SlideShare ist ein Scribd-Unternehmen logo
1 von 45
Downloaden Sie, um offline zu lesen
A member of Analogue Group of Companies
Topic - Lift, Escalator, Walkway
& automated Pedestrian overpass
Speaker: Samuel Cheng, Sale Manager of Anlev Elevator Inc.
Date: 18 Mar 2015
Middle East Rail 2015
Contents
• Traction lift, MRL
• Heavy Duty Escalator
• Horizontal Walkway
• Automated Pedestrian
Overpass
Test tower
AT – VVVF Traction Elevator
• Capacity : 630, 800, 1000,
1275, 1600kg … , 14600kg…
• Speed : 0.5 ~ 4m/s
• Drive : ACVVVF geared
• Passenger lift, cargo lift…
AT/MRL – Machine Roomless Elevator
• Capacity : 630, 800, 1000, 1275,
1600, 2000kg
• Speed : up to 2m/s
• Drive : ACVVVF gearless
• No machine room needed
• Compact designed
machinery inside lift shaft
• Slim control panel adjacent
to the top floor entry
A2T – Transport type Escalator
• 600, 800, 1000mm step width
• 27 °, 27.3 °, 30 °, 35 ° rising angle
• 0.5, 0.65 ,0.75 m/s speed
STH – Flat type Walkway
• 800, 1000, 1200, 1400 or 1600mm pallet width
• 0.5, 0.65, 0.75 or 0.9 m/s
• Non-standard angle from 12-35° for escalator
Rising Angle
12 - 35°
27 & 27.3° for Milan Metro
30 ° for Korean Railway
30 & 35° for Network Rail,UK
• Tailor made extended truss to fit existing supports.
Truss (pit) Extension
• Tailor made skewed truss supports to fit existing civil
supports.
Special shape of end supports
Standard
Tailor made for UK
Network Rail
• Truss and flat steps/pallets extension.
Extended Flat Steps / Pallets
5 & 4 flat steps for UK Network Rail
3 flat steps for Spanish Metro, Korean Railway
• Enlarged upper and lower transition curve in
escalator and moving walkway.
Non-standard Transition Curve
• Balustrade height according to client’s requirement
from 900mm-1100mm
Balustrade Height
Material of Balustrade
10mm temper glass, Brescia Metro 13mm laminated glass, Network Rail
Stainless Steel, Korean Railway 10mm temper glass + Stainless Steel
Custom Logo / Finishing
• Custom etched logo on landing cover
• Color handrails
• Non-standard material, finishing …etc.
ADV Control System
• Fully integrate microprocessor controller designed to support
advance control functions in escalator and moving walkway
application.
Voice
announcement
Passenger sensor
interface
Safety chain
monitoring
Step & Handrail
speed monitoring
BMS
interface
Status indication
Auto lubrication
control
CANBus
interface
Upgradeable
firmware
Control Redundancy
• Dual microprocessor controllers link up by CANBus to cross replicate
control status and data.
CANBus
Indication System
• User friendly tri-color dot matrix LED display provide comprehensive
operation status indication, dual display on each landing.
Status/Direction Indication
Enter (Manual mode)
Unit is running. Enter the
unit from this entrance
No enter
Exit or unit ready to start.
Don't enter the unit from
this entrance.
Enter (Auto mode)
Unit is set to start
automatically. Enter the unit
from this entrance.
Out of service
Service suspended. Unit
switched off, require service
or under maintanence
Alarm Indication
100 error codes could be recorded in our system
Remote Control and Monitoring
RS485 (Modbus RTU protocol)
• Built in RS485 serial communication port
for communication with CCMS
CCMS Dry Contact Interface
x5
Power on
Out of service
Down direction
Up direction
In service
Fire
Announcement
~
Built-in CCMS
Dry Contact
Interface
(e.g.)
(e.g.)
(e.g.)
(e.g.)
(e.g.)
(e.g.)
Other’s CCMS control panel
More contacts could be added if required
Energy Saving and Environmental Friendly
features
• Full VVVF - Auto start/stop or Low speed in
environmental mode
• Oil free step chains
• LED skirt lightings / handrails lighting
Paddington Station, UK Brescia Metrobus, Italy
Renfe Entrevias Station, Madrid, Spain
Puerto Santa Maria Train Station, Spain
TEB Light Rail, Borgo Palazzo Station, Italy
Milan Metro Line 3 extension, Italy
Milan Metro Line 5 (9 stations), Italy
Brescia Metrobus (11 Stations), Italy
Birmingham Station, U.K.
Gwangju Songjeong Station, South Korea
Milan Metro Line 1 Rho Station, Italy
Melbourne Airport T2, Australia
PEDARCO – Automated Pedestrian Overpass
Pedarco - Movie
Advantages
• Low cost compared to traditional overpasses and
footbridges
• Suitable for all types of passengers
• Easy to install
• Slim Size, easy fit
• Low energy consumption
• Less pollution
• Reusable/Recyclable
• Cutting edge design and panoramic
How it’s made
• Steel structure (welded steel sheet)
• Open, Semi Open or Close structure depends on
environmental conditions
• Cabin made by Aluminum, glass, steel
• Electric motor drive system with emergency power
• Air conditioning
• Minimal reinforced concrete footings for the stations
Specification
• Height 6m
• Span length from 8m to 24m for structure without
intermediate support
• Capacity 1650kg (~20 passengers)
• Travel time (for 18m span, ~50s)
• Max. vertical speed 0.8m/s
• Max. horizontal speed 2m/s
• Total power ~8kw
Dimension
Energy saving
• Hydro-pneumatic balancing system is used
in our product
• Potential energy is kept and transferred
• Power is adjusted according to the weight of
load, which acts on both phases of ascent
and descent of the same load
• 30% of energy less compared to traditional
traction lift system
Travel between Two Platforms
Travel between Two Platforms
Travel between Multi Platforms
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Vertical Circulation and Services of Highrise
Vertical Circulation and Services of HighriseVertical Circulation and Services of Highrise
Vertical Circulation and Services of Highrise
 
LIFT/ELEVATOR
LIFT/ELEVATORLIFT/ELEVATOR
LIFT/ELEVATOR
 
Spatial organisation in Hospital Design
Spatial organisation in Hospital DesignSpatial organisation in Hospital Design
Spatial organisation in Hospital Design
 
STAIRS AND LIFTS IN ARCHIETCTURE
STAIRS AND LIFTS IN ARCHIETCTURESTAIRS AND LIFTS IN ARCHIETCTURE
STAIRS AND LIFTS IN ARCHIETCTURE
 
Lifts & escalators
Lifts & escalators Lifts & escalators
Lifts & escalators
 
Elevators and its types
Elevators and its typesElevators and its types
Elevators and its types
 
Live case study motel
Live case study motelLive case study motel
Live case study motel
 
Auditorium Architecture planning
Auditorium Architecture planningAuditorium Architecture planning
Auditorium Architecture planning
 
Elevators and excelarators
Elevators and excelaratorsElevators and excelarators
Elevators and excelarators
 
False ceiling
False ceiling False ceiling
False ceiling
 
Steel sections-Building Construction
Steel sections-Building ConstructionSteel sections-Building Construction
Steel sections-Building Construction
 
Lift, Escalators and travelator.pptx
Lift, Escalators and travelator.pptxLift, Escalators and travelator.pptx
Lift, Escalators and travelator.pptx
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle Slab
 
Case study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshworCase study in uwtc mall of tripeshwor
Case study in uwtc mall of tripeshwor
 
Globus shopping mall
Globus shopping mallGlobus shopping mall
Globus shopping mall
 
ELEVATORS
ELEVATORSELEVATORS
ELEVATORS
 
Motel Literature Study
Motel Literature StudyMotel Literature Study
Motel Literature Study
 
Barrierfree design and services literature study
Barrierfree design and services literature studyBarrierfree design and services literature study
Barrierfree design and services literature study
 
Primary school literature study
Primary school literature studyPrimary school literature study
Primary school literature study
 
Lifts
LiftsLifts
Lifts
 

Andere mochten auch

Travelator - Revolutionizing European Travel
Travelator - Revolutionizing European TravelTravelator - Revolutionizing European Travel
Travelator - Revolutionizing European TravelRoman Abashin
 
Elevators and escalators
Elevators and escalatorsElevators and escalators
Elevators and escalatorsKuNal MeHta
 

Andere mochten auch (6)

Elevators & Escalators
Elevators & EscalatorsElevators & Escalators
Elevators & Escalators
 
Travelator - Revolutionizing European Travel
Travelator - Revolutionizing European TravelTravelator - Revolutionizing European Travel
Travelator - Revolutionizing European Travel
 
Escalators
EscalatorsEscalators
Escalators
 
Elevators and escalators
Elevators and escalatorsElevators and escalators
Elevators and escalators
 
Presentation on building service
Presentation on building servicePresentation on building service
Presentation on building service
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 

Ähnlich wie Topic - Lift, Escalator, Walkway & automated Pedestrian overpass

Express product catalog
Express product catalogExpress product catalog
Express product catalogMaxpromotion
 
newelb_en5151615165156151561651_2203.pdf
newelb_en5151615165156151561651_2203.pdfnewelb_en5151615165156151561651_2203.pdf
newelb_en5151615165156151561651_2203.pdfAimanAlArab
 
TwoWay Lifts_Digital Brochure
TwoWay Lifts_Digital BrochureTwoWay Lifts_Digital Brochure
TwoWay Lifts_Digital BrochureIpsha barooah
 
Magaziner VNA Truck
Magaziner VNA TruckMagaziner VNA Truck
Magaziner VNA Truckpishondavid
 
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
Tts Energy   Company Presentation 3108 2011 Ver B Aug2011Tts Energy   Company Presentation 3108 2011 Ver B Aug2011
Tts Energy Company Presentation 3108 2011 Ver B Aug2011aarshipathan
 
Complete Yale Range Brochure
Complete Yale Range BrochureComplete Yale Range Brochure
Complete Yale Range BrochureJoe Gosling
 
Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07krishnan.R
 
Ct & Port Cranes Psa 22jan07
Ct & Port Cranes Psa 22jan07Ct & Port Cranes Psa 22jan07
Ct & Port Cranes Psa 22jan07krishnan.R
 
Parking and transportation
Parking and transportationParking and transportation
Parking and transportationPankti Gajjar
 
Complete Hyster Range Brochure
Complete Hyster Range BrochureComplete Hyster Range Brochure
Complete Hyster Range BrochureJoe Gosling
 
3340903- UEE- UNIT-3 ELEVATOR.pptx
3340903- UEE- UNIT-3 ELEVATOR.pptx3340903- UEE- UNIT-3 ELEVATOR.pptx
3340903- UEE- UNIT-3 ELEVATOR.pptxJigsPatel37
 
Company Introduction
Company IntroductionCompany Introduction
Company IntroductionQian Alex
 
Liebherr rmg-rail-mounted-gantry-cranes-technical-description
Liebherr rmg-rail-mounted-gantry-cranes-technical-descriptionLiebherr rmg-rail-mounted-gantry-cranes-technical-description
Liebherr rmg-rail-mounted-gantry-cranes-technical-descriptionJeevan Dhakal
 
CC-1196A-3 - Processos Automotivos
CC-1196A-3 - Processos AutomotivosCC-1196A-3 - Processos Automotivos
CC-1196A-3 - Processos AutomotivosJúlio Gengo
 
Kinetek Elevator & Escalator Solutions
Kinetek Elevator & Escalator SolutionsKinetek Elevator & Escalator Solutions
Kinetek Elevator & Escalator SolutionsNashvinder Singh
 

Ähnlich wie Topic - Lift, Escalator, Walkway & automated Pedestrian overpass (20)

ELEVATOR SYSTEM IN DELHI METRO STATIONS
ELEVATOR SYSTEM IN DELHI METRO STATIONSELEVATOR SYSTEM IN DELHI METRO STATIONS
ELEVATOR SYSTEM IN DELHI METRO STATIONS
 
Express product catalog
Express product catalogExpress product catalog
Express product catalog
 
newelb_en5151615165156151561651_2203.pdf
newelb_en5151615165156151561651_2203.pdfnewelb_en5151615165156151561651_2203.pdf
newelb_en5151615165156151561651_2203.pdf
 
Electric Stacker | Reach Stacker | Material Handling Stacker
Electric Stacker | Reach Stacker | Material Handling Stacker      Electric Stacker | Reach Stacker | Material Handling Stacker
Electric Stacker | Reach Stacker | Material Handling Stacker
 
TwoWay Lifts_Digital Brochure
TwoWay Lifts_Digital BrochureTwoWay Lifts_Digital Brochure
TwoWay Lifts_Digital Brochure
 
Magaziner VNA Truck
Magaziner VNA TruckMagaziner VNA Truck
Magaziner VNA Truck
 
Swiss Parking Systems
Swiss Parking SystemsSwiss Parking Systems
Swiss Parking Systems
 
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
Tts Energy   Company Presentation 3108 2011 Ver B Aug2011Tts Energy   Company Presentation 3108 2011 Ver B Aug2011
Tts Energy Company Presentation 3108 2011 Ver B Aug2011
 
MFI Group-V.pptx
MFI Group-V.pptxMFI Group-V.pptx
MFI Group-V.pptx
 
Complete Yale Range Brochure
Complete Yale Range BrochureComplete Yale Range Brochure
Complete Yale Range Brochure
 
Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07
 
Ct & Port Cranes Psa 22jan07
Ct & Port Cranes Psa 22jan07Ct & Port Cranes Psa 22jan07
Ct & Port Cranes Psa 22jan07
 
Parking and transportation
Parking and transportationParking and transportation
Parking and transportation
 
Complete Hyster Range Brochure
Complete Hyster Range BrochureComplete Hyster Range Brochure
Complete Hyster Range Brochure
 
3340903- UEE- UNIT-3 ELEVATOR.pptx
3340903- UEE- UNIT-3 ELEVATOR.pptx3340903- UEE- UNIT-3 ELEVATOR.pptx
3340903- UEE- UNIT-3 ELEVATOR.pptx
 
Company Introduction
Company IntroductionCompany Introduction
Company Introduction
 
Liebherr rmg-rail-mounted-gantry-cranes-technical-description
Liebherr rmg-rail-mounted-gantry-cranes-technical-descriptionLiebherr rmg-rail-mounted-gantry-cranes-technical-description
Liebherr rmg-rail-mounted-gantry-cranes-technical-description
 
CC-1196A-3 - Processos Automotivos
CC-1196A-3 - Processos AutomotivosCC-1196A-3 - Processos Automotivos
CC-1196A-3 - Processos Automotivos
 
Lift
LiftLift
Lift
 
Kinetek Elevator & Escalator Solutions
Kinetek Elevator & Escalator SolutionsKinetek Elevator & Escalator Solutions
Kinetek Elevator & Escalator Solutions
 

Mehr von Ibrahim Al-Hudhaif

Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemondIbrahim Al-Hudhaif
 
Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreauIbrahim Al-Hudhaif
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerahIbrahim Al-Hudhaif
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016Ibrahim Al-Hudhaif
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsIbrahim Al-Hudhaif
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings Ibrahim Al-Hudhaif
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings CodesIbrahim Al-Hudhaif
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...Ibrahim Al-Hudhaif
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views Ibrahim Al-Hudhaif
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Ibrahim Al-Hudhaif
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesIbrahim Al-Hudhaif
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM Ibrahim Al-Hudhaif
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYIbrahim Al-Hudhaif
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiIbrahim Al-Hudhaif
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramIbrahim Al-Hudhaif
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseIbrahim Al-Hudhaif
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approachIbrahim Al-Hudhaif
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail Ibrahim Al-Hudhaif
 

Mehr von Ibrahim Al-Hudhaif (20)

Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemond
 
Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreau
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerah
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega Projects
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings Codes
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
 
Saudi Talent in Mega Projects
Saudi Talent in Mega ProjectsSaudi Talent in Mega Projects
Saudi Talent in Mega Projects
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EY
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - Hitachi
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise Optram
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative Showcase
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approach
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail
 
Kuwait PPP Transport Projects
Kuwait PPP Transport ProjectsKuwait PPP Transport Projects
Kuwait PPP Transport Projects
 

Kürzlich hochgeladen

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 

Kürzlich hochgeladen (20)

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

Topic - Lift, Escalator, Walkway & automated Pedestrian overpass

  • 1. A member of Analogue Group of Companies Topic - Lift, Escalator, Walkway & automated Pedestrian overpass Speaker: Samuel Cheng, Sale Manager of Anlev Elevator Inc. Date: 18 Mar 2015 Middle East Rail 2015
  • 2. Contents • Traction lift, MRL • Heavy Duty Escalator • Horizontal Walkway • Automated Pedestrian Overpass
  • 4. AT – VVVF Traction Elevator • Capacity : 630, 800, 1000, 1275, 1600kg … , 14600kg… • Speed : 0.5 ~ 4m/s • Drive : ACVVVF geared • Passenger lift, cargo lift…
  • 5. AT/MRL – Machine Roomless Elevator • Capacity : 630, 800, 1000, 1275, 1600, 2000kg • Speed : up to 2m/s • Drive : ACVVVF gearless • No machine room needed • Compact designed machinery inside lift shaft • Slim control panel adjacent to the top floor entry
  • 6. A2T – Transport type Escalator • 600, 800, 1000mm step width • 27 °, 27.3 °, 30 °, 35 ° rising angle • 0.5, 0.65 ,0.75 m/s speed
  • 7. STH – Flat type Walkway • 800, 1000, 1200, 1400 or 1600mm pallet width • 0.5, 0.65, 0.75 or 0.9 m/s
  • 8. • Non-standard angle from 12-35° for escalator Rising Angle 12 - 35° 27 & 27.3° for Milan Metro 30 ° for Korean Railway 30 & 35° for Network Rail,UK
  • 9. • Tailor made extended truss to fit existing supports. Truss (pit) Extension
  • 10. • Tailor made skewed truss supports to fit existing civil supports. Special shape of end supports Standard Tailor made for UK Network Rail
  • 11. • Truss and flat steps/pallets extension. Extended Flat Steps / Pallets 5 & 4 flat steps for UK Network Rail 3 flat steps for Spanish Metro, Korean Railway
  • 12. • Enlarged upper and lower transition curve in escalator and moving walkway. Non-standard Transition Curve
  • 13. • Balustrade height according to client’s requirement from 900mm-1100mm Balustrade Height
  • 14. Material of Balustrade 10mm temper glass, Brescia Metro 13mm laminated glass, Network Rail Stainless Steel, Korean Railway 10mm temper glass + Stainless Steel
  • 15. Custom Logo / Finishing • Custom etched logo on landing cover • Color handrails • Non-standard material, finishing …etc.
  • 16. ADV Control System • Fully integrate microprocessor controller designed to support advance control functions in escalator and moving walkway application. Voice announcement Passenger sensor interface Safety chain monitoring Step & Handrail speed monitoring BMS interface Status indication Auto lubrication control CANBus interface Upgradeable firmware
  • 17. Control Redundancy • Dual microprocessor controllers link up by CANBus to cross replicate control status and data. CANBus
  • 18. Indication System • User friendly tri-color dot matrix LED display provide comprehensive operation status indication, dual display on each landing.
  • 19. Status/Direction Indication Enter (Manual mode) Unit is running. Enter the unit from this entrance No enter Exit or unit ready to start. Don't enter the unit from this entrance. Enter (Auto mode) Unit is set to start automatically. Enter the unit from this entrance. Out of service Service suspended. Unit switched off, require service or under maintanence
  • 20. Alarm Indication 100 error codes could be recorded in our system
  • 21. Remote Control and Monitoring RS485 (Modbus RTU protocol) • Built in RS485 serial communication port for communication with CCMS
  • 22. CCMS Dry Contact Interface x5 Power on Out of service Down direction Up direction In service Fire Announcement ~ Built-in CCMS Dry Contact Interface (e.g.) (e.g.) (e.g.) (e.g.) (e.g.) (e.g.) Other’s CCMS control panel More contacts could be added if required
  • 23. Energy Saving and Environmental Friendly features • Full VVVF - Auto start/stop or Low speed in environmental mode • Oil free step chains • LED skirt lightings / handrails lighting Paddington Station, UK Brescia Metrobus, Italy
  • 24. Renfe Entrevias Station, Madrid, Spain
  • 25. Puerto Santa Maria Train Station, Spain
  • 26. TEB Light Rail, Borgo Palazzo Station, Italy
  • 27. Milan Metro Line 3 extension, Italy
  • 28. Milan Metro Line 5 (9 stations), Italy
  • 29. Brescia Metrobus (11 Stations), Italy
  • 32. Milan Metro Line 1 Rho Station, Italy
  • 34. PEDARCO – Automated Pedestrian Overpass
  • 36. Advantages • Low cost compared to traditional overpasses and footbridges • Suitable for all types of passengers • Easy to install • Slim Size, easy fit • Low energy consumption • Less pollution • Reusable/Recyclable • Cutting edge design and panoramic
  • 37. How it’s made • Steel structure (welded steel sheet) • Open, Semi Open or Close structure depends on environmental conditions • Cabin made by Aluminum, glass, steel • Electric motor drive system with emergency power • Air conditioning • Minimal reinforced concrete footings for the stations
  • 38. Specification • Height 6m • Span length from 8m to 24m for structure without intermediate support • Capacity 1650kg (~20 passengers) • Travel time (for 18m span, ~50s) • Max. vertical speed 0.8m/s • Max. horizontal speed 2m/s • Total power ~8kw
  • 40. Energy saving • Hydro-pneumatic balancing system is used in our product • Potential energy is kept and transferred • Power is adjusted according to the weight of load, which acts on both phases of ascent and descent of the same load • 30% of energy less compared to traditional traction lift system
  • 41. Travel between Two Platforms
  • 42. Travel between Two Platforms
  • 43. Travel between Multi Platforms
  • 44.