6. Transport: USA leather (both grown & tanned).
Inventory: little inventory (time waste).
Motion: a wide range of motion between workers.
Information: too little information. Skills not up to date.
Waiting: No definite calculated time bewteen workers.
Over Processing: sewing techniques (assumption).
Over Production: produce by orders.
Defects: leather defects.
Safety: old machines may cause injuries.
10. How can we push Toyota’s lean system
beyond the factory gate?
Can waste be eliminated from the retail
process in a way that benefits the man-
ufacture of garments?
12. Solution: Reposition the Assembly Line
Cutting
Set-up
Arms
Lining
Final
Assembly
Final
Check-up
Final
Check-up
Cutting
Set-up
Arms
Lining
Final
Assembly
Inventory
FinalProducts
FinalProducts
ProductionStatistics
ProductionStatistics