SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Homework Help
https://www.homeworkping.com/
Research Paper help
https://www.homeworkping.com/
Online Tutoring
https://www.homeworkping.com/
click here for freelancing tutoring sites
CASE STUDY #2
INSTRUCTIONS:
Students should read the scenario below and respond in the form of an essay, which should consist of
several paragraphs and appropriate priority or task lists. Responses should be supported fully and
completely. A well-thought-out response can be accomplished in 300-500 words (one or two pages,
double spaced). Any published material used to support a response should be cited per the APA style
guidelines.
SCENARIO:
You are back at your plant the Monday after the “Dangerous When Wet” leaking tanker incident
happened, and you are telling your fellow HazMat Team Coordinator how you handled the situation.
Before he has a chance to offer his opinion, a call comes in over your radio that a forklift has punctured a
55 gallon drum at the door between the oxidizer storage area and the production department.
There is a spill, and no one is injured; however, the production employee does not know what was spilled.
You make an immediate page to all emergency response team members in the area, and then you head
out the door to the scene with your fellow HazMat Team Coordinator (the production department chief
engineer). While en route to the scene, you call the plant manager and apprise her of what you know and
that you will report back as soon as you have more information.
The incident command center can either be the production office or the conference room near the plant
manager's office. In this case, your first choice is the production office.
The storage area building has multiple storage bays for oxidizers, flammables, acids, and bases. When
you arrive near the scene, you find the punctured drum on its side against a pallet of three other drums
and a very small fuming cloud of vapor developing from the area, but you cannot tell its exact point of
origin. It turns out that the drums are just inside the storage area building. You can see that the drums on
the pallet have flammable labels. The fourth flammable drum has been knocked off the pallet and is also
lying on its side next to the punctured drum. The punctured drum has not been identified at this point – it
is a strong oxidizer, strong acid, or strong base raw material.
How do you proceed? To proceed I would obtain the necessary document that contained the total amount
of chemical in the site which would include their type of hazard, flammable , acid or base, exact location
and number of drums of each chemical.
Stanley Njoku
Case Study II
March 12, 2012
What information are you after, how do you gather it, this information would collected from the
storage of shift supervisor nor manager's office and what instructions do you provide for your
team? I will develop plans to handle anticipated emergencies prior to the commencement of
emergency response operations make it available for inspection and present a copy to the
manager and supervisor.
I will evacuate all the employees from the workplace and will not permit any of the employees to
assist in handling the emergency except my Hazmat team in accordance with CFR 1910.38(a).
I would develop an emergency response plan for emergencies which will address as a minimum
requirement in an emergency situation as follows;
i. Pre-emergency planning and coordination with outside parties.
ii. Personnel roles, lines of authority, training, and communication.
iii. Emergency recognition and prevention.
iv. Safe distances and places of refuge.
v. Site security and control.
vi. Evacuation routes and procedures.
vii. Decontamination.
viii. Emergency medical treatment and first aid.
ix. Emergency alerting and response procedures.
x. Critique of response and follow-up
xi. PPE and emergency equipment.
I will communicate, coordinate, and control in cohesion with the manager or supervisor in
charge of shift to assist in providing information about the chemical in the site. I will use all
hazardous substances or conditions present and shall address as appropriate site analysis making
use of engineering controls, maximum exposure limits, hazardous substance handling
procedures, and use of any new technologies based on hazardous substances and /or conditions
present. I will assure that the personal protective equipment worn is appropriate for the hazards
to be encountered and make sure that PPE is met, at a minimum, the criteria contained in 29
CFR 1910.156(e) when worn while performing fire fighting operations beyond the incipient
stage for any incident or site. I will make sure that the Employees engaged in emergency
response and exposed to hazardous substances presenting an inhalation hazard or potential
inhalation hazard shall wear positive pressure self-contained breathing apparatus while engaged
in emergency response, until such time that the individual in charge of the ICS determines
through the use of air monitoring that a decreased level of respiratory protection will not result in
hazardous exposures to employees.
What hazardous situations are you and your team facing? My team and I would be facing
multiple storage bays for oxidizers, flammables, acids, and bases which can pose serious danger.
To define the primary hazard associated with flammable liquids is their ability to readily ignite
and burn. It can ignite and start a fire.
Store oxidizers away from flammables, organic compounds and combustible materials.
Strong oxidizing agents like chronic acid to avoid reaction vessels containing oxidizing material
to prevent heated and possibly ignite flames.
Flash point - The lowest temperature at which a liquid gives off vapor to form an air-vapor
mixture that will ignite, but will not sustain ignition. Many commonly used flammable liquids
have flashpoints significantly lower than room temperature
What advice would you give to any other individuals coming upon the scene? I will advise other
individuals not to come upon the scene due to chemical exposure.
Do you call for an evacuation of any, or all, of the plant itself?
There are approximately 180 employees currently on site during this first shift – located in
different areas around the plant (i.e., administrative offices, shipping and receiving, raw
material bulk chemical storage, finished product bulk chemical storage, production operations,
packaging operations, labs, and production/engineering offices). The situation can be considered
as an extremely dangerous due to type of chemical substance that were involved. It was
completely overwhelmed the type safety hazards. You need to answer the question whether you
will call for an evacuation or not and what kind of evacuation?
REFERENCE
Meyer, E. (2010). Chemistry of hazardous materials (5th
ed.). Upper Saddle
River, NJ: Pearson Education Inc.
Timberlake Karen , C. (2003). General, oragnic and biological chemistry.
(Platinum ed., p. 631). Pearson Education Inc.
U.S. Agency for Toxic Substances and Disease Registry http://www.atsdr.cdc.gov/tfacts182.html
OSHA. (n.d.). (1910). Retrieved from website:
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=9756&p_table=STANDARDS
http://www.chemicalspill.org/ChemicalsWorkPlace/response.html
http://www.utexas.edu/safety/ehs/lab/manual/5_procedures.html
packaging operations, labs, and production/engineering offices). The situation can be considered
as an extremely dangerous due to type of chemical substance that were involved. It was
completely overwhelmed the type safety hazards. You need to answer the question whether you
will call for an evacuation or not and what kind of evacuation?
REFERENCE
Meyer, E. (2010). Chemistry of hazardous materials (5th
ed.). Upper Saddle
River, NJ: Pearson Education Inc.
Timberlake Karen , C. (2003). General, oragnic and biological chemistry.
(Platinum ed., p. 631). Pearson Education Inc.
U.S. Agency for Toxic Substances and Disease Registry http://www.atsdr.cdc.gov/tfacts182.html
OSHA. (n.d.). (1910). Retrieved from website:
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=9756&p_table=STANDARDS
http://www.chemicalspill.org/ChemicalsWorkPlace/response.html
http://www.utexas.edu/safety/ehs/lab/manual/5_procedures.html

Weitere ähnliche Inhalte

Andere mochten auch

Daniel Arroyo CV Español
Daniel Arroyo CV EspañolDaniel Arroyo CV Español
Daniel Arroyo CV EspañolDaniel Arroyo
 
Modulo Instruccional
Modulo Instruccional Modulo Instruccional
Modulo Instruccional Riccirenee
 
პირველი ჯგუფი
პირველი ჯგუფიპირველი ჯგუფი
პირველი ჯგუფიMaka Gasitashvili
 
La informació al client en cas d'incidència de FGC
La informació al client en cas d'incidència de FGCLa informació al client en cas d'incidència de FGC
La informació al client en cas d'incidència de FGCAMTU
 
STP engagement and consultation for NHS & Local Authorities
STP engagement and consultation for NHS & Local AuthoritiesSTP engagement and consultation for NHS & Local Authorities
STP engagement and consultation for NHS & Local AuthoritiesRhion Jones
 
ทรัพย์สินทางปัญญาของไทย
ทรัพย์สินทางปัญญาของไทยทรัพย์สินทางปัญญาของไทย
ทรัพย์สินทางปัญญาของไทยWeerayuth Wongsiri
 
The heart structure
The heart structureThe heart structure
The heart structurehscteacher04
 

Andere mochten auch (14)

Unit3
Unit3Unit3
Unit3
 
Guía del alumno 2.0
Guía del alumno 2.0Guía del alumno 2.0
Guía del alumno 2.0
 
SouthGarland_ad
SouthGarland_adSouthGarland_ad
SouthGarland_ad
 
Aprendizaje colaborativo
Aprendizaje colaborativoAprendizaje colaborativo
Aprendizaje colaborativo
 
Action Plan Used
Action Plan UsedAction Plan Used
Action Plan Used
 
Daniel Arroyo CV Español
Daniel Arroyo CV EspañolDaniel Arroyo CV Español
Daniel Arroyo CV Español
 
Bigdatappt
BigdatapptBigdatappt
Bigdatappt
 
Modulo Instruccional
Modulo Instruccional Modulo Instruccional
Modulo Instruccional
 
პირველი ჯგუფი
პირველი ჯგუფიპირველი ჯგუფი
პირველი ჯგუფი
 
Planeacion 3
Planeacion 3Planeacion 3
Planeacion 3
 
La informació al client en cas d'incidència de FGC
La informació al client en cas d'incidència de FGCLa informació al client en cas d'incidència de FGC
La informació al client en cas d'incidència de FGC
 
STP engagement and consultation for NHS & Local Authorities
STP engagement and consultation for NHS & Local AuthoritiesSTP engagement and consultation for NHS & Local Authorities
STP engagement and consultation for NHS & Local Authorities
 
ทรัพย์สินทางปัญญาของไทย
ทรัพย์สินทางปัญญาของไทยทรัพย์สินทางปัญญาของไทย
ทรัพย์สินทางปัญญาของไทย
 
The heart structure
The heart structureThe heart structure
The heart structure
 

Ähnlich wie 92131583 case-study-ii

Protocol for Chemical Spills Training by University of Northern Iowa
Protocol  for Chemical Spills Training by University of Northern IowaProtocol  for Chemical Spills Training by University of Northern Iowa
Protocol for Chemical Spills Training by University of Northern IowaAtlantic Training, LLC.
 
Hazcomm Right To Know
Hazcomm Right To KnowHazcomm Right To Know
Hazcomm Right To Knowvtsiri
 
2014 County of Simcoe WHMIS presentation
2014 County of Simcoe WHMIS presentation2014 County of Simcoe WHMIS presentation
2014 County of Simcoe WHMIS presentationarmandosimcoe
 
Orientation training interactive and posted
Orientation training interactive and postedOrientation training interactive and posted
Orientation training interactive and postedMelinda Box
 
2014 County of Simcoe WHMIS presentation
2014 County of Simcoe WHMIS presentation2014 County of Simcoe WHMIS presentation
2014 County of Simcoe WHMIS presentationarmandosimcoe
 
Material Safety Data Sheet
Material Safety Data Sheet Material Safety Data Sheet
Material Safety Data Sheet Reliance
 
UMN_FactSheet_Release 0715
UMN_FactSheet_Release 0715UMN_FactSheet_Release 0715
UMN_FactSheet_Release 0715Julianne Rantala
 
Spill Response Training by New York Medical College
Spill Response Training by New York Medical CollegeSpill Response Training by New York Medical College
Spill Response Training by New York Medical CollegeAtlantic Training, LLC.
 
_2-Crisis Prevention - Chemical Spills training.ppt
_2-Crisis Prevention - Chemical Spills training.ppt_2-Crisis Prevention - Chemical Spills training.ppt
_2-Crisis Prevention - Chemical Spills training.pptPragyaGupta179377
 
Chemical Handling.ppt
Chemical Handling.pptChemical Handling.ppt
Chemical Handling.pptNiniaDidulo1
 
Agri-Crop Production: Lesson 4 occupational safety and health
Agri-Crop Production: Lesson 4 occupational safety and health Agri-Crop Production: Lesson 4 occupational safety and health
Agri-Crop Production: Lesson 4 occupational safety and health Je-Jireh Silva
 
Associate Safety Professional (ASP) exam prep
Associate Safety Professional (ASP) exam prepAssociate Safety Professional (ASP) exam prep
Associate Safety Professional (ASP) exam prepFred MPAMA
 
DG Forum March 2014
DG Forum March 2014DG Forum March 2014
DG Forum March 2014Amanda Wylde
 
Safety Index and Fire Index
Safety Index and Fire IndexSafety Index and Fire Index
Safety Index and Fire Indexshiyunkuan
 
Eoc construction ic powerpoint
Eoc construction ic powerpointEoc construction ic powerpoint
Eoc construction ic powerpointdaphnemedrano
 
Hazard Communication- LinkedIn
Hazard Communication- LinkedInHazard Communication- LinkedIn
Hazard Communication- LinkedInsusanmaman
 

Ähnlich wie 92131583 case-study-ii (20)

Protocol for Chemical Spills Training by University of Northern Iowa
Protocol  for Chemical Spills Training by University of Northern IowaProtocol  for Chemical Spills Training by University of Northern Iowa
Protocol for Chemical Spills Training by University of Northern Iowa
 
Hazcomm Right To Know
Hazcomm Right To KnowHazcomm Right To Know
Hazcomm Right To Know
 
2014 County of Simcoe WHMIS presentation
2014 County of Simcoe WHMIS presentation2014 County of Simcoe WHMIS presentation
2014 County of Simcoe WHMIS presentation
 
Orientation training interactive and posted
Orientation training interactive and postedOrientation training interactive and posted
Orientation training interactive and posted
 
2014 County of Simcoe WHMIS presentation
2014 County of Simcoe WHMIS presentation2014 County of Simcoe WHMIS presentation
2014 County of Simcoe WHMIS presentation
 
ChemLabSafety.ppt
ChemLabSafety.pptChemLabSafety.ppt
ChemLabSafety.ppt
 
Material Safety Data Sheet
Material Safety Data Sheet Material Safety Data Sheet
Material Safety Data Sheet
 
UMN_FactSheet_Release 0715
UMN_FactSheet_Release 0715UMN_FactSheet_Release 0715
UMN_FactSheet_Release 0715
 
Spill Response Training by New York Medical College
Spill Response Training by New York Medical CollegeSpill Response Training by New York Medical College
Spill Response Training by New York Medical College
 
Chemical Safety.pptx
 Chemical Safety.pptx Chemical Safety.pptx
Chemical Safety.pptx
 
_2-Crisis Prevention - Chemical Spills training.ppt
_2-Crisis Prevention - Chemical Spills training.ppt_2-Crisis Prevention - Chemical Spills training.ppt
_2-Crisis Prevention - Chemical Spills training.ppt
 
Chemical Handling.ppt
Chemical Handling.pptChemical Handling.ppt
Chemical Handling.ppt
 
project on safety and prevention measures in petrol pumps of indianoil corpo...
project on safety and prevention measures in petrol pumps of indianoil  corpo...project on safety and prevention measures in petrol pumps of indianoil  corpo...
project on safety and prevention measures in petrol pumps of indianoil corpo...
 
Agri-Crop Production: Lesson 4 occupational safety and health
Agri-Crop Production: Lesson 4 occupational safety and health Agri-Crop Production: Lesson 4 occupational safety and health
Agri-Crop Production: Lesson 4 occupational safety and health
 
Associate Safety Professional (ASP) exam prep
Associate Safety Professional (ASP) exam prepAssociate Safety Professional (ASP) exam prep
Associate Safety Professional (ASP) exam prep
 
DG Forum March 2014
DG Forum March 2014DG Forum March 2014
DG Forum March 2014
 
Safety Index and Fire Index
Safety Index and Fire IndexSafety Index and Fire Index
Safety Index and Fire Index
 
CHEMICAL.PPT
CHEMICAL.PPTCHEMICAL.PPT
CHEMICAL.PPT
 
Eoc construction ic powerpoint
Eoc construction ic powerpointEoc construction ic powerpoint
Eoc construction ic powerpoint
 
Hazard Communication- LinkedIn
Hazard Communication- LinkedInHazard Communication- LinkedIn
Hazard Communication- LinkedIn
 

Mehr von homeworkping4

242269855 dell-case-study
242269855 dell-case-study242269855 dell-case-study
242269855 dell-case-studyhomeworkping4
 
242266287 case-study-on-guil
242266287 case-study-on-guil242266287 case-study-on-guil
242266287 case-study-on-guilhomeworkping4
 
242259868 legal-research-cases
242259868 legal-research-cases242259868 legal-research-cases
242259868 legal-research-caseshomeworkping4
 
241999259 case-hemstoma-sukonjungtiva
241999259 case-hemstoma-sukonjungtiva241999259 case-hemstoma-sukonjungtiva
241999259 case-hemstoma-sukonjungtivahomeworkping4
 
241985748 plm-case-study
241985748 plm-case-study241985748 plm-case-study
241985748 plm-case-studyhomeworkping4
 
241946212 case-study-for-ocd
241946212 case-study-for-ocd241946212 case-study-for-ocd
241946212 case-study-for-ocdhomeworkping4
 
241941333 case-digest-statcon
241941333 case-digest-statcon241941333 case-digest-statcon
241941333 case-digest-statconhomeworkping4
 
241909563 impact-of-emergency
241909563 impact-of-emergency241909563 impact-of-emergency
241909563 impact-of-emergencyhomeworkping4
 
241905839 mpcvv-report
241905839 mpcvv-report241905839 mpcvv-report
241905839 mpcvv-reporthomeworkping4
 
241767629 ethics-cases
241767629 ethics-cases241767629 ethics-cases
241767629 ethics-caseshomeworkping4
 
241716493 separation-of-powers-cases
241716493 separation-of-powers-cases241716493 separation-of-powers-cases
241716493 separation-of-powers-caseshomeworkping4
 
241603963 drug-study-final
241603963 drug-study-final241603963 drug-study-final
241603963 drug-study-finalhomeworkping4
 
241573114 persons-cases
241573114 persons-cases241573114 persons-cases
241573114 persons-caseshomeworkping4
 
241566373 workshop-on-case-study
241566373 workshop-on-case-study241566373 workshop-on-case-study
241566373 workshop-on-case-studyhomeworkping4
 
241524597 succession-full-cases
241524597 succession-full-cases241524597 succession-full-cases
241524597 succession-full-caseshomeworkping4
 
241299249 pale-cases-batch-2
241299249 pale-cases-batch-2241299249 pale-cases-batch-2
241299249 pale-cases-batch-2homeworkping4
 
241262134 rubab-thesis
241262134 rubab-thesis241262134 rubab-thesis
241262134 rubab-thesishomeworkping4
 
241259161 citizenship-case-digests
241259161 citizenship-case-digests241259161 citizenship-case-digests
241259161 citizenship-case-digestshomeworkping4
 

Mehr von homeworkping4 (20)

242269855 dell-case-study
242269855 dell-case-study242269855 dell-case-study
242269855 dell-case-study
 
242266287 case-study-on-guil
242266287 case-study-on-guil242266287 case-study-on-guil
242266287 case-study-on-guil
 
242259868 legal-research-cases
242259868 legal-research-cases242259868 legal-research-cases
242259868 legal-research-cases
 
241999259 case-hemstoma-sukonjungtiva
241999259 case-hemstoma-sukonjungtiva241999259 case-hemstoma-sukonjungtiva
241999259 case-hemstoma-sukonjungtiva
 
241985748 plm-case-study
241985748 plm-case-study241985748 plm-case-study
241985748 plm-case-study
 
241946212 case-study-for-ocd
241946212 case-study-for-ocd241946212 case-study-for-ocd
241946212 case-study-for-ocd
 
241941333 case-digest-statcon
241941333 case-digest-statcon241941333 case-digest-statcon
241941333 case-digest-statcon
 
241909563 impact-of-emergency
241909563 impact-of-emergency241909563 impact-of-emergency
241909563 impact-of-emergency
 
241905839 mpcvv-report
241905839 mpcvv-report241905839 mpcvv-report
241905839 mpcvv-report
 
241767629 ethics-cases
241767629 ethics-cases241767629 ethics-cases
241767629 ethics-cases
 
241716493 separation-of-powers-cases
241716493 separation-of-powers-cases241716493 separation-of-powers-cases
241716493 separation-of-powers-cases
 
241603963 drug-study-final
241603963 drug-study-final241603963 drug-study-final
241603963 drug-study-final
 
241585426 cases-vii
241585426 cases-vii241585426 cases-vii
241585426 cases-vii
 
241573114 persons-cases
241573114 persons-cases241573114 persons-cases
241573114 persons-cases
 
241566373 workshop-on-case-study
241566373 workshop-on-case-study241566373 workshop-on-case-study
241566373 workshop-on-case-study
 
241524597 succession-full-cases
241524597 succession-full-cases241524597 succession-full-cases
241524597 succession-full-cases
 
241356684 citibank
241356684 citibank241356684 citibank
241356684 citibank
 
241299249 pale-cases-batch-2
241299249 pale-cases-batch-2241299249 pale-cases-batch-2
241299249 pale-cases-batch-2
 
241262134 rubab-thesis
241262134 rubab-thesis241262134 rubab-thesis
241262134 rubab-thesis
 
241259161 citizenship-case-digests
241259161 citizenship-case-digests241259161 citizenship-case-digests
241259161 citizenship-case-digests
 

Kürzlich hochgeladen

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 

Kürzlich hochgeladen (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 

92131583 case-study-ii

  • 1. Homework Help https://www.homeworkping.com/ Research Paper help https://www.homeworkping.com/ Online Tutoring https://www.homeworkping.com/ click here for freelancing tutoring sites CASE STUDY #2 INSTRUCTIONS: Students should read the scenario below and respond in the form of an essay, which should consist of several paragraphs and appropriate priority or task lists. Responses should be supported fully and completely. A well-thought-out response can be accomplished in 300-500 words (one or two pages, double spaced). Any published material used to support a response should be cited per the APA style guidelines. SCENARIO: You are back at your plant the Monday after the “Dangerous When Wet” leaking tanker incident happened, and you are telling your fellow HazMat Team Coordinator how you handled the situation. Before he has a chance to offer his opinion, a call comes in over your radio that a forklift has punctured a 55 gallon drum at the door between the oxidizer storage area and the production department. There is a spill, and no one is injured; however, the production employee does not know what was spilled. You make an immediate page to all emergency response team members in the area, and then you head out the door to the scene with your fellow HazMat Team Coordinator (the production department chief engineer). While en route to the scene, you call the plant manager and apprise her of what you know and that you will report back as soon as you have more information. The incident command center can either be the production office or the conference room near the plant manager's office. In this case, your first choice is the production office.
  • 2. The storage area building has multiple storage bays for oxidizers, flammables, acids, and bases. When you arrive near the scene, you find the punctured drum on its side against a pallet of three other drums and a very small fuming cloud of vapor developing from the area, but you cannot tell its exact point of origin. It turns out that the drums are just inside the storage area building. You can see that the drums on the pallet have flammable labels. The fourth flammable drum has been knocked off the pallet and is also lying on its side next to the punctured drum. The punctured drum has not been identified at this point – it is a strong oxidizer, strong acid, or strong base raw material. How do you proceed? To proceed I would obtain the necessary document that contained the total amount of chemical in the site which would include their type of hazard, flammable , acid or base, exact location and number of drums of each chemical. Stanley Njoku Case Study II March 12, 2012 What information are you after, how do you gather it, this information would collected from the storage of shift supervisor nor manager's office and what instructions do you provide for your team? I will develop plans to handle anticipated emergencies prior to the commencement of emergency response operations make it available for inspection and present a copy to the manager and supervisor. I will evacuate all the employees from the workplace and will not permit any of the employees to assist in handling the emergency except my Hazmat team in accordance with CFR 1910.38(a).
  • 3. I would develop an emergency response plan for emergencies which will address as a minimum requirement in an emergency situation as follows; i. Pre-emergency planning and coordination with outside parties. ii. Personnel roles, lines of authority, training, and communication. iii. Emergency recognition and prevention. iv. Safe distances and places of refuge. v. Site security and control. vi. Evacuation routes and procedures. vii. Decontamination. viii. Emergency medical treatment and first aid. ix. Emergency alerting and response procedures. x. Critique of response and follow-up xi. PPE and emergency equipment. I will communicate, coordinate, and control in cohesion with the manager or supervisor in charge of shift to assist in providing information about the chemical in the site. I will use all hazardous substances or conditions present and shall address as appropriate site analysis making use of engineering controls, maximum exposure limits, hazardous substance handling procedures, and use of any new technologies based on hazardous substances and /or conditions present. I will assure that the personal protective equipment worn is appropriate for the hazards to be encountered and make sure that PPE is met, at a minimum, the criteria contained in 29 CFR 1910.156(e) when worn while performing fire fighting operations beyond the incipient stage for any incident or site. I will make sure that the Employees engaged in emergency
  • 4. response and exposed to hazardous substances presenting an inhalation hazard or potential inhalation hazard shall wear positive pressure self-contained breathing apparatus while engaged in emergency response, until such time that the individual in charge of the ICS determines through the use of air monitoring that a decreased level of respiratory protection will not result in hazardous exposures to employees. What hazardous situations are you and your team facing? My team and I would be facing multiple storage bays for oxidizers, flammables, acids, and bases which can pose serious danger. To define the primary hazard associated with flammable liquids is their ability to readily ignite and burn. It can ignite and start a fire. Store oxidizers away from flammables, organic compounds and combustible materials. Strong oxidizing agents like chronic acid to avoid reaction vessels containing oxidizing material to prevent heated and possibly ignite flames. Flash point - The lowest temperature at which a liquid gives off vapor to form an air-vapor mixture that will ignite, but will not sustain ignition. Many commonly used flammable liquids have flashpoints significantly lower than room temperature What advice would you give to any other individuals coming upon the scene? I will advise other individuals not to come upon the scene due to chemical exposure. Do you call for an evacuation of any, or all, of the plant itself? There are approximately 180 employees currently on site during this first shift – located in different areas around the plant (i.e., administrative offices, shipping and receiving, raw material bulk chemical storage, finished product bulk chemical storage, production operations,
  • 5. packaging operations, labs, and production/engineering offices). The situation can be considered as an extremely dangerous due to type of chemical substance that were involved. It was completely overwhelmed the type safety hazards. You need to answer the question whether you will call for an evacuation or not and what kind of evacuation? REFERENCE Meyer, E. (2010). Chemistry of hazardous materials (5th ed.). Upper Saddle River, NJ: Pearson Education Inc. Timberlake Karen , C. (2003). General, oragnic and biological chemistry. (Platinum ed., p. 631). Pearson Education Inc. U.S. Agency for Toxic Substances and Disease Registry http://www.atsdr.cdc.gov/tfacts182.html OSHA. (n.d.). (1910). Retrieved from website: http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=9756&p_table=STANDARDS http://www.chemicalspill.org/ChemicalsWorkPlace/response.html http://www.utexas.edu/safety/ehs/lab/manual/5_procedures.html
  • 6. packaging operations, labs, and production/engineering offices). The situation can be considered as an extremely dangerous due to type of chemical substance that were involved. It was completely overwhelmed the type safety hazards. You need to answer the question whether you will call for an evacuation or not and what kind of evacuation? REFERENCE Meyer, E. (2010). Chemistry of hazardous materials (5th ed.). Upper Saddle River, NJ: Pearson Education Inc. Timberlake Karen , C. (2003). General, oragnic and biological chemistry. (Platinum ed., p. 631). Pearson Education Inc. U.S. Agency for Toxic Substances and Disease Registry http://www.atsdr.cdc.gov/tfacts182.html OSHA. (n.d.). (1910). Retrieved from website: http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_id=9756&p_table=STANDARDS http://www.chemicalspill.org/ChemicalsWorkPlace/response.html http://www.utexas.edu/safety/ehs/lab/manual/5_procedures.html