Important Points to Remember for Quantity Estimation. 
Civil Works: 
 To carefully note the various levels while calculating excavation & backfilling. 
 To make note of the various levels of the structure & compare the measured 
heights/length of various items with the levels. 
 To check all the sections & elevations carefully prior to any estimation. 
 To look into the NOTES given at the right side of the drawing in the info column. 
 To look out for trenches, drops, slab elevations, projections & many others. 
 To check for different slab depths over the plan. 
 To carefully look into the openings, their types & numbers. 
 To measure the height of the pedestal & columns up to the top level of above Ground 
(plinth) & Roof beams respectively. 
 To measure the length of the beam from column face to face. 
 To carefully note the various given dimensions of the different structures. 
 To carefully carry out the estimation of staircase, trenches etc. separately. 
 To carefully note the beam positions & their depths while calculating Block/Brickwork. 
 To consider the height of the wall for internal plastering works up to the slab bottom & 
thereby considering deductions for openings. 
 To carefully note the beams bottom surface (where there is no block work) for roof 
bottom plastering. 
Steel Reinforcement: 
 To carefully name & number every individual rods before any calculations & workout 
the no. of rods, length & span accordingly & individually. 
 To learn the extra length formulae for the 45 & 30 deg cranks. 
 To learn the calculations of the length & no. of rods for the top reinforcement in slab. 
 To carefully note the data while calculating the length of rods, their numbers, their 
span of distribution etc. 
 To carefully keep note of the covers for various items of the structure. 
 To carefully note the bends, elevations, cranks, while calculating length of rods. 
 To carefully calculate the stirrups, their shapes, bends & the no. of stirrups for columns 
& beams – Please learn about no. of branches of stirrups. 
 To learn the measurement of lengths of 45, 90 deg bends, small cranks, hooks etc.
Unit Weight of steel (Kg/m) 
 Unit Weight of steel (Kg/m) = Area (mm2) X Density (Kg/m3) 
= (Pi * d2) / 4 X 7850. 
= 3.141*d2 / 4 X 7850. 
Since d is in mm, convert it into meters by diving it by (1000) 
= 3.141*d2*7850/ (4*(1000)2) 
= (3.141*7850*d2) / (4000000) 
= 0.00616 * (d2) 
= d2 / 162. 
 1 cum = 30.31 cft. 
 1 sqm = 10.76 sft. 
 1 m = 3.28 ft. 
 1 feet = 0.305 m. 
 1 inch = 25.4 mm. 
 1 cum of cement = 1440 kgs. 
 1 bag of cement (50kg) = 0.034 cum. 
 1 sqm of block work = 13 blocks (for 6” & 8”), 
15 blocks (for 4” block) 
 1 cum of brick work = 473 bricks 
 1 sqm of brick work = 44 bricks 
 M5 = 1:5:4 
 M7.5 = 1:4:8 
 M10 = 1:3:6 
 M15 = 1:2:4 
 M20 = 1:1.5:3 
 M25 = 1:1:2
Steps in Quantity Estimation 
1. Excavation - Individual footings / Entire Area with extra working space. 
2. Backfilling - By Parts / Total excavation minus concrete qty below GL. 
3. Column Necks/Pedestals - up to Grade Beam top level. 
4. Plinth/Grade Beam - PCC & Concrete (Column face to face). 
5. Columns - Grade Beam top to Roof Beam bottom. 
6. Grade Slab - PCC, moisture insulation polyethylene & concrete. 
7. Water Insulation/Bitumen for the substructure 
 Footing bottom, side & top 
 Column neck sides 
 Concrete Walls 
 Grade beams below GL 
 Grade Slab Bottom 
8. Roof Beam concrete 
9. Roof Slab Concrete 
10. Parappet Wall - RCC / Block work 
11. Lintel Concrete 
12. Block work 
13. Plastering - Ceiling, Wall - ext & int, jambs. 
14. Painting 
15. Flooring - cement, tiles, marble etc. 
16. Schedule of openings 
17. Floor Finishes 
 Roof Concrete slopes 
 Heat insulation layers 
 Screed concrete 
 Mortar floor

Weitere ähnliche Inhalte

Was ist angesagt?

How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
Duc Tran Xuan
 
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
AMIT PAYAL
 

Was ist angesagt? (8)

How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
 
Ch 7 design of rcc footing
Ch 7 design of rcc footingCh 7 design of rcc footing
Ch 7 design of rcc footing
 
الفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحة
الفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحةالفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحة
الفصل العاشر - البلاطات المسطحة - تصميم المنشآت الخرسانية المسلحة
 
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
Whatisworkofcivilengineeronconstructionsite 190827025839 (9 files merged)
 
Tower smart tower_detailing_tips_series_3
Tower smart tower_detailing_tips_series_3Tower smart tower_detailing_tips_series_3
Tower smart tower_detailing_tips_series_3
 
Tutor brickwork below ground level
Tutor brickwork below ground levelTutor brickwork below ground level
Tutor brickwork below ground level
 
DESIGN OF FLAT SLABS
DESIGN OF FLAT SLABSDESIGN OF FLAT SLABS
DESIGN OF FLAT SLABS
 

Ähnlich wie 232365197 points-qe

Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
AJAY SHAHU
 
Bar bending schedule (2)
Bar bending schedule (2)Bar bending schedule (2)
Bar bending schedule (2)
ManimaranS17
 

Ähnlich wie 232365197 points-qe (20)

ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
Sp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILINGSp34 STRUCTURAL DRAWING FOR DETAILING
Sp34 STRUCTURAL DRAWING FOR DETAILING
 
Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
 
flat Slab
flat Slabflat Slab
flat Slab
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
final praveen.pptx
final praveen.pptxfinal praveen.pptx
final praveen.pptx
 
Plinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protectionPlinth beam work procedure - checklist, protection
Plinth beam work procedure - checklist, protection
 
Civil drawing detail
Civil drawing detailCivil drawing detail
Civil drawing detail
 
IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...
IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...
IRJET- A Technical Approach to Flat Slab Multistorey Building under Wind Spee...
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 
slabs.ppt
slabs.pptslabs.ppt
slabs.ppt
 
Form Work
Form Work Form Work
Form Work
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
 
Formwork
FormworkFormwork
Formwork
 
Bar bending schedule (2)
Bar bending schedule (2)Bar bending schedule (2)
Bar bending schedule (2)
 
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil EngineeringQuantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
Quantity Surveying/longwall shortwall method/Earthwork- Civil Engineering
 
Roof framing
Roof framingRoof framing
Roof framing
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Estimation & costing guide
Estimation & costing guideEstimation & costing guide
Estimation & costing guide
 
I Download (1)
I Download (1)I Download (1)
I Download (1)
 

Mehr von hlksd

Write better essays in 20 minutes a day
Write better essays in 20 minutes a dayWrite better essays in 20 minutes a day
Write better essays in 20 minutes a day
hlksd
 
Research and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayResearch and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a day
hlksd
 
Reasonskills
ReasonskillsReasonskills
Reasonskills
hlksd
 
R05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillsR05420107 advancedcommunicationskills
R05420107 advancedcommunicationskills
hlksd
 
Proofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayProofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a day
hlksd
 
R05420107 advanced-communication-skills
R05420107 advanced-communication-skillsR05420107 advanced-communication-skills
R05420107 advanced-communication-skills
hlksd
 
Tuladhar
TuladharTuladhar
Tuladhar
hlksd
 
Standard specifications
Standard specificationsStandard specifications
Standard specifications
hlksd
 
Presentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comPresentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.com
hlksd
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
hlksd
 
Pre engineered buildings
Pre engineered buildingsPre engineered buildings
Pre engineered buildings
hlksd
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
hlksd
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
hlksd
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteel
hlksd
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)
hlksd
 
Peb structures
Peb structuresPeb structures
Peb structures
hlksd
 
As22267272
As22267272As22267272
As22267272
hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
hlksd
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
hlksd
 

Mehr von hlksd (20)

Write better essays in 20 minutes a day
Write better essays in 20 minutes a dayWrite better essays in 20 minutes a day
Write better essays in 20 minutes a day
 
Research and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a dayResearch and writing skills success in 20 minutes a day
Research and writing skills success in 20 minutes a day
 
Reasonskills
ReasonskillsReasonskills
Reasonskills
 
R05420107 advancedcommunicationskills
R05420107 advancedcommunicationskillsR05420107 advancedcommunicationskills
R05420107 advancedcommunicationskills
 
Proofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a dayProofreading revising editing skills success in 20 minutes a day
Proofreading revising editing skills success in 20 minutes a day
 
R05420107 advanced-communication-skills
R05420107 advanced-communication-skillsR05420107 advanced-communication-skills
R05420107 advanced-communication-skills
 
Tuladhar
TuladharTuladhar
Tuladhar
 
Standard specifications
Standard specificationsStandard specifications
Standard specifications
 
Presentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.comPresentation by gursharan singh for engineeringcivil.com
Presentation by gursharan singh for engineeringcivil.com
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
 
Pre engineered buildings
Pre engineered buildingsPre engineered buildings
Pre engineered buildings
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
 
Pebvsconvsteel
PebvsconvsteelPebvsconvsteel
Pebvsconvsteel
 
Peb
PebPeb
Peb
 
Peb structures (1)
Peb structures (1)Peb structures (1)
Peb structures (1)
 
Peb structures
Peb structuresPeb structures
Peb structures
 
As22267272
As22267272As22267272
As22267272
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 

Kürzlich hochgeladen

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Kürzlich hochgeladen (20)

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

232365197 points-qe

  • 1. Important Points to Remember for Quantity Estimation. Civil Works:  To carefully note the various levels while calculating excavation & backfilling.  To make note of the various levels of the structure & compare the measured heights/length of various items with the levels.  To check all the sections & elevations carefully prior to any estimation.  To look into the NOTES given at the right side of the drawing in the info column.  To look out for trenches, drops, slab elevations, projections & many others.  To check for different slab depths over the plan.  To carefully look into the openings, their types & numbers.  To measure the height of the pedestal & columns up to the top level of above Ground (plinth) & Roof beams respectively.  To measure the length of the beam from column face to face.  To carefully note the various given dimensions of the different structures.  To carefully carry out the estimation of staircase, trenches etc. separately.  To carefully note the beam positions & their depths while calculating Block/Brickwork.  To consider the height of the wall for internal plastering works up to the slab bottom & thereby considering deductions for openings.  To carefully note the beams bottom surface (where there is no block work) for roof bottom plastering. Steel Reinforcement:  To carefully name & number every individual rods before any calculations & workout the no. of rods, length & span accordingly & individually.  To learn the extra length formulae for the 45 & 30 deg cranks.  To learn the calculations of the length & no. of rods for the top reinforcement in slab.  To carefully note the data while calculating the length of rods, their numbers, their span of distribution etc.  To carefully keep note of the covers for various items of the structure.  To carefully note the bends, elevations, cranks, while calculating length of rods.  To carefully calculate the stirrups, their shapes, bends & the no. of stirrups for columns & beams – Please learn about no. of branches of stirrups.  To learn the measurement of lengths of 45, 90 deg bends, small cranks, hooks etc.
  • 2. Unit Weight of steel (Kg/m)  Unit Weight of steel (Kg/m) = Area (mm2) X Density (Kg/m3) = (Pi * d2) / 4 X 7850. = 3.141*d2 / 4 X 7850. Since d is in mm, convert it into meters by diving it by (1000) = 3.141*d2*7850/ (4*(1000)2) = (3.141*7850*d2) / (4000000) = 0.00616 * (d2) = d2 / 162.  1 cum = 30.31 cft.  1 sqm = 10.76 sft.  1 m = 3.28 ft.  1 feet = 0.305 m.  1 inch = 25.4 mm.  1 cum of cement = 1440 kgs.  1 bag of cement (50kg) = 0.034 cum.  1 sqm of block work = 13 blocks (for 6” & 8”), 15 blocks (for 4” block)  1 cum of brick work = 473 bricks  1 sqm of brick work = 44 bricks  M5 = 1:5:4  M7.5 = 1:4:8  M10 = 1:3:6  M15 = 1:2:4  M20 = 1:1.5:3  M25 = 1:1:2
  • 3. Steps in Quantity Estimation 1. Excavation - Individual footings / Entire Area with extra working space. 2. Backfilling - By Parts / Total excavation minus concrete qty below GL. 3. Column Necks/Pedestals - up to Grade Beam top level. 4. Plinth/Grade Beam - PCC & Concrete (Column face to face). 5. Columns - Grade Beam top to Roof Beam bottom. 6. Grade Slab - PCC, moisture insulation polyethylene & concrete. 7. Water Insulation/Bitumen for the substructure  Footing bottom, side & top  Column neck sides  Concrete Walls  Grade beams below GL  Grade Slab Bottom 8. Roof Beam concrete 9. Roof Slab Concrete 10. Parappet Wall - RCC / Block work 11. Lintel Concrete 12. Block work 13. Plastering - Ceiling, Wall - ext & int, jambs. 14. Painting 15. Flooring - cement, tiles, marble etc. 16. Schedule of openings 17. Floor Finishes  Roof Concrete slopes  Heat insulation layers  Screed concrete  Mortar floor