INTRODUCTION
 Hydrographic surveying or bathymetric surveying is the survey of physical features present
underwater. It is the science of measuring all factors beneath water that affect all the marine
activities like dredging, marine constructions, offshore drilling etc.
 Hydrographic surveying is mainly conducted under authority concerns. It is carried out by
means of sensors, sounding or electronic sensor system for shallow water.
The information obtained from hydrographic surveying is required to bring up nautical
charts which involves,
 Available depths
 Natural features of seabed
 Details of the coastline
 Breakwater
 The aids to navigation harbor facility
These survey also take part in necessary data collection relating to construction and
developments of port facilities, such as pier construction. This help in finding the loss in
capacity due to silt and many uncertainties.
APPLICATIONS OF HYDROGRAPHIC SURVEYING
• Water Power
• Flood Control
• Sewage Disposal
• Dock and Harbor Engineering
• Irrigation
• River Works
USES OF HYDROGRAPHIC SURVEYING
• Depth of the bed can be determined
• Shore lines can be determined
• Navigation Chart Preparation
• Locating mean sea level
• Scouring, silting and irregularities of the bed can be identified
• Tide measurement
• River and stream discharge measurement
• Massive structures like bridges, dams harbors are planned
PRELIMINARY STEPS IN HYDROGRAPHIC SURVEYING
The method starts by locating special control points along the shore line. The
sounding method is employed to determine the depth at various points by means of
stationary boats. Sounding locations can be either made from boat to the control
points or by fixing a point in the boat and taking sounding from the control point.
Before this procedure certain preliminary steps have to be made:
 Reconnaissance
 Locate Horizontal Control
 Locate vertical Control
As every project require a start-up plan to complete it effectively and economically,
reconnaissance has to be undergone. A complete reconnaissance of whole survey area to
choose the best way of performing the survey.
This would facilitate satisfactory completion of the survey in accordance with the
requirements and specifications governing such work. Aerial photographs would help this
study.
RECONNAISSANCE
LOCATING HORIZONTAL CONTROL
• For large areas – 2nd or 3rd order triangulation
• For smaller areas – transit tape traverse
• For small detached areas – stadia, graphical, plane table methods
• For long narrow river – traverse on one side
• For width < 1 km – traverse on both sides
Horizontal control surveys coordinate horizontal positional data. These positions can be referenced
by coordinate axes.
The horizontal control is necessary to locate all features of the land and marine in true relative
positions. Hence a series of lines is drawn whose lengths and azimuths are determined by means of
either triangulation or any other methods. The following guidelines may help in selection of the
type of control.
A number of benchmarks are established near the shore lines at close spacing to serve as
vertical control. The benchmarks are used for setting and checking the levels of gauge to which
the soundings refer to.
A vertical control survey determines elevation with respect to sea level. In a vertical control system,
at least two permanent benchmarks should be used, but more may be required depending upon
the needs and complexity of the project.
LOCATING VERTICAL CONTROL
SOUNDING IN HYDROGRAPHIC SURVEY
Sounding is the measurement of depth below the water surface. Sounding is most important
for any water body to improve its navigable properties, to know about silting and scouring etc.
The specific need for sounding are
1. Preparation of accurate charts for navigation.
2. Determination of the quantities of material to be dredged.
3. Location of the areas from where the material is to be dredged, and where to be dumped.
4. Obtaining information for the design of breakwaters, wharves, sea-wells, etc.
EQUIPMENT FOR SOUNDING
These are required to mark the range lines. A line perpendicular to shore line obtained by
line joining 2 or 3 signals in a straight line constitute the range line along which sounding
has to be performed. To make it visible from considerable distance in the sea it is made
highly conspicuous. Different range lines are distinguished by flags of different colours,
attached to the mast or pole of the signal.
A float made of light wood or air tight vessel which is weighted at bottom kept vertical by
anchoring with guywires are called buoys. In order to accommodate a flag a hole is
drilled. Under water deep, the range lines are marked by shore signals & the buoys.
SHORE SIGNAL AND BUOYS
Buoy
SOUNDING EQUIPMENT
 SOUNDING BOAT
 SOUNDING POLE OR ROD
 LEAD LINE
Sounding Equipment
A fathometer is an echo-sounding instrument used to determine the depth of oceans
indirectly, It works on the principle of recording time of travel by sound waves. Knowing the
time of travel from a point on the surface of the water to the bottom of the ocean and back,
and the velocity of sound waves, the depth can be calculated.
The fathometer gives truly vertical and accurate depth. It gives continuous profile by
recording the measurements on a drum. The soundings can be made with greater speed.
FATHOMETER
• Most common instruments are theodolite, prismatic compass, and sextant.
• The theodolite and prismatic compass are not suitable for angle measurements from
sounding boats due to instability of rowing boats.
• On the other hand, a sextant has been found to be most suitable for measuring angle
in any plane. Navigators and surveyors measures angles from a sounding boat by
sextant only.
• However, when the observations are made from the shore, theodolite and prismatic
compass are used.
ANGLE MEASURING INSTRUMENTS
METHODS OF LOCATING SOUNDINGS IN
HYDROGRAPHIC SURVEYING
The points where the sounding has been made in the water body, are required to be located for
plotting on the drawing sheet.
Depending upon the places of the observation points from where the location are made, the
methods may be classified as:
 Observation from the shore.
 Observation from the sounding boat
 Observation from both the shore and the sounding boat.
Depending upon the of instrument used, methods may be classified as:
• Conning the survey vessel
• Observations with theodolite or sextant
• Theodolite angles and EDM distances from the shore
• Microwave systems
SOUNDING BY CONNING THE SURVEY VESSEL
In this method, conning means keeping the boat at known course. This method is
suitable for rivers, open sea up to 5 km off shore. The markers are fixed on the shore
called as ranges along which vessel or boat is run. This method is again sub divided
into two types as follows.
 Location by cross rope
 Location by range and time interval
Location by Cross Rope
In this method, a wire or rope with markings or
tags at known distances is stretched across the
channel. The starting point of rope at the shore
is marked as reference point. Then using boat,
the sounding at different distances of wire are
determined by weighted pole. This method is
more accurate. This is most suitable for rivers,
narrow lakes and for harbors. This is also
suitable for knowing the amount of material
removed by dredging.
Location by Range and Time Interval
In this method, the boat is positioned in
range with two signals provided on the
shore. Then, the boat is rowed at
constant speed and time required to
reach the instant of sounding is
measured which gives the distance of
total point along the range. This method
is more suitable for less width channels
or rivers. It is not so much accurate.
BY RANGE AND ONE ANGLE FROM THE SHORE
In this method the shore line is divided by a number of range lines A’A,B’B,C’C, etc. at equal
intervals, and the instrument stations A, B, C etc., and the signal stations A’, B’, C’ etc., are fixed.
When the sounding is taken at a1, which is on the range line AA’, the angle is also observed from B
using a theodolite. Knowing the distance AB the distance Aa1 is calculated
In a similar manner the distances of points on other range lines be determined. The time of all
sounding are recorded. Every tenth sounding is usually located by observing angles and the
intermediate sounds are located by interpolation. The method is quiet convenient and gives
reasonable accuracy
Let AB = BC = CD = d then from the
right angled triangle BAa1,
we have, Aa1= dtanΘ
SOUNDING BY OBSERVATIONS WITH THEODOLITE OR SEXTANT
BY TWO ANGLES FROM THE SHORE
 In this method, two instrument stations are fixed
on the shore with proper distance. Two
instruments and two instrument men are
required to do this job. From the two instrument
stations, angular observations are made and a
point is located where sounding is measured.
 This method is used when it is not possible to
keep the sounding boat on a fixed range line or
where the shore topography does not permit
laying out system of intersecting lines. The
instrument stations A and B should be selected in
such a way that they provide good intervisibility
and intersections.
 Let the sounding boat be at P. When the
sounding is taken the boatman gives a signal to
the observers at A and B, and the angles a1 and
a2, are measured. If the distance AB is d, the
distances x and y for P can be computed from
the following equation
 This method gives good result if the angle of
intersection is nearly 90. The disadvantage of the
method is that it requires two instrument.
BY ONE ANGLE FROM THE SHORE AND ONE
ANGLE FROM BOAT
 This method also requires two instruments and two men to
operate. The method requires use of a theodolite for
measuring angle from the shore and a sextant for
measuring the angle from the boat. On the shore two
points A and B are selected. Let the point A be the
theodolite station and point B be the shore signal or any
other prominent point. The distance AB is measured, and
let it be d. To locate the sounding point P, the angles a and
B are measured with the theodolite with the sextant at P,
respectively. The coordinates x and y of P are computed
from the following relations
• In tidal rivers and oceans, an appropriate safe route is required for navigation of vessels
during low tide. For this a common datum of reduction of soundings, mean low water of
spring tides (M.L.W.S. or L.W.O.S.T) is commonly adopted.
• M.L.W.S. or L.W.O.S.T is the lowest level of water in tidal areas. Since the soundings refer to
existing water level at the time of observations, they are required to be reduced to the
assumed datum, i.e., M.L.W.S.
• This is made possible by taking gauge reading the time of soundings. The tidal gauge
readings are recorded at every 5 minutes. For any sounding between five minutes of time,
gauge readings can be obtained by interpolation.
• The soundings are reduced to M.L.W.S. by applying corrections to the soundings. The
difference of levels between the gauge reading, i.e., actual water level the time of soundings
and M.L.W.S., is the required correction to be applied to the soundings.
REDUCTION OF SOUNDINGS
AIRBORNE LIDAR BATHYMETRY (ALB) - It is used to measure water depth
by aircraft equipped with laser ranging system instead of survey vessel with
systems that produce acoustic waves.
The ALB principle is to generally transmit two types of lasers, a green laser and an
infrared laser. The green laser can measure the distance between the aircraft and the
sea bottom, while the infrared laser, which is absorbed by water, measures the distance
between the aircraft and sea surface.
GLOBAL POSITIONING SYSTEM (GPS)
The principle behind GPS positioning is similar to that of radio navigation.
• GPS satellites are equipped with very accurate clocks and the signal transmitter, and
GPS receivers on ship can receive the signal transmitted from GPS satellites.
• The distance between a GPS satellite and a receiver can be determine by timing the
difference between transmitted and receive times.
• The receiver position can be determined by computing the geometric relation
among the multiple GPS satellites and the receiver at the same time.
MODERN INSTRUMENTS
THANK YOU!!!

Weitere ähnliche Inhalte

Was ist angesagt?

CE203 -Hydrographic survey.pptx
CE203 -Hydrographic survey.pptxCE203 -Hydrographic survey.pptx
CE203 -Hydrographic survey.pptxAbdulQHannan
 
Methods of Shore Observations for Horizontal position Fixing
Methods of Shore Observations for Horizontal position FixingMethods of Shore Observations for Horizontal position Fixing
Methods of Shore Observations for Horizontal position FixingNzar Braim
 
PURPOSE OF HYDROGRAPHIC SURVEYINGical seminar
PURPOSE OF HYDROGRAPHICSURVEYINGical seminarPURPOSE OF HYDROGRAPHICSURVEYINGical seminar
PURPOSE OF HYDROGRAPHIC SURVEYINGical seminarAjitha Aji
 
3.2 Sounding methods.pptx
3.2 Sounding methods.pptx3.2 Sounding methods.pptx
3.2 Sounding methods.pptxYogeshwaranV4
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and TrilaterationPramesh Hada
 
Input of Surveying in Civil Engineering.pdf
Input of Surveying in Civil Engineering.pdfInput of Surveying in Civil Engineering.pdf
Input of Surveying in Civil Engineering.pdfMANISHKUMAR863071
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Gokul Saud
 
Hydrography :Sounding Instrument
Hydrography :Sounding InstrumentHydrography :Sounding Instrument
Hydrography :Sounding Instrumentpmevada
 
harbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionharbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionHasna Hassan
 
Hydrography documents
Hydrography documentsHydrography documents
Hydrography documentsHafez Ahmad
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Bathla Tuition Centre
 
Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...amansingh2914
 
S2 1 introduction of basic surveying
S2 1 introduction of basic surveyingS2 1 introduction of basic surveying
S2 1 introduction of basic surveyingEst
 

Was ist angesagt? (20)

CE203 -Hydrographic survey.pptx
CE203 -Hydrographic survey.pptxCE203 -Hydrographic survey.pptx
CE203 -Hydrographic survey.pptx
 
Methods of Shore Observations for Horizontal position Fixing
Methods of Shore Observations for Horizontal position FixingMethods of Shore Observations for Horizontal position Fixing
Methods of Shore Observations for Horizontal position Fixing
 
PURPOSE OF HYDROGRAPHIC SURVEYINGical seminar
PURPOSE OF HYDROGRAPHICSURVEYINGical seminarPURPOSE OF HYDROGRAPHICSURVEYINGical seminar
PURPOSE OF HYDROGRAPHIC SURVEYINGical seminar
 
3.2 Sounding methods.pptx
3.2 Sounding methods.pptx3.2 Sounding methods.pptx
3.2 Sounding methods.pptx
 
EDM
EDMEDM
EDM
 
Side scan sonar
Side scan sonarSide scan sonar
Side scan sonar
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and Trilateration
 
Input of Surveying in Civil Engineering.pdf
Input of Surveying in Civil Engineering.pdfInput of Surveying in Civil Engineering.pdf
Input of Surveying in Civil Engineering.pdf
 
HARBOUR ENGINEERING
HARBOUR ENGINEERING HARBOUR ENGINEERING
HARBOUR ENGINEERING
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
 
Hydrography :Sounding Instrument
Hydrography :Sounding InstrumentHydrography :Sounding Instrument
Hydrography :Sounding Instrument
 
harbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionharbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introduction
 
Hydrography documents
Hydrography documentsHydrography documents
Hydrography documents
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)
 
Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...
 
surveying contouring
surveying contouring surveying contouring
surveying contouring
 
GPS Surveying
GPS SurveyingGPS Surveying
GPS Surveying
 
S2 1 introduction of basic surveying
S2 1 introduction of basic surveyingS2 1 introduction of basic surveying
S2 1 introduction of basic surveying
 
Total station
Total station Total station
Total station
 

Ähnlich wie Hydrographic Survey

4- Hydrographic Surveying.pdf
4- Hydrographic Surveying.pdf4- Hydrographic Surveying.pdf
4- Hydrographic Surveying.pdffankarworld
 
Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
 Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
Download-manuals-surface water-software-estimationofdischargebyarea-slopemethodhydrologyproject0
 
Reconnaissance for Hydrographic Survey Project
Reconnaissance for Hydrographic  Survey ProjectReconnaissance for Hydrographic  Survey Project
Reconnaissance for Hydrographic Survey ProjectNzar Braim
 
Pipeline Depth Of Cover Surveys
Pipeline Depth Of Cover SurveysPipeline Depth Of Cover Surveys
Pipeline Depth Of Cover SurveysSidescan
 
W7b Side Scan Sonar 2018-19.pdf
W7b  Side Scan Sonar 2018-19.pdfW7b  Side Scan Sonar 2018-19.pdf
W7b Side Scan Sonar 2018-19.pdfAzryHafize
 
Measurement of discharge in channels & Design of lined canal
Measurement of discharge in channels & Design of lined canalMeasurement of discharge in channels & Design of lined canal
Measurement of discharge in channels & Design of lined canalJaswinder Singh
 
Ocean current measurements
Ocean current measurementsOcean current measurements
Ocean current measurementsbealberith
 
Coastal processes wave measurements usage of buoys
Coastal processes wave measurements usage of buoysCoastal processes wave measurements usage of buoys
Coastal processes wave measurements usage of buoysSoumyaranjan Jena
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiiihydrologyproject001
 
streamflowmeasurement-170307185522.pdf
streamflowmeasurement-170307185522.pdfstreamflowmeasurement-170307185522.pdf
streamflowmeasurement-170307185522.pdfMashrufaHussain1
 
Stream flow measurement
Stream flow measurementStream flow measurement
Stream flow measurementMOHIT MAYOOR
 
Surveying II - Hydrographic surveying Unit -5
Surveying II - Hydrographic surveying Unit -5Surveying II - Hydrographic surveying Unit -5
Surveying II - Hydrographic surveying Unit -5JaganNathan555342
 
Applications of cross correlation
Applications of cross correlationApplications of cross correlation
Applications of cross correlationVinodhini
 
Download-manuals-surface water-software-introductiontoadvanceddischargemeasu...
 Download-manuals-surface water-software-introductiontoadvanceddischargemeasu... Download-manuals-surface water-software-introductiontoadvanceddischargemeasu...
Download-manuals-surface water-software-introductiontoadvanceddischargemeasu...hydrologyproject0
 

Ähnlich wie Hydrographic Survey (20)

4- Hydrographic Surveying.pdf
4- Hydrographic Surveying.pdf4- Hydrographic Surveying.pdf
4- Hydrographic Surveying.pdf
 
Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
 Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
Download-manuals-surface water-software-estimationofdischargebyarea-slopemethod
 
Aoil survey presentation
Aoil survey presentation Aoil survey presentation
Aoil survey presentation
 
Reconnaissance for Hydrographic Survey Project
Reconnaissance for Hydrographic  Survey ProjectReconnaissance for Hydrographic  Survey Project
Reconnaissance for Hydrographic Survey Project
 
Pipeline Depth Of Cover Surveys
Pipeline Depth Of Cover SurveysPipeline Depth Of Cover Surveys
Pipeline Depth Of Cover Surveys
 
Hydrographic survey.pptx
Hydrographic survey.pptxHydrographic survey.pptx
Hydrographic survey.pptx
 
W7b Side Scan Sonar 2018-19.pdf
W7b  Side Scan Sonar 2018-19.pdfW7b  Side Scan Sonar 2018-19.pdf
W7b Side Scan Sonar 2018-19.pdf
 
Hydrography
Hydrography Hydrography
Hydrography
 
Measurement of discharge in channels & Design of lined canal
Measurement of discharge in channels & Design of lined canalMeasurement of discharge in channels & Design of lined canal
Measurement of discharge in channels & Design of lined canal
 
Surveying i
Surveying iSurveying i
Surveying i
 
Ocean current measurements
Ocean current measurementsOcean current measurements
Ocean current measurements
 
Coastal processes wave measurements usage of buoys
Coastal processes wave measurements usage of buoysCoastal processes wave measurements usage of buoys
Coastal processes wave measurements usage of buoys
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartiii
 
streamflowmeasurement-170307185522.pdf
streamflowmeasurement-170307185522.pdfstreamflowmeasurement-170307185522.pdf
streamflowmeasurement-170307185522.pdf
 
Stream flow measurement
Stream flow measurementStream flow measurement
Stream flow measurement
 
Surveying II - Hydrographic surveying Unit -5
Surveying II - Hydrographic surveying Unit -5Surveying II - Hydrographic surveying Unit -5
Surveying II - Hydrographic surveying Unit -5
 
Applications of cross correlation
Applications of cross correlationApplications of cross correlation
Applications of cross correlation
 
Introduction to Seismic Method
Introduction to Seismic Method Introduction to Seismic Method
Introduction to Seismic Method
 
Download-manuals-surface water-software-introductiontoadvanceddischargemeasu...
 Download-manuals-surface water-software-introductiontoadvanceddischargemeasu... Download-manuals-surface water-software-introductiontoadvanceddischargemeasu...
Download-manuals-surface water-software-introductiontoadvanceddischargemeasu...
 
Hydrographic Surveying1.pptx
Hydrographic Surveying1.pptxHydrographic Surveying1.pptx
Hydrographic Surveying1.pptx
 

Kürzlich hochgeladen

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 

Hydrographic Survey

  • 1. Submitted by, Shubham Bathwal BE/10585/2017 Semester - VI BIRLA INSTITUTE OF TECHNOLOGY MESRA SURVEYING – II CE 6005 HYDROGRAPHIC SURVEY
  • 2. INTRODUCTION  Hydrographic surveying or bathymetric surveying is the survey of physical features present underwater. It is the science of measuring all factors beneath water that affect all the marine activities like dredging, marine constructions, offshore drilling etc.  Hydrographic surveying is mainly conducted under authority concerns. It is carried out by means of sensors, sounding or electronic sensor system for shallow water. The information obtained from hydrographic surveying is required to bring up nautical charts which involves,  Available depths  Natural features of seabed  Details of the coastline  Breakwater  The aids to navigation harbor facility These survey also take part in necessary data collection relating to construction and developments of port facilities, such as pier construction. This help in finding the loss in capacity due to silt and many uncertainties.
  • 3. APPLICATIONS OF HYDROGRAPHIC SURVEYING • Water Power • Flood Control • Sewage Disposal • Dock and Harbor Engineering • Irrigation • River Works USES OF HYDROGRAPHIC SURVEYING • Depth of the bed can be determined • Shore lines can be determined • Navigation Chart Preparation • Locating mean sea level • Scouring, silting and irregularities of the bed can be identified • Tide measurement • River and stream discharge measurement • Massive structures like bridges, dams harbors are planned
  • 4. PRELIMINARY STEPS IN HYDROGRAPHIC SURVEYING The method starts by locating special control points along the shore line. The sounding method is employed to determine the depth at various points by means of stationary boats. Sounding locations can be either made from boat to the control points or by fixing a point in the boat and taking sounding from the control point. Before this procedure certain preliminary steps have to be made:  Reconnaissance  Locate Horizontal Control  Locate vertical Control As every project require a start-up plan to complete it effectively and economically, reconnaissance has to be undergone. A complete reconnaissance of whole survey area to choose the best way of performing the survey. This would facilitate satisfactory completion of the survey in accordance with the requirements and specifications governing such work. Aerial photographs would help this study. RECONNAISSANCE
  • 5. LOCATING HORIZONTAL CONTROL • For large areas – 2nd or 3rd order triangulation • For smaller areas – transit tape traverse • For small detached areas – stadia, graphical, plane table methods • For long narrow river – traverse on one side • For width < 1 km – traverse on both sides Horizontal control surveys coordinate horizontal positional data. These positions can be referenced by coordinate axes. The horizontal control is necessary to locate all features of the land and marine in true relative positions. Hence a series of lines is drawn whose lengths and azimuths are determined by means of either triangulation or any other methods. The following guidelines may help in selection of the type of control. A number of benchmarks are established near the shore lines at close spacing to serve as vertical control. The benchmarks are used for setting and checking the levels of gauge to which the soundings refer to. A vertical control survey determines elevation with respect to sea level. In a vertical control system, at least two permanent benchmarks should be used, but more may be required depending upon the needs and complexity of the project. LOCATING VERTICAL CONTROL
  • 6. SOUNDING IN HYDROGRAPHIC SURVEY Sounding is the measurement of depth below the water surface. Sounding is most important for any water body to improve its navigable properties, to know about silting and scouring etc. The specific need for sounding are 1. Preparation of accurate charts for navigation. 2. Determination of the quantities of material to be dredged. 3. Location of the areas from where the material is to be dredged, and where to be dumped. 4. Obtaining information for the design of breakwaters, wharves, sea-wells, etc.
  • 7. EQUIPMENT FOR SOUNDING These are required to mark the range lines. A line perpendicular to shore line obtained by line joining 2 or 3 signals in a straight line constitute the range line along which sounding has to be performed. To make it visible from considerable distance in the sea it is made highly conspicuous. Different range lines are distinguished by flags of different colours, attached to the mast or pole of the signal. A float made of light wood or air tight vessel which is weighted at bottom kept vertical by anchoring with guywires are called buoys. In order to accommodate a flag a hole is drilled. Under water deep, the range lines are marked by shore signals & the buoys. SHORE SIGNAL AND BUOYS Buoy
  • 8. SOUNDING EQUIPMENT  SOUNDING BOAT  SOUNDING POLE OR ROD  LEAD LINE Sounding Equipment
  • 9. A fathometer is an echo-sounding instrument used to determine the depth of oceans indirectly, It works on the principle of recording time of travel by sound waves. Knowing the time of travel from a point on the surface of the water to the bottom of the ocean and back, and the velocity of sound waves, the depth can be calculated. The fathometer gives truly vertical and accurate depth. It gives continuous profile by recording the measurements on a drum. The soundings can be made with greater speed. FATHOMETER • Most common instruments are theodolite, prismatic compass, and sextant. • The theodolite and prismatic compass are not suitable for angle measurements from sounding boats due to instability of rowing boats. • On the other hand, a sextant has been found to be most suitable for measuring angle in any plane. Navigators and surveyors measures angles from a sounding boat by sextant only. • However, when the observations are made from the shore, theodolite and prismatic compass are used. ANGLE MEASURING INSTRUMENTS
  • 10. METHODS OF LOCATING SOUNDINGS IN HYDROGRAPHIC SURVEYING The points where the sounding has been made in the water body, are required to be located for plotting on the drawing sheet. Depending upon the places of the observation points from where the location are made, the methods may be classified as:  Observation from the shore.  Observation from the sounding boat  Observation from both the shore and the sounding boat. Depending upon the of instrument used, methods may be classified as: • Conning the survey vessel • Observations with theodolite or sextant • Theodolite angles and EDM distances from the shore • Microwave systems
  • 11. SOUNDING BY CONNING THE SURVEY VESSEL In this method, conning means keeping the boat at known course. This method is suitable for rivers, open sea up to 5 km off shore. The markers are fixed on the shore called as ranges along which vessel or boat is run. This method is again sub divided into two types as follows.  Location by cross rope  Location by range and time interval Location by Cross Rope In this method, a wire or rope with markings or tags at known distances is stretched across the channel. The starting point of rope at the shore is marked as reference point. Then using boat, the sounding at different distances of wire are determined by weighted pole. This method is more accurate. This is most suitable for rivers, narrow lakes and for harbors. This is also suitable for knowing the amount of material removed by dredging. Location by Range and Time Interval In this method, the boat is positioned in range with two signals provided on the shore. Then, the boat is rowed at constant speed and time required to reach the instant of sounding is measured which gives the distance of total point along the range. This method is more suitable for less width channels or rivers. It is not so much accurate.
  • 12. BY RANGE AND ONE ANGLE FROM THE SHORE In this method the shore line is divided by a number of range lines A’A,B’B,C’C, etc. at equal intervals, and the instrument stations A, B, C etc., and the signal stations A’, B’, C’ etc., are fixed. When the sounding is taken at a1, which is on the range line AA’, the angle is also observed from B using a theodolite. Knowing the distance AB the distance Aa1 is calculated In a similar manner the distances of points on other range lines be determined. The time of all sounding are recorded. Every tenth sounding is usually located by observing angles and the intermediate sounds are located by interpolation. The method is quiet convenient and gives reasonable accuracy Let AB = BC = CD = d then from the right angled triangle BAa1, we have, Aa1= dtanΘ SOUNDING BY OBSERVATIONS WITH THEODOLITE OR SEXTANT
  • 13. BY TWO ANGLES FROM THE SHORE  In this method, two instrument stations are fixed on the shore with proper distance. Two instruments and two instrument men are required to do this job. From the two instrument stations, angular observations are made and a point is located where sounding is measured.  This method is used when it is not possible to keep the sounding boat on a fixed range line or where the shore topography does not permit laying out system of intersecting lines. The instrument stations A and B should be selected in such a way that they provide good intervisibility and intersections.  Let the sounding boat be at P. When the sounding is taken the boatman gives a signal to the observers at A and B, and the angles a1 and a2, are measured. If the distance AB is d, the distances x and y for P can be computed from the following equation  This method gives good result if the angle of intersection is nearly 90. The disadvantage of the method is that it requires two instrument.
  • 14. BY ONE ANGLE FROM THE SHORE AND ONE ANGLE FROM BOAT  This method also requires two instruments and two men to operate. The method requires use of a theodolite for measuring angle from the shore and a sextant for measuring the angle from the boat. On the shore two points A and B are selected. Let the point A be the theodolite station and point B be the shore signal or any other prominent point. The distance AB is measured, and let it be d. To locate the sounding point P, the angles a and B are measured with the theodolite with the sextant at P, respectively. The coordinates x and y of P are computed from the following relations
  • 15. • In tidal rivers and oceans, an appropriate safe route is required for navigation of vessels during low tide. For this a common datum of reduction of soundings, mean low water of spring tides (M.L.W.S. or L.W.O.S.T) is commonly adopted. • M.L.W.S. or L.W.O.S.T is the lowest level of water in tidal areas. Since the soundings refer to existing water level at the time of observations, they are required to be reduced to the assumed datum, i.e., M.L.W.S. • This is made possible by taking gauge reading the time of soundings. The tidal gauge readings are recorded at every 5 minutes. For any sounding between five minutes of time, gauge readings can be obtained by interpolation. • The soundings are reduced to M.L.W.S. by applying corrections to the soundings. The difference of levels between the gauge reading, i.e., actual water level the time of soundings and M.L.W.S., is the required correction to be applied to the soundings. REDUCTION OF SOUNDINGS
  • 16. AIRBORNE LIDAR BATHYMETRY (ALB) - It is used to measure water depth by aircraft equipped with laser ranging system instead of survey vessel with systems that produce acoustic waves. The ALB principle is to generally transmit two types of lasers, a green laser and an infrared laser. The green laser can measure the distance between the aircraft and the sea bottom, while the infrared laser, which is absorbed by water, measures the distance between the aircraft and sea surface. GLOBAL POSITIONING SYSTEM (GPS) The principle behind GPS positioning is similar to that of radio navigation. • GPS satellites are equipped with very accurate clocks and the signal transmitter, and GPS receivers on ship can receive the signal transmitted from GPS satellites. • The distance between a GPS satellite and a receiver can be determine by timing the difference between transmitted and receive times. • The receiver position can be determined by computing the geometric relation among the multiple GPS satellites and the receiver at the same time. MODERN INSTRUMENTS