridge inspection report, Current Situation
and Issues of Myanmar's Bridge Work, this
suspension bridge had lost a great deal of camber
since completion. And also it is found that there are
some problems such as movement of anchor block
tilting tower. In this study, investigations on the
existing of Pathein suspension bridge are
using 3D laser scanner, and site surveying. According
to the investigation results, it is found that all towers
are inclined towards river and the m
inclination occurs the downstream tower of
Chaungthar side. The downstream main cable sag is
lower than the upstream one. Most hangers are
inclined towards Pathein side and the maximum
inclination degree occurs at middle portion. The
existing truss profile is very different from as per
drawing and all truss nodes are under the horizontal
surface. Therefore seismic risk assessment and
disaster mitigation plan for unexpected future severe
earthquake should be developed.
Keyword: Pathein Suspension Bridge, FARO 3D laser
scanner, tower inclination, main cable profile.
I. INTRODUCTION
Pathein is the largest city and the capital of the
Ayeyarwaddy Region, Myanmar. It is located 190
(120 mi) west of Yangon on the bank of the
River which is a western branch of the
River. Pathein Suspension Bridge const
Pathein (Ngawan) river completed in 2004 is a
span suspension bridge as shown in Fig.
of the most important bridge connected to some
western costal line areas such as Ngwesaung
and Chaungthar Beach and the Southern part of
Rakhine state. The region has soft alluvial
International Journal of Trend in Scientific Research and Development (IJTSRD)
International Open Access Journal | www.ijtsrd.com
ISSN No: 2456 - 6470 | Volume - 2 | Issue – 6 | Sep
www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018
Existing Geometry of Pathein Suspension Bridge
Win Bo, Khin Maung Zaw, Kyaw Kyaw
Civil Engineering Department, Yangon Technological University,
Gyogone, Insein Township, Yangon, Myanmar
Pathein Suspension Bridge constructed across Pathein
span suspension
bridge. The region has soft alluvial ground. According
to 2012 bridge inspection report, Current Situation
and Issues of Myanmar's Bridge Work, this
suspension bridge had lost a great deal of camber
since completion. And also it is found that there are
some problems such as movement of anchor block,
investigations on the
existing of Pathein suspension bridge are presented by
using 3D laser scanner, and site surveying. According
to the investigation results, it is found that all towers
are inclined towards river and the maximum
inclination occurs the downstream tower of
Chaungthar side. The downstream main cable sag is
lower than the upstream one. Most hangers are
inclined towards Pathein side and the maximum
inclination degree occurs at middle portion. The
profile is very different from as per
drawing and all truss nodes are under the horizontal
surface. Therefore seismic risk assessment and
disaster mitigation plan for unexpected future severe
Bridge, FARO 3D laser
scanner, tower inclination, main cable profile.
is the largest city and the capital of the
. It is located 190 km
on the bank of the Pathein
which is a western branch of the Ayeyarwaddy
nstructed across
Pathein (Ngawan) river completed in 2004 is a single-
Fig. 1. It is one
of the most important bridge connected to some
Ngwesaung Beach
r Beach and the Southern part of
soft alluvial ground.
According to 2012 bridge inspection report
suspension bridge had lost a great deal of
since completion. In the 2010 study it was suggested
that because the anchorage has simply been laid on
the cast-in-place concrete piles, the horizontal force of
the main cable may move the anchorage forward.
a result, both main towers top
has not been investigated w
stopped or not and this tilting effect may damage or
not the existing bridge. Recently the Myaung Mya
suspension bridge failure occurred in Ayeyarwaddy
delta region. It is important to
during its design life.
So the purpose of this study is to measure the existing
condition of this bridge. To check the top of tower
tilting is dead or alive, the monitoring system has
installed at both side of downstream tower. FAR
3D laser scanner and conventional measuring devices
were used to know some data of the existing bridge.
II. DESCRIPTION OF PATHEIN BRIDGE
Pathein Bridge is a suspensi
span of 268.2240 m and the distance between the
splay saddle in the anchor and main tower is 86.00 m
as shown in Fig. 1. The carriage way consists of two
lanes for motorized traffic on the decking of the truss,
total width 8.5 m. the headroom for navigation is 33 ft
and the deck has a transverse inclination of 0.5 % an
longitudinal inclination of 1.0 %.
the following loadings;
HS 25 of AASHTO Highway loadings.
Single heavy vehicles of 75 ton at 10 m apart.
Fluctuation temperature with a range of +/
Wind velocity has been considered 90 mph.
Research and Development (IJTSRD)
www.ijtsrd.com
6 | Sep – Oct 2018
Oct 2018 Page: 118
Pathein Suspension Bridge
iversity,
According to 2012 bridge inspection report, this
suspension bridge had lost a great deal of camber
since completion. In the 2010 study it was suggested
that because the anchorage has simply been laid on
place concrete piles, the horizontal force of
the main cable may move the anchorage forward. As
towers top were tilted to river. It
whether movement has
stopped or not and this tilting effect may damage or
not the existing bridge. Recently the Myaung Mya
suspension bridge failure occurred in Ayeyarwaddy
delta region. It is important to strengthen the structure
So the purpose of this study is to measure the existing
condition of this bridge. To check the top of tower
tilting is dead or alive, the monitoring system has
installed at both side of downstream tower. FARO
3D laser scanner and conventional measuring devices
were used to know some data of the existing bridge.
DESCRIPTION OF PATHEIN BRIDGE
ion bridge with a main
m and the distance between the
the anchor and main tower is 86.00 m
1. The carriage way consists of two
lanes for motorized traffic on the decking of the truss,
total width 8.5 m. the headroom for navigation is 33 ft
and the deck has a transverse inclination of 0.5 % and
longitudinal inclination of 1.0 %. It is designed with
HS 25 of AASHTO Highway loadings.
Single heavy vehicles of 75 ton at 10 m apart.
Fluctuation temperature with a range of +/- 25˚C.
Wind velocity has been considered 90 mph.
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
@ IJTSRD | Available Online @ www.ijtsrd.com
Fig. 1.a Elevation of Pathein Suspension Bridge
Fig. 1.b Perspective View of Pathein Suspension
Bridge
Fig. 1.c Plan View from Google Earth
III. SOME CURRENT CONDITIONS OF
PATHEIN BRIDGE
The main cables are suspended between two main
towers. There may be many reasons tilting the top of
tower towards river. As described before, because the
region has soft alluvial ground, the horizontal force of
the main cable may move concrete blocks and/o
tower foundation may rotate due to differential
settlement. Moreover, it is due to some construction
errors or the backstay cables lengths are
the optimum. Most hangers are inclined towards
Pathein side and the towers top tilting amounts are
same. We can see clearly loss of camber and the
unsymmetrical deflection of the main truss of this
bridge.
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018
Fig. 1.a Elevation of Pathein Suspension Bridge
Fig. 1.b Perspective View of Pathein Suspension
Fig. 1.c Plan View from Google Earth
SOME CURRENT CONDITIONS OF
The main cables are suspended between two main
towers. There may be many reasons tilting the top of
tower towards river. As described before, because the
region has soft alluvial ground, the horizontal force of
the main cable may move concrete blocks and/or the
tower foundation may rotate due to differential
settlement. Moreover, it is due to some construction
lengths are longer than
the optimum. Most hangers are inclined towards
amounts are not
same. We can see clearly loss of camber and the
unsymmetrical deflection of the main truss of this
Fig. 2 Inclined
Fig. 3 Inclined hanger
Fig. 4 Web crippling of Vertical member at
downstream bearing of Chaungthar Side
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470
Oct 2018 Page: 119
Inclined tower
Fig. 3 Inclined hanger
Fig. 4 Web crippling of Vertical member at
downstream bearing of Chaungthar Side
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
@ IJTSRD | Available Online @ www.ijtsrd.com
Fig. 5 Deflection of truss near Tower
IV. SOME DEVICES MEASURED AT
BRIDGE SITE
The following devices were used to know the existing
condition of Pathein Suspension bridge. They are
1. Monitoring system
2. FARO 3D Laser scanner
3. Digital spirit level
4.1 Monitoring System
The main purpose of installing the monitoring system
is to check whether the top of tower tilting is dead or
alive. In order to monitor the inclination of the main
tower, the system has an inclinometer and a portable
data logger. The inclinometer is to measure the
movement of tower and the data logger is to record
the measured data of inclinometer. The monitoring
system was installed both downstream towers of
Pathein suspension bridge. Fig. 8 shows the plan view
of the bridge site and the location of
system. The tower movement which is positive or
negative direction is also shown.
Fig. 6 Inclinometer
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018
Fig. 5 Deflection of truss near Tower
SOME DEVICES MEASURED AT
The following devices were used to know the existing
condition of Pathein Suspension bridge. They are
The main purpose of installing the monitoring system
to check whether the top of tower tilting is dead or
In order to monitor the inclination of the main
tower, the system has an inclinometer and a portable
to measure the
movement of tower and the data logger is to record
the measured data of inclinometer. The monitoring
system was installed both downstream towers of
Pathein suspension bridge. Fig. 8 shows the plan view
of the bridge site and the location of monitoring
system. The tower movement which is positive or
Fig. 7 Portable data logger
.
Fig. 8 Plan view of the direction
4.2 FARO 3D Laser Scanning Process
FARO 3D Laser Scanner
measurement of Pathein Suspension bridge. It can
produce incredibly detailed three
of complex environments and large scale geometries.
The resulting image is an assembly of millions of 3D
measurement points that pro
reproduction of existing conditions. The
measurements of using FARO 3D Laser Scanner to
measure the detail measurements are described the
following chart.
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470
Oct 2018 Page: 120
Fig. 7 Portable data logger
irection of measurement
FARO 3D Laser Scanning Process
is used for detailed
measurement of Pathein Suspension bridge. It can
produce incredibly detailed three-dimensional images
of complex environments and large scale geometries.
The resulting image is an assembly of millions of 3D
measurement points that provide an exact digital
reproduction of existing conditions. The
measurements of using FARO 3D Laser Scanner to
measure the detail measurements are described the
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
@ IJTSRD | Available Online @ www.ijtsrd.com
Fig. 9 FARO 3D Laser Scanner and Scanning
Objects
V. RESULTS AND DISCUSSIONS
Most of results are based on the monitoring and field
measurement. Moreover the data from the ministry of
construction such as field measurement data and some
as per drawing data discussed. The following portions
are discusses in this paper.
1. Main Tower
2. Main cable
3. Hanger
4. Steel Stiffening Truss
5.1 Main Tower
The Main Tower are designed with a box
1.9 m x 2.2 m, and made of steel Q345. The height of
main tower columns at both sides is 34.43 m. The
bottom transverse beam of main tower i
prestressing reinforced concrete, and have a box
section of 2.5 m x 2.0 m. Table I and Table II shows
the tower top tilting amount measured from Ministry
of Construction and measured with FARO 3D Laser
Scanner. All towers are inclined to longitud
direction and towards river.
TABLE I. MAIN TOWER INCLINATION
Measured
Date
Pathein Side
(mm)
Chaungthar
Side
20-6-2016 -240
14-10-2016 -225
TABLE II. MAIN TOWER INCLINATION
(MEASURED DATE 6.4.17)
Side
Location
Pathein Side
(mm)
Chaungthar
Side
Upstream -197
Downstream -213
Average -205
The data contained in Table I are collected from
Ministry of construction measured in 2016. Although
the two measurement values at Pathein side are much
closed, Chaungthar side values are quite different.
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018
Fig. 9 FARO 3D Laser Scanner and Scanning
DISCUSSIONS
Most of results are based on the monitoring and field
measurement. Moreover the data from the ministry of
construction such as field measurement data and some
as per drawing data discussed. The following portions
The Main Tower are designed with a box-section of
1.9 m x 2.2 m, and made of steel Q345. The height of
main tower columns at both sides is 34.43 m. The
bottom transverse beam of main tower is made of
prestressing reinforced concrete, and have a box-
section of 2.5 m x 2.0 m. Table I and Table II shows
the tower top tilting amount measured from Ministry
of Construction and measured with FARO 3D Laser
Scanner. All towers are inclined to longitudinal
INCLINATION
Chaungthar
Side (mm)
+165
+310
INCLINATION
6.4.17)
Chaungthar
Side (mm)
+281
+291
+286
The data contained in Table I are collected from
Ministry of construction measured in 2016. Although
the two measurement values at Pathein side are much
closed, Chaungthar side values are quite different.
The data measured with FARO 3D Laser Scanner are
described in Table II. Every tower has its own tilting
amount. Although the inclinations are different, both
downstream towers tilting are more than the upstream
one. Moreover, Chaungthar side towers are more
inclined than Pathein side.
Fig. 10 Tower inclination at Chaungthar side due to
temperature
Fig. 11 Tower inclination and Temperature at
Chaungthar side
Fig 10 and Fig 11 are the monitoring results for
downstream tower of Chaungthar side from
November 2017 to April 2018. Fig 10 shows the
inclination degree of tower due to temperature
fluctuation. The blue sports represent for the
inclination degree parallel to bridge axis direction and
the red sports are for perpendicular to bridge axis
direction. Fig 11 describes the hourly recorded data of
temperature, inclination degree parallel to bridge axis
direction and perpendicular to bridge axis direction.
According to these recorded data, no significant
amount of tower inclination degree can be seen. The
inclination degrees are very small and these a
the effect of temperature fluctuation. So we can
conclude that the tower is stable or it is not alive.
5.2 Main Cable
The main cables adopt high tensile strength
galvanized steel wires. It is parallel wire strand type.
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470
Oct 2018 Page: 121
The data measured with FARO 3D Laser Scanner are
scribed in Table II. Every tower has its own tilting
amount. Although the inclinations are different, both
downstream towers tilting are more than the upstream
one. Moreover, Chaungthar side towers are more
inclination at Chaungthar side due to
temperature
Fig. 11 Tower inclination and Temperature at
Chaungthar side
Fig 10 and Fig 11 are the monitoring results for
downstream tower of Chaungthar side from
November 2017 to April 2018. Fig 10 shows the
nation degree of tower due to temperature
fluctuation. The blue sports represent for the
inclination degree parallel to bridge axis direction and
the red sports are for perpendicular to bridge axis
direction. Fig 11 describes the hourly recorded data of
mperature, inclination degree parallel to bridge axis
direction and perpendicular to bridge axis direction.
According to these recorded data, no significant
amount of tower inclination degree can be seen. The
inclination degrees are very small and these are due to
the effect of temperature fluctuation. So we can
conclude that the tower is stable or it is not alive.
The main cables adopt high tensile strength
galvanized steel wires. It is parallel wire strand type.
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
@ IJTSRD | Available Online @ www.ijtsrd.com
The diameter of steel wire is 5.1 mm after galvanized.
There are 37 bundles of steel wire in the main cable
and each bundle consists of 61 number of steel wires.
As describe the previous section, each tower has its
own tilting amount. Because of this differential tilting,
the existing main cables profile is unsymmetrical.
Moreover these two main cables profile are different
from its original, as per drawing, profile.
Fig. 12 Main Cable Profiles
TABLE III. MAXIMUM SAG
DIFFERENCE
Location
Drawing
Sag (m)
Measured
Sag (m)
Upstream 28.737 29.37
Downstream 28.737 29.50
Fig. 12 shows the two main cables profile, the
existing main cable profile and profile as per drawing.
The existing profile is lower than as per drawing
profile. Table III describes the maximum sag of main
cables profile and the difference of these two pro
From Table II, it can be clearly seen that the
downstream towers are more inclined than the
upstream. This is the reason why the downstream
main cable sag is lower than the upper one.
Fig. 13.a Upstream Cable length
Chaungthar Side
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018
is 5.1 mm after galvanized.
There are 37 bundles of steel wire in the main cable
and each bundle consists of 61 number of steel wires.
As describe the previous section, each tower has its
own tilting amount. Because of this differential tilting,
existing main cables profile is unsymmetrical.
Moreover these two main cables profile are different
from its original, as per drawing, profile.
Fig. 12 Main Cable Profiles
SAG AND
Difference
(m)
- 0.633
- 0.763
Fig. 12 shows the two main cables profile, the
existing main cable profile and profile as per drawing.
The existing profile is lower than as per drawing
profile. Table III describes the maximum sag of main
cables profile and the difference of these two profiles.
From Table II, it can be clearly seen that the
downstream towers are more inclined than the
upstream. This is the reason why the downstream
main cable sag is lower than the upper one.
length
Fig. 13.b Downstream Cable length
TABLE IV. TOTAL LENGTH
Location
Drawing
length
(m)
Measured
length (m)
Upstream 276.103
Downstream 276.103
The measured main cables length and as per drawing
main cables length are shown in Fig. 13.a and Fig.
13.b. Fig. 13.a is for the upstream main cable length
and Fig. 13.b is for downstream. The main cables
difference near towers are noticeable and others are
nearly the same length. The maximum segment length
difference is 1.009 m at the nearest segment of
Pathein side tower for upstream and 0.937 m at the
nearest segment of Chaungthar side tower for
downstream. The total upstream main cable length
between the towers is 276.94 m and the downstream
is 275.981 m. The length difference is 0.06% for
upstream and 0.044% for downstream. Both upstream
and downstream main cable
Table 4.
5.3 Hanger
The hangers are parallel wire strand type. There is one
suspender per suspending point at 5 m apart. The
suspenders are designed with high tensile strength
galvanized steel wires. There are 61 numbers of 5
mm diameter strand wire for one hanger. Pathein
suspension bridge was inspected in 2010 and 2011
with JAPAN-Myanmar Bridge engineer. It was
reported some hangers are inclined and most of them
are inclined towards Pathein side. But few hangers are
towards Chaungthar side. The reason of these hanger
inclination problem was not reported.
Hangers’ inclinations were measured with electronic
spirit level and FARO 3D Laser Scanner. The first
one is direct measurement and it was done in
February 2017. The second is not a direct
measurement and the processes are described in chart
Pathein Side
Chaungthar Side
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470
Oct 2018 Page: 122
Fig. 13.b Downstream Cable length
LENGTH OF MAIN CABLE
Measured
length (m)
Difference
(m)
275.940 - 0.150
275.981 - 0.122
measured main cables length and as per drawing
main cables length are shown in Fig. 13.a and Fig.
13.b. Fig. 13.a is for the upstream main cable length
and Fig. 13.b is for downstream. The main cables
difference near towers are noticeable and others are
early the same length. The maximum segment length
difference is 1.009 m at the nearest segment of
Pathein side tower for upstream and 0.937 m at the
nearest segment of Chaungthar side tower for
downstream. The total upstream main cable length
owers is 276.94 m and the downstream
is 275.981 m. The length difference is 0.06% for
upstream and 0.044% for downstream. Both upstream
and downstream main cable lengths are shown in
The hangers are parallel wire strand type. There is one
suspender per suspending point at 5 m apart. The
suspenders are designed with high tensile strength
galvanized steel wires. There are 61 numbers of 5
mm diameter strand wire for one hanger. Pathein
suspension bridge was inspected in 2010 and 2011
Myanmar Bridge engineer. It was
reported some hangers are inclined and most of them
are inclined towards Pathein side. But few hangers are
towards Chaungthar side. The reason of these hanger
inclination problem was not reported.
measured with electronic
spirit level and FARO 3D Laser Scanner. The first
one is direct measurement and it was done in
February 2017. The second is not a direct
measurement and the processes are described in chart
Pathein Side
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
@ IJTSRD | Available Online @ www.ijtsrd.com
1. The scanning object processing was
2017. The finalization was done with AutoCAD
software.
Fig. 14.a Hanger inclination measured with FARO 3D
Laser Scanner
Fig. 14.b Hanger inclination measured with electronic
spirit level
Fig. 14.c Hanger inclination measured with FA
Laser Scanner and electronic spirit level
Fig. 14.d Hanger length difference
Fig. 14.a and Fig 14.b show the hanger inclination
degree of Pathein suspension bridge. Fig. 14.a is the
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018
1. The scanning object processing was taken in April
2017. The finalization was done with AutoCAD
Fig. 14.a Hanger inclination measured with FARO 3D
Fig. 14.b Hanger inclination measured with electronic
Fig. 14.c Hanger inclination measured with FARO 3D
Laser Scanner and electronic spirit level
Fig. 14.d Hanger length difference
Fig. 14.a and Fig 14.b show the hanger inclination
degree of Pathein suspension bridge. Fig. 14.a is the
measured results used FARO 3D laser scanner. The
direct measured results used the electronic spirit level
is shown in Fig. 14.b. From these two figures
hangers near tower and the middle hangers are more
inclined than others. Negative sign means the hangers
are inclined towards Chaungthar side. The towers at
Chaungthar side are more inclined than the tower at
Pathein side. This is one of the reasons
hangers are inclined towards Pathein side. Fig. 14.c is
the hanger inclination degree measured with FARO
3D Laser Scanner and electronic spirit level. Although
the measured results are different, their lines shape are
similar. Fig. 14 d. is the hanger length difference
between the measured length and as per drawing
length. All existing hangers are longer than as per
drawing length. This may be one of the factors that
this suspension bridge steel truss vertical profile has
unusual deformed shape. The blue line represents
upstream hangers’ length difference and the red line is
for downstream.
5.4 Steel Stiffing Truss
Main girder is a steel stiffening truss using "warren''
girder trusses. The truss is 3m high and 5m long per
bay. The end bays are 5.5 m long. A bay is taken as a
unit to the upper and bottom chord. The total length of
truss between bearings is 266.00 m. The truss has a
vertical curve and it is for camber and its radius is
14000 m. The steel structures have the bottom bracing
for wind stability and they are designed with H
section. To increase the stability of main truss, all
gussets on upper chords have transverse bracing.
Ministry of Construction have checked regularly to
know the condition of this bridge especially the
inclination of towers and the vertical profile of steel
stiffening truss. Moreover variations of the vertical
profile were recorded during a load test program
tested in June 2016. It was done with two dump trucks
weighing 20 tons each and the total weight
The trucks were placed at three locations on the
bridge and Fig. 15 is one of the locations of trucks
during load test program.
Fig. 15 Location of trucks during load test at L/4 Span
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470
Oct 2018 Page: 123
measured results used FARO 3D laser scanner. The
direct measured results used the electronic spirit level
is shown in Fig. 14.b. From these two figures, the
hangers near tower and the middle hangers are more
inclined than others. Negative sign means the hangers
are inclined towards Chaungthar side. The towers at
Chaungthar side are more inclined than the tower at
Pathein side. This is one of the reasons why the most
hangers are inclined towards Pathein side. Fig. 14.c is
the hanger inclination degree measured with FARO
3D Laser Scanner and electronic spirit level. Although
the measured results are different, their lines shape are
e hanger length difference
between the measured length and as per drawing
length. All existing hangers are longer than as per
drawing length. This may be one of the factors that
this suspension bridge steel truss vertical profile has
. The blue line represents
upstream hangers’ length difference and the red line is
Main girder is a steel stiffening truss using "warren''
girder trusses. The truss is 3m high and 5m long per
e 5.5 m long. A bay is taken as a
unit to the upper and bottom chord. The total length of
truss between bearings is 266.00 m. The truss has a
vertical curve and it is for camber and its radius is
14000 m. The steel structures have the bottom bracing
nd stability and they are designed with H
section. To increase the stability of main truss, all
gussets on upper chords have transverse bracing.
Ministry of Construction have checked regularly to
know the condition of this bridge especially the
inclination of towers and the vertical profile of steel
stiffening truss. Moreover variations of the vertical
profile were recorded during a load test program
tested in June 2016. It was done with two dump trucks
weighing 20 tons each and the total weight is 40 tons.
The trucks were placed at three locations on the
bridge and Fig. 15 is one of the locations of trucks
Fig. 15 Location of trucks during load test at L/4 Span
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
@ IJTSRD | Available Online @ www.ijtsrd.com
Fig. 16 Location of trucks during load test at 3L/4
Span
Fig. 16 Deflection of Pathein suspension Bridge
Fig. 16 shows the vertical profile of steel stiffening
truss of Pathein suspension bridge. The blue line is as
per drawing profile of the truss and the maximum
camber is + 642.15 mm at the mid-span
construction was completed in 2004. The yellow
colour line is the truss profile measured by ministry of
construction survey team in September 2011. At that
time, the road surface was under the horizontal line.
The maximum deflection is -104.233 mm and that
point is 33 m from Pathein side tower. Meanwhile the
mid-span deflection was -74.305 mm. at the end of
year 2011 measurement, the maximum deflection
became - 224.334 mm and mid-span deflection was
84.683 mm. The deflection was gradually
and it was found the worst condition in July 2016
measurement. But in October 2016 measurement,
recovery deflection was occurred. The red line is the
deflection measured with FARO 3D laser scanner in
April 2017. According to that measurement, the
maximum is -253.49 mm near Chaungthar side tower
and mid-span deflection is -109.85 mm.
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456
www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018
Fig. 16 Location of trucks during load test at 3L/4
Fig. 16 Deflection of Pathein suspension Bridge
Fig. 16 shows the vertical profile of steel stiffening
truss of Pathein suspension bridge. The blue line is as
s and the maximum
of bridge. The
construction was completed in 2004. The yellow
colour line is the truss profile measured by ministry of
construction survey team in September 2011. At that
time, the road surface was under the horizontal line.
.233 mm and that
point is 33 m from Pathein side tower. Meanwhile the
74.305 mm. at the end of
year 2011 measurement, the maximum deflection
span deflection was -
84.683 mm. The deflection was gradually increased
and it was found the worst condition in July 2016
measurement. But in October 2016 measurement,
recovery deflection was occurred. The red line is the
deflection measured with FARO 3D laser scanner in
April 2017. According to that measurement, the
253.49 mm near Chaungthar side tower
VI. CONCLUSION
Based on these investigation results,
inclinations of towers are different, both downstream
towers tilting are more than the upstream one.
Moreover, both towers at Chaungthar side are more
inclined than Pathein side. This is the reason why the
downstream main cable sag is greater
upstream one and most of hangers are inclined
towards Pathein side. The maximum hanger
inclination is 4.16 degrees and it is occurred at mid
span. The existing truss deformation is unusual
pattern and it may be due to the differential
inclination of tower. Measuring the existing geometry
is one of the essential processes to model and analyze
the structures. The existing structural performance of
this bridge can be assessed using these investigative
data. After assessing the existing structural
performances, the required action plan can be
proposed confidentially.
ACKNOWLEDGMENT
The authors are thankful to the Ministry of
Construction for providing the required data in this
study.
REFERENCES
1. Public Works. 2004. Design Drawings of Pathein
Suspension Bridge.
2. AASHTO. 2002. Standard Specifications for
Highway Bridge. 17th
ed. American Association of
State Highway and Transportation Officials.
3. FARO® Laser Scanner Focus3D Manual
October 2011.
4. Japan Infrastructure Partners (JIP)
Situation and Issues of Myanmar's Bridge
September 2012.
International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470
Oct 2018 Page: 124
Based on these investigation results, although the
inclinations of towers are different, both downstream
towers tilting are more than the upstream one.
Moreover, both towers at Chaungthar side are more
inclined than Pathein side. This is the reason why the
downstream main cable sag is greater than the
upstream one and most of hangers are inclined
towards Pathein side. The maximum hanger
inclination is 4.16 degrees and it is occurred at mid-
span. The existing truss deformation is unusual
pattern and it may be due to the differential
of tower. Measuring the existing geometry
is one of the essential processes to model and analyze
the structures. The existing structural performance of
this bridge can be assessed using these investigative
data. After assessing the existing structural
ormances, the required action plan can be
The authors are thankful to the Ministry of
Construction for providing the required data in this
Design Drawings of Pathein
Standard Specifications for
ed. American Association of
State Highway and Transportation Officials.
Laser Scanner Focus3D Manual,
Japan Infrastructure Partners (JIP), Current
Myanmar's Bridge Work,

Weitere ähnliche Inhalte

Was ist angesagt?

Engineering surveys and construction of new lines
Engineering surveys and construction of new linesEngineering surveys and construction of new lines
Engineering surveys and construction of new lines
Nasir Uddin
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...
swaroop k s
 
Introductiontobridges07 08-090507223401-phpapp02-converted
Introductiontobridges07 08-090507223401-phpapp02-convertedIntroductiontobridges07 08-090507223401-phpapp02-converted
Introductiontobridges07 08-090507223401-phpapp02-converted
naveen kumar
 

Was ist angesagt? (17)

Engineering surveys and construction of new lines
Engineering surveys and construction of new linesEngineering surveys and construction of new lines
Engineering surveys and construction of new lines
 
selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...selection operation and maintainance of mobile cranes ( for education purpose...
selection operation and maintainance of mobile cranes ( for education purpose...
 
Alternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment DesignAlternative Approach to Permanent way Alignment Design
Alternative Approach to Permanent way Alignment Design
 
jarrad new CV
jarrad new CVjarrad new CV
jarrad new CV
 
FEMA Guidelines for Dam Safety
FEMA Guidelines for Dam SafetyFEMA Guidelines for Dam Safety
FEMA Guidelines for Dam Safety
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
 
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Mohammad S. Alshakhatreh - Geotechnical / Grouting
Mohammad S. Alshakhatreh - Geotechnical / Grouting Mohammad S. Alshakhatreh - Geotechnical / Grouting
Mohammad S. Alshakhatreh - Geotechnical / Grouting
 
Lh3619271935
Lh3619271935Lh3619271935
Lh3619271935
 
RAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERINGRAILWAYS,HARBOR, TUNNEL ENGINEERING
RAILWAYS,HARBOR, TUNNEL ENGINEERING
 
Introductiontobridges07 08-090507223401-phpapp02-converted
Introductiontobridges07 08-090507223401-phpapp02-convertedIntroductiontobridges07 08-090507223401-phpapp02-converted
Introductiontobridges07 08-090507223401-phpapp02-converted
 
Tds 04-06 floating-wind-measurement-platform-a00
Tds 04-06 floating-wind-measurement-platform-a00Tds 04-06 floating-wind-measurement-platform-a00
Tds 04-06 floating-wind-measurement-platform-a00
 
Mayport Naval Station
Mayport Naval StationMayport Naval Station
Mayport Naval Station
 
Lnb 20303 naval a
Lnb 20303 naval aLnb 20303 naval a
Lnb 20303 naval a
 
Investigation for bridge construction
Investigation for bridge constructionInvestigation for bridge construction
Investigation for bridge construction
 
Bridges Functionality and Aesthetics
Bridges Functionality and AestheticsBridges Functionality and Aesthetics
Bridges Functionality and Aesthetics
 

Ähnlich wie Investigation on the Existing Geometry of Pathein Suspension Bridge

segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
Sravan Kumar
 
Segmnetal construction of bridges
Segmnetal construction of bridgesSegmnetal construction of bridges
Segmnetal construction of bridges
Civil Engineers
 

Ähnlich wie Investigation on the Existing Geometry of Pathein Suspension Bridge (20)

ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Austroads Bridge Conference 2017
Austroads Bridge Conference 2017Austroads Bridge Conference 2017
Austroads Bridge Conference 2017
 
Modelling of Cable stayed bridge by AIT
Modelling of Cable stayed bridge by AITModelling of Cable stayed bridge by AIT
Modelling of Cable stayed bridge by AIT
 
Progressive Collapse Analysis of Steel Truss Foot Over Bridge
Progressive Collapse Analysis of Steel Truss Foot Over BridgeProgressive Collapse Analysis of Steel Truss Foot Over Bridge
Progressive Collapse Analysis of Steel Truss Foot Over Bridge
 
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
Hydraulic Model Studies for Evaluating the Performance of Energy Dissipater’s...
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
 
Three Dimensional Non-Linear Seismic Analysis of a Cable Stayed Bridge using ...
Three Dimensional Non-Linear Seismic Analysis of a Cable Stayed Bridge using ...Three Dimensional Non-Linear Seismic Analysis of a Cable Stayed Bridge using ...
Three Dimensional Non-Linear Seismic Analysis of a Cable Stayed Bridge using ...
 
IRJET- Time-History Analysis of a Cable Stayed Bridge for Various Spans and P...
IRJET- Time-History Analysis of a Cable Stayed Bridge for Various Spans and P...IRJET- Time-History Analysis of a Cable Stayed Bridge for Various Spans and P...
IRJET- Time-History Analysis of a Cable Stayed Bridge for Various Spans and P...
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
Segmnetal construction of bridges
Segmnetal construction of bridgesSegmnetal construction of bridges
Segmnetal construction of bridges
 
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala BridgeIRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
IRJET- Conditional Assessment of Bridges Case Study: Kund-Mala Bridge
 
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...
Sustainable Solution for Shoring Method of Cross-Creek Bridge in Ankeng MRT S...
 
IRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed BridgeIRJET- Seismic Analysis of Curve Cable-Stayed Bridge
IRJET- Seismic Analysis of Curve Cable-Stayed Bridge
 
Design of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A reviewDesign of Skew Culvert Analysis: A review
Design of Skew Culvert Analysis: A review
 
Solutions to minimize flood damage to Bridges
Solutions to minimize flood damage to BridgesSolutions to minimize flood damage to Bridges
Solutions to minimize flood damage to Bridges
 
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)
 
project-1.pptx
project-1.pptxproject-1.pptx
project-1.pptx
 
Management of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructionsManagement of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructions
 

Mehr von ijtsrd

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
ijtsrd
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
ijtsrd
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
ijtsrd
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
ijtsrd
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Study
ijtsrd
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
ijtsrd
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...
ijtsrd
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
ijtsrd
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
ijtsrd
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
ijtsrd
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
ijtsrd
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
ijtsrd
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Map
ijtsrd
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Society
ijtsrd
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
ijtsrd
 

Mehr von ijtsrd (20)

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
 
Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
 
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Study
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
 
The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Map
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Society
 
Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
 
Streamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine LearningStreamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine Learning
 

Kürzlich hochgeladen

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Kürzlich hochgeladen (20)

Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

Investigation on the Existing Geometry of Pathein Suspension Bridge

  • 1. International Journal of Trend in International Open Access Journal ISSN No: 2456 @ IJTSRD | Available Online @ www.ijtsrd.com Investigation on the Existing Geometry Win Bo, Khin Maung Zaw, Kyaw Kyaw Civil Engineering Department, Yangon Gyogone, ABSTRACT Pathein Suspension Bridge constructed across Pathein River completed in 2004 is a single-span suspension bridge. The region has soft alluvial ground to 2012 bridge inspection report, Current Situation and Issues of Myanmar's Bridge Work, this suspension bridge had lost a great deal of camber since completion. And also it is found that there are some problems such as movement of anchor block tilting tower. In this study, investigations on the existing of Pathein suspension bridge are using 3D laser scanner, and site surveying. According to the investigation results, it is found that all towers are inclined towards river and the m inclination occurs the downstream tower of Chaungthar side. The downstream main cable sag is lower than the upstream one. Most hangers are inclined towards Pathein side and the maximum inclination degree occurs at middle portion. The existing truss profile is very different from as per drawing and all truss nodes are under the horizontal surface. Therefore seismic risk assessment and disaster mitigation plan for unexpected future severe earthquake should be developed. Keyword: Pathein Suspension Bridge, FARO 3D laser scanner, tower inclination, main cable profile. I. INTRODUCTION Pathein is the largest city and the capital of the Ayeyarwaddy Region, Myanmar. It is located 190 (120 mi) west of Yangon on the bank of the River which is a western branch of the River. Pathein Suspension Bridge const Pathein (Ngawan) river completed in 2004 is a span suspension bridge as shown in Fig. of the most important bridge connected to some western costal line areas such as Ngwesaung and Chaungthar Beach and the Southern part of Rakhine state. The region has soft alluvial International Journal of Trend in Scientific Research and Development (IJTSRD) International Open Access Journal | www.ijtsrd.com ISSN No: 2456 - 6470 | Volume - 2 | Issue – 6 | Sep www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018 Existing Geometry of Pathein Suspension Bridge Win Bo, Khin Maung Zaw, Kyaw Kyaw Civil Engineering Department, Yangon Technological University, Gyogone, Insein Township, Yangon, Myanmar Pathein Suspension Bridge constructed across Pathein span suspension bridge. The region has soft alluvial ground. According to 2012 bridge inspection report, Current Situation and Issues of Myanmar's Bridge Work, this suspension bridge had lost a great deal of camber since completion. And also it is found that there are some problems such as movement of anchor block, investigations on the existing of Pathein suspension bridge are presented by using 3D laser scanner, and site surveying. According to the investigation results, it is found that all towers are inclined towards river and the maximum inclination occurs the downstream tower of Chaungthar side. The downstream main cable sag is lower than the upstream one. Most hangers are inclined towards Pathein side and the maximum inclination degree occurs at middle portion. The profile is very different from as per drawing and all truss nodes are under the horizontal surface. Therefore seismic risk assessment and disaster mitigation plan for unexpected future severe Bridge, FARO 3D laser scanner, tower inclination, main cable profile. is the largest city and the capital of the . It is located 190 km on the bank of the Pathein which is a western branch of the Ayeyarwaddy nstructed across Pathein (Ngawan) river completed in 2004 is a single- Fig. 1. It is one of the most important bridge connected to some Ngwesaung Beach r Beach and the Southern part of soft alluvial ground. According to 2012 bridge inspection report suspension bridge had lost a great deal of since completion. In the 2010 study it was suggested that because the anchorage has simply been laid on the cast-in-place concrete piles, the horizontal force of the main cable may move the anchorage forward. a result, both main towers top has not been investigated w stopped or not and this tilting effect may damage or not the existing bridge. Recently the Myaung Mya suspension bridge failure occurred in Ayeyarwaddy delta region. It is important to during its design life. So the purpose of this study is to measure the existing condition of this bridge. To check the top of tower tilting is dead or alive, the monitoring system has installed at both side of downstream tower. FAR 3D laser scanner and conventional measuring devices were used to know some data of the existing bridge. II. DESCRIPTION OF PATHEIN BRIDGE Pathein Bridge is a suspensi span of 268.2240 m and the distance between the splay saddle in the anchor and main tower is 86.00 m as shown in Fig. 1. The carriage way consists of two lanes for motorized traffic on the decking of the truss, total width 8.5 m. the headroom for navigation is 33 ft and the deck has a transverse inclination of 0.5 % an longitudinal inclination of 1.0 %. the following loadings; HS 25 of AASHTO Highway loadings. Single heavy vehicles of 75 ton at 10 m apart. Fluctuation temperature with a range of +/ Wind velocity has been considered 90 mph. Research and Development (IJTSRD) www.ijtsrd.com 6 | Sep – Oct 2018 Oct 2018 Page: 118 Pathein Suspension Bridge iversity, According to 2012 bridge inspection report, this suspension bridge had lost a great deal of camber since completion. In the 2010 study it was suggested that because the anchorage has simply been laid on place concrete piles, the horizontal force of the main cable may move the anchorage forward. As towers top were tilted to river. It whether movement has stopped or not and this tilting effect may damage or not the existing bridge. Recently the Myaung Mya suspension bridge failure occurred in Ayeyarwaddy delta region. It is important to strengthen the structure So the purpose of this study is to measure the existing condition of this bridge. To check the top of tower tilting is dead or alive, the monitoring system has installed at both side of downstream tower. FARO 3D laser scanner and conventional measuring devices were used to know some data of the existing bridge. DESCRIPTION OF PATHEIN BRIDGE ion bridge with a main m and the distance between the the anchor and main tower is 86.00 m 1. The carriage way consists of two lanes for motorized traffic on the decking of the truss, total width 8.5 m. the headroom for navigation is 33 ft and the deck has a transverse inclination of 0.5 % and longitudinal inclination of 1.0 %. It is designed with HS 25 of AASHTO Highway loadings. Single heavy vehicles of 75 ton at 10 m apart. Fluctuation temperature with a range of +/- 25˚C. Wind velocity has been considered 90 mph.
  • 2. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 @ IJTSRD | Available Online @ www.ijtsrd.com Fig. 1.a Elevation of Pathein Suspension Bridge Fig. 1.b Perspective View of Pathein Suspension Bridge Fig. 1.c Plan View from Google Earth III. SOME CURRENT CONDITIONS OF PATHEIN BRIDGE The main cables are suspended between two main towers. There may be many reasons tilting the top of tower towards river. As described before, because the region has soft alluvial ground, the horizontal force of the main cable may move concrete blocks and/o tower foundation may rotate due to differential settlement. Moreover, it is due to some construction errors or the backstay cables lengths are the optimum. Most hangers are inclined towards Pathein side and the towers top tilting amounts are same. We can see clearly loss of camber and the unsymmetrical deflection of the main truss of this bridge. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018 Fig. 1.a Elevation of Pathein Suspension Bridge Fig. 1.b Perspective View of Pathein Suspension Fig. 1.c Plan View from Google Earth SOME CURRENT CONDITIONS OF The main cables are suspended between two main towers. There may be many reasons tilting the top of tower towards river. As described before, because the region has soft alluvial ground, the horizontal force of the main cable may move concrete blocks and/or the tower foundation may rotate due to differential settlement. Moreover, it is due to some construction lengths are longer than the optimum. Most hangers are inclined towards amounts are not same. We can see clearly loss of camber and the unsymmetrical deflection of the main truss of this Fig. 2 Inclined Fig. 3 Inclined hanger Fig. 4 Web crippling of Vertical member at downstream bearing of Chaungthar Side International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470 Oct 2018 Page: 119 Inclined tower Fig. 3 Inclined hanger Fig. 4 Web crippling of Vertical member at downstream bearing of Chaungthar Side
  • 3. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 @ IJTSRD | Available Online @ www.ijtsrd.com Fig. 5 Deflection of truss near Tower IV. SOME DEVICES MEASURED AT BRIDGE SITE The following devices were used to know the existing condition of Pathein Suspension bridge. They are 1. Monitoring system 2. FARO 3D Laser scanner 3. Digital spirit level 4.1 Monitoring System The main purpose of installing the monitoring system is to check whether the top of tower tilting is dead or alive. In order to monitor the inclination of the main tower, the system has an inclinometer and a portable data logger. The inclinometer is to measure the movement of tower and the data logger is to record the measured data of inclinometer. The monitoring system was installed both downstream towers of Pathein suspension bridge. Fig. 8 shows the plan view of the bridge site and the location of system. The tower movement which is positive or negative direction is also shown. Fig. 6 Inclinometer International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018 Fig. 5 Deflection of truss near Tower SOME DEVICES MEASURED AT The following devices were used to know the existing condition of Pathein Suspension bridge. They are The main purpose of installing the monitoring system to check whether the top of tower tilting is dead or In order to monitor the inclination of the main tower, the system has an inclinometer and a portable to measure the movement of tower and the data logger is to record the measured data of inclinometer. The monitoring system was installed both downstream towers of Pathein suspension bridge. Fig. 8 shows the plan view of the bridge site and the location of monitoring system. The tower movement which is positive or Fig. 7 Portable data logger . Fig. 8 Plan view of the direction 4.2 FARO 3D Laser Scanning Process FARO 3D Laser Scanner measurement of Pathein Suspension bridge. It can produce incredibly detailed three of complex environments and large scale geometries. The resulting image is an assembly of millions of 3D measurement points that pro reproduction of existing conditions. The measurements of using FARO 3D Laser Scanner to measure the detail measurements are described the following chart. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470 Oct 2018 Page: 120 Fig. 7 Portable data logger irection of measurement FARO 3D Laser Scanning Process is used for detailed measurement of Pathein Suspension bridge. It can produce incredibly detailed three-dimensional images of complex environments and large scale geometries. The resulting image is an assembly of millions of 3D measurement points that provide an exact digital reproduction of existing conditions. The measurements of using FARO 3D Laser Scanner to measure the detail measurements are described the
  • 4. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 @ IJTSRD | Available Online @ www.ijtsrd.com Fig. 9 FARO 3D Laser Scanner and Scanning Objects V. RESULTS AND DISCUSSIONS Most of results are based on the monitoring and field measurement. Moreover the data from the ministry of construction such as field measurement data and some as per drawing data discussed. The following portions are discusses in this paper. 1. Main Tower 2. Main cable 3. Hanger 4. Steel Stiffening Truss 5.1 Main Tower The Main Tower are designed with a box 1.9 m x 2.2 m, and made of steel Q345. The height of main tower columns at both sides is 34.43 m. The bottom transverse beam of main tower i prestressing reinforced concrete, and have a box section of 2.5 m x 2.0 m. Table I and Table II shows the tower top tilting amount measured from Ministry of Construction and measured with FARO 3D Laser Scanner. All towers are inclined to longitud direction and towards river. TABLE I. MAIN TOWER INCLINATION Measured Date Pathein Side (mm) Chaungthar Side 20-6-2016 -240 14-10-2016 -225 TABLE II. MAIN TOWER INCLINATION (MEASURED DATE 6.4.17) Side Location Pathein Side (mm) Chaungthar Side Upstream -197 Downstream -213 Average -205 The data contained in Table I are collected from Ministry of construction measured in 2016. Although the two measurement values at Pathein side are much closed, Chaungthar side values are quite different. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018 Fig. 9 FARO 3D Laser Scanner and Scanning DISCUSSIONS Most of results are based on the monitoring and field measurement. Moreover the data from the ministry of construction such as field measurement data and some as per drawing data discussed. The following portions The Main Tower are designed with a box-section of 1.9 m x 2.2 m, and made of steel Q345. The height of main tower columns at both sides is 34.43 m. The bottom transverse beam of main tower is made of prestressing reinforced concrete, and have a box- section of 2.5 m x 2.0 m. Table I and Table II shows the tower top tilting amount measured from Ministry of Construction and measured with FARO 3D Laser Scanner. All towers are inclined to longitudinal INCLINATION Chaungthar Side (mm) +165 +310 INCLINATION 6.4.17) Chaungthar Side (mm) +281 +291 +286 The data contained in Table I are collected from Ministry of construction measured in 2016. Although the two measurement values at Pathein side are much closed, Chaungthar side values are quite different. The data measured with FARO 3D Laser Scanner are described in Table II. Every tower has its own tilting amount. Although the inclinations are different, both downstream towers tilting are more than the upstream one. Moreover, Chaungthar side towers are more inclined than Pathein side. Fig. 10 Tower inclination at Chaungthar side due to temperature Fig. 11 Tower inclination and Temperature at Chaungthar side Fig 10 and Fig 11 are the monitoring results for downstream tower of Chaungthar side from November 2017 to April 2018. Fig 10 shows the inclination degree of tower due to temperature fluctuation. The blue sports represent for the inclination degree parallel to bridge axis direction and the red sports are for perpendicular to bridge axis direction. Fig 11 describes the hourly recorded data of temperature, inclination degree parallel to bridge axis direction and perpendicular to bridge axis direction. According to these recorded data, no significant amount of tower inclination degree can be seen. The inclination degrees are very small and these a the effect of temperature fluctuation. So we can conclude that the tower is stable or it is not alive. 5.2 Main Cable The main cables adopt high tensile strength galvanized steel wires. It is parallel wire strand type. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470 Oct 2018 Page: 121 The data measured with FARO 3D Laser Scanner are scribed in Table II. Every tower has its own tilting amount. Although the inclinations are different, both downstream towers tilting are more than the upstream one. Moreover, Chaungthar side towers are more inclination at Chaungthar side due to temperature Fig. 11 Tower inclination and Temperature at Chaungthar side Fig 10 and Fig 11 are the monitoring results for downstream tower of Chaungthar side from November 2017 to April 2018. Fig 10 shows the nation degree of tower due to temperature fluctuation. The blue sports represent for the inclination degree parallel to bridge axis direction and the red sports are for perpendicular to bridge axis direction. Fig 11 describes the hourly recorded data of mperature, inclination degree parallel to bridge axis direction and perpendicular to bridge axis direction. According to these recorded data, no significant amount of tower inclination degree can be seen. The inclination degrees are very small and these are due to the effect of temperature fluctuation. So we can conclude that the tower is stable or it is not alive. The main cables adopt high tensile strength galvanized steel wires. It is parallel wire strand type.
  • 5. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 @ IJTSRD | Available Online @ www.ijtsrd.com The diameter of steel wire is 5.1 mm after galvanized. There are 37 bundles of steel wire in the main cable and each bundle consists of 61 number of steel wires. As describe the previous section, each tower has its own tilting amount. Because of this differential tilting, the existing main cables profile is unsymmetrical. Moreover these two main cables profile are different from its original, as per drawing, profile. Fig. 12 Main Cable Profiles TABLE III. MAXIMUM SAG DIFFERENCE Location Drawing Sag (m) Measured Sag (m) Upstream 28.737 29.37 Downstream 28.737 29.50 Fig. 12 shows the two main cables profile, the existing main cable profile and profile as per drawing. The existing profile is lower than as per drawing profile. Table III describes the maximum sag of main cables profile and the difference of these two pro From Table II, it can be clearly seen that the downstream towers are more inclined than the upstream. This is the reason why the downstream main cable sag is lower than the upper one. Fig. 13.a Upstream Cable length Chaungthar Side International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018 is 5.1 mm after galvanized. There are 37 bundles of steel wire in the main cable and each bundle consists of 61 number of steel wires. As describe the previous section, each tower has its own tilting amount. Because of this differential tilting, existing main cables profile is unsymmetrical. Moreover these two main cables profile are different from its original, as per drawing, profile. Fig. 12 Main Cable Profiles SAG AND Difference (m) - 0.633 - 0.763 Fig. 12 shows the two main cables profile, the existing main cable profile and profile as per drawing. The existing profile is lower than as per drawing profile. Table III describes the maximum sag of main cables profile and the difference of these two profiles. From Table II, it can be clearly seen that the downstream towers are more inclined than the upstream. This is the reason why the downstream main cable sag is lower than the upper one. length Fig. 13.b Downstream Cable length TABLE IV. TOTAL LENGTH Location Drawing length (m) Measured length (m) Upstream 276.103 Downstream 276.103 The measured main cables length and as per drawing main cables length are shown in Fig. 13.a and Fig. 13.b. Fig. 13.a is for the upstream main cable length and Fig. 13.b is for downstream. The main cables difference near towers are noticeable and others are nearly the same length. The maximum segment length difference is 1.009 m at the nearest segment of Pathein side tower for upstream and 0.937 m at the nearest segment of Chaungthar side tower for downstream. The total upstream main cable length between the towers is 276.94 m and the downstream is 275.981 m. The length difference is 0.06% for upstream and 0.044% for downstream. Both upstream and downstream main cable Table 4. 5.3 Hanger The hangers are parallel wire strand type. There is one suspender per suspending point at 5 m apart. The suspenders are designed with high tensile strength galvanized steel wires. There are 61 numbers of 5 mm diameter strand wire for one hanger. Pathein suspension bridge was inspected in 2010 and 2011 with JAPAN-Myanmar Bridge engineer. It was reported some hangers are inclined and most of them are inclined towards Pathein side. But few hangers are towards Chaungthar side. The reason of these hanger inclination problem was not reported. Hangers’ inclinations were measured with electronic spirit level and FARO 3D Laser Scanner. The first one is direct measurement and it was done in February 2017. The second is not a direct measurement and the processes are described in chart Pathein Side Chaungthar Side International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470 Oct 2018 Page: 122 Fig. 13.b Downstream Cable length LENGTH OF MAIN CABLE Measured length (m) Difference (m) 275.940 - 0.150 275.981 - 0.122 measured main cables length and as per drawing main cables length are shown in Fig. 13.a and Fig. 13.b. Fig. 13.a is for the upstream main cable length and Fig. 13.b is for downstream. The main cables difference near towers are noticeable and others are early the same length. The maximum segment length difference is 1.009 m at the nearest segment of Pathein side tower for upstream and 0.937 m at the nearest segment of Chaungthar side tower for downstream. The total upstream main cable length owers is 276.94 m and the downstream is 275.981 m. The length difference is 0.06% for upstream and 0.044% for downstream. Both upstream and downstream main cable lengths are shown in The hangers are parallel wire strand type. There is one suspender per suspending point at 5 m apart. The suspenders are designed with high tensile strength galvanized steel wires. There are 61 numbers of 5 mm diameter strand wire for one hanger. Pathein suspension bridge was inspected in 2010 and 2011 Myanmar Bridge engineer. It was reported some hangers are inclined and most of them are inclined towards Pathein side. But few hangers are towards Chaungthar side. The reason of these hanger inclination problem was not reported. measured with electronic spirit level and FARO 3D Laser Scanner. The first one is direct measurement and it was done in February 2017. The second is not a direct measurement and the processes are described in chart Pathein Side
  • 6. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 @ IJTSRD | Available Online @ www.ijtsrd.com 1. The scanning object processing was 2017. The finalization was done with AutoCAD software. Fig. 14.a Hanger inclination measured with FARO 3D Laser Scanner Fig. 14.b Hanger inclination measured with electronic spirit level Fig. 14.c Hanger inclination measured with FA Laser Scanner and electronic spirit level Fig. 14.d Hanger length difference Fig. 14.a and Fig 14.b show the hanger inclination degree of Pathein suspension bridge. Fig. 14.a is the International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018 1. The scanning object processing was taken in April 2017. The finalization was done with AutoCAD Fig. 14.a Hanger inclination measured with FARO 3D Fig. 14.b Hanger inclination measured with electronic Fig. 14.c Hanger inclination measured with FARO 3D Laser Scanner and electronic spirit level Fig. 14.d Hanger length difference Fig. 14.a and Fig 14.b show the hanger inclination degree of Pathein suspension bridge. Fig. 14.a is the measured results used FARO 3D laser scanner. The direct measured results used the electronic spirit level is shown in Fig. 14.b. From these two figures hangers near tower and the middle hangers are more inclined than others. Negative sign means the hangers are inclined towards Chaungthar side. The towers at Chaungthar side are more inclined than the tower at Pathein side. This is one of the reasons hangers are inclined towards Pathein side. Fig. 14.c is the hanger inclination degree measured with FARO 3D Laser Scanner and electronic spirit level. Although the measured results are different, their lines shape are similar. Fig. 14 d. is the hanger length difference between the measured length and as per drawing length. All existing hangers are longer than as per drawing length. This may be one of the factors that this suspension bridge steel truss vertical profile has unusual deformed shape. The blue line represents upstream hangers’ length difference and the red line is for downstream. 5.4 Steel Stiffing Truss Main girder is a steel stiffening truss using "warren'' girder trusses. The truss is 3m high and 5m long per bay. The end bays are 5.5 m long. A bay is taken as a unit to the upper and bottom chord. The total length of truss between bearings is 266.00 m. The truss has a vertical curve and it is for camber and its radius is 14000 m. The steel structures have the bottom bracing for wind stability and they are designed with H section. To increase the stability of main truss, all gussets on upper chords have transverse bracing. Ministry of Construction have checked regularly to know the condition of this bridge especially the inclination of towers and the vertical profile of steel stiffening truss. Moreover variations of the vertical profile were recorded during a load test program tested in June 2016. It was done with two dump trucks weighing 20 tons each and the total weight The trucks were placed at three locations on the bridge and Fig. 15 is one of the locations of trucks during load test program. Fig. 15 Location of trucks during load test at L/4 Span International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470 Oct 2018 Page: 123 measured results used FARO 3D laser scanner. The direct measured results used the electronic spirit level is shown in Fig. 14.b. From these two figures, the hangers near tower and the middle hangers are more inclined than others. Negative sign means the hangers are inclined towards Chaungthar side. The towers at Chaungthar side are more inclined than the tower at Pathein side. This is one of the reasons why the most hangers are inclined towards Pathein side. Fig. 14.c is the hanger inclination degree measured with FARO 3D Laser Scanner and electronic spirit level. Although the measured results are different, their lines shape are e hanger length difference between the measured length and as per drawing length. All existing hangers are longer than as per drawing length. This may be one of the factors that this suspension bridge steel truss vertical profile has . The blue line represents upstream hangers’ length difference and the red line is Main girder is a steel stiffening truss using "warren'' girder trusses. The truss is 3m high and 5m long per e 5.5 m long. A bay is taken as a unit to the upper and bottom chord. The total length of truss between bearings is 266.00 m. The truss has a vertical curve and it is for camber and its radius is 14000 m. The steel structures have the bottom bracing nd stability and they are designed with H section. To increase the stability of main truss, all gussets on upper chords have transverse bracing. Ministry of Construction have checked regularly to know the condition of this bridge especially the inclination of towers and the vertical profile of steel stiffening truss. Moreover variations of the vertical profile were recorded during a load test program tested in June 2016. It was done with two dump trucks weighing 20 tons each and the total weight is 40 tons. The trucks were placed at three locations on the bridge and Fig. 15 is one of the locations of trucks Fig. 15 Location of trucks during load test at L/4 Span
  • 7. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 @ IJTSRD | Available Online @ www.ijtsrd.com Fig. 16 Location of trucks during load test at 3L/4 Span Fig. 16 Deflection of Pathein suspension Bridge Fig. 16 shows the vertical profile of steel stiffening truss of Pathein suspension bridge. The blue line is as per drawing profile of the truss and the maximum camber is + 642.15 mm at the mid-span construction was completed in 2004. The yellow colour line is the truss profile measured by ministry of construction survey team in September 2011. At that time, the road surface was under the horizontal line. The maximum deflection is -104.233 mm and that point is 33 m from Pathein side tower. Meanwhile the mid-span deflection was -74.305 mm. at the end of year 2011 measurement, the maximum deflection became - 224.334 mm and mid-span deflection was 84.683 mm. The deflection was gradually and it was found the worst condition in July 2016 measurement. But in October 2016 measurement, recovery deflection was occurred. The red line is the deflection measured with FARO 3D laser scanner in April 2017. According to that measurement, the maximum is -253.49 mm near Chaungthar side tower and mid-span deflection is -109.85 mm. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456 www.ijtsrd.com | Volume – 2 | Issue – 6 | Sep-Oct 2018 Fig. 16 Location of trucks during load test at 3L/4 Fig. 16 Deflection of Pathein suspension Bridge Fig. 16 shows the vertical profile of steel stiffening truss of Pathein suspension bridge. The blue line is as s and the maximum of bridge. The construction was completed in 2004. The yellow colour line is the truss profile measured by ministry of construction survey team in September 2011. At that time, the road surface was under the horizontal line. .233 mm and that point is 33 m from Pathein side tower. Meanwhile the 74.305 mm. at the end of year 2011 measurement, the maximum deflection span deflection was - 84.683 mm. The deflection was gradually increased and it was found the worst condition in July 2016 measurement. But in October 2016 measurement, recovery deflection was occurred. The red line is the deflection measured with FARO 3D laser scanner in April 2017. According to that measurement, the 253.49 mm near Chaungthar side tower VI. CONCLUSION Based on these investigation results, inclinations of towers are different, both downstream towers tilting are more than the upstream one. Moreover, both towers at Chaungthar side are more inclined than Pathein side. This is the reason why the downstream main cable sag is greater upstream one and most of hangers are inclined towards Pathein side. The maximum hanger inclination is 4.16 degrees and it is occurred at mid span. The existing truss deformation is unusual pattern and it may be due to the differential inclination of tower. Measuring the existing geometry is one of the essential processes to model and analyze the structures. The existing structural performance of this bridge can be assessed using these investigative data. After assessing the existing structural performances, the required action plan can be proposed confidentially. ACKNOWLEDGMENT The authors are thankful to the Ministry of Construction for providing the required data in this study. REFERENCES 1. Public Works. 2004. Design Drawings of Pathein Suspension Bridge. 2. AASHTO. 2002. Standard Specifications for Highway Bridge. 17th ed. American Association of State Highway and Transportation Officials. 3. FARO® Laser Scanner Focus3D Manual October 2011. 4. Japan Infrastructure Partners (JIP) Situation and Issues of Myanmar's Bridge September 2012. International Journal of Trend in Scientific Research and Development (IJTSRD) ISSN: 2456-6470 Oct 2018 Page: 124 Based on these investigation results, although the inclinations of towers are different, both downstream towers tilting are more than the upstream one. Moreover, both towers at Chaungthar side are more inclined than Pathein side. This is the reason why the downstream main cable sag is greater than the upstream one and most of hangers are inclined towards Pathein side. The maximum hanger inclination is 4.16 degrees and it is occurred at mid- span. The existing truss deformation is unusual pattern and it may be due to the differential of tower. Measuring the existing geometry is one of the essential processes to model and analyze the structures. The existing structural performance of this bridge can be assessed using these investigative data. After assessing the existing structural ormances, the required action plan can be The authors are thankful to the Ministry of Construction for providing the required data in this Design Drawings of Pathein Standard Specifications for ed. American Association of State Highway and Transportation Officials. Laser Scanner Focus3D Manual, Japan Infrastructure Partners (JIP), Current Myanmar's Bridge Work,