SlideShare ist ein Scribd-Unternehmen logo
1 von 22
Downloaden Sie, um offline zu lesen
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
1
How to Extend LTE Coverage with
Limited RRU Capacity
@ DTAC Live Network
Thananan Numtti
RF Manager
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
2
Content
1. LTE Technology over all power consumptions
2. LTE Formula CRS gain (Cell Referent Signal by PB (Power Boosting)
3 Demo prediction CRS gain LTE2100 by AIRCOM asset planning tool
4. LTE2100 Nationwide calculate POP & Area comparisons by CRS gain
5. How to CRS gain configuration 3 Vendors (Huawei, Ericsson, Nokia)
6. LTEs Predictions and Comparisons CRS gain (L21,E18,T23)
7. RAN Recommendations with PB value DTAC LTE Live Network
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
3
Recommendation value for PA and PB
PB PA Remark
0 3 RS -3dB but PDSCH type B +1dB
1 0 RS & PDSCH having same power(Existing Config)
1 -1.77 RS +1.77 dB
1 -3 RS +3 dB (2x2MIMO)
2 -4.77 RS +4.77 dB but PDSCH type B -1.2 dB
3 -6 RS +6 dB but PDSCH type B -3 dB(4x4MIMO)
1. LTE Technology over all power consumptions
PDSCH power to RS, where NO
reference signals are present, is UE
specific and signaled by higher layers
as Pa (ρA).
For PDSCH power in same
symbol as reference signal
an additional cell specific
offset is applied, that is
signaled by higher layers as
Pb (ρB).
Credits form
https://www.wirelessdesignmag.com/blog/2011/02/understanding-downlink-power-allocation-lte
References: 1. 3GPP, TS 36.331.,2. 3GPP, TS 36.213
PDCCH power
depending on
ρA/ρB
Cell-Specific reference
signal power (RS
power),signaled in SIB
Type2
Cell-Specific
reference signal
power (RS
power),signaled in
SIB Type2
Because PDSCH power in
same symbol as reference
signal cell specific offset
will be Compensates
Pb (ρB).
UE RSRP_Pa -54.77dBm
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
4
2. LTE Formula CRS gain (Cell Referent Signal by PB (Power Boosting)
CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1)
1.Power per port antenna
@maxRRU 43dBm(20Watt),configuration 2T2R MIMO
@Power single port = pRRU-10Log (No. Antenna port)
= 43-10log (2)
@Power single port = 39.99 dBm or 10Watt/Antenna port
@PB:1 CRS = 39.9 – 10 log(25*12)+10Log(1+1) = 18.23 dBm
2. Extend Coverage by Power bossing(PB) Level 0 ,1 , 2 ,3
@PB:2 CRS = 39.9 – 10 log(25*12)+10Log(2+1) = 20.00 dBm
@PB:0 CRS = 39.9 – 10 log(25*12)+10Log(0+1) = 15.22 dBm
@PB:3 CRS = 39.9 – 10 log(25*12)+10Log(3+1) = 21.24 dBm
PB:0 is mean there is non power boosting incensement on CRS RE
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
5
1.Power per port antenna
@maxRRU 46dBm(40Watt),configuration 2T2R MIMO
@Power single port = pRRU-10Log (No. Antenna port)
= 46-10log (2)
@Power single port = 42.9 dBm or 20Watt/Antenna port
@PB:1 CRS = 42.9 – 10 log(100*12)+10Log(1+1) = 21.23 dBm
2. Extend Coverage by Power bossing(PB) Level 0 ,1 , 2 ,3
@PB:2 CRS = 42.9 – 10 log(100*12)+10Log(2+1) = 22.99 dBm
@PB:0 CRS = 42.9 – 10 log(100*12)+10Log(0+1) = 18.22 dBm
@PB:3 CRS = 42.9 – 10 log(100*12)+10Log(3+1) = 24.24 dBm
PB:0 is mean there is non power boosting incensement on CRS RE
CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1)
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
6
3. Demo prediction CRS gain LTE2100 by AIRCOM asset planning tool
- RSRP, SINR, Downlink Throughput 2x2 MIMO
15.22dBm,PA-3,PB0
18.23dBm,PA-3,PB1
20.00dBm,PA-3,PB2
21.24dBm,PA-3,PB3
RSRP SINR Downlink Throughput
2x2 MIMO
30-35Mbps
25-30Mbps
20-25Mbps
15-20Mbps
10-15Mbps
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
7
3. Demo prediction CRS gain LTE2100 by AIRCOM asset planning tool
- CRS Gain Vs Distance (Kilometers)
15.22dBm,PA-3,PB0
18.23dBm,PA-3,PB1
20.00dBm,PA-3,PB2
21.24dBm,PA-3,PB3
RSRP
CRS
gain
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
8
4. LTE2100 Nationwide calculatePOP & Area comparisons by CRS gain
Region Thailand_
Area
Thailand_
POP
LTE2100
15.22dBm
LTE2100
18.23dBm
LTE2100
20.00dBm
LTE2100
21.20dBm
LTE2100
15.22dBm
LTE2100
18.23dBm
LTE2100
20.00dBm
LTE2100
21.20dBm
BANGKOK 100% 100% 85% 87% 90% 91% 98% 99% 99% 99%
CENTRAL&E
AST
100% 100% 55% 59% 65% 66% 82% 86% 90% 91%
NORTH 100% 100% 42% 43% 50% 51% 66% 68% 75% 76%
NORTHEAST 100% 100% 73% 75% 84% 85% 84% 85% 92% 93%
SOUTH&WE
ST
100% 100% 56% 60% 64% 65% 81% 84% 86% 87%
Grand Total 100% 100% 58% 60% 67% 68% 82% 84% 89% 90%
-110dBm
Coverage Area
-110dBm
Coverage POP
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
9
5. How to CRS gain configuration 3 Vendors (Huawei, Ericsson, Nokia)
Existing Configuration Propose Configuration
VendorsParameter ID Meaning GUI Value Range Unit Defulte L21 E18 T23 L21 E18 T23 Command
Huawei
ReferenceSignalPwr
Cell reference signal
power of each physical
antenna
-600~500 0.1dBm None
212(21.2
3dBm)
182(18.2d
Bm)
212(21.23
dBm)
242(24.2dB
m)
MOD PDSCHCFG: LocalCellId=0,
ReferenceSignalPwr=212;
PdschPaAdjSwitch
Switch for adjusting the
PA through power
control on the PDSCH
OFF(Off), ON(On) None OFF OFF OFF ON ON
MOD CELLDLPCPDSCHPA: LocalCellId=0,
PdschPaAdjSwitch=ON, PaPcOff=DB_6_P_A;
Pb
Energy Per Resource
Element (EPRE) on the
PDSCH
0~3 None None 1 1 3 3
MOD PDSCHCFG: LocalCellId=0,
ReferenceSignalPwr=212; Pb=3;
PaPcOff
PA to be used when PA
adjustment for PDSCH
power control
DB_6_P_A(-6 dB),
DB_4DOT77_P_A(-4.77 dB),
DB_3_P_A(-3 dB),
DB_1DOT77_P_A(-1.77 dB),
DB0_P_A(0 dB), DB1_P_A(1
dB), DB2_P_A(2 dB),
DB3_P_A(3 dB)
dB None
DB_3_P_
A(-3 dB)
DB_3_P_A(
-3 dB)
DB_6_P_A
(-6 dB)
DB_6_P_A(-
6 dB)
MOD CELLDLPCPDSCHPA: LocalCellId=0,
PdschPaAdjSwitch=ON, PaPcOff=DB_6_P_A;
Ericsson
crsGain
Cell reference signal
power of each physical
antenna
0 { -300, -200, -100, 0, 177,
300, 477, 600 } Unit: 0.01dB
0.01dB 0(0dB) 0(0dB) 0(0dB) 0(0dB) 600(3dB) 600(3dB) 600(3dB)
[SectorEquipmentFunction]configuredOutput
Power[EUtranCellFDD] crsGain 600 (6 dB)
pdschTypeBgain
Energy Per Resource
Element (EPRE) on the
PDSCH
0 { 0, 1, 2, 3 } define the gains
(5/4,1,3/4,1/2)
None None 0 0 0 3 3 3 [EUtranCellFDD/TDD] pdschTypeBgain 3
Nokia
dlRsBoost
Cell reference signal
power of each physical
antenna
LNCEL: -3dB (700), 0dB(1000),
1.77dB (1177), 3dB(1300),
4.77dB (1477),6dB, (1600);
0dB
dB None
3dB(1300
)
-
3dB(1300
)
6dB(1600)- 6dB(1600) [LNCEL] pMax[LNCEL] dlRsBoost 1600(6 dB)
allowPbIndexZero
Energy Per Resource
Element (EPRE) on the
PDSCH
0 (false), 1 (true) None 0 (false) 0 (false) 0 (false) 1 1 1 1
[LNCEL] pMax[LNCEL] allowPbIndexZero 1
(true)
Nokia set to 1 (Hard code)
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
10
5. How to CRS gain configuration 3 Vendors (Huawei, Ericsson, Nokia)
BKK0009-L21> get . crsgain
MO Attribute Value
==========================================
EUtranCellFDD=L21-BKK0009-1A crsGain 0
EUtranCellFDD=L21-BKK0009-1B crsGain 300
EUtranCellFDD=L21-BKK0009-1C crsGain 0
EUtranCellFDD=L21-BKK0009-1D crsGain 0
==========================================
BKK0009-L21> get . pdschtypeb
MO Attribute Value
==========================================
EUtranCellFDD=L21-BKK0009-1A pdschTypeBGain 0
EUtranCellFDD=L21-BKK0009-1B pdschTypeBGain 1
EUtranCellFDD=L21-BKK0009-1C pdschTypeBGain 0
EUtranCellFDD=L21-BKK0009-1D pdschTypeBGain 0
==========================================
BKK0009-E18> get . crsgain
MO Attribute Value
===========================================
EUtranCellFDD=E18-BKK0009-1A crsGain 0
EUtranCellFDD=E18-BKK0009-1B crsGain 0
EUtranCellFDD=E18-BKK0009-1C crsGain 0
EUtranCellFDD=E18-BKK0009-1D crsGain 0
============================================
BKK0009-E18> get . pdschtype
MO Attribute Value
============================================
EUtranCellFDD=E18-BKK0009-1A pdschTypeBGain 0
EUtranCellFDD=E18-BKK0009-1B pdschTypeBGain 0
EUtranCellFDD=E18-BKK0009-1C pdschTypeBGain 0
EUtranCellFDD=E18-BKK0009-1D pdschTypeBGain 0
============================================
BKK0024-L23> get . crsgain
MO Attribute Value
==============================================
EUtranCellTDD=L23-BKK0024-1A crsGain 0
EUtranCellTDD=L23-BKK0024-1B crsGain 0
EUtranCellTDD=L23-BKK0024-1C crsGain 0
EUtranCellTDD=L23-BKK0024-2A crsGain 0
EUtranCellTDD=L23-BKK0024-2B crsGain 0
EUtranCellTDD=L23-BKK0024-2C crsGain 0
EUtranCellTDD=L23-BKK0024-3A crsGain 0
EUtranCellTDD=L23-BKK0024-3B crsGain 0
EUtranCellTDD=L23-BKK0024-3C crsGain 0
BKK0024-L23> get . pdschtyp
MO Attribute Value
=========================================================
EUtranCellTDD=L23-BKK0024-1A pdschTypeBGain 0
EUtranCellTDD=L23-BKK0024-1B pdschTypeBGain 0
EUtranCellTDD=L23-BKK0024-1C pdschTypeBGain 0
LST CELLDLPCPDSCHPA:;
KBI0106-UL
List Pa parameters for PDSCH power control
------------------------------------------
Local cell ID PA adjusting switch PA for even power distribution(dB)
1 Off -3 dB
2 Off -3 dB
3 Off -3 dB
LST PDSCHCFG:;
KBI0106-UL
+++ KBI0106-UL 2018-01-22 14:49:22
Display PDSCHCfg
----------------
Local cell ID Reference signal power(0.1dBm) PB Reference Signal Power Margin(0.1dB) Offset of Ant0 to Tx Power(0.1dB) Offset of Ant1 to Tx Power(0.1dB) Offset of
Ant2 to Tx Power(0.1dB) Offset of Ant3 to Tx Power(0.1dB)
1 212 1 0 255 255 255 255
2 212 1 0 255 255 255 255
3 212 1 0 255 255 255 255
(Number of results = 3)
--- END
SiteName CellName MO pMax dlRsBoost allowPbIndexRatio
L23-CMI0003 L23-CMI0003-1A PLMN-PLMN/MRBTS-400102/LNBTS-
400102/LNCEL-11
430 (43dBm) 1300 (3dB) 0 (false)
L23-CMI0003 L23-CMI0003-1B PLMN-PLMN/MRBTS-400102/LNBTS-
400102/LNCEL-21
430 (43dBm) 1300 (3dB) 0 (false)
L23-CMI0003 L23-CMI0003-1C PLMN-PLMN/MRBTS-400102/LNBTS-
400102/LNCEL-31
430 (43dBm) 1300 (3dB) 0 (false)
L23-CMI0003 L23-CMI0003-2A PLMN-PLMN/MRBTS-400102/LNBTS-
400102/LNCEL-12
400 (40dBm) 1300 (3dB) 0 (false)
L23-CMI0003 L23-CMI0003-2B PLMN-PLMN/MRBTS-400102/LNBTS-
400102/LNCEL-22
400 (40dBm) 1300 (3dB) 0 (false)
L23-CMI0003 L23-CMI0003-2C PLMN-PLMN/MRBTS-400102/LNBTS-
400102/LNCEL-32
400 (40dBm) 1300 (3dB) 0 (false)
L23-CMI0003 L23-CMI0003-3A PLMN-PLMN/MRBTS-400102/LNBTS-
400102/LNCEL-13
400 (40dBm) 1300 (3dB) 0 (false)
L23-CMI0003 L23-CMI0003-3B PLMN-PLMN/MRBTS-400102/LNBTS-
400102/LNCEL-23
400 (40dBm) 1300 (3dB) 0 (false)
L23-CMI0003 L23-CMI0003-3C PLMN-PLMN/MRBTS-400102/LNBTS-
400102/LNCEL-33
400 (40dBm) 1300 (3dB) 0 (false)
SiteName CellName MO pMax dlRsBoost allowPbIndexZero
L21-CMI0130 L21-CMI0130-1A
PLMN-PLMN/MRBTS-100130/LNBTS-
100130/LNCEL-1
430 1300 0
L21-CMI0130 L21-CMI0130-1B
PLMN-PLMN/MRBTS-100130/LNBTS-
100130/LNCEL-2
448 1300 0
L21-CMI0130 L21-CMI0130-1C
PLMN-PLMN/MRBTS-100130/LNBTS-
100130/LNCEL-3
430 1300 0
-4.77,-6
2,3
1
1
1477
,1600
1477
,1600
477,
600
477,
600
1,2,3
1,2,3
477,
600
ON
200-
600
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
14
6.LTE Predictions and Comparisons CRS gain (L21,E18,T23)@-110dBm
Under Condition @ Antenna High43m
- L21:20watt @BW:5MHz
- E18:40watt @BW:20MHz
- T23:20watt @BW:20MHz
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
15
7. RAN Recommendations with PB value DTAC LTE Live Network
Recommendation value for PA and PB
PB PA Remark Area
0 3 RS -3dB but PDSCH type B +1dB
1 0 RS & PDSCH having same power (Existing Network) Existing Network
1 -1.77 RS +1.77 dB
1 -3 RS +3 dB (2x2MIMO) Dens Urban ,Urban
2 -4.77 RS +4.77 dB but PDSCH type B -1.2 dB Sub Urban ,Rural
3 -6 RS +6 dB but PDSCH type B -3 dB(4x4MIMO) or 2x2MIMO Rural ,IBC
1. CRS gain configuration should be separate area coverage ,deep indoor or
capacity area
2. Trade off main KPIs site by site
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
16
Backup Slide
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
17
CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1)
LTE2300 Network 3 Frequencies ,Frequencies = 13 watts
1.Power per port antenna
@maxRRU 41.1dBm(13Watt ),configuration 4T4R MIMO
@Power single port = pRRU-10Log (No. Antenna port)
= 41.1-10log (4)
@Power single port = 35.0 dBm or 3.2Watt/Antenna port
@PB:1 CRS = 35.0 – 10 log(100*12)+10Log(1+1) = 7.30 dBm
2. Extend coverage by Power bossing(PB) Level 0 ,1 , 2 ,3
@PB:2 CRS = 35.0 – 10 log(100*12)+10Log(2+1) = 9.06 dBm
@PB:0 CRS = 35.0 – 10 log(100*12)+10Log(0+1) = 4.29 dBm
@PB:3 CRS = 35.0 – 10 log(100*12)+10Log(3+1) = 10.31 dBm
PB:0 is mean there is non power boosting incensement on CRS RE
T
D
D
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
18
CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1)
LTE2300 Network ,1st Frequency = 20 watts, 2nd &3rd Frequent =10Watt
1.Power per port antenna
@maxRRU 43 dBm(20Watt ),configuration 4T4R MIMO
@Power single port = pRRU-10Log (No. Antenna port)
= 43 -10log (4)
@Power single port = 36.9 dBm or 5 Watt/Antenna port
@PB:1 CRS = 36.9 – 10 log(100*12)+10Log(1+1) = 9.20 dBm
2. Extend coverage by Power bossing(PB) Level 0 ,1 , 2 ,3
@PB:2 CRS = 36.9 – 10 log(100*12)+10Log(2+1) = 10.96 dBm
@PB:0 CRS = 36.9 – 10 log(100*12)+10Log(0+1) = 6.19 dBm
@PB:3 CRS = 36.9 – 10 log(100*12)+10Log(3+1) = 12.21 dBm
PB:0 is mean there is non power boosting incensement on CRS RE
T
D
D
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
19
CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1)
LTE2300 Network ,1st Frequency = 20 watts, 2nd &3rd Frequent =10Watt
1.Power per port antenna
@maxRRU 40 dBm(10Watt ),configuration 4T4R MIMO
@Power single port = pRRU-10Log (No. Antenna port)
= 40 -10log (4)
@Power single port = 33.98 dBm or 2.5 Watt/Antenna port
@PB:1 CRS = 33.9 – 10 log(100*12)+10Log(1+1) = 6.20 dBm
2. Extend coverage by Power bossing(PB) Level 0 ,1 , 2 ,3
@PB:2 CRS = 33.9 – 10 log(100*12)+10Log(2+1) = 7.96 dBm
@PB:0 CRS = 33.9 – 10 log(100*12)+10Log(0+1) = 3.19 dBm
@PB:3 CRS = 33.9 – 10 log(100*12)+10Log(3+1) = 9.19 dBm
PB:0 is mean there is non power boosting incensement on CRS RE
T
D
D
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
20
How to calculate and find the Total Power of PDSCH become
Symbol
12REs
/1PRB
15Khz
RE
1. RE(Resource Element)
'= Engergy (Power) allocated to 1 RE is calleds EPRE(Energy Per 1Resource Element)
2. RSRP =If there is no noise at all, RSRP would be same as EPRE you set for Reference Signal
'= RE for reference Signal Average Power of all the RS(Reference Signal within a Symbol)
3. Total Power PDSCH This value may vary with different symbols
-Symbol 0 in first slot is made up of multiple component - PCFICH, HICH, RS.
-Symbol 4 is made up of PDSCH and Reference signal).
Within Reference Signal
1.RSRP=(p(51)+p(57))/2
2.Total Power PDSCH= p(49)+p(52)+p(53)+p(55)+p(56)+p(58)+p(59)+p(60)
= EPRE PDSCH x 10 (In linear Scale)
3.Total Power PDSCH all Channel
=(RSRP x 2) + Total Power PDSCH
4.Total Power PDSCH all Channel
= EPRE for PDSCH x Number of PDSCH RE
= EPRE for PDSCH (in dBm) + 10 Log(Number of PDSCH RE)
Without Reference Signal
1.RSRP=N/A (since there is NO RS)
2Ttoal Power PDSCH
=p(25)+p(26)+p(27)+p(28)+p(29)+p(30)+p(31)+p(32)+p(33)+p(34)+p(35)+p(36)
=EPRE PDSCHx12 (In linear Scale)
3.Total Power PDSCH all Channel
=Total Power PDSCH
4.Total Power of PDSCH (Without Reference Signal)
= EPRE for PDSCH x Number of RB x 12 (assuming for the symbol with no
Reference Signal)
= EPRE for PDSCH + 10 Log(Number of RB x 12)
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
21
How to calculate and find the Total Power of PDSCH become
Example
If DTAC Network allocated at -90 dBm/EPRE for PDSCH and allocated 100 RBs for the PDSCH(BW:20MHz),
Find the Total Power of PDSCH become as follows.
Total Power of PDSCH (in dB/dBm scale )
= EPRE for PDSCH + 10 Log(Number of RB x 12)
= -90 + 10 Log(100 x 12)
= -90 + 30.8
= - 59.2 dBm
If DTAC allocated at -95 dBm Find the Total Power of PDSCH become as follows.
= -95 + 10 Log(100 x 12)
= -95 + 30.8
= -64.2 dBm
If DTAC allocated at -100 dBm Find the Total Power of PDSCH become as follows.
= -100 + 10 Log(100 x 12)
= -100 + 30.8
= -69.2 dBm
If DTAC allocated at -105 dBm Find the Total Power of PDSCH become as follows.
= -105 + 10 Log(100 x 12)
= -105 + 30.8
= -74.2 dBm
If DTAC allocated at -110 dBm Find the Total Power of PDSCH become as follows.
= -110 + 10 Log(100 x 12)
= -110 + 30.8
= -79.2 dBm
@ -90dBm
@ -95dBm
@ -100dBm
@ -105dBm
@ -110dBm
RSRP =If there is no noise at all, RSRP would be same as EPRE you
set for Reference Signal
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
22
1.25MIMO
1MIMO
0.75MIMO
0.5MIMO
‘@BW=5MHz ‘@25PRB ‘@RRU43dBm(20Watt) MIMO
PB level P_PDSCH_B
Power RS ref powerP_PDSCH_B = P_PDSCH_A * ρA/ ρB 0 19.04dBm 3.81
Power RS ref powerP_PDSCH_B = P_PDSCH_A * ρA/ ρB 1 15.23dBm 3.81
Power RS ref powerP_PDSCH_B = P_PDSCH_A * ρA/ ρB 2 11.42dBm 3.81
power RS ref powerP_PDSCH_B = P_PDSCH_A * ρA/ ρB 3 7.61dBm 3.81
Power With out RS
power
P_PDSCH_A = EPRE_0 - mimoComp
15.23
P_PDSCH_A = EPRE_0 - mimoComp
PSD =(pMax)-10*LOG10(PRBs_DL*12),@pmax=39.9dBm
RS Power = PSD - PA
PDSCH Type B =PSD +10*LOG10(PB)
RS= RRU_single port(dBm)-10log(PRB*12)+10Log(Pb+1)
EPRE_0 = 15.23 dBm
When •PSD_CELL_RS = PSD_0_SISO + dlRsBoost (for 1Tx),
•PSD_CELL_RS = PSD_MIMO + dlRsBoost (for 2Tx)
• where PSD_0 = (pMax – CELL_PWR_RED) –
10log10(#PRBs_DL x 12)
• and PSD_MIMO = PSD_0 – MIMO_COMP
EPRE_0 = (pmax – dlCellPwrRed)-10log (#PRB * 12);
@pmax=39.9dBm
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
23
Radio Access Network Dept., TG
DTAC Confidential 5/29/2022
24
Thank You

Weitere ähnliche Inhalte

Was ist angesagt?

LTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptxLTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptxHasanBilalKhan
 
huawei-lte-kpi-ref
huawei-lte-kpi-refhuawei-lte-kpi-ref
huawei-lte-kpi-refAbd Yehia
 
422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...
422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...
422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...SudheeraIndrajith
 
06a_LTE mobility management v1_0.ppt
06a_LTE mobility management v1_0.ppt06a_LTE mobility management v1_0.ppt
06a_LTE mobility management v1_0.pptssuser022794
 
Chap 4. call processing and handover.eng
Chap 4. call processing and handover.engChap 4. call processing and handover.eng
Chap 4. call processing and handover.engsivakumar D
 
E2 e+call+setup+time+(cst)+enhacenments p3_benchmarking
E2 e+call+setup+time+(cst)+enhacenments p3_benchmarkingE2 e+call+setup+time+(cst)+enhacenments p3_benchmarking
E2 e+call+setup+time+(cst)+enhacenments p3_benchmarkingOtseakemhe
 
Lte basic parameters
Lte basic parametersLte basic parameters
Lte basic parametersLinh Phạm
 
3G ERICSSON COUNTERS spptx
3G  ERICSSON COUNTERS spptx3G  ERICSSON COUNTERS spptx
3G ERICSSON COUNTERS spptxankur tomar
 
Kpi 2g troubleshootin
Kpi 2g troubleshootinKpi 2g troubleshootin
Kpi 2g troubleshootinAbd Yehia
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...Jean de la Sagesse
 
NSA Mobility Managment.pptx
NSA Mobility Managment.pptxNSA Mobility Managment.pptx
NSA Mobility Managment.pptxErayUyanik
 
4.oeo000040 lte traffic fault diagnosis issue 1
4.oeo000040 lte traffic fault diagnosis issue 14.oeo000040 lte traffic fault diagnosis issue 1
4.oeo000040 lte traffic fault diagnosis issue 1Klajdi Husi
 
Lte capacity monitoring
Lte capacity monitoringLte capacity monitoring
Lte capacity monitoringKlajdi Husi
 
Radio Measurements in LTE
Radio Measurements in LTERadio Measurements in LTE
Radio Measurements in LTESofian .
 
01 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl101 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl1Md.Akm Sahansha
 
2.oeo000010 lte handover fault diagnosis issue 1
2.oeo000010 lte handover fault diagnosis issue 12.oeo000010 lte handover fault diagnosis issue 1
2.oeo000010 lte handover fault diagnosis issue 1Klajdi Husi
 

Was ist angesagt? (20)

LTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptxLTE Optimization-KPIs.pptx
LTE Optimization-KPIs.pptx
 
huawei-lte-kpi-ref
huawei-lte-kpi-refhuawei-lte-kpi-ref
huawei-lte-kpi-ref
 
422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...
422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...
422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...
 
06a_LTE mobility management v1_0.ppt
06a_LTE mobility management v1_0.ppt06a_LTE mobility management v1_0.ppt
06a_LTE mobility management v1_0.ppt
 
Chap 4. call processing and handover.eng
Chap 4. call processing and handover.engChap 4. call processing and handover.eng
Chap 4. call processing and handover.eng
 
E2 e+call+setup+time+(cst)+enhacenments p3_benchmarking
E2 e+call+setup+time+(cst)+enhacenments p3_benchmarkingE2 e+call+setup+time+(cst)+enhacenments p3_benchmarking
E2 e+call+setup+time+(cst)+enhacenments p3_benchmarking
 
LTE KPI
LTE KPILTE KPI
LTE KPI
 
Lte basic parameters
Lte basic parametersLte basic parameters
Lte basic parameters
 
3G ERICSSON COUNTERS spptx
3G  ERICSSON COUNTERS spptx3G  ERICSSON COUNTERS spptx
3G ERICSSON COUNTERS spptx
 
Kpi 2g troubleshootin
Kpi 2g troubleshootinKpi 2g troubleshootin
Kpi 2g troubleshootin
 
Cs fallback feature
Cs fallback featureCs fallback feature
Cs fallback feature
 
NEI_LTE1235_ready_02.pdf
NEI_LTE1235_ready_02.pdfNEI_LTE1235_ready_02.pdf
NEI_LTE1235_ready_02.pdf
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
NSA Mobility Managment.pptx
NSA Mobility Managment.pptxNSA Mobility Managment.pptx
NSA Mobility Managment.pptx
 
4.oeo000040 lte traffic fault diagnosis issue 1
4.oeo000040 lte traffic fault diagnosis issue 14.oeo000040 lte traffic fault diagnosis issue 1
4.oeo000040 lte traffic fault diagnosis issue 1
 
Lte capacity monitoring
Lte capacity monitoringLte capacity monitoring
Lte capacity monitoring
 
Radio Measurements in LTE
Radio Measurements in LTERadio Measurements in LTE
Radio Measurements in LTE
 
01 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl101 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl1
 
WCDMA Based Events
WCDMA Based EventsWCDMA Based Events
WCDMA Based Events
 
2.oeo000010 lte handover fault diagnosis issue 1
2.oeo000010 lte handover fault diagnosis issue 12.oeo000010 lte handover fault diagnosis issue 1
2.oeo000010 lte handover fault diagnosis issue 1
 

Ähnlich wie Extend LTE Coverage with Limited RRU Capacity

Operator E CA(Carrier Aggregation) Feature Test Guide.docx
Operator E CA(Carrier Aggregation) Feature Test Guide.docxOperator E CA(Carrier Aggregation) Feature Test Guide.docx
Operator E CA(Carrier Aggregation) Feature Test Guide.docxAkhtar Khan
 
ePRTC in data centers – GNSS backup as a service (GBaaS)
ePRTC in data centers – GNSS backup as a service (GBaaS)ePRTC in data centers – GNSS backup as a service (GBaaS)
ePRTC in data centers – GNSS backup as a service (GBaaS)ADVA
 
LTE-Advanced Carrier Aggregation CA – from design to implementation and test ...
LTE-Advanced Carrier Aggregation CA – from design to implementation and test ...LTE-Advanced Carrier Aggregation CA – from design to implementation and test ...
LTE-Advanced Carrier Aggregation CA – from design to implementation and test ...CPqD
 
Timing and synchronization for 5G over optical networks
Timing and synchronization for 5G over optical networksTiming and synchronization for 5G over optical networks
Timing and synchronization for 5G over optical networksADVA
 
dwdm-sfp10g-40km-c61-optical-module-141107.doc
dwdm-sfp10g-40km-c61-optical-module-141107.docdwdm-sfp10g-40km-c61-optical-module-141107.doc
dwdm-sfp10g-40km-c61-optical-module-141107.docGLsun Mall
 
dwdm-sfp10g-40km-c59-optical-module-141105.doc
dwdm-sfp10g-40km-c59-optical-module-141105.docdwdm-sfp10g-40km-c59-optical-module-141105.doc
dwdm-sfp10g-40km-c59-optical-module-141105.docGLsun Mall
 
dwdm-sfp10g-40km-c57-optical-module-141103.doc
dwdm-sfp10g-40km-c57-optical-module-141103.docdwdm-sfp10g-40km-c57-optical-module-141103.doc
dwdm-sfp10g-40km-c57-optical-module-141103.docGLsun Mall
 
dwdm-sfp10g-40km-c29-fiber-transceiver-module-141075.doc
dwdm-sfp10g-40km-c29-fiber-transceiver-module-141075.docdwdm-sfp10g-40km-c29-fiber-transceiver-module-141075.doc
dwdm-sfp10g-40km-c29-fiber-transceiver-module-141075.docGLsun Mall
 
NextGen Network Synchronization
NextGen Network SynchronizationNextGen Network Synchronization
NextGen Network SynchronizationDhiman Chowdhury
 
dwdm-sfp10g-40km-c53-optical-module-141099.doc
dwdm-sfp10g-40km-c53-optical-module-141099.docdwdm-sfp10g-40km-c53-optical-module-141099.doc
dwdm-sfp10g-40km-c53-optical-module-141099.docGLsun Mall
 
dwdm-sfp10g-40km-c54-optical-transceiver-module-141100.doc
dwdm-sfp10g-40km-c54-optical-transceiver-module-141100.docdwdm-sfp10g-40km-c54-optical-transceiver-module-141100.doc
dwdm-sfp10g-40km-c54-optical-transceiver-module-141100.docGLsun Mall
 
dwdm-sfp10g-40km-c60-optical-module-141106.doc
dwdm-sfp10g-40km-c60-optical-module-141106.docdwdm-sfp10g-40km-c60-optical-module-141106.doc
dwdm-sfp10g-40km-c60-optical-module-141106.docGLsun Mall
 
dwdm-sfp10g-40km-c58-optical-module-141104.doc
dwdm-sfp10g-40km-c58-optical-module-141104.docdwdm-sfp10g-40km-c58-optical-module-141104.doc
dwdm-sfp10g-40km-c58-optical-module-141104.docGLsun Mall
 
dwdm-sfp10g-40km-c56-optical-module-141102.doc
dwdm-sfp10g-40km-c56-optical-module-141102.docdwdm-sfp10g-40km-c56-optical-module-141102.doc
dwdm-sfp10g-40km-c56-optical-module-141102.docGLsun Mall
 
DWDM-SFP10G-40-C47-T02#141093.pdf
DWDM-SFP10G-40-C47-T02#141093.pdfDWDM-SFP10G-40-C47-T02#141093.pdf
DWDM-SFP10G-40-C47-T02#141093.pdfGLsun Mall
 
DWDM-SFP10G-40-C61-T02#141107.pdf
DWDM-SFP10G-40-C61-T02#141107.pdfDWDM-SFP10G-40-C61-T02#141107.pdf
DWDM-SFP10G-40-C61-T02#141107.pdfGLsun Mall
 
DWDM-SFP10G-40-C21-T02#141067.pdf
DWDM-SFP10G-40-C21-T02#141067.pdfDWDM-SFP10G-40-C21-T02#141067.pdf
DWDM-SFP10G-40-C21-T02#141067.pdfGLsun Mall
 
DWDM-SFP10G-40-C59-T02#141105.pdf
DWDM-SFP10G-40-C59-T02#141105.pdfDWDM-SFP10G-40-C59-T02#141105.pdf
DWDM-SFP10G-40-C59-T02#141105.pdfGLsun Mall
 
DWDM-SFP10G-40-C57-T02#141103.pdf
DWDM-SFP10G-40-C57-T02#141103.pdfDWDM-SFP10G-40-C57-T02#141103.pdf
DWDM-SFP10G-40-C57-T02#141103.pdfGLsun Mall
 
DWDM-SFP10G-40-C23-T02#141069.pdf
DWDM-SFP10G-40-C23-T02#141069.pdfDWDM-SFP10G-40-C23-T02#141069.pdf
DWDM-SFP10G-40-C23-T02#141069.pdfGLsun Mall
 

Ähnlich wie Extend LTE Coverage with Limited RRU Capacity (20)

Operator E CA(Carrier Aggregation) Feature Test Guide.docx
Operator E CA(Carrier Aggregation) Feature Test Guide.docxOperator E CA(Carrier Aggregation) Feature Test Guide.docx
Operator E CA(Carrier Aggregation) Feature Test Guide.docx
 
ePRTC in data centers – GNSS backup as a service (GBaaS)
ePRTC in data centers – GNSS backup as a service (GBaaS)ePRTC in data centers – GNSS backup as a service (GBaaS)
ePRTC in data centers – GNSS backup as a service (GBaaS)
 
LTE-Advanced Carrier Aggregation CA – from design to implementation and test ...
LTE-Advanced Carrier Aggregation CA – from design to implementation and test ...LTE-Advanced Carrier Aggregation CA – from design to implementation and test ...
LTE-Advanced Carrier Aggregation CA – from design to implementation and test ...
 
Timing and synchronization for 5G over optical networks
Timing and synchronization for 5G over optical networksTiming and synchronization for 5G over optical networks
Timing and synchronization for 5G over optical networks
 
dwdm-sfp10g-40km-c61-optical-module-141107.doc
dwdm-sfp10g-40km-c61-optical-module-141107.docdwdm-sfp10g-40km-c61-optical-module-141107.doc
dwdm-sfp10g-40km-c61-optical-module-141107.doc
 
dwdm-sfp10g-40km-c59-optical-module-141105.doc
dwdm-sfp10g-40km-c59-optical-module-141105.docdwdm-sfp10g-40km-c59-optical-module-141105.doc
dwdm-sfp10g-40km-c59-optical-module-141105.doc
 
dwdm-sfp10g-40km-c57-optical-module-141103.doc
dwdm-sfp10g-40km-c57-optical-module-141103.docdwdm-sfp10g-40km-c57-optical-module-141103.doc
dwdm-sfp10g-40km-c57-optical-module-141103.doc
 
dwdm-sfp10g-40km-c29-fiber-transceiver-module-141075.doc
dwdm-sfp10g-40km-c29-fiber-transceiver-module-141075.docdwdm-sfp10g-40km-c29-fiber-transceiver-module-141075.doc
dwdm-sfp10g-40km-c29-fiber-transceiver-module-141075.doc
 
NextGen Network Synchronization
NextGen Network SynchronizationNextGen Network Synchronization
NextGen Network Synchronization
 
dwdm-sfp10g-40km-c53-optical-module-141099.doc
dwdm-sfp10g-40km-c53-optical-module-141099.docdwdm-sfp10g-40km-c53-optical-module-141099.doc
dwdm-sfp10g-40km-c53-optical-module-141099.doc
 
dwdm-sfp10g-40km-c54-optical-transceiver-module-141100.doc
dwdm-sfp10g-40km-c54-optical-transceiver-module-141100.docdwdm-sfp10g-40km-c54-optical-transceiver-module-141100.doc
dwdm-sfp10g-40km-c54-optical-transceiver-module-141100.doc
 
dwdm-sfp10g-40km-c60-optical-module-141106.doc
dwdm-sfp10g-40km-c60-optical-module-141106.docdwdm-sfp10g-40km-c60-optical-module-141106.doc
dwdm-sfp10g-40km-c60-optical-module-141106.doc
 
dwdm-sfp10g-40km-c58-optical-module-141104.doc
dwdm-sfp10g-40km-c58-optical-module-141104.docdwdm-sfp10g-40km-c58-optical-module-141104.doc
dwdm-sfp10g-40km-c58-optical-module-141104.doc
 
dwdm-sfp10g-40km-c56-optical-module-141102.doc
dwdm-sfp10g-40km-c56-optical-module-141102.docdwdm-sfp10g-40km-c56-optical-module-141102.doc
dwdm-sfp10g-40km-c56-optical-module-141102.doc
 
DWDM-SFP10G-40-C47-T02#141093.pdf
DWDM-SFP10G-40-C47-T02#141093.pdfDWDM-SFP10G-40-C47-T02#141093.pdf
DWDM-SFP10G-40-C47-T02#141093.pdf
 
DWDM-SFP10G-40-C61-T02#141107.pdf
DWDM-SFP10G-40-C61-T02#141107.pdfDWDM-SFP10G-40-C61-T02#141107.pdf
DWDM-SFP10G-40-C61-T02#141107.pdf
 
DWDM-SFP10G-40-C21-T02#141067.pdf
DWDM-SFP10G-40-C21-T02#141067.pdfDWDM-SFP10G-40-C21-T02#141067.pdf
DWDM-SFP10G-40-C21-T02#141067.pdf
 
DWDM-SFP10G-40-C59-T02#141105.pdf
DWDM-SFP10G-40-C59-T02#141105.pdfDWDM-SFP10G-40-C59-T02#141105.pdf
DWDM-SFP10G-40-C59-T02#141105.pdf
 
DWDM-SFP10G-40-C57-T02#141103.pdf
DWDM-SFP10G-40-C57-T02#141103.pdfDWDM-SFP10G-40-C57-T02#141103.pdf
DWDM-SFP10G-40-C57-T02#141103.pdf
 
DWDM-SFP10G-40-C23-T02#141069.pdf
DWDM-SFP10G-40-C23-T02#141069.pdfDWDM-SFP10G-40-C23-T02#141069.pdf
DWDM-SFP10G-40-C23-T02#141069.pdf
 

Kürzlich hochgeladen

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 

Kürzlich hochgeladen (20)

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 

Extend LTE Coverage with Limited RRU Capacity

  • 1. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 1 How to Extend LTE Coverage with Limited RRU Capacity @ DTAC Live Network Thananan Numtti RF Manager
  • 2. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 2 Content 1. LTE Technology over all power consumptions 2. LTE Formula CRS gain (Cell Referent Signal by PB (Power Boosting) 3 Demo prediction CRS gain LTE2100 by AIRCOM asset planning tool 4. LTE2100 Nationwide calculate POP & Area comparisons by CRS gain 5. How to CRS gain configuration 3 Vendors (Huawei, Ericsson, Nokia) 6. LTEs Predictions and Comparisons CRS gain (L21,E18,T23) 7. RAN Recommendations with PB value DTAC LTE Live Network
  • 3. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 3 Recommendation value for PA and PB PB PA Remark 0 3 RS -3dB but PDSCH type B +1dB 1 0 RS & PDSCH having same power(Existing Config) 1 -1.77 RS +1.77 dB 1 -3 RS +3 dB (2x2MIMO) 2 -4.77 RS +4.77 dB but PDSCH type B -1.2 dB 3 -6 RS +6 dB but PDSCH type B -3 dB(4x4MIMO) 1. LTE Technology over all power consumptions PDSCH power to RS, where NO reference signals are present, is UE specific and signaled by higher layers as Pa (ρA). For PDSCH power in same symbol as reference signal an additional cell specific offset is applied, that is signaled by higher layers as Pb (ρB). Credits form https://www.wirelessdesignmag.com/blog/2011/02/understanding-downlink-power-allocation-lte References: 1. 3GPP, TS 36.331.,2. 3GPP, TS 36.213 PDCCH power depending on ρA/ρB Cell-Specific reference signal power (RS power),signaled in SIB Type2 Cell-Specific reference signal power (RS power),signaled in SIB Type2 Because PDSCH power in same symbol as reference signal cell specific offset will be Compensates Pb (ρB). UE RSRP_Pa -54.77dBm
  • 4. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 4 2. LTE Formula CRS gain (Cell Referent Signal by PB (Power Boosting) CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1) 1.Power per port antenna @maxRRU 43dBm(20Watt),configuration 2T2R MIMO @Power single port = pRRU-10Log (No. Antenna port) = 43-10log (2) @Power single port = 39.99 dBm or 10Watt/Antenna port @PB:1 CRS = 39.9 – 10 log(25*12)+10Log(1+1) = 18.23 dBm 2. Extend Coverage by Power bossing(PB) Level 0 ,1 , 2 ,3 @PB:2 CRS = 39.9 – 10 log(25*12)+10Log(2+1) = 20.00 dBm @PB:0 CRS = 39.9 – 10 log(25*12)+10Log(0+1) = 15.22 dBm @PB:3 CRS = 39.9 – 10 log(25*12)+10Log(3+1) = 21.24 dBm PB:0 is mean there is non power boosting incensement on CRS RE
  • 5. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 5 1.Power per port antenna @maxRRU 46dBm(40Watt),configuration 2T2R MIMO @Power single port = pRRU-10Log (No. Antenna port) = 46-10log (2) @Power single port = 42.9 dBm or 20Watt/Antenna port @PB:1 CRS = 42.9 – 10 log(100*12)+10Log(1+1) = 21.23 dBm 2. Extend Coverage by Power bossing(PB) Level 0 ,1 , 2 ,3 @PB:2 CRS = 42.9 – 10 log(100*12)+10Log(2+1) = 22.99 dBm @PB:0 CRS = 42.9 – 10 log(100*12)+10Log(0+1) = 18.22 dBm @PB:3 CRS = 42.9 – 10 log(100*12)+10Log(3+1) = 24.24 dBm PB:0 is mean there is non power boosting incensement on CRS RE CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1)
  • 6. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 6 3. Demo prediction CRS gain LTE2100 by AIRCOM asset planning tool - RSRP, SINR, Downlink Throughput 2x2 MIMO 15.22dBm,PA-3,PB0 18.23dBm,PA-3,PB1 20.00dBm,PA-3,PB2 21.24dBm,PA-3,PB3 RSRP SINR Downlink Throughput 2x2 MIMO 30-35Mbps 25-30Mbps 20-25Mbps 15-20Mbps 10-15Mbps
  • 7. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 7 3. Demo prediction CRS gain LTE2100 by AIRCOM asset planning tool - CRS Gain Vs Distance (Kilometers) 15.22dBm,PA-3,PB0 18.23dBm,PA-3,PB1 20.00dBm,PA-3,PB2 21.24dBm,PA-3,PB3 RSRP CRS gain
  • 8. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 8 4. LTE2100 Nationwide calculatePOP & Area comparisons by CRS gain Region Thailand_ Area Thailand_ POP LTE2100 15.22dBm LTE2100 18.23dBm LTE2100 20.00dBm LTE2100 21.20dBm LTE2100 15.22dBm LTE2100 18.23dBm LTE2100 20.00dBm LTE2100 21.20dBm BANGKOK 100% 100% 85% 87% 90% 91% 98% 99% 99% 99% CENTRAL&E AST 100% 100% 55% 59% 65% 66% 82% 86% 90% 91% NORTH 100% 100% 42% 43% 50% 51% 66% 68% 75% 76% NORTHEAST 100% 100% 73% 75% 84% 85% 84% 85% 92% 93% SOUTH&WE ST 100% 100% 56% 60% 64% 65% 81% 84% 86% 87% Grand Total 100% 100% 58% 60% 67% 68% 82% 84% 89% 90% -110dBm Coverage Area -110dBm Coverage POP
  • 9. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 9 5. How to CRS gain configuration 3 Vendors (Huawei, Ericsson, Nokia) Existing Configuration Propose Configuration VendorsParameter ID Meaning GUI Value Range Unit Defulte L21 E18 T23 L21 E18 T23 Command Huawei ReferenceSignalPwr Cell reference signal power of each physical antenna -600~500 0.1dBm None 212(21.2 3dBm) 182(18.2d Bm) 212(21.23 dBm) 242(24.2dB m) MOD PDSCHCFG: LocalCellId=0, ReferenceSignalPwr=212; PdschPaAdjSwitch Switch for adjusting the PA through power control on the PDSCH OFF(Off), ON(On) None OFF OFF OFF ON ON MOD CELLDLPCPDSCHPA: LocalCellId=0, PdschPaAdjSwitch=ON, PaPcOff=DB_6_P_A; Pb Energy Per Resource Element (EPRE) on the PDSCH 0~3 None None 1 1 3 3 MOD PDSCHCFG: LocalCellId=0, ReferenceSignalPwr=212; Pb=3; PaPcOff PA to be used when PA adjustment for PDSCH power control DB_6_P_A(-6 dB), DB_4DOT77_P_A(-4.77 dB), DB_3_P_A(-3 dB), DB_1DOT77_P_A(-1.77 dB), DB0_P_A(0 dB), DB1_P_A(1 dB), DB2_P_A(2 dB), DB3_P_A(3 dB) dB None DB_3_P_ A(-3 dB) DB_3_P_A( -3 dB) DB_6_P_A (-6 dB) DB_6_P_A(- 6 dB) MOD CELLDLPCPDSCHPA: LocalCellId=0, PdschPaAdjSwitch=ON, PaPcOff=DB_6_P_A; Ericsson crsGain Cell reference signal power of each physical antenna 0 { -300, -200, -100, 0, 177, 300, 477, 600 } Unit: 0.01dB 0.01dB 0(0dB) 0(0dB) 0(0dB) 0(0dB) 600(3dB) 600(3dB) 600(3dB) [SectorEquipmentFunction]configuredOutput Power[EUtranCellFDD] crsGain 600 (6 dB) pdschTypeBgain Energy Per Resource Element (EPRE) on the PDSCH 0 { 0, 1, 2, 3 } define the gains (5/4,1,3/4,1/2) None None 0 0 0 3 3 3 [EUtranCellFDD/TDD] pdschTypeBgain 3 Nokia dlRsBoost Cell reference signal power of each physical antenna LNCEL: -3dB (700), 0dB(1000), 1.77dB (1177), 3dB(1300), 4.77dB (1477),6dB, (1600); 0dB dB None 3dB(1300 ) - 3dB(1300 ) 6dB(1600)- 6dB(1600) [LNCEL] pMax[LNCEL] dlRsBoost 1600(6 dB) allowPbIndexZero Energy Per Resource Element (EPRE) on the PDSCH 0 (false), 1 (true) None 0 (false) 0 (false) 0 (false) 1 1 1 1 [LNCEL] pMax[LNCEL] allowPbIndexZero 1 (true) Nokia set to 1 (Hard code)
  • 10. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 10 5. How to CRS gain configuration 3 Vendors (Huawei, Ericsson, Nokia) BKK0009-L21> get . crsgain MO Attribute Value ========================================== EUtranCellFDD=L21-BKK0009-1A crsGain 0 EUtranCellFDD=L21-BKK0009-1B crsGain 300 EUtranCellFDD=L21-BKK0009-1C crsGain 0 EUtranCellFDD=L21-BKK0009-1D crsGain 0 ========================================== BKK0009-L21> get . pdschtypeb MO Attribute Value ========================================== EUtranCellFDD=L21-BKK0009-1A pdschTypeBGain 0 EUtranCellFDD=L21-BKK0009-1B pdschTypeBGain 1 EUtranCellFDD=L21-BKK0009-1C pdschTypeBGain 0 EUtranCellFDD=L21-BKK0009-1D pdschTypeBGain 0 ========================================== BKK0009-E18> get . crsgain MO Attribute Value =========================================== EUtranCellFDD=E18-BKK0009-1A crsGain 0 EUtranCellFDD=E18-BKK0009-1B crsGain 0 EUtranCellFDD=E18-BKK0009-1C crsGain 0 EUtranCellFDD=E18-BKK0009-1D crsGain 0 ============================================ BKK0009-E18> get . pdschtype MO Attribute Value ============================================ EUtranCellFDD=E18-BKK0009-1A pdschTypeBGain 0 EUtranCellFDD=E18-BKK0009-1B pdschTypeBGain 0 EUtranCellFDD=E18-BKK0009-1C pdschTypeBGain 0 EUtranCellFDD=E18-BKK0009-1D pdschTypeBGain 0 ============================================ BKK0024-L23> get . crsgain MO Attribute Value ============================================== EUtranCellTDD=L23-BKK0024-1A crsGain 0 EUtranCellTDD=L23-BKK0024-1B crsGain 0 EUtranCellTDD=L23-BKK0024-1C crsGain 0 EUtranCellTDD=L23-BKK0024-2A crsGain 0 EUtranCellTDD=L23-BKK0024-2B crsGain 0 EUtranCellTDD=L23-BKK0024-2C crsGain 0 EUtranCellTDD=L23-BKK0024-3A crsGain 0 EUtranCellTDD=L23-BKK0024-3B crsGain 0 EUtranCellTDD=L23-BKK0024-3C crsGain 0 BKK0024-L23> get . pdschtyp MO Attribute Value ========================================================= EUtranCellTDD=L23-BKK0024-1A pdschTypeBGain 0 EUtranCellTDD=L23-BKK0024-1B pdschTypeBGain 0 EUtranCellTDD=L23-BKK0024-1C pdschTypeBGain 0 LST CELLDLPCPDSCHPA:; KBI0106-UL List Pa parameters for PDSCH power control ------------------------------------------ Local cell ID PA adjusting switch PA for even power distribution(dB) 1 Off -3 dB 2 Off -3 dB 3 Off -3 dB LST PDSCHCFG:; KBI0106-UL +++ KBI0106-UL 2018-01-22 14:49:22 Display PDSCHCfg ---------------- Local cell ID Reference signal power(0.1dBm) PB Reference Signal Power Margin(0.1dB) Offset of Ant0 to Tx Power(0.1dB) Offset of Ant1 to Tx Power(0.1dB) Offset of Ant2 to Tx Power(0.1dB) Offset of Ant3 to Tx Power(0.1dB) 1 212 1 0 255 255 255 255 2 212 1 0 255 255 255 255 3 212 1 0 255 255 255 255 (Number of results = 3) --- END SiteName CellName MO pMax dlRsBoost allowPbIndexRatio L23-CMI0003 L23-CMI0003-1A PLMN-PLMN/MRBTS-400102/LNBTS- 400102/LNCEL-11 430 (43dBm) 1300 (3dB) 0 (false) L23-CMI0003 L23-CMI0003-1B PLMN-PLMN/MRBTS-400102/LNBTS- 400102/LNCEL-21 430 (43dBm) 1300 (3dB) 0 (false) L23-CMI0003 L23-CMI0003-1C PLMN-PLMN/MRBTS-400102/LNBTS- 400102/LNCEL-31 430 (43dBm) 1300 (3dB) 0 (false) L23-CMI0003 L23-CMI0003-2A PLMN-PLMN/MRBTS-400102/LNBTS- 400102/LNCEL-12 400 (40dBm) 1300 (3dB) 0 (false) L23-CMI0003 L23-CMI0003-2B PLMN-PLMN/MRBTS-400102/LNBTS- 400102/LNCEL-22 400 (40dBm) 1300 (3dB) 0 (false) L23-CMI0003 L23-CMI0003-2C PLMN-PLMN/MRBTS-400102/LNBTS- 400102/LNCEL-32 400 (40dBm) 1300 (3dB) 0 (false) L23-CMI0003 L23-CMI0003-3A PLMN-PLMN/MRBTS-400102/LNBTS- 400102/LNCEL-13 400 (40dBm) 1300 (3dB) 0 (false) L23-CMI0003 L23-CMI0003-3B PLMN-PLMN/MRBTS-400102/LNBTS- 400102/LNCEL-23 400 (40dBm) 1300 (3dB) 0 (false) L23-CMI0003 L23-CMI0003-3C PLMN-PLMN/MRBTS-400102/LNBTS- 400102/LNCEL-33 400 (40dBm) 1300 (3dB) 0 (false) SiteName CellName MO pMax dlRsBoost allowPbIndexZero L21-CMI0130 L21-CMI0130-1A PLMN-PLMN/MRBTS-100130/LNBTS- 100130/LNCEL-1 430 1300 0 L21-CMI0130 L21-CMI0130-1B PLMN-PLMN/MRBTS-100130/LNBTS- 100130/LNCEL-2 448 1300 0 L21-CMI0130 L21-CMI0130-1C PLMN-PLMN/MRBTS-100130/LNBTS- 100130/LNCEL-3 430 1300 0 -4.77,-6 2,3 1 1 1477 ,1600 1477 ,1600 477, 600 477, 600 1,2,3 1,2,3 477, 600 ON 200- 600
  • 11. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 14 6.LTE Predictions and Comparisons CRS gain (L21,E18,T23)@-110dBm Under Condition @ Antenna High43m - L21:20watt @BW:5MHz - E18:40watt @BW:20MHz - T23:20watt @BW:20MHz
  • 12. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 15 7. RAN Recommendations with PB value DTAC LTE Live Network Recommendation value for PA and PB PB PA Remark Area 0 3 RS -3dB but PDSCH type B +1dB 1 0 RS & PDSCH having same power (Existing Network) Existing Network 1 -1.77 RS +1.77 dB 1 -3 RS +3 dB (2x2MIMO) Dens Urban ,Urban 2 -4.77 RS +4.77 dB but PDSCH type B -1.2 dB Sub Urban ,Rural 3 -6 RS +6 dB but PDSCH type B -3 dB(4x4MIMO) or 2x2MIMO Rural ,IBC 1. CRS gain configuration should be separate area coverage ,deep indoor or capacity area 2. Trade off main KPIs site by site
  • 13. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 16 Backup Slide
  • 14. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 17 CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1) LTE2300 Network 3 Frequencies ,Frequencies = 13 watts 1.Power per port antenna @maxRRU 41.1dBm(13Watt ),configuration 4T4R MIMO @Power single port = pRRU-10Log (No. Antenna port) = 41.1-10log (4) @Power single port = 35.0 dBm or 3.2Watt/Antenna port @PB:1 CRS = 35.0 – 10 log(100*12)+10Log(1+1) = 7.30 dBm 2. Extend coverage by Power bossing(PB) Level 0 ,1 , 2 ,3 @PB:2 CRS = 35.0 – 10 log(100*12)+10Log(2+1) = 9.06 dBm @PB:0 CRS = 35.0 – 10 log(100*12)+10Log(0+1) = 4.29 dBm @PB:3 CRS = 35.0 – 10 log(100*12)+10Log(3+1) = 10.31 dBm PB:0 is mean there is non power boosting incensement on CRS RE T D D
  • 15. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 18 CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1) LTE2300 Network ,1st Frequency = 20 watts, 2nd &3rd Frequent =10Watt 1.Power per port antenna @maxRRU 43 dBm(20Watt ),configuration 4T4R MIMO @Power single port = pRRU-10Log (No. Antenna port) = 43 -10log (4) @Power single port = 36.9 dBm or 5 Watt/Antenna port @PB:1 CRS = 36.9 – 10 log(100*12)+10Log(1+1) = 9.20 dBm 2. Extend coverage by Power bossing(PB) Level 0 ,1 , 2 ,3 @PB:2 CRS = 36.9 – 10 log(100*12)+10Log(2+1) = 10.96 dBm @PB:0 CRS = 36.9 – 10 log(100*12)+10Log(0+1) = 6.19 dBm @PB:3 CRS = 36.9 – 10 log(100*12)+10Log(3+1) = 12.21 dBm PB:0 is mean there is non power boosting incensement on CRS RE T D D
  • 16. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 19 CRS= RRU_single port(dBm) - 10log(PRB*12)+10Log(Pb+1) LTE2300 Network ,1st Frequency = 20 watts, 2nd &3rd Frequent =10Watt 1.Power per port antenna @maxRRU 40 dBm(10Watt ),configuration 4T4R MIMO @Power single port = pRRU-10Log (No. Antenna port) = 40 -10log (4) @Power single port = 33.98 dBm or 2.5 Watt/Antenna port @PB:1 CRS = 33.9 – 10 log(100*12)+10Log(1+1) = 6.20 dBm 2. Extend coverage by Power bossing(PB) Level 0 ,1 , 2 ,3 @PB:2 CRS = 33.9 – 10 log(100*12)+10Log(2+1) = 7.96 dBm @PB:0 CRS = 33.9 – 10 log(100*12)+10Log(0+1) = 3.19 dBm @PB:3 CRS = 33.9 – 10 log(100*12)+10Log(3+1) = 9.19 dBm PB:0 is mean there is non power boosting incensement on CRS RE T D D
  • 17. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 20 How to calculate and find the Total Power of PDSCH become Symbol 12REs /1PRB 15Khz RE 1. RE(Resource Element) '= Engergy (Power) allocated to 1 RE is calleds EPRE(Energy Per 1Resource Element) 2. RSRP =If there is no noise at all, RSRP would be same as EPRE you set for Reference Signal '= RE for reference Signal Average Power of all the RS(Reference Signal within a Symbol) 3. Total Power PDSCH This value may vary with different symbols -Symbol 0 in first slot is made up of multiple component - PCFICH, HICH, RS. -Symbol 4 is made up of PDSCH and Reference signal). Within Reference Signal 1.RSRP=(p(51)+p(57))/2 2.Total Power PDSCH= p(49)+p(52)+p(53)+p(55)+p(56)+p(58)+p(59)+p(60) = EPRE PDSCH x 10 (In linear Scale) 3.Total Power PDSCH all Channel =(RSRP x 2) + Total Power PDSCH 4.Total Power PDSCH all Channel = EPRE for PDSCH x Number of PDSCH RE = EPRE for PDSCH (in dBm) + 10 Log(Number of PDSCH RE) Without Reference Signal 1.RSRP=N/A (since there is NO RS) 2Ttoal Power PDSCH =p(25)+p(26)+p(27)+p(28)+p(29)+p(30)+p(31)+p(32)+p(33)+p(34)+p(35)+p(36) =EPRE PDSCHx12 (In linear Scale) 3.Total Power PDSCH all Channel =Total Power PDSCH 4.Total Power of PDSCH (Without Reference Signal) = EPRE for PDSCH x Number of RB x 12 (assuming for the symbol with no Reference Signal) = EPRE for PDSCH + 10 Log(Number of RB x 12)
  • 18. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 21 How to calculate and find the Total Power of PDSCH become Example If DTAC Network allocated at -90 dBm/EPRE for PDSCH and allocated 100 RBs for the PDSCH(BW:20MHz), Find the Total Power of PDSCH become as follows. Total Power of PDSCH (in dB/dBm scale ) = EPRE for PDSCH + 10 Log(Number of RB x 12) = -90 + 10 Log(100 x 12) = -90 + 30.8 = - 59.2 dBm If DTAC allocated at -95 dBm Find the Total Power of PDSCH become as follows. = -95 + 10 Log(100 x 12) = -95 + 30.8 = -64.2 dBm If DTAC allocated at -100 dBm Find the Total Power of PDSCH become as follows. = -100 + 10 Log(100 x 12) = -100 + 30.8 = -69.2 dBm If DTAC allocated at -105 dBm Find the Total Power of PDSCH become as follows. = -105 + 10 Log(100 x 12) = -105 + 30.8 = -74.2 dBm If DTAC allocated at -110 dBm Find the Total Power of PDSCH become as follows. = -110 + 10 Log(100 x 12) = -110 + 30.8 = -79.2 dBm @ -90dBm @ -95dBm @ -100dBm @ -105dBm @ -110dBm RSRP =If there is no noise at all, RSRP would be same as EPRE you set for Reference Signal
  • 19. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 22 1.25MIMO 1MIMO 0.75MIMO 0.5MIMO ‘@BW=5MHz ‘@25PRB ‘@RRU43dBm(20Watt) MIMO PB level P_PDSCH_B Power RS ref powerP_PDSCH_B = P_PDSCH_A * ρA/ ρB 0 19.04dBm 3.81 Power RS ref powerP_PDSCH_B = P_PDSCH_A * ρA/ ρB 1 15.23dBm 3.81 Power RS ref powerP_PDSCH_B = P_PDSCH_A * ρA/ ρB 2 11.42dBm 3.81 power RS ref powerP_PDSCH_B = P_PDSCH_A * ρA/ ρB 3 7.61dBm 3.81 Power With out RS power P_PDSCH_A = EPRE_0 - mimoComp 15.23 P_PDSCH_A = EPRE_0 - mimoComp PSD =(pMax)-10*LOG10(PRBs_DL*12),@pmax=39.9dBm RS Power = PSD - PA PDSCH Type B =PSD +10*LOG10(PB) RS= RRU_single port(dBm)-10log(PRB*12)+10Log(Pb+1) EPRE_0 = 15.23 dBm When •PSD_CELL_RS = PSD_0_SISO + dlRsBoost (for 1Tx), •PSD_CELL_RS = PSD_MIMO + dlRsBoost (for 2Tx) • where PSD_0 = (pMax – CELL_PWR_RED) – 10log10(#PRBs_DL x 12) • and PSD_MIMO = PSD_0 – MIMO_COMP EPRE_0 = (pmax – dlCellPwrRed)-10log (#PRB * 12); @pmax=39.9dBm
  • 20. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 23
  • 21. Radio Access Network Dept., TG DTAC Confidential 5/29/2022 24